Shatayu Yrg Enclave
SHATAYU DEVELOPERS · Mahabubnagar · RERA P01400006202
SHATAYU YRG ENCLAVE is a residential plotted development in Badepally, Jadcherla Mandal, Mahabubnagar District, developed by registered promoter SHATAYU DEVELOPERS, a partnership. The project covers 57,902.66 sq m and comprises 180 plots; plot sizes are 125.42–539.83 sq m (150.0–645.6 sq yd). It is registered with TG-RERA under P01400006202, granted 29/04/2023, and its proposed completion date is 31/01/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SHATAYU YRG ENCLAVE RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase / registered portion | A single registered plotted layout is identified; no separate phase name is disclosed. RERA record |
| TG-RERA registration | P01400006202, Form C; granted 29/04/2023. The certificate states validity from 29/04/2023 to 31/01/2026; no extension is recorded in the supplied certificate. Approvals record |
| Registered promoter | SHATAYU DEVELOPERS, a partnership. RERA record RERA filing Corporate record |
| RERA status | The supplied certificate records registration; it does not establish current registration status after the stated validity end date. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Badepally RERA record RERA filing |
| Revenue village | Badepally; the approval document calls it “BADEPALLY Revenue Village.” RERA record |
| Mandal | Jadcherla RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509301 RERA record |
| Survey numbers / subdivisions as recorded | 125, 126/1, 127, 137/ A, 139, 140/ A, 140/ AA, 126/ 2, 127/ AA, 133/ 1, 134, 137/AA, 137/AA/1, 140/A/1 RERA record |
| Site area | RERA land record: 57,902.66 sq m total and net area. Land records The tentative-layout document states 14 Acer 12.31 Gts; 69,251 Sq. Yds. |
| Boundaries in RERA record | East: OTHERS LAND; West: EXISTING 40 FEET ROAD; North: OTHERS LAND; South: OTHERS LAND. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; RERA record names DTCP as the authority. Approvals record |
| Principal approval | Tentative layout approval 0001/LO/3068/2023, dated 31/01/2023; application 000123/LO/DTCP/3068/0001/2023. Approvals record |
| Approved built-up area | RERA filing states 31,917.49 sq m; its context as a plotted layout is not further explained in the supplied material. RERA filing |
| Plots | 180 plots, stated in the tentative-layout approval. |
| Building / floor configuration | Not disclosed; this is a plotted layout rather than a supplied multi-storey building plan. |
| Parking provision | No parking count or parking layout is established in the supplied records. |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots; the layout approval records 180 plots. |
| Plot sizes | Software-read from the approved layout drawing: 125.42–539.83 sq m (150.0–645.6 sq yd); the drawing-derived schedule identifies 180 plots with sizes. Verify against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. RERA filing |
| Construction / development stage | No independently verified site-progress status is supplied. The approval requires the promoter to carry out layout infrastructure works; the RERA record does not provide a measured progress figure. RERA amenities |
| Completion date | Promoter’s Form B declaration states 31st January, 2026 as the completion undertaking; the project record lists 31/01/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The cited approval is for a tentative layout, not an OC. |
2. The project story
SHATAYU YRG ENCLAVE is registered as a residential plotted development in Badepally revenue village, Jadcherla Mandal, Mahabubnagar District. The registered land schedule lists the survey numbers and subdivisions in the identity table above. The project is arranged as a 180-plot layout, not as apartment towers or villas. RERA record
The tentative layout drawing’s area statement allocates 31,916.58 sq m to plots, 18,216.75 sq m to roads, 5,209.07 sq m to parks/open space, 579.02 sq m to utilities, and 1,447.40 sq m to social infrastructure. These are drawing-derived figures; the drawing’s own area statement is the source. Layout record
The approval is conditional on the applicant completing layout infrastructure and obtaining release of the mortgaged plots and final layout. No project-specific evidence in the supplied pack verifies which infrastructure works have been completed or whether final layout release or a completion certificate has been issued. RERA amenities
3. Master plan, architecture & building design
This is a plotted layout. The approved drawing is reported as two layout sheets, with a schedule of 180 plots; it does not provide a building-by-building or floor-by-floor design. Layout record The RERA filing lists an approved built-up area of 31,917.49 sq m, but the supplied record does not explain its application to the plotted development. RERA filing
The drawing-derived layout area statement identifies the following uses:
| Layout use | Area | Share of net layout area |
|---|---|---|
| Plots | 31,916.58 sq m | 55.29% |
| Roads | 18,216.75 sq m | 31.56% |
| Parks / open space | 5,209.07 sq m | 9.02% |
| Utilities | 579.02 sq m | 1.00% |
| Social infrastructure | 1,447.40 sq m | 2.51% |
| Amenities | 0.00 sq m | 0.00% |
These figures are software-read from the approved layout drawing; the drawing identifies 57,723.49 sq m as net layout area. The approved layout document separately describes a 15.73% of plotted area mortgage area. Layout record
The tentative-layout approval calls for roads to be opened for access to neighbouring sites and bars a compound wall/fence around the site. It also requires specified open-space, utility and road areas to be handed over to the Municipality by registered gift deed before final release.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The approved layout document records 180 plots. Software measurement of the drawing reports all 180 plot sizes, with a range of 125.42–539.83 sq m (150.0–645.6 sq yd); those drawing-derived measurements should be checked against the original layout schedule. Layout record
| Plot-size band | Number of plots |
|---|---|
| 150–200 sq yd (125–167 sq m) | 71 |
| 200–250 sq yd (167–209 sq m) | 80 |
| 250–300 sq yd (209–251 sq m) | 16 |
| 300–400 sq yd (251–334 sq m) | 7 |
| 400–500 sq yd (334–418 sq m) | 5 |
| 500–1000 sq yd (418–836 sq m) | 1 |
The size bands and plot count are software-read from the layout drawing, not a RERA-filed unit schedule. The supplied records do not establish booked or available plot counts, plot-specific saleable areas, or room/floor-plan details. Layout record RERA filing
5. Parking & vehicle circulation
The supplied records do not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking plan. The approved layout requires roads and access within and around the layout, but does not provide a vehicle-space schedule in the extracted information. Layout record
6. Amenities, recreation & open spaces
The tentative-layout approval requires infrastructure and amenities to be provided by the applicant, but the supplied evidence does not verify completion. RERA amenity entries marked “YES” are filing records, not independent confirmation that facilities are built or operational. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Roads account for 18,216.75 sq m in the drawing-derived area statement. | Layout record RERA amenities | Amenity record says “YES”; completion not independently verified. |
| Park / open space | 5,209.07 sq m; approval document states 1 Acer 11.49 Gts and 9.02%. | Layout record | Reserved in the layout; handover and completion not verified. |
| Social infrastructure | 1,447.40 sq m; approval document states 0 Acer 14.31 Gts and 2.51%. | Layout record | Area shown in the layout; facility type and completion not established. |
| Utilities area | 579.02 sq m; approval document describes 0 Acer 5.72 Gts and 1% for utility-related provision. | Layout record | Reserved area; delivery not verified. |
| Community buildings | No size or quantity supplied. | RERA amenities | Listed without a “YES” value or progress evidence. |
| Other recreation / indoor facilities | No specific facility or size established in the supplied RERA amenity record. | RERA amenities | Not established. |
The vendor record lists additional amenities, including landscaped garden, open park, gated community and security personnel; these are third-party marketing claims and are not treated here as sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The tentative-layout approval describes required layout works including internal water-supply pipelines, an overhead tank, an assured water source, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lights, a transformer, avenue planting and rainwater-harvesting pits. These are approval requirements, not evidence of completed works or operating capacities.
| Service | Supplied evidence |
|---|---|
| Water | Approval calls for internal water-supply pipelines, an overhead tank and an assured water supply source. No source, storage capacity or completion status is supplied. |
| Sewerage / drainage | Approval calls for storm-water drains, underground drainage and a common septic tank/STP. No treatment capacity, reuse arrangement or completion status is supplied. |
| Electrical | Approval calls for electrical supply lines, street lights and a transformer; no capacity or completed-installation evidence is supplied. |
| Rainwater management | Rainwater-harvesting pits are specified in the approval. No quantity or completion status is supplied. |
| Waste | Approval lists solid-waste management among the utility provisions. No operating details or completion status are supplied. |
| Fire, lifts and accessibility | No project-specific provision, capacity or completion evidence is supplied. RERA amenities |
8. Location, access & connectivity
The project is identified in Badepally revenue village, Jadcherla Mandal, Mahabubnagar District, PIN 509301. The RERA land record describes the west boundary as an EXISTING 40 FEET ROAD; the other three boundaries are recorded as “OTHERS LAND.” RERA record Land records
A cadastral parcel-centroid point is supplied at 16.75751, 78.15186. The location data gives the nearest sampled Outer Ring Road interchange at approximately 60.3 km; this is a sampled-distance measure, not a travel-time claim. Cadastral map Location record
A third-party listing describes connectivity to IT hubs, schools, hospitals and shopping, but supplies no measured distances or named destinations. Promoter website
9. Developer & development status
The registered promoter is SHATAYU DEVELOPERS, recorded as a partnership, with GSTIN 36AESFS4464C1ZP. The supplied project record identifies Abhilash Munugala as an authorized signatory. Corporate record RERA filing Parties record
The Form B affidavit-cum-declaration is signed by Abhilash Munugala on behalf of SHATAYU DEVELOPERS and declares a completion undertaking of 31st January, 2026, a 70% separate-account commitment, and that pending approvals would be obtained. These are promoter declarations.
The RERA certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. The project record separately lists an address at Kadiri Apurupa Urban, Kondapur, Badepally, Jadcherla, Mahabubnagar, 509301; a verified official contact number, email address or website is not supplied. Parties record
No independent construction-progress report, final layout release or occupancy/completion certificate is supplied. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P01400006202; issued 29/04/2023; validity stated to 31/01/2026 |
|---|---|
| What it establishes | Registration particulars, named promoter and certificate conditions. |
| Identifier / date | 0001/LO/3068/2023, dated 31/01/2023; application 000123/LO/DTCP/3068/0001/2023 |
|---|---|
| What it establishes | Tentative approval for a 180-plot layout, with conditions for infrastructure, mortgage and final layout release. |
| Identifier / date | 593/2023, dated 24 January 2023 |
|---|---|
| What it establishes | The approval document identifies plots reserved under mortgage by conditional sale in favour of the Municipality. |
| Identifier / date | TS/0280/2023 (05 January 2023); TS/0281/2023 (05 January 2023); TS/0282/2023 (23 January 2023) |
|---|---|
| What it establishes | Receipts listed in the approval document. |
| Identifier / date | 14 February 2023 |
|---|---|
| What it establishes | Promoter’s declared title basis, encumbrance statement, completion undertaking and other undertakings. |
The supplied records include no final layout-release document, completion/occupancy certificate, or independent verification of infrastructure delivery. The tentative approval expressly states that it is not proof of land title.
1. Project at a glance
Project identity
Registered project name: SHATAYU YRG ENCLAVE
Project type: Plotted development / residential layout
Phase / registered portion: A single registered plotted layout is identified; no separate phase name is disclosed.
TG-RERA registration: P01400006202, Form C; granted 29/04/2023. The certificate states validity from 29/04/2023 to 31/01/2026; no extension is recorded in the supplied certificate.
Registered promoter: SHATAYU DEVELOPERS, a partnership.
RERA status: The supplied certificate records registration; it does not establish current registration status after the stated validity end date.
Land and geographic identity
Locality: Badepally
Revenue village: Badepally; the approval document calls it “BADEPALLY Revenue Village.”
Mandal: Jadcherla
District: Mahabubnagar
PIN: 509301
Survey numbers / subdivisions as recorded: 125, 126/1, 127, 137/ A, 139, 140/ A, 140/ AA, 126/ 2, 127/ AA, 133/ 1, 134, 137/AA, 137/AA/1, 140/A/1
Site area: RERA land record: 57,902.66 sq m total and net area. The tentative-layout document states 14 Acer 12.31 Gts; 69,251 Sq. Yds.
Boundaries in RERA record: East: OTHERS LAND; West: EXISTING 40 FEET ROAD; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; RERA record names DTCP as the authority.
Principal approval: Tentative layout approval 0001/LO/3068/2023, dated 31/01/2023; application 000123/LO/DTCP/3068/0001/2023.
Approved built-up area: RERA filing states 31,917.49 sq m; its context as a plotted layout is not further explained in the supplied material.
Plots: 180 plots, stated in the tentative-layout approval.
Building / floor configuration: Not disclosed; this is a plotted layout rather than a supplied multi-storey building plan.
Parking provision: No parking count or parking layout is established in the supplied records.
Offering and status
Offering: Residential plots; the layout approval records 180 plots.
Plot sizes: Software-read from the approved layout drawing: 125.42–539.83 sq m (150.0–645.6 sq yd); the drawing-derived schedule identifies 180 plots with sizes. Verify against the drawing.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development stage: No independently verified site-progress status is supplied. The approval requires the promoter to carry out layout infrastructure works; the RERA record does not provide a measured progress figure.
Completion date: Promoter’s Form B declaration states 31st January, 2026 as the completion undertaking; the project record lists 31/01/2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The cited approval is for a tentative layout, not an OC.
2. The project story
SHATAYU YRG ENCLAVE is registered as a residential plotted development in Badepally revenue village, Jadcherla Mandal, Mahabubnagar District. The registered land schedule lists the survey numbers and subdivisions in the identity table above. The project is arranged as a 180-plot layout, not as apartment towers or villas.
The tentative layout drawing’s area statement allocates 31,916.58 sq m to plots, 18,216.75 sq m to roads, 5,209.07 sq m to parks/open space, 579.02 sq m to utilities, and 1,447.40 sq m to social infrastructure. These are drawing-derived figures; the drawing’s own area statement is the source.
The approval is conditional on the applicant completing layout infrastructure and obtaining release of the mortgaged plots and final layout. No project-specific evidence in the supplied pack verifies which infrastructure works have been completed or whether final layout release or a completion certificate has been issued.
3. Master plan, architecture & building design
This is a plotted layout. The approved drawing is reported as two layout sheets, with a schedule of 180 plots; it does not provide a building-by-building or floor-by-floor design. The RERA filing lists an approved built-up area of 31,917.49 sq m, but the supplied record does not explain its application to the plotted development.
The drawing-derived layout area statement identifies the following uses:
| Layout use | Area | Share of net layout area |
|---|---|---|
| Plots | 31,916.58 sq m | 55.29% |
| Roads | 18,216.75 sq m | 31.56% |
| Parks / open space | 5,209.07 sq m | 9.02% |
| Utilities | 579.02 sq m | 1.00% |
| Social infrastructure | 1,447.40 sq m | 2.51% |
| Amenities | 0.00 sq m | 0.00% |
These figures are software-read from the approved layout drawing; the drawing identifies 57,723.49 sq m as net layout area. The approved layout document separately describes a 15.73% of plotted area mortgage area.
The tentative-layout approval calls for roads to be opened for access to neighbouring sites and bars a compound wall/fence around the site. It also requires specified open-space, utility and road areas to be handed over to the Municipality by registered gift deed before final release.
4. Homes, configurations & floor plans
The project offers plots, not apartment configurations. The approved layout document records 180 plots. Software measurement of the drawing reports all 180 plot sizes, with a range of 125.42–539.83 sq m (150.0–645.6 sq yd); those drawing-derived measurements should be checked against the original layout schedule.
150–200 sq yd (125–167 sq m): 71
200–250 sq yd (167–209 sq m): 80
250–300 sq yd (209–251 sq m): 16
300–400 sq yd (251–334 sq m): 7
400–500 sq yd (334–418 sq m): 5
500–1000 sq yd (418–836 sq m): 1
The size bands and plot count are software-read from the layout drawing, not a RERA-filed unit schedule. The supplied records do not establish booked or available plot counts, plot-specific saleable areas, or room/floor-plan details.
5. Parking & vehicle circulation
The supplied records do not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking plan. The approved layout requires roads and access within and around the layout, but does not provide a vehicle-space schedule in the extracted information.
6. Amenities, recreation & open spaces
The tentative-layout approval requires infrastructure and amenities to be provided by the applicant, but the supplied evidence does not verify completion. RERA amenity entries marked “YES” are filing records, not independent confirmation that facilities are built or operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Roads account for 18,216.75 sq m in the drawing-derived area statement. | Amenity record says “YES”; completion not independently verified. | |
| Park / open space | 5,209.07 sq m; approval document states 1 Acer 11.49 Gts and 9.02%. | Reserved in the layout; handover and completion not verified. | |
| Social infrastructure | 1,447.40 sq m; approval document states 0 Acer 14.31 Gts and 2.51%. | Area shown in the layout; facility type and completion not established. | |
| Utilities area | 579.02 sq m; approval document describes 0 Acer 5.72 Gts and 1% for utility-related provision. | Reserved area; delivery not verified. | |
| Community buildings | No size or quantity supplied. | Listed without a “YES” value or progress evidence. | |
| Other recreation / indoor facilities | No specific facility or size established in the supplied RERA amenity record. | Not established. |
The vendor record lists additional amenities, including landscaped garden, open park, gated community and security personnel; these are third-party marketing claims and are not treated here as sanctioned or delivered facilities.
7. Utilities, building services & safety
The tentative-layout approval describes required layout works including internal water-supply pipelines, an overhead tank, an assured water source, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lights, a transformer, avenue planting and rainwater-harvesting pits. These are approval requirements, not evidence of completed works or operating capacities.
Water: Approval calls for internal water-supply pipelines, an overhead tank and an assured water supply source. No source, storage capacity or completion status is supplied.
Sewerage / drainage: Approval calls for storm-water drains, underground drainage and a common septic tank/STP. No treatment capacity, reuse arrangement or completion status is supplied.
Electrical: Approval calls for electrical supply lines, street lights and a transformer; no capacity or completed-installation evidence is supplied.
Rainwater management: Rainwater-harvesting pits are specified in the approval. No quantity or completion status is supplied.
Waste: Approval lists solid-waste management among the utility provisions. No operating details or completion status are supplied.
Fire, lifts and accessibility: No project-specific provision, capacity or completion evidence is supplied.
8. Location, access & connectivity
The project is identified in Badepally revenue village, Jadcherla Mandal, Mahabubnagar District, PIN 509301. The RERA land record describes the west boundary as an EXISTING 40 FEET ROAD; the other three boundaries are recorded as “OTHERS LAND.”
A cadastral parcel-centroid point is supplied at 16.75751, 78.15186. The location data gives the nearest sampled Outer Ring Road interchange at approximately 60.3 km; this is a sampled-distance measure, not a travel-time claim.
A third-party listing describes connectivity to IT hubs, schools, hospitals and shopping, but supplies no measured distances or named destinations.
9. Developer & development status
The registered promoter is SHATAYU DEVELOPERS, recorded as a partnership, with GSTIN 36AESFS4464C1ZP. The supplied project record identifies Abhilash Munugala as an authorized signatory.
The Form B affidavit-cum-declaration is signed by Abhilash Munugala on behalf of SHATAYU DEVELOPERS and declares a completion undertaking of 31st January, 2026, a 70% separate-account commitment, and that pending approvals would be obtained. These are promoter declarations.
The RERA certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. The project record separately lists an address at Kadiri Apurupa Urban, Kondapur, Badepally, Jadcherla, Mahabubnagar, 509301; a verified official contact number, email address or website is not supplied.
No independent construction-progress report, final layout release or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P01400006202; issued 29/04/2023; validity stated to 31/01/2026 |
|---|---|
| What it establishes | Registration particulars, named promoter and certificate conditions. |
| Identifier / date | 0001/LO/3068/2023, dated 31/01/2023; application 000123/LO/DTCP/3068/0001/2023 |
|---|---|
| What it establishes | Tentative approval for a 180-plot layout, with conditions for infrastructure, mortgage and final layout release. |
| Identifier / date | 593/2023, dated 24 January 2023 |
|---|---|
| What it establishes | The approval document identifies plots reserved under mortgage by conditional sale in favour of the Municipality. |
| Identifier / date | TS/0280/2023 (05 January 2023); TS/0281/2023 (05 January 2023); TS/0282/2023 (23 January 2023) |
|---|---|
| What it establishes | Receipts listed in the approval document. |
| Identifier / date | 14 February 2023 |
|---|---|
| What it establishes | Promoter’s declared title basis, encumbrance statement, completion undertaking and other undertakings. |
The supplied records include no final layout-release document, completion/occupancy certificate, or independent verification of infrastructure delivery. The tentative approval expressly states that it is not proof of land title.
Frequently asked questions
Is SHATAYU YRG ENCLAVE registered with Telangana RERA?
Yes. SHATAYU YRG ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P01400006202; the registration status is New Project.
Who is the developer of SHATAYU YRG ENCLAVE?
The promoter named in the RERA registration is SHATAYU DEVELOPERS.
Where is SHATAYU YRG ENCLAVE located?
SHATAYU YRG ENCLAVE is in Badepally, Jadcherla, Mahabubnagar, Telangana (509301).
When will SHATAYU YRG ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 31/01/2026. This is the promoter's declaration, not a guarantee.