SRI BALAJI TOWNSHIP is a plotted development in NEW MANDAL - KALWAKURTHY, Veldanda Mandal, Nagarkurnool District. The registered promoter developing it is SAMPATH INFRA PROJECTS LLP. The registered site extent is 90394.63 sqmts, and the offering is plots; the supplied RERA fields do not disclose a plot count or plot-size schedule, and buildings and floors are not disclosed. Its TG-RERA registration is P01600009014, and the promoter declared completion by 31st JULY, 2026.

01What we found

Period endedTG-RERA registration ran to 31 Jul 2026 - check its extension on TG-RERA
27documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSRI BALAJI TOWNSHIP RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase not specified; registration is for the project identified at Sy.Nos. 321/P and 330/P
TG-RERA registrationP01600009014
Registration validity31/07/2024 to 31/07/2026, unless extended by the Authority
Registered promoterSAMPATH INFRA PROJECTS LLP, an LLP RERA record Corporate record
RERA status in supplied recordNew Project; the certificate records registration for the period above. A later extension or current registration status is not supplied RERA record

Land and geographic identity

ItemProject record
LocalityNEW MANDAL - KALWAKURTHY RERA record RERA filing
Revenue villageTandra RERA record
MandalVeldanda RERA record
DistrictNagarkurnool RERA record
PIN509324 RERA record
Project survey numbersSY NOS 321/P AND 330/P RERA record RERA filing
Registered site extent90394.63 sqmts RERA filing
Net area90394.63 sqmts RERA filing
Boundaries, as filedEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

ItemProject record
Stated sanctioning authorityDTCP in the project record RERA filing
Principal approval identified in the project recordT.L.P. No. 123/2024/H; the supplied document is described as a draft technical layout pattern for residential plots Approvals record
Approval communication detailsDraft-TLP.No. 123/2024/H, communicated by the Director of Town and Country Planning on 31- 07-2024, for Sy.Nos. 321/P and 330/P at Tandra
Approved built-up areaNot disclosed as an applicable built-up figure for the plotted development RERA filing
Buildings / floorsBuilding count and floor configuration are not disclosed; the offering is a plotted layout RERA record
ParkingRERA-filed parking count or plot-wise parking allocation not supplied RERA amenities

Offering and status

ItemProject record
Offered productPlots in a proposed residential layout RERA filing
RERA-filed plot count and sizesPlot count and plot-size schedule are not set out in the supplied RERA project fields. The approved-drawing extraction identifies 333 plots; drawing-derived plot counts and sizes are detailed below Layout record
Booked / available countsNot supplied RERA filing
Completion deadlineThe registered promoter’s Form B declares completion by 31st JULY, 2026
Registration validity vs. completion dateRegistration certificate validity ends 31/07/2026, unless extended; the promoter’s declared completion date is also 31st JULY, 2026. These are separate record items
Construction stageRERA record indicates 80% completeness, but the supplied evidence does not establish whether this is independently verified or identify the specific works completed RERA record
Occupancy / completion certificateNo project-specific occupancy or completion certificate is supplied for this plotted layout Document index

2. The project story

SRI BALAJI TOWNSHIP is registered as a plotted development on SY NOS 321/P AND 330/P at Tandra, Veldanda Mandal, Nagarkurnool District. The registered site extent is 90394.63 sqmts. The filed project proposes plots rather than apartment blocks or villas. The promoter, SAMPATH INFRA PROJECTS LLP, declared a completion date of 31st JULY, 2026; the supplied RERA record gives a completeness figure of 80%, without a work-by-work description or independent site verification. RERA record RERA filing

The supplied layout-permission material describes a draft technical layout pattern for 333 plots, with roads, open space, social-infrastructure land, utilities and a mortgaged portion. The documents state that development works and handover requirements remain relevant to final layout release. No project-specific completion or occupancy certificate is included in the evidence provided. Document index

3. Master plan, architecture & building design

This is a plotted layout, so building counts, heights, floor configurations, flat arrangements and building-area figures are not applicable on the supplied record. The project’s RERA filing reports a total and net land area of 90394.63 sqmts; it does not provide a built-up area figure for this plotted development. RERA filing RERA filing

The supplied drawing-derived layout record describes 44 plots across a layout area of 12137.33 sq.m, with 6100.17 sq.m for plots, 4517.39 sq.m for roads, 1094.01 sq.m for parks/open space, 303.62 sq.m for social infrastructure, and 122.16 sq.m for utilities. This is software-read information from a drawing, not a substitute for a verified RERA plot schedule. Layout record

The project-specific draft layout material for Sy.Nos. 321/P and 330/P records a different drawing-derived layout configuration: 333 plots, an extent of Ac.22.337 Cents; 108111.08 Sq.Yds., and land-use allocations of Ac.13.167 Cents; 63,728.28 Sq.Yds. plotted area (58.95%), Ac.6.936 Cents; 33,570.24 Sq.Yds. roads (31.05%), and Ac.2.234 Cents; 10812.56 Sq.Yds. open space (10%). It also identifies Ac.2.00 Cents; 9680.00 Sq.Yds. as mortgage area on plotted land (15.18%). These figures describe the supplied draft-layout document and are not RERA-filed unit counts.

4. Homes, configurations & floor plans

The registered offering is plotted development. The supplied RERA fields do not include a plot-wise unit inventory, RERA-filed plot-size range, or booked/available counts. RERA filing

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosed in the supplied RERA fields; drawing extraction identifies 333Not suppliedNot suppliedNot suppliedNot applicableNot supplied

The approved-drawing extraction for the project layout identifies plots 33'-0" x 40'-0" in its sanctioned parameters, but no plot-by-plot schedule is supplied in the RERA filing excerpt. The separate software-read drawing data describes 44 plots, with sizes from 124.37 sq.m to 158.04 sq.m; it is drawing-derived and flagged for verification, not a RERA-filed saleable-area schedule. Layout record

Floor-plan data is not applicable to the plotted offering; the supplied drawing inventory records one layout sheet and no apartment floor plans. Floor plans

5. Parking & vehicle circulation

The supplied project records do not establish a count of parking spaces, parking allocation to individual plots, visitor parking, accessible parking, or any dedicated parking facility. The layout drawing extraction identifies 0 proposed parking spaces and 0.00 common parking area; this is a drawing-reported provision, not evidence of an individual plot entitlement.

The draft layout material describes proposed internal roads, including 33'-0" and 40'-0" roads and an existing road stated as 100'-0". The final road-access arrangement and delivered status are not established by the supplied evidence.

6. Amenities, recreation & open spaces

The RERA amenities record lists facilities but shows 0% progress for the entries; it does not establish completion. The draft-layout approval material also describes development and handover conditions for roads, open space, utilities and other works. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsListed as available: YES; no delivered-condition evidence suppliedRERA amenities0% shown; independently verified completion not supplied
Green strip / tot lot / parkListed as available: YES; project-specific draft layout allocates Ac.2.234 Cents; 10812.56 Sq.Yds. open space (10%)RERA amenities0% shown; independently verified completion not supplied
Social infrastructureDraft layout identifies Ac.0.075 cents; 363.13 Sq.Yds. in its area breakdownNo completion evidence supplied
Utility landDraft layout identifies Ac.0.03 cents; 146.103 Sq.Yds. in its area breakdownNo completion evidence supplied
Street lightingListed as available: YES; also included in draft-layout development conditionsRERA amenities0% shown; independently verified completion not supplied
Community buildingsListed in the amenities record; no facility or size specifiedRERA amenitiesProgress 0%; no completion evidence supplied

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage (chamber, lines, septic tank, STP), electrical meter room/sub-station/receiving station, and other infrastructure, but the supplied entries show 0% progress and do not give capacities or completion evidence. RERA amenities

The project-specific draft-layout conditions call for protected water supply, sewerage disposal, drains and nala channelization, storm-water drainage, rainwater-harvesting pits, street lighting and electricity facilities. The approval material also lists a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among the utility provisions. These are specified or required provisions in the supplied document, not confirmation that they are installed or operational.

No capacities, source or storage details for water; STP specifications or reuse figures; electrical supply or backup details; EV charging provisions; fire-system details; CCTV/access-control specifications; or accessibility arrangements are supplied. RERA amenities Document index

8. Location, access & connectivity

The registered location is Tandra, Veldanda Mandal, Nagarkurnool District, Telangana 509324, in locality NEW MANDAL - KALWAKURTHY. The registered site boundaries describe road frontage on the west, with other land on the east, north and south. RERA record RERA filing

The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 51.0 km. No other verified road, public-transport or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SAMPATH INFRA PROJECTS LLP, an LLP. The supplied promoter address is GROUND FLOOR, ESAMIA BAZAR, TANDRA, NEW MANDAL - KALWAKURTHY, Veldanda, Nagarkurnool, 509324. The registration certificate gives a Hyderabad address line for the promoter; no official project contact details or promoter website are supplied here. Corporate record Parties record

The authorized signatory recorded for the promoter is ASHWIN KUMAR KIMTEE; the listed partners are PRIYA DARSHINI KIMTEE and SHLOKE KIMTEE. Parties record

The promoter’s Form B affidavit dated 09th DAY OF OCT, 2024 declares a completion date of 31st JULY, 2026. The RERA record reports 80% completeness, but no independently verified site report or detailed progress schedule is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SRI BALAJI TOWNSHIP, registration P01600009014, valid 31/07/2024–31/07/2026 unless extended
Project layout documentDraft technical layout pattern T.L.P. No. 123/2024/H, for Sy.Nos. 321/P and 330/P, Tandra; the document states that final release/approval is subject to fulfilment of layout conditions
Layout approval communicationDirector of Town and Country Planning communication Draft-TLP.No. 123/2024/H, dated 31- 07-2024
Other layout-plan documentDrawing identified as Permit_Number TS/039015/2023, dated 05-06-2023; the supplied extraction identifies a plan for a proposed residential plots layout
Commencement / permission correspondenceFile reference 13144/360/2024/H-, application 13144/360; the supplied extraction does not state an approval decision or approved land particulars
Promoter declarationForm B by SAMPATH INFRA PROJECTS LLP, represented by Ashwin Kumar Kimtee, dated 09th DAY OF OCT, 2024
Completion / occupancy certificateNo project-specific certificate supplied in the reviewed documents Document index

The available evidence does not include a project-specific occupancy or completion certificate, a final layout-release certificate, or a verified document establishing the completion status of the listed infrastructure. Document index

Frequently asked questions

Is SRI BALAJI TOWNSHIP registered with Telangana RERA?

Yes. SRI BALAJI TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01600009014; the registration status is New Project.

Who is the developer of SRI BALAJI TOWNSHIP?

The promoter named in the RERA registration is SAMPATH INFRA PROJECTS LLP.

Where is SRI BALAJI TOWNSHIP located?

SRI BALAJI TOWNSHIP is in NEW MANDAL - KALWAKURTHY, Tandra, Veldanda, Nagarkurnool, Telangana (509324).

When will SRI BALAJI TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 31/07/2026. This is the promoter's declaration, not a guarantee.