Sign in

Ripple-2

IRA REALITY TECH PRIVATE LIMITED · Vikarabad · RERA P02100009024

RIPPLE-2 is a plotted development in Nadireddypally, Nawabpet mandal, Vikarabad district, developed by registered promoter IRA REALITY TECH PRIVATE LIMITED. The registered land area is 217310.23 sqmts, and the draft layout identifies 235 plots; tower, block, floor and individual plot configurations are not disclosed. The TG-RERA registration is P02100009024, and the project record gives proposed completion as 21/02/2027.

More from Ira Reality Tech Pvt Ltd · 6 projects →

01What we found

RegisteredTG-RERA
64documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Madireddypally, Nawabpet, Vikarabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameRIPPLE-2 RERA record
Project type / phasePlotted development; registered portion and phase label beyond the project name are not disclosed. RERA record RERA filing
TG-RERA registrationP02100009024; registration granted from 25/06/2024 through 21/10/2026, unless extended by the Authority. This is the registration-validity period, not a statement that the project is complete.
Registered promoter / entity typeIRA REALITY TECH PRIVATE LIMITED, company. RERA record Corporate record
RERA statusListed as a New Project; the RERA record gives proposed completion as 21/02/2027. RERA filing RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageLocality: Nadireddypally; revenue village: Madireddypally. RERA record
Mandal / district / PINNawabpet, Vikarabad, 501111. RERA record
Project survey numbers155, 156, 157; the filed project approval identifies these as Sy.Nos.155/Part, 156/Part and 157/Part. RERA record
Registered site extentRERA land details state total area 217310.23 sqmts, affected area 4359.37 sqmts and net area 212950.86 sqmts. RERA filing
BoundariesNorth: 60 FEET WIDE ROAD; south, east and west: Neighbours Land. RERA filing

Development identity

ItemProject record
Sanctioning authority / principal layout approvalDirector of Town and Country Planning; Draft-TLP.No:158/2024/H, dated 17-10-2024, for a revised draft technical layout pattern. Approvals record
Panchayat permission to start layout development worksMadireddypally Gram Panchayat letter Lr No:-MRDP/Layout/02/2024, dated 21/10/2024. It permits layout development subject to conditions and requires submission for final approval. Approvals record
Approved built-up area / buildings and floorsNot applicable as a building scheme is not identified in the supplied project record; no building count, floor configuration or tower details are disclosed. RERA filing
Layout scale and plot countDraft layout: 235 plots.
RERA land-area use figures in the draft layoutTotal layout 231429.44 Sq.Yds.; Nala Area 2081.20 Sq. Yds; Buffer Area 3160.52 Sq. Yds; Net Plot Area 226187.72 Sq. Yds.

Offering and status

ItemProject record
OfferingPlotted development; RERA unit-level plot sizes, plot configuration counts, and booked/available counts are not disclosed in the supplied data. RERA record RERA filing
RERA-filed completion date21/02/2027 (proposed completion in the project record). RERA record RERA filing
Promoter declaration of completionForm B declares completion by 21/10/2026. This is a promoter declaration in the filed affidavit, distinct from the RERA project-record proposed date.
Registration validity25/06/2024–21/10/2026, unless extended; separate from the completion date.
Construction / development stageThe Panchayat letter permits layout development works subject to conditions; the supplied material does not establish independently verified on-site progress or completion.
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied records. For this plotted layout, no certified completion status is established here. Document index

2. The project story

RIPPLE-2 is registered as a plotted development by IRA REALITY TECH PRIVATE LIMITED in the Madireddypally revenue village, Nawabpet mandal, Vikarabad district. The registration identifies survey numbers 155, 156 and 157; the filed draft layout and Panchayat permission refer to the project land as Sy.Nos.155/Part, 156/Part and 157/Part. RERA record

The filed layout approval is for a 235-plot residential layout. Its land-use schedule identifies plotted land, roads, park/open space, school and nursery-school sites, and a convenient-shopping site. The draft approval also sets out development requirements such as road formation, drains, nala channelization, plantation, rainwater-harvesting pits, street lighting, sewerage disposal and protected water supply. These are plan provisions or required works, not evidence that the works have been completed.

The Gram Panchayat letter dated 21/10/2024 permits the promoter to start layout development subject to the draft technical layout conditions and requires the completed development works to be submitted for final approval. The evidence supplied does not include measured construction progress or a final layout approval, so the present physical completion stage cannot be independently established from these records.

3. Master plan, architecture & building design

This is a plotted layout, not a tower or apartment scheme in the records supplied. The draft technical layout identifies 235 plots on a stated layout extent of Ac.47.816 Cents; 231429.44 Sq.Yds. Its page 1 land-use schedule records Nala Area of Ac. 0.430 Cents; 2081.20 Sq. Yds, Buffer Area of Ac. 0.653 Cents; 3160.52 Sq. Yds, and Net Plot Area of Ac. 46.733 Cents; 226187.72 Sq. Yds. These are figures stated in the draft layout document.

The same schedule allocates Ac.4.68 Cents; 22651.20 Sq.Yds. (10.00%) to open space reserved for park purpose; Ac.9.379 Cents; 45394.36 Sq.Yds. (20.07%) to roads; and Ac.32.674 Cents; 1,58,142.16Sq. Yds. (69.93%) to plotted area. It separately identifies Ac. 1.27 Cents; 6146.80 Sq. Yds for a primary school, Ac. 0.25 Cents; 1210.00 Sq. Yds for a nursery school, and Ac. 0.90 Cents; 4356.00 Sq. Yds for convenient shopping at plots 82–88. The approved draft also identifies 15.07% of plotted area, Ac.4.924Cents; 23832.16 Sq.Yds., as mortgage area, from Plot Nos. 94–98 and 131–162, in favour of Maddireddypally Gram Panchayat.

The drawing record includes another filed plan document, APPROVED TLP NO.: 284/1 /2022/AH, showing 40-foot, 60-foot, 12.19-metre and 32-foot road labels, plots with stated dimensions, open-space, school, nursery-school and convenient-shopping labels, and a mortgaged-plot area. No project-specific reconciliation of that plan to the registered RIPPLE-2 layout is supplied in this Overview.

No building footprints, floor plans for homes, tower or block arrangement, or building-level design information is established in the supplied material. The two drawing files listed for floor-plan review are scans pending measurement; there are no software-measured home areas. Floor plans

4. Homes, configurations & floor plans

The RERA record identifies a plotted project, but the supplied data does not provide a RERA unit-type schedule with plot sizes, plot-by-plot booked or available counts, or saleable-area figures. A configuration table therefore cannot be populated without inventing figures. RERA record RERA filing

The available floor-plan review record says there are two drawings, both scans pending, and 0 measured. It expressly describes any drawing-based carpet-area method as software measurement rather than a RERA disclosure; no measured carpet-area values are available. The vendor listing’s “3 & 4 BHK” and built-up-area claims are not used as RERA-filed configurations or measurements for this plotted project. Floor plans Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots—individual sizes and counts not disclosed in supplied RERA unit scheduleNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not measuredNot disclosed

5. Parking & vehicle circulation

The supplied project records do not establish a parking-space count, visitor or accessible parking provision, or an allotment arrangement for individual plots. The draft layout provides for internal roads, with road widths marked in the additional layout drawing; the supplied material does not establish completed roads, vehicle-entry arrangements, separate pedestrian routes or EV charging. RERA amenities

6. Amenities, recreation & open spaces

The draft layout reserves park/open space and identifies school, nursery-school and convenient-shopping sites. These are layout provisions; their operation or completion is not independently verified in the supplied evidence. The RERA amenities schedule marks several infrastructure categories “YES” but reports 0% progress for each item with a percentage supplied. RERA amenities

Park / recreational open space
Description / sizeAc.4.68 Cents; 22651.20 Sq.Yds.; 10.00% in the draft layout. The approval requires handover of the open-space area to the Gram Panchayat by registered gift deed before final layout release.
Evidence sourceDraft layout; Panchayat letter
Declared progress / verified statusRERA amenity schedule: 0% for aggregate recreational open space. Completion not independently verified.
Primary school site
Description / sizeAc. 1.27 Cents; 6146.80 Sq. Yds
Evidence sourceDraft layout
Declared progress / verified statusSite allocation shown; facility completion not established.
Nursery school site
Description / sizeAc. 0.25 Cents; 1210.00 Sq. Yds
Evidence sourceDraft layout
Declared progress / verified statusSite allocation shown; facility completion not established.
Convenient shopping
Description / sizeAc. 0.90 Cents; 4356.00 Sq. Yds, plots 82–88
Evidence sourceDraft layout
Declared progress / verified statusSite allocation shown; facility completion not established.
Internal roads and footpaths
Description / sizeLayout access network; road area in the draft schedule is Ac.9.379 Cents; 45394.36 Sq. Yds.
Evidence sourceDraft layout; RERA amenities RERA amenities
Declared progress / verified statusRERA amenity schedule: 10%. Independent completion verification not supplied.
Green strip / park
Description / sizeNo separate area beyond the layout’s park/open-space provision is stated in the amenity schedule.
Evidence sourceRERA amenities RERA amenities; draft layout
Declared progress / verified statusRERA amenity schedule: 0%; completion not independently verified.

7. Utilities, building services & safety

The draft layout conditions require the developer to undertake road formation and levelling, drains and nala channelization, greenery and avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, a sewerage disposal system and protected water supply, under Gram Panchayat supervision. The supplied records establish these as required works, not as completed services.

The RERA amenities schedule lists water supply, sewerage and sewage treatment/disposal, storm-water drains, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. The schedule reports 0% progress for the listed water, sewerage, drainage, harvesting, energy, fire-safety and electrical-room categories; no system capacities, supply sources, storage volumes, equipment specifications or completion certificates are supplied. RERA amenities

No project-specific evidence is supplied for lift systems, building fire equipment, CCTV, waste-management arrangements, access control, accessible routes or emergency access. The promoter’s separate vendor-listing amenities are not treated as RERA-filed or delivered facilities. RERA amenities Promoter website

8. Location, access & connectivity

The registered location is Madireddypally, Nawabpet, Vikarabad, 501111; the project’s locality field also uses Nadireddypally. The registered land is identified in Sy.Nos. 155, 156 and 157, and the RERA land-details field identifies a 60 FEET WIDE ROAD on the north boundary. RERA record RERA filing

The cadastral parcel-centroid point supplied for the project location is 17.45788180581467, 77.97924315683319. The nearest sampled Outer Ring Road interchange is recorded at approximately 30.8 km; this is a supplied distance estimate, not a travel-time claim. Cadastral map Location record

9. Developer & development status

The registered promoter is IRA REALITY TECH PRIVATE LIMITED, a company. Its GSTIN is 36AAFCI2025R1ZA. The supplied promoter address is FINANCIAL DISTRICT, IRA ROAD, Nadireddypally, Nawabpet, Vikarabad, 501111. Corporate record Parties record

A project registration certificate names Ira Reality Tech Private Limited as promoter, and the RERA filing identifies KONALA RAMESH as authorized signatory. The supplied project website is https://ripples.irarealty.in/. Parties record [508931]

The project record gives proposed completion as 21/02/2027. The promoter’s Form B affidavit, dated 19 October 2024, declares completion by 21/10/2026. The registration certificate separately states validity through 21/10/2026, unless extended. The supplied evidence does not confirm a registration extension, final layout approval, independently measured development progress, or completed works. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02100009024; valid 25/06/2024–21/10/2026, unless extended
What it establishes in the supplied materialRegistration of RIPPLE-2 and identification of the promoter, location and survey numbers.
DTCP revised draft technical layout pattern
Identifier / dateDraft-TLP.No:158/2024/H; 17-10-2024; application e-P.No.3422/290; file Lr. Roc. No.3422/290/2024/H/e.p.
What it establishes in the supplied materialDraft layout for 235 plots on Sy.Nos.155/Part, 156/Part and 157/Part, subject to conditions.
Earlier layout-plan document in the RERA file
Identifier / dateTLP No. 284/1 /2022/AH
What it establishes in the supplied materialPlan document with plotted layout, roads and reserved-site labels.
Gram Panchayat letter
Identifier / dateLr No:-MRDP/Layout/02/2024; 21/10/2024
What it establishes in the supplied materialPermits layout development works subject to conditions and requires completion and submission for final approval.
Form B promoter declaration
Identifier / dateDated 19 October 2024
What it establishes in the supplied materialPromoter’s declaration concerning title, encumbrances, funds and completion by 21/10/2026. This is a filed promoter declaration, not a title conveyance or completion certificate.
Title-search report filed with RERA
Identifier / dateDocument 505665
What it establishes in the supplied materialAdvocate’s report based on copies of records concerning Madireddypally land; the supplied extraction describes historical records and separate extents.
Encumbrance statement filed with RERA
Identifier / dateDocument 505666
What it establishes in the supplied materialFiled encumbrance statement; the project record separately declares a mortgage area. RERA filing
Occupancy / completion certificate
Identifier / dateNot identified in supplied documents
What it establishes in the supplied materialNo such certificate is established by the supplied record. Document index

Frequently asked questions

Is RIPPLE-2 registered with Telangana RERA?

Yes. RIPPLE-2 is registered with the Telangana Real Estate Regulatory Authority as P02100009024; the registration status is New Project.

Who is the developer of RIPPLE-2?

The promoter named in the RERA registration is IRA REALITY TECH PRIVATE LIMITED.

Where is RIPPLE-2 located?

RIPPLE-2 is in Nadireddypally, Madireddypally, Nawabpet, Vikarabad, Telangana (501111).

When will RIPPLE-2 be completed?

The promoter's proposed date of completion filed with RERA is 21/02/2027. This is the promoter's declaration, not a guarantee.

More projects in Madireddypally