Rainbow City

HOLINESS INFRA INDIA LLP · Rangareddy · RERA P02400007486

RAINBOW CITY is a plotted development in Bodnampally, Keshampet, Ranga Reddy. It is being developed by HOLINESS INFRA INDIA LLP on a registered site extent of 22864.73 sq. m, with a layout record specifying 88 plots; building or floor configurations are not disclosed. The project is registered under TG-RERA **P02400007486**, and the promoter-declared completion date is **01/08/2025**.

More from Holiness Infra India LLP · 2 projects →

01What we found

Period endedTG-RERA registration ran to 1 Aug 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bodnampally, Keshampet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameRAINBOW CITY RERA record
Project typePlotted development RERA filing
Phase / registered portionThe registration identifies the project and its land in Survey No. 188/P; a separate phase or phase-wise registration is not disclosed.
TG-RERA registrationP02400007486 Approvals record
Registration validityCertificate states validity commencing 02/01/2024 and ending 01/08/2025, unless extended by the Authority. Registration validity is distinct from the promoter’s completion undertaking.
RERA status in supplied recordRegistered project. An extension order or current registration status after 01/08/2025 is not provided. Approvals record
Registered promoterHOLINESS INFRA INDIA LLP, an LLP Corporate record

Land and geographic identity

ItemProject record
Locality / revenue villageBodnampally (also rendered Bodanampally in project records) RERA record RERA filing
MandalKeshampet RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN509216 RERA record RERA filing
Project survey number(s)188/P; no project subdivision is specified in the RERA land record. Land records
Registered site extent22864.73 sq. m (RERA land details) RERA filing
Layout-plan extent27346.00 Sq. Yards
Net / affected area in RERA land detailsNet area 22864.73 sq. m; area affected in road widening/FTL of tanks/nala widening: 0. RERA filing
Boundaries as filedEast: OTHERS LAND; West: EXISTING WIDE ROAD 60; North: OTHERS LAND; South: EXISTING WIDE ROAD 33. RERA filing

Development identity

ItemProject record
Planning / sanctioning authorities shownDirector of Town and Country Planning (DTCP) and Bodanampally Grampanchayat Approvals record
Principal layout referenceDraft Technical Layout Pattern Draft TLP.No. 177/2023/H, dated Dt.02-08-2023; Grampanchayat proceedings TLP No. 177/2023/H, dated 25/11/2023. The Grampanchayat document describes release of the draft pattern and says open space with a compound wall must be handed over before release of the final layout.
Layout / application numbersLayout Permit No. 12482/2189/2023/e-Panchayat; application no. 12482/2189; file references C.No.: 12482 / 2189 / 2023 and Lr.Roc.No.12482/2189/2023/e-Panchayat. Approvals record
Approved plotted developmentLayout record specifies 88 plots.
Layout land-use figures in approval recordTotal layout area 27346.00 Sq. Yards; plotted area 17249.76 Sq. Yards; roads area 7361.64 Sq. Yards; open space and social infrastructure 2734.60 Sq. Yards.
Building count / floorsNot applicable to the filed plotted-layout offering; no building or floor configuration is disclosed.
Approved built-up areaNot disclosed in the supplied layout approval extracts. The RERA project record separately lists “Approved Built up Area” as 14422.99 sq. m, without further breakdown in the supplied material. RERA filing
Mortgage area in RERA filing2258.14 sq. m RERA filing

Offering and status

ItemProject record
Offered unit typePlots; the layout approval identifies 88 plots. Plot-wise sizes, plot numbers and plot inventory are not provided in the supplied RERA extracts.
Booked / available countsNot disclosed in the supplied evidence.
Promoter-declared completion date01/08/2025, stated in the Form B undertaking. This is separate from registration validity.
Construction / development stageThe RERA amenities fields show 0 progress for the listed items. The supplied record does not provide independent site verification of physical progress. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence. For a plotted layout, the supplied documents instead refer to release of the final layout; the Grampanchayat proceeding says open-space handover is required before that release.

2. The project story

RAINBOW CITY is a proposed residential plotted-layout project in Bodnampally, Keshampet Mandal, Ranga Reddy District, on land recorded as Survey No. 188/P. The RERA-filed land record gives an extent of 22864.73 sq. m. The layout documents describe a pattern for 88 plots, with land designated for plots, roads, and open space/social infrastructure. RERA record Land records

The approval material records DTCP approval of a Draft Technical Layout Pattern and subsequent Bodanampally Grampanchayat proceedings. Those proceedings state that the applicant must hand over the open space with a compound wall before release of the final layout. The supplied record does not establish that this handover occurred or that a final layout release was issued.

The promoter’s RERA Form B declares completion by 01/08/2025. RERA’s amenities entries show 0% progress for listed project items; these are filed progress figures, not an independent site inspection. RERA amenities

3. Master plan, architecture & building design

The available design evidence is for a plotted layout, not a multi-storey building plan. The approval extracts identify 88 plots and describe the layout’s land-use components as follows:

Layout componentArea stated in approval record
Total layout area27346.00 Sq. Yards
Plotted area17249.76 Sq. Yards
Roads area7361.64 Sq. Yards
Open Space & Social Infra2734.60 Sq. Yards

The DTCP document additionally states a Mortgage area of 15.65 %, described as Ac. 0.558 Cents; 2700.72 Sq. Yds. and identifies Plot Nos. 69 to 74 and 83 to 88 as mortgaged to Bodanampally Gram Panchayat. It says those plots are not to be sold while mortgaged and refers to release after development conditions are met.

The supplied extracts do not include a readable plot-by-plot layout drawing, plot-size schedule, internal-road widths, building footprints, or detailed open-space design. The DTCP document specifies that only a detached dwelling house designed for occupation by one family may be built on a site, and that future development requires prior competent-authority approval.

4. Homes, configurations & floor plans

This is a plotted development. The approval record specifies 88 plots, but the supplied RERA material does not provide a plot-wise count of booked or available inventory, a plot-size schedule, or RERA-filed saleable areas for individual plots.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots88 in layout approvalNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

Third-party vendor material lists plot-size claims, including 1579 Sq. Ft. and 3746 Sq. Ft., but these are not established as RERA-filed plot sizes in the supplied project record. Promoter website

No software-measured floor-plan areas are available: the floor-plan record says three drawings are scans pending measurement, with 0 measured. Carpet-area measurements are therefore not available, and apartment-style carpet-area or loading comparisons are not applicable to the supplied plotted-layout evidence. Floor plans

5. Parking & vehicle circulation

The supplied project record does not state a parking-space count, visitor or accessible parking provision, parking allocation by plot, or a dedicated parking facility. The layout approval identifies 7361.64 Sq. Yards as roads area and requires roads to be opened for access to neighbouring sites; it does not provide road-width or vehicle-circulation details in the supplied extract.

The RERA amenities record marks internal roads and footpaths as available, with progress recorded as 0. No parking allotment or exclusive ownership arrangement is established by the available evidence. RERA amenities

6. Amenities, recreation & open spaces

The RERA amenities record lists the following items. The “progress” figures shown are the filed record; they do not establish independent completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities RERA amenities0; independent completion not verified
Water SupplyDetails and capacity not statedRERA amenities RERA amenities0; independent completion not verified
Sewerage (Chamber, Lines, Septic Tank, STP)Components are named; design and capacity not statedRERA amenities RERA amenities0; independent completion not verified
Storm Water DrainsDetails not statedRERA amenities RERA amenities0; independent completion not verified
Green Strip/TOT LOT/ParkArea and design not stated in this RERA entry; layout approval separately allocates 2734.60 Sq. Yards to open space and social infrastructureRERA amenities RERA amenities; layout approval0 in RERA amenities; handover status not established
Street LightingQuantity and specification not statedRERA amenities RERA amenities; layout condition0; independent completion not verified
Water Conservation / Rain Water HarvestingDetails and capacity not statedRERA amenities RERA amenities; layout condition0; independent completion not verified
Community BuildingsNo size or facility details statedRERA amenities RERA amenitiesProgress 0; availability not marked
Treatment and Disposal of Sewage and Sullage WaterDetails and capacity not statedRERA amenities RERA amenitiesProgress 0; availability not marked
Solid Waste Management and DisposalDetails not statedRERA amenities RERA amenitiesProgress 0; availability not marked
Energy managementDetails not statedRERA amenities RERA amenitiesProgress 0; availability not marked
Fire Protection and Fire Safety RequirementsDetails not statedRERA amenities RERA amenitiesProgress 0; availability not marked
Electrical Meter Room, Sub-Station, Receiving StationDetails and capacity not statedRERA amenities RERA amenities0; independent completion not verified
Aggregate area of recreational Open SpaceNo separate figure in this entry; layout approval states 2734.60 Sq. Yards for Open Space & Social InfraRERA amenities RERA amenities; layout approvalProgress 0; handover status not established

Vendor-listed items such as kids’ play areas, sand pits, yoga areas, landscaped garden, and gated-community features are marketing claims and are not established as sanctioned or delivered facilities by the supplied RERA evidence. Promoter website

7. Utilities, building services & safety

The layout approval conditions call for street lighting, electricity facilities, a sewerage disposal system, protected water supply, rain-water-harvesting pits, avenue plantation, and construction of drains and channelization of nalas for storm-water runoff. These are approval conditions or specified provisions; the supplied documents do not establish their completion, capacity, or operating status.

The RERA amenities record lists water supply, sewerage, storm-water drains, rain-water harvesting, and an electrical meter room/sub-station/receiving station, each with progress shown as 0. It provides no capacities, utility-source details, storage or treatment specifications, backup-power information, or service-operation evidence. RERA amenities

No project-specific fire-safety design, lift or vertical-transportation system, accessibility details, waste-management operating arrangements, CCTV or access-control specifications are established in the supplied material. Fire protection and solid-waste management appear in the RERA amenities list with progress recorded as 0 and without detailed specifications. RERA amenities

8. Location, access & connectivity

The registered location is Bodnampally, Keshampet, Ranga Reddy, 509216, with Survey No. 188/P identified for the project land. The filed boundary descriptions identify an existing wide road on the west and another existing wide road on the south; the adjoining north and east boundaries are described as other land. RERA filing

The supplied location data gives the cadastral parcel centroid as 16.92182, 78.35139. It reports the nearest sampled Outer Ring Road interchange at approximately 35.3 km. Location record

The layout approval requires roads to be opened for access to neighbouring sites but does not provide the project’s detailed road network, public-transport connections, or measured distances to local services and landmarks.

9. Developer & development status

The registered legal promoter is HOLINESS INFRA INDIA LLP, an LLP, with GSTIN 36AAPFH8725G1ZZ. The supplied corporate record lists its address as B, SRI SAI NAGAR, RAGHAVENDRA NAGAR, BODANAMPALLY, KESHAMPET, Keshampet, Ranga Reddy, 509216. The registration certificate separately records the promoter address as Village Raghavendranagar, Mandal Uppal, District Medchal-Malkajgiri, PIN 500076. Corporate record

The promoter’s authorized signatory, BASAVA RAJASEKHARA ACHARY, submitted the Form B declaration undertaking completion by 01/08/2025. This is a promoter declaration; the supplied evidence does not include an extension order, an updated completion schedule, an independent construction-progress report, or a final layout-release record.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeRAINBOW CITY; P02400007486; validity stated from 02/01/2024 to 01/08/2025, unless extended
Supplied evidenceCertificate extract
DTCP layout document
Reference and scopeDraft Technical Layout Pattern Draft TLP.No. 177/2023/H, dated Dt.02-08-2023; Survey No. 188/P; 88 plots
Supplied evidenceApproval-plan extract
Grampanchayat proceedings
Reference and scopeTLP No. 177/2023/H, dated 25/11/2023; layout area stated as 27346.00 Sq. Yards; proceedings refer to open-space handover before final layout release
Supplied evidenceProceedings extract
Layout application / permit reference
Reference and scopeLayout Permit No. 12482/2189/2023/e-Panchayat; application no. 12482/2189
Layout approval letter record
Reference and scopeFile No. C.No.: 12482 / 2189 / 2023; approval no. T.L.P.N.O. I77/ 2023/H; records that legal validity is tied to release/approval by the concerned Grampanchayat
Promoter declaration
Reference and scopeForm B affidavit-cum-declaration by the promoter’s authorized signatory; includes the completion undertaking and title/encumbrance declarations
Title-report document on file
Reference and scopeAdvocate’s Title Investigation Report dated 15-12-2023 concerning proposed land of Ac.5.65 Cents in Survey No. 188/P; review of underlying title material is addressed separately in Land & Title
Final layout release / completion record
Reference and scopeNot included in the supplied evidence; the Grampanchayat proceedings state that open-space handover with a compound wall is required before release of the final layout

The supplied material does not include a separate occupancy certificate or project completion certificate. The available approval documents are layout-related; they should not be read as evidence that the stated development works or handover conditions have been completed.

Frequently asked questions

Is RAINBOW CITY registered with Telangana RERA?

Yes. RAINBOW CITY is registered with the Telangana Real Estate Regulatory Authority as P02400007486; the registration status is New Project.

Who is the developer of RAINBOW CITY?

The promoter named in the RERA registration is HOLINESS INFRA INDIA LLP.

Where is RAINBOW CITY located?

RAINBOW CITY is in KESHAMPET, Bodnampally, Rangareddy, Telangana (509216).

When will RAINBOW CITY be completed?

The promoter's proposed date of completion filed with RERA is 01/08/2025. This is the promoter's declaration, not a guarantee.