Sign in

Sai Spoorthy Colony Phase-2

S GOPAL AND OTHERS (2) · Mahabubnagar · RERA P01400007811

SAI SPOORTHY COLONY PHASE-2 is a plotted development in Yenugonda, Mahabubnagar Urban mandal, Mahabubnagar district. The registered promoter is S GOPAL AND OTHERS (2). The project covers **17,551.15 sq.m** and the layout identifies **65** residential plots, with measured sizes of **103.17–208.27 sq.m** (**123.4–249.1 sq.yd**); no towers or floors are stated. Its TG-RERA registration number is **P01400007811**, and the promoter’s Form B states a completion deadline of **1st November, 2023**.

01What we found

Period endedTG-RERA registration ran to 1 Nov 2023 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Yenugonda, Mahabubnagar Urban, Mahabubnagar · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSAI SPOORTHY COLONY PHASE-2 RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase 2; registered land is identified as Survey No. 83 PART RERA record
TG-RERA registrationP01400007811 RERA record
Registration validityCertificate states commencement on 02/03/2024 and expiry on 01/11/2023; recorded period is 0 years. No extension is evidenced in the supplied record. Registration validity is distinct from the completion undertaking below.
Registered promoterS GOPAL AND OTHERS (2) RERA record
RERA statusRecord labels the project “New Project”; certificate grants registration. The supplied certificate does not establish a current validity extension. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageYenugonda; the plan identifies YENUGONDA VILLAGE, MAHABUBNAGAR MUNICIPALITY, and the RERA certificate identifies Yenugonda. RERA record
Mandal / district / PINMahabubnagar Urban / Mahabubnagar / 509001 RERA record
Project survey identifiers83 PART; the layout-plan extraction also prints 83PART. RERA record
Registered site extentRERA land record: 17,551.15 sq.m Land records
Plan-stated area figuresLayout plan: 17,550.87 sq.m minimum plot area and 16,958.05 sq.m total net layout; plan parameters state 17,550.87 sq.mt. area of plot and 16,958.04 sq.mt. net area.
Boundaries in RERA land recordEast: EXISTING 9 M WIDE ROAD; west, north and south: OTHERS LAND RERA filing

Development identity

FieldRecord
Principal plan referenceTS/053847/2021, dated 01-11-2021, identified on the layout plan Approvals record
Tentative layout approval0050/LO/3063/2022, issued by MAHABOOBNAGAR Municipality/Municipal Corporation; approval date shown as 02/12/2022 5:10:33 PM Approvals record
Layout scale and plotsDrawing states scale 1:500 and plot numbers 01 to 65; the schedule gives 65 plots. Layout record
Approved built-up area / buildingsPlan parameters state proposed coverage area 0.00 and net BUA 0.00; this is a plotted layout, not a multi-building project.
Internal road referencesDrawing lists 9.14 MT. WIDE ROAD, 10.06 MT. WIDE ROAD, 9.14 MT WIDE EXISTING, 18.29 MT WIDE PROPOSED ROAD, 33'-0" WIDE, and Proposed 200' Bye Pass Road.
ParkingPlan parameters state Proposed Number of Parkings: 0 and 0.00% common parking area.

Offering and status

FieldRecord
ProductResidential plots; the layout schedule identifies plots 01 to 65.
Plot-size rangeSoftware-measured from the approved drawing: 103.17–208.27 sq.m (123.4–249.1 sq.yd); the drawing-derived schedule lists 65 plots. Layout record
Booked / availableNot disclosed in the supplied project record. RERA filing
Construction stageNo independently verified site-progress record is supplied. The RERA registration certificate requires quarterly updates, but those updates are not included here.
Completion deadlinePromoter’s Form B states 1st November, 2023.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; certificate status is not established by this record. Document index

2. The project story

  • This is a residential plotted layout registered as SAI SPOORTHY COLONY PHASE-2, in Yenugonda, Mahabubnagar Urban mandal, Mahabubnagar district. Its RERA-identified land is Survey No. 83 PART. The layout drawing shows 65 numbered plots, internal roads, a park/open-space reservation, social-infrastructure land and a utility plot. RERA record Land records
  • The submitted drawing describes a tentative layout rather than a building or apartment scheme. Its schedule covers plots 01–65, while no RERA booking or availability counts, current construction progress, or independent site-verification results are supplied. The promoter’s Form B states a completion deadline of 1 November 2023; that undertaking is not itself evidence that the layout works were completed.

3. Master plan, architecture & building design

The layout drawing states a total net-layout area of 16,958.05 sq.m and allocates it as follows. These are plan figures, not measurements of individual plots or homes.

Layout useAreaShare stated in plan
Plotted area9,474.56 sq.m55.87%
Roads5,232.58 sq.m30.86%
Organized open space / park1,586.56 sq.m9.36%
Social infrastructure488.15 sq.m2.88%
Utility area176.20 sq.m1.04%
Amenity area0.00 sq.m0.00%
Total net layout16,958.05 sq.m100.00%
  • The plan identifies plot numbers 01 to 65 and the road widths listed in the identity table. Its parameters state proposed coverage and net built-up area as 0.00; it gives no building count, floor configuration, tower heights, or building design. Plot-size figures are software-measured from the drawing, not RERA-filed saleable areas. Layout record
  • The tentative-approval document records six mortgaged plots—28, 26, 27, 39, 40 and 41—and states that the open space, utility land and roads are to be handed to the municipality by registered gift deed before release of the final layout. These are approval-document statements; the supplied pack does not establish the later release or handover status.

4. Homes, configurations & floor plans

This is a plotted development, so the offering is plots rather than apartment configurations. The layout schedule identifies 65 plots. The following size bands and range are software-measured from the approved layout drawing and are not RERA-filed saleable-area figures. Layout record

Plot size bandNumber of plots
100–150 sq.yd (84–125 sq.m)10
150–200 sq.yd (125–167 sq.m)49
200–250 sq.yd (167–209 sq.m)6
Measured range103.17–208.27 sq.m (123.4–249.1 sq.yd)

A plot-area schedule does not establish a future home’s carpet area, built-up area, permitted design, or individual plot availability. The supplied project record does not provide booked/available counts or a plot-wise RERA saleable-area schedule. Layout record RERA filing

5. Parking & vehicle circulation

  • The plan parameters state Proposed Number of Parkings: 0 and Common Parking Area: 0.00%. The tentative-layout approval also records a common-parking reservation of 0 Acer 0 Gts. No visitor, accessible, or plot-specific parking allocation is documented in the supplied record.
  • The drawing lists internal road widths of 9.14 MT, 10.06 MT, 18.29 MT and 33'-0", as well as a 9.14 MT existing road and a Proposed 200' Bye Pass Road. It does not establish actual access completion, pedestrian separation, or parking rights for a particular plot.

6. Amenities, recreation & open spaces

Organized open space / park
Description / size1,586.56 sq.m, 9.36% of net-layout area
Evidence sourceLayout drawing; tentative-layout approval
Declared progress / verified statusReserved in the plan; completion and handover are not established.
Social-infrastructure site
Description / size488.15 sq.m, 2.88%
Evidence sourceLayout drawing; tentative-layout approval
Declared progress / verified statusSite reservation shown; facility construction or operation is not established.
Utility plot
Description / size176.20 sq.m, 1.04%
Evidence sourceLayout drawing; tentative-layout approval
Declared progress / verified statusReserved area shown; delivered utility infrastructure is not established.
Internal roads
Description / sizeRoad area 5,232.58 sq.m, 30.86%; several widths are shown on the drawing
Evidence sourceLayout drawing; tentative-layout approval
Declared progress / verified statusPlanned; completion is not verified in the supplied evidence.

The project’s RERA amenity record marks Green Strip/TOT LOT/Park, Aggregate area of recreational Open Space, and Internal Roads & Footpaths as available, but reports 0% progress for the listed items. These are filing entries, not independent confirmation of completed facilities. RERA amenities

7. Utilities, building services & safety

  • The tentative-layout approval lists a water reservoir, septic tank, Sewerage Treatment Plant, Electric transformer and Solid Waste Management among amenities/utilities. It also instructs the layout applicant to construct an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. These are approval-document references and conditions; the supplied materials do not verify installation, capacity, operation, or completion.
  • The RERA amenity record marks water supply, sewerage (including chamber, lines, septic tank and STP), rainwater harvesting, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as available, while reporting 0% progress for the listed items. No capacities, detailed systems, commissioning evidence, or independent compliance verification are supplied. RERA amenities

8. Location, access & connectivity

  • The registered location is Yenugonda, Mahabubnagar Urban mandal, Mahabubnagar district, PIN 509001. The plan describes the locality as YENUGONDA VILLAGE, MAHABUBNAGAR MUNICIPALITY. RERA record
  • The RERA land record lists an EXISTING 9 M WIDE ROAD at the east boundary. The layout drawing also depicts internal and proposed road references, including a Proposed 200' Bye Pass Road; the supplied evidence does not verify that the proposed road has been built or is open for use. RERA filing
  • A location record gives the nearest sampled Outer Ring Road interchange as approximately 67.2 km away. No further public-transport, landmark, or travel-time information is supplied. Location record

9. Developer & development status

  • The TG-RERA registration identifies the promoter as S Gopal and others; the project record gives the registered promoter name as S GOPAL AND OTHERS (2) and organization type Others, described as a partnership. The corporate legal-entity type and corporate identifier are not verified in the supplied materials. RERA record RERA filing
  • The supplied project documents include a Form B signed by Sri. Siddipet Gopal, which declares a completion deadline of 1st November, 2023. The registration certificate calls for quarterly updates, but no QPRs or independent construction-progress evidence are included here. The project’s current works status and any subsequent completion certificate are therefore not established by this Overview’s evidence set. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01400007811; certificate states 02/03/2024–01/11/2023
What the supplied record showsRegistration for SAI SPOORTHY COLONY PHASE-2 at Yenugonda; includes registration conditions and the promoter’s quarterly-update obligation.
Layout plan
Identifier / dateTS/053847/2021; 01-11-2021
What the supplied record showsDrawing for the plotted layout, including plots 01–65, road and land-use schedule, and plan parameters.
Tentative layout approval
Identifier / date0050/LO/3063/2022; 02/12/2022 5:10:33 PM
What the supplied record showsTentative layout approval issued by MAHABOOBNAGAR Municipality/Municipal Corporation, with development conditions and reserved-area handover requirements.
Project completion undertaking
Identifier / dateForm B; 10*h May, 2023
What the supplied record showsPromoter declaration naming Phase-I and stating a completion deadline of 1 November 2023; it is not an independent completion certificate.
Occupancy/completion certificate
Identifier / dateNot supplied
What the supplied record showsThe evidence set does not establish issuance of an occupancy or completion certificate. Document index

The evidence index includes the layout drawing and tentative layout approval, but no final-layout release or occupancy/completion certificate is supplied. This summary identifies the records reviewed; it does not independently verify the current status of the authority’s files. Document index

Frequently asked questions

Is SAI SPOORTHY COLONY PHASE-2 registered with Telangana RERA?

Yes. SAI SPOORTHY COLONY PHASE-2 is registered with the Telangana Real Estate Regulatory Authority as P01400007811; the registration status is New Project.

Who is the developer of SAI SPOORTHY COLONY PHASE-2?

The promoter named in the RERA registration is S GOPAL AND OTHERS (2).

Where is SAI SPOORTHY COLONY PHASE-2 located?

SAI SPOORTHY COLONY PHASE-2 is in Yenugonda, Mahabubnagar Urban, Mahabubnagar, Telangana (509001).

When will SAI SPOORTHY COLONY PHASE-2 be completed?

The promoter's proposed date of completion filed with RERA is 01/11/2023. This is the promoter's declaration, not a guarantee.

More projects in Yenugonda