Signature36

DEV INFRA · Hyderabad · RERA P02500000228

SIGNATURE36 is a commercial office building in Jubilee Hills, Shaikpet mandal, Hyderabad district, developed by registered promoter DEV INFRA / M/s. Dev Infra. The site area is 1183.94 sq m, and the development is one building with a cellar and ground plus four upper floors, comprising 5 commercial units. The project is registered with TG-RERA as P02500000228, with proposed completion by 30.06.2019 plus a 9-month grace period.

More from Dev Infra · 2 projects →

01What we found

Period endedTG-RERA registration ran to 26 May 2020 - check its extension on TG-RERA
8documents on file - each fact links to its page
357court cases on this project's land (survey 1, 102, 120, 403, Jubilee Hills)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSIGNATURE36 RERA record
Project typeCommercial; the GHMC permit describes an office building. RERA record
Phase / registered portionNot identified as a separately named phase in the supplied record. RERA record
TG-RERA registrationP02500000228; registration certificate dated 21/01/2019. Approvals record
Registration validity21/01/2019 to 26/05/2020, as stated in the TG-RERA certificate; no extension is recorded in the supplied certificate data. This is registration validity, not the completion deadline or OC status. Approvals record
Registered promoterDEV INFRA / M/s. Dev Infra; entity type recorded as Partnership. RERA record Parties record Corporate record
RERA statusThe filing labels the project “New Project”; the registration certificate records the registration dates above. RERA record

Land and geographic identity

FieldProject record
LocalityJubilee Hills; the registration certificate also states “Shaikpet, Hyderabad.” RERA record
Revenue villagesShaikpet and Hakimpet are both named in the GHMC building permit. The RERA certificate identifies the surveys as “403 /1 (OLD) 120 (NEW) OF SHAIKPET” and “102 /1 HAKIMPET.”
Mandal / district / PINShaikpet / Hyderabad / 500033 in the project header and certificate record. The certificate’s promoter-office field separately records PIN 500034. RERA record
Project survey numbers and subdivisionsSy.Nos.403/1 (O), 120 (New), and Sy.No.102/1; the RERA certificate spells these out as “403 /1 (OLD) 120 (NEW) OF SHAIKPET” and “102 /1 HAKIMPET.” Land records
Site extentTotal site area 1183.94 sq m; road-affected area 148.04 sq m; net area 1035.90 sq m, as recorded in the GHMC permit and RERA project fields. Land records
Site address / plot8-2-293/82/A/486, Plot No. 486. RERA record
BoundariesNorth: Plot No. 487; South: Plot No. 485; East and West: Road No. 10. Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permitApproval No. 53244/HO/CZ/Cir-10/2016; File No. 1989/16/01/2015; approved 27.4.2017. Approvals record
Building use and configurationCommercial office building; cellar and ground plus four upper floors.
Approved built-up area2616.62 sq m in the project record. The permit separately lists 1440.77 sq m for “Commercial (Office)” and 2616.62 for “Cellar”; the supplied extraction does not explain the area basis, so these figures are retained as labelled rather than combined. RERA record
Building / block countOne building is recorded in the project fields; the permit describes one office building. RERA record
Parking provision in permitCellar is identified as a parking floor; the permit also requires the cellar and stilts approved for parking to be used exclusively for vehicle parking. No parking-space count is supplied.
UnitsThe RERA filing records 5 commercial units; the permit condition says the sanctioned number of units must not be increased without GHMC approval. RERA unit table

Offering and status

FieldProject record
Unit typeCommercial; filed as “COMMERCIAL.” RERA unit table RERA unit details
RERA saleable area523.32 sq m per filed configuration entry; the record does not provide a different range. RERA unit table RERA unit details
Booked / available5 booked and 0 available in the portal-derived filing data. The record has no as-of date, so the counts are indicative. RERA unit table
Construction stageAn architect’s Form–1A dated 12.03.2024 certifies completion of construction work and says the project was completed in all aspects. This is a filed architect certification, not an independent site inspection.
Completion datesForm B undertakes completion by 30.06.2019 plus a 9-month grace period. A separate architect’s certificate records completion date 01.09.2021. These are respectively a promoter declaration and a filed architect certification.
Occupancy certificateForm–1A records GHMC OC No. 1/C18/09623/2021, dated 18.09.2021. The certificate identifies SIGNATURE 36 and registration P02500000228; the supplied record describes the project as completed, but does not specify separate tower or phase scopes.

2. The project story

SIGNATURE36 is registered with TG-RERA as a commercial project by DEV INFRA. The GHMC permit describes an office building in Jubilee Hills, Hyderabad, on land identified across Shaikpet and Hakimpet villages: Sy.Nos.403/1 (O), 120 (New), and Sy.No.102/1. The registered site details show a total area of 1183.94 sq m, including a 148.04 sq m road-affected portion, and a net area of 1035.90 sq m. RERA record Land records

The sanctioned building is one commercial office building with a cellar and ground plus four upper floors. The RERA filing records five commercial units, all shown as booked in the portal-derived count; the count has no supplied as-of date. RERA unit table

The project file includes an architect’s Form–1A certifying completion and recording a GHMC occupancy certificate dated 18.09.2021. This presents the status evidenced by the filed certificate; it is not an independent inspection of the site.

3. Master plan, architecture & building design

The GHMC building permit describes a single commercial office building with a cellar and ground plus four upper floors. It records a building height of 14.98 m and ground-floor area of 1440.77 sq m. The permit also lists a 2616.62 sq m cellar entry; the supplied extraction does not establish whether that entry is comparable to the separately recorded approved built-up-area figure, so the measurements are not treated as interchangeable. RERA record

The approved site area is stated as 1183.94 sq m, with 148.04 sq m affected by road widening and 1035.90 sq m net area. The permit records setbacks of Front: 6.00 TO 11.56 m; Rear: 3.00 TO 3.08 m; Side: 3.00 TO 3.01 m; and Side I: 2.50 TO 3.91 m. It identifies a cellar parking floor, a tot-lot to be maintained as greenery, space for a transformer, a garbage house, and a rain-water-harvesting structure (percolation pit). Land records

The RERA filing records one building and one proposed building unit, while the permit describes the office building. The supplied materials do not provide floor plans with measured unit geometry: two drawing records are marked as scans pending and zero were software-measured. No FSI-counted area, building footprint, floors-per-floor unit arrangement, lift or stair configuration, or internal circulation plan is supplied here. RERA record Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Commercial550523.32 sq mNot measured; drawings pending scan reviewNot supplied

The unit type and unit count are from the TG-RERA filing; the booking counts are portal-derived and have no supplied as-of date. The filing identifies the saleable area, not carpet area. RERA unit table RERA unit details

The two drawing records have not been software-measured, so no drawing-based carpet-area or room-dimension figures are available. Carpet area, saleable area and any share of common areas should not be treated as equivalent measurements. Floor plans

5. Parking & vehicle circulation

The GHMC permit identifies a cellar parking floor and states that cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also prohibits parking or construction in setback areas. The supplied permit extraction does not give the number of parking spaces, visitor or accessible spaces, or a unit-wise parking allocation. A drawn or sanctioned parking provision does not, by itself, establish exclusive ownership or allocation to a particular unit.

The permit’s site conditions also address the road-affected portion and front boundary treatment adjoining an 18 m road; no internal driveway, ramp arrangement, EV charging provision, or pedestrian-vehicle separation details are supplied.

6. Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizePermit requires the tot-lot to be fenced and maintained as greenery; no size supplied.
Evidence sourceGHMC building permit
Declared progress / verified statusSanction condition; completion not independently verified.
Rain-water harvesting
Description / sizeRain Water Harvesting Structure (percolation pit); no capacity supplied.
Evidence sourceGHMC building permit; RERA amenities record RERA amenities
Declared progress / verified statusIncluded in permit; RERA record marks water conservation/rain-water harvesting “YES” with 0% progress recorded.
Community buildings
Description / sizeListed in RERA amenities; no size or description supplied.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not established.
Recreational open space
Description / sizeAggregate area listed in RERA amenities; no area supplied.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not established.

No clubhouse, sports facility, restaurant, or terrace garden is established by the supplied RERA-filed amenity and permit extracts. The RERA amenities table records 14 items, but gives 0% progress for the listed items; “YES” entries are recorded for water supply, water conservation/rain-water harvesting, energy management, and electrical meter room/sub-station/receiving station. These are filing entries, not independent verification of delivery. RERA amenities

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, electrical meter room/sub-station/receiving station, fire protection and safety, and rain-water harvesting. It marks water supply, rain-water harvesting, energy management, and electrical meter room/sub-station/receiving station “YES”; the listed progress values are 0%. The supplied data does not specify capacities, sources, equipment, or completed status for these services. RERA amenities

The GHMC permit requires automatic sprinklers in cellar floors and fire-safety measures as per NBC norms before an occupancy certificate, and requires a rain-water-harvesting structure (percolation pit). These are permit conditions; the supplied materials do not independently document the installed systems or their capacities.

No lift or service-lift details, backup-power capacity, water-storage or treatment capacity, STP capacity, waste-segregation arrangements, CCTV, access control, accessibility provisions, or emergency-access layout are established by the supplied RERA and permit records. RERA amenities

8. Location, access & connectivity

The registered project location is Jubilee Hills, Shaikpet mandal, Hyderabad district, PIN 500033, with the site identified at 8-2-293/82/A/486, Plot No. 486. The GHMC permit names the revenue villages of Shaikpet and Hakimpet and gives the project surveys as Sy.Nos.403/1 (O), 120 (New), and 102/1. RERA record

The site boundaries recorded in the project fields are Plot No. 487 to the north, Plot No. 485 to the south, and Road No. 10 to both the east and west. The location data supplied also records the Financial District (Nanakramguda) at 1.2 km. No additional transport routes or travel-time claims are established by the supplied location record. Land records Location record

9. Developer & development status

The registered promoter is DEV INFRA / M/s. Dev Infra, recorded as a partnership. Sanjay Kumar Bansal is identified in the project records as a partner and authorized signatory; the Form B declaration identifies him as Managing Partner. The supplied corporate identifier is not available in full, and no registered-office address is established beyond the promoter address recorded in the project fields. Corporate record Parties record

The Form B affidavit dated 15 December 2017 declares that the promoter has legal title to the land, that the land is free from encumbrances, and that completion would be by 30.06.2019 plus a 9-month grace period. These are promoter declarations. The project file separately includes an architect’s completion certificate dated 12.03.2024, which records completion date 01.09.2021 and a GHMC occupancy certificate dated 18.09.2021.

10. Approvals, official records & documents

TG-RERA registration
DetailsSIGNATURE36; P02500000228; issued 21/01/2019; validity stated as 21/01/2019–26/05/2020.
GHMC building permit
DetailsApproval No. 53244/HO/CZ/Cir-10/2016; File No. 1989/16/01/2015; approved 27.4.2017; commercial office building described as cellar and ground plus four upper floors.
GHMC occupancy certificate, as recorded in Form–1A
DetailsOC No. 1/C18/09623/2021; dated 18.09.2021.
Architect’s completion certificate
DetailsForm–1A dated 12.03.2024; certifies completion and records completion date 01.09.2021.
Promoter Form B declaration
DetailsAffidavit-cum-declaration by Sanjay Kumar Bansal, dated 15 December 2017; includes title, encumbrance, completion, fund-account, audit and pending-approval declarations.
Title report
DetailsLegal scrutiny report concerning Plot No. 486 and the project land; see the title report for the document’s title-chain account.

The supplied record does not include a separately extracted approved layout plan or floor-plan measurements. Document index Floor plans

Frequently asked questions

Is SIGNATURE36 registered with Telangana RERA?

Yes. SIGNATURE36 is registered with the Telangana Real Estate Regulatory Authority as P02500000228; the registration status is New Project.

Who is the developer of SIGNATURE36?

The promoter named in the RERA registration is DEV INFRA.

Where is SIGNATURE36 located?

SIGNATURE36 is in JUBILEE HILLS, Shaikpet, Hyderabad, Telangana (500033).

When will SIGNATURE36 be completed?

The promoter's proposed date of completion filed with RERA is 26/05/2020. This is the promoter's declaration, not a guarantee.