Silver Oak
SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS · Mahabubnagar · RERA P01400008501
SILVER OAK is a new plotted development in Mudireddypally, Rajapoor Mandal, Mahabubnagar District. It is being developed by SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS. The layout approval records 257 plots across a tentative layout over Ac. 19.731 cents 95502.394 Sq.Yds in Survey Nos. 584/P and 585/P; no tower or floor configuration is stated. The TG-RERA registration is P01400008501, and the proposed completion date recorded in the project header is 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SILVER OAK RERA record |
| Project type and registered portion | New project; plotted development/open-plot layout. The registration concerns the project land in Survey Nos. 584/P and 585/P. No separate phase number is disclosed. RERA record RERA filing |
| TG-RERA registration | P01400008501; shown as registered from 15 July 2024 to 7 May 2026. This is the registration-validity period, not the completion deadline. RERA record Approvals record |
| Registered promoter | SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS. RERA record RERA filing |
| RERA status in supplied record | The project has a TG-RERA registration certificate. The supplied registration record does not establish a later extension or current validity beyond the stated end date. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / registered location | Mudireddypally; the registration certificate identifies the project at Mudireddypally, Rajapoor, Mahabubnagar, Telangana, 509301. RERA record |
| Revenue villages named in the filed layout approval | MUDIREDDY PALLI VILLAGE and RAJAPUR VILLAGE; the approval also describes the site as in Rajapur Revenue Village. |
| Mandal / district / PIN | Rajapoor Mandal; Mahabubnagar District; 509301. The approval spells the mandal and district as “RAJAPUR MANDAL” and “MAHABUBNAGAR DISTRICT.” RERA record |
| Project survey numbers | 584/P and 585/P. No further project parcel subdivision is identified in the registration certificate or layout approval. Land records |
| Site extent | The layout approval states Total Layout Area 79934.62 sq.mt and Net Layout Area 79853.93 sq.mt. It also lists “Total net layout” as 79851.50; the supplied extract does not explain that separate figure. |
| RERA land fields | Total area 79852.16 sqmts; affected area in road widening/FTL of tanks/nala widening 31433.18 sqmts; net area 48418.98 sqmts. RERA filing |
| Boundaries in RERA filing | East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority and principal approval | MUDA Urban Development Authority, approval for tentative layout plan 381392/LP/GP/204900/0002/2024, dated 07-05-2024. The filed layout plan also shows file number TS/014003/2024 and identifies TS-DTCP as authority on that drawing record. Approvals record |
| Approved layout scale | 257 plots; the layout approval records a tentative layout over Ac. 19.731 cents 95502.394 Sq.Yds. The drawing-derived schedule also records 257 plots. Layout record |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the layout approval’s sanctioned parameters. This is an open-plot layout, not a building approval. |
| Building / floor configuration | No building count, floor configuration, tower height or parking level is stated in the supplied project record. The approval’s conditions permit only detached single-family dwelling houses on sites, subject to competent-authority approval for future development. |
| Mortgage area disclosed | RERA land fields state 7759.57 sqmts. The layout approval records 29 plots and proposed mortgage area 6487.94 sq.mt (15.11%) against a required 6440.91 (15%). RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Unit type and count | Plots; 257 plots shown in the approved layout schedule. Layout record |
| Drawing-derived plot sizes | Software-read from the approved layout drawing: 122.96–330.25 sq.m (approximately 147.1–395.0 sq.yd); median 125.75 sq.m (approximately 150.4 sq.yd). These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record |
| Booked / available | No booked or available plot counts supplied. RERA filing Document index |
| Completion dates | The Form B declaration undertakes completion by 07/05/2026; the RERA project header records proposed completion as 30/11/2026. These are stated completion dates, distinct from the registration validity period above. RERA record |
| Development stage / OC | No independently verified site-progress information or occupancy/completion certificate is supplied. The approval is for a tentative layout plan; the record requires completion of development works and approval of a Final Layout Plan. Document index |
2. The project story
SILVER OAK is registered as a new plotted development in the Mudireddypally–Rajapur area of Mahabubnagar District, covering Survey Nos. 584/P and 585/P. The registered offering is plots rather than apartments or completed homes; the filed layout approval identifies 257 proposed plots. RERA record
The approved drawing allocates land to plots, internal roads, organized open space/parks, social infrastructure, utilities and a water-bodies buffer. The layout approval does not identify residential building construction as part of the sanctioned project: proposed built-up area is recorded as 0.00. Layout record
The available record establishes tentative layout approval and RERA registration, but does not establish the present on-site completion of roads, utilities, parks or other development works. The approval calls for infrastructure works and a work-completion certificate before approval of the Final Layout Plan; no final layout approval or site-verification evidence is included here. Document index
3. Master plan, architecture & building design
The approved drawing is for a residential open plotted layout, not a multi-storey building scheme. It records 257 individual sub-plots and a proposed built-up area of 0.00. No building footprint, floor configuration, tower arrangement, lifts, stairs or building-level circulation plan is evidenced in the supplied records.
The approval’s area schedule states:
| Layout component | Area | Share |
|---|---|---|
| Plotted area | 42679.68 sq mt. | 53.45% |
| Road area | 26281.93 | 32.91% |
| Organized open space/park area | 7318.70 | 9.17% |
| Social infrastructure area | 2070.36 | 2.59% |
| Utility area | 868.73 | 1.09% |
| BufferZone Area | 632.10 | 0.79% |
| Amenity area | 0.00 | 0.00% |
| Common parking area | 0.00 | 0.00% |
These are the components and figures shown in the filed layout approval; the drawing-derived layout record separately identifies plotted area, roads, parks/open space, utilities and social infrastructure. Layout record
The layout drawing lists 9.14 mt. Wide InternalRoad, 18.00 mt. Wide InternalRoad, 10.06 MT WIDE EXISTING ROAD, 10.06 MT WIDE PROPOSED ROAD, 40 Feet Road, and 33 Feet Road. It also identifies a 632.10 sq.mt water-bodies buffer. No FSI, gross building area, saleable area or carpet area is applicable or provided for this plotted-layout approval.
4. Homes, configurations & floor plans
The RERA-filed project is a plotted development, and the supplied project records do not provide RERA-filed plot saleable areas, booked inventory or available inventory. The layout drawing’s schedule has 257 plots; the following size information is software-read from that drawing and should be checked against the approved drawing. Layout record
| Plot information | Drawing-derived figure |
|---|---|
| Plot count | 257 |
| Smallest plot | 122.96 sq.m / 147.1 sq.yd |
| Median plot | 125.75 sq.m / 150.4 sq.yd |
| Largest plot | 330.25 sq.m / 395.0 sq.yd |
| Drawing size band | Plots |
|---|---|
| 100–150 sq.yd | 1 |
| 150–200 sq.yd | 177 |
| 200–250 sq.yd | 16 |
| 250–300 sq.yd | 45 |
| 300–400 sq.yd | 18 |
The layout’s most common printed sizes are 125.75 sq.m (135 plots), 247.15 sq.m (30 plots), 157.32 sq.m (18 plots), 310.30 sq.m (6 plots), and 153.31 sq.m (4 plots). These are software-measured drawing figures, not RERA-filed saleable areas. No apartment floor plans or unit carpet-area measurements are supplied. Layout record Floor plans
5. Parking & vehicle circulation
The approved layout schedule records Common Parking Area: 0.00. No project-wide resident, visitor or accessible parking count, parking allocation arrangement, EV charging provision or dedicated parking facility is established in the supplied records.
The layout drawing shows internal and connecting road widths, including 9.14 mt., 18.00 mt., 10.06 MT, 40 Feet, and 33 Feet roads. The approval also requires roads to be opened for neighboring-site accessibility and prohibits a compound wall or fencing around the site under the stated tentative-layout conditions. These are approval conditions, not evidence that the roads or access works have been completed.
6. Amenities, recreation & open spaces
The RERA amenity record lists facilities as available in the project disclosure, but reports 0% progress for each listed item. This is a filed status, not independent confirmation of delivery. RERA amenities
| Facility | Green Strip / TOT LOT / Park |
|---|---|
| Description / size | Approved organized open space/park area: 7318.70 sq.mt; the layout approval also names “Tot-lot.” |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%; completion not independently verified. |
| Facility | Community Buildings |
|---|---|
| Description / size | No size or capacity supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%; completion not independently verified. |
| Facility | Social infrastructure |
|---|---|
| Description / size | 2070.36 sq.mt in the layout area schedule. |
| Declared progress / verified status | Approved allocation; development/completion not independently verified. |
The layout approval records 0.00 amenity area as a separate land-use line. No clubhouse or indoor facility, sports facility, or separately sized recreational facility is detailed in the supplied project documents.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, treatment and disposal of sewage and sullage, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each has 0% progress in that record. RERA amenities
The layout approval lists utility land of 868.73 sq.mt and requires the applicant to undertake works including drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. It also identifies a water reservoir, septic tank, sewage treatment plant, electric transformer and solid-waste management among the specified utilities. These are approval requirements or identified provisions, not proof of completed installations; capacities and operating details are not supplied.
No project-specific evidence supplied establishes water source or storage capacity, treatment capacity, reuse arrangements, backup power, fire systems, CCTV/access control, accessibility features, or completed safety infrastructure. The RERA amenity record does not show a completion percentage for fire protection and fire-safety requirements. RERA amenities
8. Location, access & connectivity
The project’s registered location is Mudireddypally, Rajapoor, Mahabubnagar, Telangana, 509301. The layout approval names MUDIREDDY PALLI VILLAGE and RAJAPUR VILLAGE and identifies Survey Nos. 584/P and 585/P.
The approved layout drawing identifies NH 44, a proposed site, a railway track and internal/connecting roads. These are drawing labels; the supplied material does not establish the project’s measured distance to NH 44, a railway station or other landmarks. The location record supplies a geocode at 16.6965686, 77.9591146 and a sampled nearest Outer Ring Road interchange distance of 77.6 km. Location record
9. Developer & development status
The registered promoter is SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS. The supplied corporate record identifies the entity type as pvt_ltd and gives GSTIN 36ABHCS3190G1Z7. The RERA certificate lists Shathabdhi Properties Private Limited as promoter and gives its address as Village: Mandal: District: Hyderabad, Pin: 500034; the supplied project header separately lists the promoter address at CYBER HEIGHTS, ROAD NO 2, MUDIREDDYPALLI, Rajapoor, Mahabubnagar, 509301. RERA record RERA filing Corporate record
The Form B declaration states a project completion undertaking of 07/05/2026. The project header records a proposed completion date of 30/11/2026. No construction-progress percentage or independent site-progress verification is supplied, and no occupancy or completion certificate is provided. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SILVER OAK, registration P01400008501; stated validity 15/07/2024–07/05/2026. |
| Layout approval | Tentative layout plan approval 381392/LP/GP/204900/0002/2024, dated 07-05-2024, issued by MUDA Urban Development Authority; drawing file number TS/014003/2024. The record describes 257 plots in Survey Nos. 584/P and 585/P. |
| Title and encumbrance documents filed | Advocate’s title search report, document 449443; title-report materials and registered instruments filed with RERA; encumbrance statement 456377. These are included here as document-index entries, not as a substitute for the detailed Land & Title review. Document index |
| Promoter declaration | Form B affidavit dated 01-06-2024, declaring project obligations and a completion undertaking. |
| Layout completion / final approval evidence | The supplied approval requires development works and a work-completion certificate for approval of the Final Layout Plan. No final layout approval or work-completion certificate is included in the supplied materials. Document index |
| Building and occupancy records | No building approval, building commencement certificate, occupancy certificate or completion certificate is supplied for this plotted layout. Document index |
1. Project at a glance
Project identity
Registered project name: SILVER OAK
Project type and registered portion: New project; plotted development/open-plot layout. The registration concerns the project land in Survey Nos. 584/P and 585/P. No separate phase number is disclosed.
TG-RERA registration: P01400008501; shown as registered from 15 July 2024 to 7 May 2026. This is the registration-validity period, not the completion deadline.
Registered promoter: SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS.
RERA status in supplied record: The project has a TG-RERA registration certificate. The supplied registration record does not establish a later extension or current validity beyond the stated end date.
Land and geographic identity
Locality / registered location: Mudireddypally; the registration certificate identifies the project at Mudireddypally, Rajapoor, Mahabubnagar, Telangana, 509301.
Revenue villages named in the filed layout approval: MUDIREDDY PALLI VILLAGE and RAJAPUR VILLAGE; the approval also describes the site as in Rajapur Revenue Village.
Mandal / district / PIN: Rajapoor Mandal; Mahabubnagar District; 509301. The approval spells the mandal and district as “RAJAPUR MANDAL” and “MAHABUBNAGAR DISTRICT.”
Project survey numbers: 584/P and 585/P. No further project parcel subdivision is identified in the registration certificate or layout approval.
Site extent: The layout approval states Total Layout Area 79934.62 sq.mt and Net Layout Area 79853.93 sq.mt. It also lists “Total net layout” as 79851.50; the supplied extract does not explain that separate figure.
RERA land fields: Total area 79852.16 sqmts; affected area in road widening/FTL of tanks/nala widening 31433.18 sqmts; net area 48418.98 sqmts.
Boundaries in RERA filing: East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority and principal approval: MUDA Urban Development Authority, approval for tentative layout plan 381392/LP/GP/204900/0002/2024, dated 07-05-2024. The filed layout plan also shows file number TS/014003/2024 and identifies TS-DTCP as authority on that drawing record.
Approved layout scale: 257 plots; the layout approval records a tentative layout over Ac. 19.731 cents 95502.394 Sq.Yds. The drawing-derived schedule also records 257 plots.
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the layout approval’s sanctioned parameters. This is an open-plot layout, not a building approval.
Building / floor configuration: No building count, floor configuration, tower height or parking level is stated in the supplied project record. The approval’s conditions permit only detached single-family dwelling houses on sites, subject to competent-authority approval for future development.
Mortgage area disclosed: RERA land fields state 7759.57 sqmts. The layout approval records 29 plots and proposed mortgage area 6487.94 sq.mt (15.11%) against a required 6440.91 (15%).
Offering and status
Unit type and count: Plots; 257 plots shown in the approved layout schedule.
Drawing-derived plot sizes: Software-read from the approved layout drawing: 122.96–330.25 sq.m (approximately 147.1–395.0 sq.yd); median 125.75 sq.m (approximately 150.4 sq.yd). These are drawing-derived measurements, not RERA-filed saleable-area figures.
Booked / available: No booked or available plot counts supplied.
Completion dates: The Form B declaration undertakes completion by 07/05/2026; the RERA project header records proposed completion as 30/11/2026. These are stated completion dates, distinct from the registration validity period above.
Development stage / OC: No independently verified site-progress information or occupancy/completion certificate is supplied. The approval is for a tentative layout plan; the record requires completion of development works and approval of a Final Layout Plan.
2. The project story
SILVER OAK is registered as a new plotted development in the Mudireddypally–Rajapur area of Mahabubnagar District, covering Survey Nos. 584/P and 585/P. The registered offering is plots rather than apartments or completed homes; the filed layout approval identifies 257 proposed plots.
The approved drawing allocates land to plots, internal roads, organized open space/parks, social infrastructure, utilities and a water-bodies buffer. The layout approval does not identify residential building construction as part of the sanctioned project: proposed built-up area is recorded as 0.00.
The available record establishes tentative layout approval and RERA registration, but does not establish the present on-site completion of roads, utilities, parks or other development works. The approval calls for infrastructure works and a work-completion certificate before approval of the Final Layout Plan; no final layout approval or site-verification evidence is included here.
3. Master plan, architecture & building design
The approved drawing is for a residential open plotted layout, not a multi-storey building scheme. It records 257 individual sub-plots and a proposed built-up area of 0.00. No building footprint, floor configuration, tower arrangement, lifts, stairs or building-level circulation plan is evidenced in the supplied records.
The approval’s area schedule states:
| Layout component | Area | Share |
|---|---|---|
| Plotted area | 42679.68 sq mt. | 53.45% |
| Road area | 26281.93 | 32.91% |
| Organized open space/park area | 7318.70 | 9.17% |
| Social infrastructure area | 2070.36 | 2.59% |
| Utility area | 868.73 | 1.09% |
| BufferZone Area | 632.10 | 0.79% |
| Amenity area | 0.00 | 0.00% |
| Common parking area | 0.00 | 0.00% |
These are the components and figures shown in the filed layout approval; the drawing-derived layout record separately identifies plotted area, roads, parks/open space, utilities and social infrastructure.
The layout drawing lists 9.14 mt. Wide InternalRoad, 18.00 mt. Wide InternalRoad, 10.06 MT WIDE EXISTING ROAD, 10.06 MT WIDE PROPOSED ROAD, 40 Feet Road, and 33 Feet Road. It also identifies a 632.10 sq.mt water-bodies buffer. No FSI, gross building area, saleable area or carpet area is applicable or provided for this plotted-layout approval.
4. Homes, configurations & floor plans
The RERA-filed project is a plotted development, and the supplied project records do not provide RERA-filed plot saleable areas, booked inventory or available inventory. The layout drawing’s schedule has 257 plots; the following size information is software-read from that drawing and should be checked against the approved drawing.
Plot count: 257
Smallest plot: 122.96 sq.m / 147.1 sq.yd
Median plot: 125.75 sq.m / 150.4 sq.yd
Largest plot: 330.25 sq.m / 395.0 sq.yd
100–150 sq.yd: 1
150–200 sq.yd: 177
200–250 sq.yd: 16
250–300 sq.yd: 45
300–400 sq.yd: 18
The layout’s most common printed sizes are 125.75 sq.m (135 plots), 247.15 sq.m (30 plots), 157.32 sq.m (18 plots), 310.30 sq.m (6 plots), and 153.31 sq.m (4 plots). These are software-measured drawing figures, not RERA-filed saleable areas. No apartment floor plans or unit carpet-area measurements are supplied.
5. Parking & vehicle circulation
The approved layout schedule records Common Parking Area: 0.00. No project-wide resident, visitor or accessible parking count, parking allocation arrangement, EV charging provision or dedicated parking facility is established in the supplied records.
The layout drawing shows internal and connecting road widths, including 9.14 mt., 18.00 mt., 10.06 MT, 40 Feet, and 33 Feet roads. The approval also requires roads to be opened for neighboring-site accessibility and prohibits a compound wall or fencing around the site under the stated tentative-layout conditions. These are approval conditions, not evidence that the roads or access works have been completed.
6. Amenities, recreation & open spaces
The RERA amenity record lists facilities as available in the project disclosure, but reports 0% progress for each listed item. This is a filed status, not independent confirmation of delivery.
| Facility | Green Strip / TOT LOT / Park |
|---|---|
| Description / size | Approved organized open space/park area: 7318.70 sq.mt; the layout approval also names “Tot-lot.” |
| Declared progress / verified status | RERA amenity record: 0%; completion not independently verified. |
| Facility | Community Buildings |
|---|---|
| Description / size | No size or capacity supplied. |
| Declared progress / verified status | RERA amenity record: 0%; completion not independently verified. |
| Facility | Social infrastructure |
|---|---|
| Description / size | 2070.36 sq.mt in the layout area schedule. |
| Declared progress / verified status | Approved allocation; development/completion not independently verified. |
The layout approval records 0.00 amenity area as a separate land-use line. No clubhouse or indoor facility, sports facility, or separately sized recreational facility is detailed in the supplied project documents.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, treatment and disposal of sewage and sullage, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each has 0% progress in that record.
The layout approval lists utility land of 868.73 sq.mt and requires the applicant to undertake works including drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. It also identifies a water reservoir, septic tank, sewage treatment plant, electric transformer and solid-waste management among the specified utilities. These are approval requirements or identified provisions, not proof of completed installations; capacities and operating details are not supplied.
No project-specific evidence supplied establishes water source or storage capacity, treatment capacity, reuse arrangements, backup power, fire systems, CCTV/access control, accessibility features, or completed safety infrastructure. The RERA amenity record does not show a completion percentage for fire protection and fire-safety requirements.
8. Location, access & connectivity
The project’s registered location is Mudireddypally, Rajapoor, Mahabubnagar, Telangana, 509301. The layout approval names MUDIREDDY PALLI VILLAGE and RAJAPUR VILLAGE and identifies Survey Nos. 584/P and 585/P.
The approved layout drawing identifies NH 44, a proposed site, a railway track and internal/connecting roads. These are drawing labels; the supplied material does not establish the project’s measured distance to NH 44, a railway station or other landmarks. The location record supplies a geocode at 16.6965686, 77.9591146 and a sampled nearest Outer Ring Road interchange distance of 77.6 km.
9. Developer & development status
The registered promoter is SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS. The supplied corporate record identifies the entity type as pvt_ltd and gives GSTIN 36ABHCS3190G1Z7. The RERA certificate lists Shathabdhi Properties Private Limited as promoter and gives its address as Village: Mandal: District: Hyderabad, Pin: 500034; the supplied project header separately lists the promoter address at CYBER HEIGHTS, ROAD NO 2, MUDIREDDYPALLI, Rajapoor, Mahabubnagar, 509301.
The Form B declaration states a project completion undertaking of 07/05/2026. The project header records a proposed completion date of 30/11/2026. No construction-progress percentage or independent site-progress verification is supplied, and no occupancy or completion certificate is provided.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SILVER OAK, registration P01400008501; stated validity 15/07/2024–07/05/2026.
Layout approval: Tentative layout plan approval 381392/LP/GP/204900/0002/2024, dated 07-05-2024, issued by MUDA Urban Development Authority; drawing file number TS/014003/2024. The record describes 257 plots in Survey Nos. 584/P and 585/P.
Title and encumbrance documents filed: Advocate’s title search report, document 449443; title-report materials and registered instruments filed with RERA; encumbrance statement 456377. These are included here as document-index entries, not as a substitute for the detailed Land & Title review.
Promoter declaration: Form B affidavit dated 01-06-2024, declaring project obligations and a completion undertaking.
Layout completion / final approval evidence: The supplied approval requires development works and a work-completion certificate for approval of the Final Layout Plan. No final layout approval or work-completion certificate is included in the supplied materials.
Building and occupancy records: No building approval, building commencement certificate, occupancy certificate or completion certificate is supplied for this plotted layout.
Frequently asked questions
Is SILVER OAK registered with Telangana RERA?
Yes. SILVER OAK is registered with the Telangana Real Estate Regulatory Authority as P01400008501; the registration status is New Project.
Who is the developer of SILVER OAK?
The promoter named in the RERA registration is SHATHABDHI PROPERTIES PRIVATE LIMITED AND OTHERS.
Where is SILVER OAK located?
SILVER OAK is in MUDIREDDYPALLI, Mudireddypally, Rajapoor, Mahabubnagar, Telangana (509301).
When will SILVER OAK be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Mudireddypally