Sign in

R K S Township

PITTA JAGAN MOHAN REDDY AND OTHERS · Nalgonda · RERA P01800009235

R K S TOWNSHIP is a residential plotted layout in NALGONDA Revenue Village, Nalgonda Mandal, Nalgonda District. The registered promoter is PITTA JAGAN MOHAN REDDY AND OTHERS. The project covers 24864.75 sq. m and has 95 plots, with plot areas of 115.15–221.0 sq. m. It is registered under TG-RERA number P01800009235, with proposed completion on 09/05/2024.

01What we found

RegisteredTG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameR K S TOWNSHIP RERA record
Project typePlotted development / residential plotted layout RERA record
Phase or registered portionPhase not separately identified in the supplied record; registration is for the project named above Approvals record
TG-RERA registrationP01800009235 Approvals record
Registration validity10/05/2022 to 09/05/2024; the certificate does not record an extension
RERA project statusOn-Going Project in the RERA record RERA record RERA filing
Registered promoterPITTA JAGAN MOHAN REDDY AND OTHERS RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageRERA location fields say NALGONDA MANDAL; the approval and registration certificate identify NALGONDA Revenue Village. RERA filing
Mandal / district / PINNalgonda Mandal / Nalgonda District / 508001 RERA filing
Project survey numbers748, 749; no project subdivision is specified in the registered project identity. RERA filing
Registered site extent24864.75 sq. m in the RERA land fields RERA filing
Net area24864.75 sq. m in the RERA land fields RERA filing
Tentative layout extent6 Acer 5.77 Gts 29738 Sq. Yds in the layout approval
BoundariesEast: OWNERS PLOTS; West: OTHERS PLOTS; North: 30 MT WIDE EXISTING ROAD; South: 9 MT WIDE ROAD RERA filing

Development identity

ItemRecord
Sanctioning authorityNALGONDA Municipality/Municipal Corporation Approvals record
Principal approvalTentative Layout Plan No. 0011/LO/3048/2022, approved 05/10/2022 8:31:30 PM Approvals record
Application number005519/LO/DTCP/3048/0012/2021 Approvals record
Approved built-up area14621.50 sq. m as recorded in the RERA fields; the supplied layout approval is for a plotted layout and does not provide a building-floor schedule. RERA filing
Layout plot count95 No's in the tentative layout approval
Buildings / floors / parking levelsNot disclosed in the supplied project record; no building or parking-floor configuration is established. Document index

Offering and status

ItemRecord
OfferingPlots; unit type is recorded as “Plot” in the available vendor data, not as a RERA unit inventory schedule. RERA record Promoter website
Plot area range from layout drawing extraction115.15–221.0 sq. m (software-read drawing values; see section 4) Layout record
Booked / available countsNot established by the supplied evidence; no current plot inventory or booking schedule is provided. Document index
Reported project completeness80% in the project header; this is a recorded progress figure, not independent site verification. RERA record
Completion deadlineProposed and revised proposed completion dates are both 09/05/2024 in the RERA fields; promoter’s Form B also undertakes completion by 09/05/2024. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The project is a plotted layout; the available approval is a tentative layout approval. RERA record Document index

2. The project story

R K S TOWNSHIP is registered as a plotted-development project covering land identified in the RERA record as Survey Nos. 748 and 749, NALGONDA Revenue Village, Nalgonda Mandal, Nalgonda District. The layout approval describes a residential plotted layout with 95 plots and requires the applicant to provide infrastructure and amenities; its stated layout extent is 6 Acer 5.77 Gts 29738 Sq. Yds. RERA record RERA filing

The RERA header reports 80% completeness, but the supplied material does not identify which layout works that percentage measures or provide an independently verified site inspection. The project’s stated completion date is 09/05/2024. No completion or occupancy certificate is supplied, so the record provided here does not establish that the layout or its infrastructure has been completed or certified. RERA record RERA filing Document index

3. Master plan, architecture & building design

The supplied approval is for a tentative residential layout, not a multi-storey building scheme. It records 95 plots and allocates the layout area as follows:

Layout useArea and share stated in approval
Plotted area3 Acer 24.52 Gts; 17488 Sq. Yds; 58.81%
Roads1 Acer 30.44 Gts; 8523 Sq. Yds; 28.66%
Open-space park0 Acer 22.13 Gts; 2678 Sq. Yds; 9%
Social infrastructure0 Acer 6.22 Gts; 753 Sq. Yds; 2.53%
Utilities0 Acer 2.46 Gts; 297 Sq. Yds; 1%
Mortgage area within plotted area0 Acer 23.27 Gts; 2816 Sq. Yds; 16.07%

The approval names plots 51–65 as mortgaged to the Municipality/Municipal Corporation under Mortgage Deed No. 5881/2022. It describes the mortgage as security for completion of layout infrastructure and states that development works and release of the mortgaged land are conditions associated with final layout release.

No building arrangement, individual building footprints, floor configuration, tower heights, apartment layouts or building-level phase organization is supplied. The project’s recorded approved built-up area is 14621.50 sq. m, but the supplied approval material does not define a corresponding building schedule. RERA filing Document index

4. Homes, configurations & floor plans

The RERA project is a plotted development. The supplied evidence does not include a RERA-filed plot-by-plot unit schedule or current booked/available inventory. A software extraction from the approved layout drawing reads plot sizes and land-use areas; the extraction itself cautions that plot count and sizes should be checked against the drawing. The drawing-based plot-size range is 115.15–221.0 sq. m (approximately 137.7–264.3 sq. yd, as supplied). RERA record Layout record

Plot-size bandNumber read from layout drawing
84–125 sq. m (100–150 sq. yd)7
125–167 sq. m (150–200 sq. yd)75
167–209 sq. m (200–250 sq. yd)8
209–251 sq. m (250–300 sq. yd)1

The most common software-read size is 153.29 sq. m (183.3 sq. yd), appearing in 60 plots. Other common sizes supplied are 150.99 sq. m (180.6 sq. yd) for 6 plots, 206.03 sq. m (246.4 sq. yd) for 3 plots, and 125.70 sq. m (150.3 sq. yd) for 3 plots. Layout record

These figures are drawing-derived, not a RERA-filed unit schedule. The floor-plan record contains one layout sheet and no measured dwelling floor plans. The vendor data lists “Plot” with a claimed saleable range of 1,239–2,379 sq ft, but this is not a RERA inventory figure. Floor plans Promoter website

5. Parking & vehicle circulation

The supplied material does not establish dedicated resident or visitor parking counts, accessible parking, parking levels, parking allocation to individual plots, or EV charging provision. The layout approval records roads as 28.66% of the layout and requires roads to be opened for access to neighbouring sites; the supplied evidence does not describe ramps, internal driveway dimensions or pedestrian/vehicle separation. Document index

The approval’s mortgage of plots 51–65 is an authority mortgage tied to layout development conditions, not evidence of private parking allocation.

6. Amenities, recreation & open spaces

The layout approval specifies layout works and land reservations. The RERA amenity record marks some infrastructure items “YES” but does not provide completion evidence; its progress percentages should therefore not be read as independent verification of delivery. RERA amenities

Park / open space
Description / size0 Acer 22.13 Gts; 2678 Sq. Yds; 9% in the approval
Declared progress / verified statusReserved in tentative layout; completion not independently verified
Social infrastructure site
Description / size0 Acer 6.22 Gts; 753 Sq. Yds; 2.53%
Declared progress / verified statusReserved in tentative layout; facility/building details and completion not supplied
Internal roads and footpaths
Description / sizeRoads occupy 1 Acer 30.44 Gts; 8523 Sq. Yds; 28.66%; approval calls for road formation with black top
Evidence sourceRERA amenities
Declared progress / verified statusMarked available in RERA amenity data; site completion not independently verified
Green strip / tot lot / park
Description / sizeNo separate size or facility schedule supplied
Evidence sourceRERA amenities Promoter website
Declared progress / verified statusMarked available in RERA amenity data; site completion not independently verified
Avenue plantation
Description / sizeRequired as a layout development work; no quantity or size supplied
Declared progress / verified statusRequired in approval; completion not independently verified

No clubhouse, indoor recreation facility, sports facility or community building specification is established in the supplied material. RERA amenities

7. Utilities, building services & safety

The tentative layout approval describes the following required layout works: road formation with black top; storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines and an overhead tank; an assured water-supply source; electrical supply lines, street lights and a transformer; avenue plantation; park development; and rainwater-harvesting pits. It also calls for an overhead tank or sump and sufficient harvesting pits. These are approval requirements/descriptions, not proof that the works are completed.

Water
Evidence in supplied recordWater reservoir, overhead tank/sump, internal water-supply pipelines and an assured source are listed in the layout approval.
Status limitationNo source, storage capacity, treatment details or independent completion verification supplied
Sewerage and drainage
Evidence in supplied recordUnderground drainage, common septic tank/STP and storm-water drains are specified.
Status limitationNo capacity, reuse specification or completion certificate supplied
Electricity
Evidence in supplied recordElectrical supply lines, transformer and street lighting are specified.
Status limitationNo supply capacity or backup-power details supplied
Waste
Evidence in supplied recordSolid Waste Management is listed among utility provisions in the approval. RERA amenities
Status limitationNo system design, capacity or delivered-status evidence supplied
Fire and life safety
Evidence in supplied recordRERA amenity data does not mark fire-protection requirements as available. RERA amenities
Status limitationNo project-specific fire-system details or clearance supplied
Accessibility and security
Evidence in supplied recordNo accessibility, CCTV or access-control details supplied. Document index
Status limitationNot established by the available record

8. Location, access & connectivity

The registered project location is recorded as NALGONDA MANDAL, Nalgonda District, PIN 508001; the tentative layout approval identifies NALGONDA Revenue Village. The project’s stated northern and southern boundaries are respectively a 30 MT WIDE EXISTING ROAD and a 9 MT WIDE ROAD. RERA filing

The location dataset gives a cadastral parcel centroid of 17.05534, 79.23381 and records the nearest sampled Outer Ring Road interchange at approximately 71.5 km. This is a supplied measured distance, not a travel-time estimate. Location record Cadastral map

9. Developer & development status

The registered promoter is PITTA JAGAN MOHAN REDDY AND OTHERS. The RERA record identifies the organization type as “Others”; a more specific legal entity type is not established in the supplied evidence. A promoter Form B affidavit is made by PITTA JAGAN MOHAN REDDY and states a completion undertaking of 09/05/2024. RERA record RERA filing

The RERA header records 80% completeness and a proposed/revised completion date of 09/05/2024. These are project-record declarations; the supplied evidence contains no independent construction-progress report or completion/occupancy certificate. The registration certificate states validity from 10/05/2022 through 09/05/2024, with no extension recorded in the supplied certificate. RERA record RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C, P01800009235, for R K S TOWNSHIP; validity 10/05/2022–09/05/2024
Tentative layout approvalNALGONDA Municipality/Municipal Corporation approval 0011/LO/3048/2022, dated 05/10/2022; residential plotted layout in Survey Nos. 748 and 749
Application reference005519/LO/DTCP/3048/0012/2021
Layout mortgage referenceMortgage Deed 5881/2022, dated 01 April 2022, for specified layout plots in favour of the Municipality/Municipal Corporation
Promoter declarationForm B affidavit by PITTA JAGAN MOHAN REDDY, including the declared completion date and separate-account undertaking
Occupancy/completion certificateNot present in the supplied documents Document index
Final layout releaseNot present in the supplied documents; the available approval is expressly for a tentative layout

Frequently asked questions

Is R K S TOWNSHIP registered with Telangana RERA?

Yes. R K S TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01800009235; the registration status is On-Going Project.

Who is the developer of R K S TOWNSHIP?

The promoter named in the RERA registration is PITTA JAGAN MOHAN REDDY AND OTHERS.

Where is R K S TOWNSHIP located?

R K S TOWNSHIP is in NALGONDA MANDAL, Nalgonda, Telangana (508001).

When will R K S TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 09/05/2024. This is the promoter's declaration, not a guarantee.

More projects in Nalgonda