Sri Lakshmi Venkateswara Colony
PARUMALA RAJU AND PARUMALA SRIVANI · Jogulamba Gadwal · RERA P01700007898
SRI LAKSHMI VENKATESWARA COLONY is a plotted development / layout with open plots in DOUDARPALLY, Gadwal Mandal, Jogulamba Gadwal District. The registered promoter is PARUMALA RAJU AND PARUMALA SRIVANI. The project has a land area of 7989.19 sq.m and provides 33 open plots, with plot areas ranging from 111.39–186.55 sq.m (133.2–223.1 sq.yd). It is registered under TG-RERA registration number P01700007898, and the promoter’s Form B undertaking states completion by 29th January, 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SRI LAKSHMI VENKATESWARA COLONY RERA record |
| Project type | Plotted development / layout with open plots RERA record |
| Phase or registered portion | A single registered plotted-layout project is identified; no separate phase is specified. RERA record |
| TG-RERA registration | P01700007898 RERA record |
| Registration validity | Form C states validity commencing 17/03/2024 and ending 29/01/2026, unless extended by the Authority. This is the registration period, distinct from the completion undertaking. |
| Registered promoter | PARUMALA RAJU AND PARUMALA SRIVANI RERA record |
| RERA project status | “New Project” in the project record; registration certificate is on file. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | DOUDARPALLY; the layout approval identifies DOUDARPALLY Revenue Village. RERA record |
| Mandal | Gadwal RERA record |
| District | Jogulamba Gadwal RERA record |
| PIN | 509125 RERA record |
| Project survey number | 1028/PART in the RERA project record; the tentative layout approval specifies 1028/PARTS. RERA record Land records |
| Extent in RERA land record | Total and net area: 7989.19 sq.m; recorded affected area: 0 sq.m. Land records |
| Extent in approved layout drawing | Net layout area: 7988.80 sq.m. |
| Boundaries in RERA land record | East: EXISTING 18M WIDE ROAD; west, north and south: NEIGHBOURS LAND. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Tentative layout approval issued by GADWAL Municipality/Municipal Corporation. The RERA record identifies the project authority as DTCP. RERA record |
| Principal layout approval | 0018/LO/3059/2024, dated 29 January, 2024; application 012664/LO/DTCP/3059/0024/2022. Approvals record |
| Drawing / permit identifier | TS/001420/2023, dated 05-01-2023; file no. G1/TP/06/1049/2020-21. Approvals record |
| Approved development | Tentative layout of 33 plots. The approval drawing records 0.00 proposed built-up area, including and excluding parking, and 0 proposed parking. |
| Buildings, floors and parking levels | Not disclosed as applicable to the approved plotted-layout proposal; no building count, floor configuration or parking levels are evidenced. |
| Authority-mortgaged plots | Layout approval records Plots 17, 16, 15, 14, 13 and 12 as mortgaged for development obligations. |
Offering and status
| Field | Project record |
|---|---|
| Offering | 33 open plots in the approved layout. |
| Plot-size range | Software-measured from the approved drawing: 111.39–186.55 sq.m (133.2–223.1 sq.yd); 30 plots fall in the 100–150 sq.yd band and 3 in the 200–250 sq.yd band. These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record |
| Booked / available plots | Counts are not provided in the supplied record. RERA record |
| Construction stage | The supplied RERA amenity entries show 0% progress; no independent site-progress verification is supplied. RERA amenities |
| Completion date | Promoter’s Form B undertaking states completion by 29th January, 2026. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval is tentative. |
2. The project story
SRI LAKSHMI VENKATESWARA COLONY is registered as a plotted development at DOUDARPALLY Revenue Village, Gadwal Mandal, Jogulamba Gadwal District. Its filed identity is survey number 1028/PART; the tentative layout approval describes the land as 1028/PARTS. The RERA record identifies the project as a new project, and the layout approval provides for 33 open plots. RERA record Land records
The approved layout drawing allocates land to plots, internal roads, a park/open space, social infrastructure and utilities. The approval also lists infrastructure and amenity works to be undertaken by the layout applicant. The RERA amenity record reports 0% progress for its listed items; that is a filed progress figure, not an independent site inspection. The promoter’s declared completion date is 29 January 2026. RERA amenities
3. Master plan, architecture & building design
This is an open-plot layout rather than a multi-storey building project. The approved drawing gives a net layout area of 7988.80 sq.m and identifies Plot Nos. 1 to 33. Its land-use statement is: plotted area 3970.78 sq.m (49.70%), road area 2981.37 sq.m (37.32%), organized open space/park area 741.34 sq.m (9.28%), social infrastructure 205.57 sq.m (2.57%) and utility area 89.74 sq.m (1.12%). Amenity area, common parking area, buffer-zone area and green-belt area are each shown as 0.00 in the drawing’s land-use statement.
The layout drawing lists existing and proposed roads of 18.00 MT width, as well as an 18 M WIDE ROAD and a 9 M WIDE ROAD. It also lists a Tot-lot, social infrastructure and low-tension electricity lines. The tentative approval requires the applicant to carry out infrastructure and amenity works and states that roads are to remain open for access to neighbouring sites.
The tentative approval lists a water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, solid waste management, overhead tank, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights, avenue plantation and rainwater-harvesting pits. These are approval-document provisions, not evidence that the works are complete. The proposal records 0.00 built-up area and does not provide building or floor plans for homes.
4. Homes, configurations & floor plans
The project offers open plots, not apartments. The approved layout schedule identifies 33 plots. Software-measured plot areas from the drawing range from 111.39 sq.m (133.2 sq.yd) to 186.55 sq.m (223.1 sq.yd); the median is 111.39 sq.m (133.2 sq.yd). Thirty plots are in the 100–150 sq.yd size band and three are in the 200–250 sq.yd band. The drawing-derived schedule indicates that 20 plots are 111.39 sq.m. These measurements are software-derived from the drawing and should be checked against the original plan. Layout record
| Plot information | Supplied figure |
|---|---|
| Total plots | 33 |
| Software-measured area range | 111.39–186.55 sq.m Layout record |
| Software-measured area range | 133.2–223.1 sq.yd Layout record |
| Plots in 100–150 sq.yd band | 30 Layout record |
| Plots in 200–250 sq.yd band | 3 Layout record |
| Booked / available counts | Not supplied RERA record |
| RERA-filed plot saleable areas | Not supplied in the provided record RERA record |
The floor-plan record contains two layout sheets and no flat plans; apartment carpet-area measurements therefore do not apply. Plot area in the drawing is not an apartment carpet or saleable-area figure. Floor plans Layout record
5. Parking & vehicle circulation
The approved layout drawing records 0 proposed parkings and 0.00 common parking area. No resident, visitor, accessible or unit-allocated parking spaces, parking levels, vehicle ramps, EV charging provision or parking-allotment terms are established by the supplied record. The layout drawing’s roads are identified separately from parking provision.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | No clubhouse or indoor facility is identified in the supplied evidence. | RERA amenities | Not stated. |
| Sports / recreation | Organized open space/park: 741.34 sq.m (9.28%); Tot-lot is listed in the layout drawing. | RERA amenity record reports 0% progress; independent completion verification not supplied. RERA amenities | |
| Landscape / open space | Avenue plantation is listed in the tentative layout approval. | Listed as an approval-document provision; completion is not verified. | |
| Convenience / community | Social infrastructure site: 205.57 sq.m (2.57%). | RERA amenity record lists community buildings at 0%; independent completion verification not supplied. RERA amenities | |
| Utilities land | Utility area: 89.74 sq.m (1.12%). | Land reservation shown in the drawing; facility completion not verified. |
The layout land-use statement shows 0.00 for amenity area, separately from its park/open-space, social-infrastructure and utility allocations.
7. Utilities, building services & safety
The tentative layout approval lists the following proposed infrastructure: water reservoir, overhead tank and internal water-supply pipelines; septic tank, Sewerage Treatment Plant and underground drainage lines; storm-water drains and rainwater-harvesting pits; electric transformer, low-tension electricity lines and street lights; and solid-waste management. It also lists avenue plantation. These are documented provisions for the layout; the supplied records do not establish installed capacities or independent completion.
The RERA amenity record reports 0% progress for its listed water, sewerage, storm-water, lighting, waste-management and rainwater-harvesting items. No capacities, water source, power-backup arrangement, fire-system detail, CCTV/security system or accessibility specification is supplied. RERA amenities
8. Location, access & connectivity
The registered location is Doudarpally, Gadwal, Jogulamba Gadwal, 509125, in Gadwal Mandal, Jogulamba Gadwal District. The project’s RERA land record identifies EXISTING 18M WIDE ROAD on the eastern boundary. The approved layout drawing also identifies existing and proposed road widths of 18.00 MT and 9 M. RERA record Land records
The location record supplies one sampled distance: the nearest sampled Outer Ring Road interchange is approximately 131.1 km away. No public-transport route, additional measured landmark distances or verified travel times are supplied. Location record
9. Developer & development status
The registered promoter is PARUMALA RAJU AND PARUMALA SRIVANI. The RERA record describes the organization type as “Others” and the description as “Partners”; the precise legal-entity form is not established in the supplied record. The registration certificate gives the promoters’ address at village/mandal Gadwal, district Jogulamba Gadwal, PIN 509125; a fuller promoter address in the project record is Ram Nagar, DOUDARPALLY, Gadwal, Jogulamba Gadwal, 509125. RERA record RERA filing Parties record
The RERA Form B affidavit, dated 15th February, 2024, is signed by Parumala Raju on behalf of the named promoters and undertakes completion by 29th January, 2026. The supplied progress record shows 0% for its listed amenities, but provides no independently verified construction-stage assessment. No official promoter website or contact details are supplied. RERA amenities Promoter website
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P01700007898 | Form C identifies the project and promoter and states registration validity commencing 17/03/2024 and ending 29/01/2026 unless extended. |
| Tentative layout approval, 0018/LO/3059/2024 | Issued by Gadwal Municipality/Municipal Corporation, dated 29 January 2024; covers a tentative layout of 33 plots in 1028/PARTS, Doudarpally Revenue Village. |
| Drawing / permit record, TS/001420/2023 | Approved-layout drawing dated 05-01-2023, with file no. G1/TP/06/1049/2020-21 and a schedule of 33 plots and layout land uses. |
| Application reference | 012664/LO/DTCP/3059/0024/2022 appears in the tentative layout approval. |
| Form B promoter declaration | Form B affidavit dated 15 February 2024 identifies the promoters, records their declarations and gives a completion undertaking of 29 January 2026. |
| Completion / occupancy certificate | None supplied. Document index |
The approval document describes the layout approval as tentative and records development conditions. The supplied document index does not include a completion or occupancy certificate. Document index
1. Project at a glance
Project identity
Registered project name: SRI LAKSHMI VENKATESWARA COLONY
Project type: Plotted development / layout with open plots
Phase or registered portion: A single registered plotted-layout project is identified; no separate phase is specified.
TG-RERA registration: P01700007898
Registration validity: Form C states validity commencing 17/03/2024 and ending 29/01/2026, unless extended by the Authority. This is the registration period, distinct from the completion undertaking.
Registered promoter: PARUMALA RAJU AND PARUMALA SRIVANI
RERA project status: “New Project” in the project record; registration certificate is on file.
Land and geographic identity
Locality / revenue village: DOUDARPALLY; the layout approval identifies DOUDARPALLY Revenue Village.
Mandal: Gadwal
District: Jogulamba Gadwal
PIN: 509125
Project survey number: 1028/PART in the RERA project record; the tentative layout approval specifies 1028/PARTS.
Extent in RERA land record: Total and net area: 7989.19 sq.m; recorded affected area: 0 sq.m.
Extent in approved layout drawing: Net layout area: 7988.80 sq.m.
Boundaries in RERA land record: East: EXISTING 18M WIDE ROAD; west, north and south: NEIGHBOURS LAND.
Development identity
Sanctioning authority: Tentative layout approval issued by GADWAL Municipality/Municipal Corporation. The RERA record identifies the project authority as DTCP.
Principal layout approval: 0018/LO/3059/2024, dated 29 January, 2024; application 012664/LO/DTCP/3059/0024/2022.
Drawing / permit identifier: TS/001420/2023, dated 05-01-2023; file no. G1/TP/06/1049/2020-21.
Approved development: Tentative layout of 33 plots. The approval drawing records 0.00 proposed built-up area, including and excluding parking, and 0 proposed parking.
Buildings, floors and parking levels: Not disclosed as applicable to the approved plotted-layout proposal; no building count, floor configuration or parking levels are evidenced.
Authority-mortgaged plots: Layout approval records Plots 17, 16, 15, 14, 13 and 12 as mortgaged for development obligations.
Offering and status
Offering: 33 open plots in the approved layout.
Plot-size range: Software-measured from the approved drawing: 111.39–186.55 sq.m (133.2–223.1 sq.yd); 30 plots fall in the 100–150 sq.yd band and 3 in the 200–250 sq.yd band. These are drawing-derived measurements, not RERA-filed saleable-area figures.
Booked / available plots: Counts are not provided in the supplied record.
Construction stage: The supplied RERA amenity entries show 0% progress; no independent site-progress verification is supplied.
Completion date: Promoter’s Form B undertaking states completion by 29th January, 2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied approval is tentative.
2. The project story
SRI LAKSHMI VENKATESWARA COLONY is registered as a plotted development at DOUDARPALLY Revenue Village, Gadwal Mandal, Jogulamba Gadwal District. Its filed identity is survey number 1028/PART; the tentative layout approval describes the land as 1028/PARTS. The RERA record identifies the project as a new project, and the layout approval provides for 33 open plots.
The approved layout drawing allocates land to plots, internal roads, a park/open space, social infrastructure and utilities. The approval also lists infrastructure and amenity works to be undertaken by the layout applicant. The RERA amenity record reports 0% progress for its listed items; that is a filed progress figure, not an independent site inspection. The promoter’s declared completion date is 29 January 2026.
3. Master plan, architecture & building design
This is an open-plot layout rather than a multi-storey building project. The approved drawing gives a net layout area of 7988.80 sq.m and identifies Plot Nos. 1 to 33. Its land-use statement is: plotted area 3970.78 sq.m (49.70%), road area 2981.37 sq.m (37.32%), organized open space/park area 741.34 sq.m (9.28%), social infrastructure 205.57 sq.m (2.57%) and utility area 89.74 sq.m (1.12%). Amenity area, common parking area, buffer-zone area and green-belt area are each shown as 0.00 in the drawing’s land-use statement.
The layout drawing lists existing and proposed roads of 18.00 MT width, as well as an 18 M WIDE ROAD and a 9 M WIDE ROAD. It also lists a Tot-lot, social infrastructure and low-tension electricity lines. The tentative approval requires the applicant to carry out infrastructure and amenity works and states that roads are to remain open for access to neighbouring sites.
The tentative approval lists a water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, solid waste management, overhead tank, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights, avenue plantation and rainwater-harvesting pits. These are approval-document provisions, not evidence that the works are complete. The proposal records 0.00 built-up area and does not provide building or floor plans for homes.
4. Homes, configurations & floor plans
The project offers open plots, not apartments. The approved layout schedule identifies 33 plots. Software-measured plot areas from the drawing range from 111.39 sq.m (133.2 sq.yd) to 186.55 sq.m (223.1 sq.yd); the median is 111.39 sq.m (133.2 sq.yd). Thirty plots are in the 100–150 sq.yd size band and three are in the 200–250 sq.yd band. The drawing-derived schedule indicates that 20 plots are 111.39 sq.m. These measurements are software-derived from the drawing and should be checked against the original plan.
Total plots: 33
Software-measured area range: 111.39–186.55 sq.m
Software-measured area range: 133.2–223.1 sq.yd
Plots in 100–150 sq.yd band: 30
Plots in 200–250 sq.yd band: 3
Booked / available counts: Not supplied
RERA-filed plot saleable areas: Not supplied in the provided record
The floor-plan record contains two layout sheets and no flat plans; apartment carpet-area measurements therefore do not apply. Plot area in the drawing is not an apartment carpet or saleable-area figure.
5. Parking & vehicle circulation
The approved layout drawing records 0 proposed parkings and 0.00 common parking area. No resident, visitor, accessible or unit-allocated parking spaces, parking levels, vehicle ramps, EV charging provision or parking-allotment terms are established by the supplied record. The layout drawing’s roads are identified separately from parking provision.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | No clubhouse or indoor facility is identified in the supplied evidence. | Not stated. | |
| Sports / recreation | Organized open space/park: 741.34 sq.m (9.28%); Tot-lot is listed in the layout drawing. | RERA amenity record reports 0% progress; independent completion verification not supplied. | |
| Landscape / open space | Avenue plantation is listed in the tentative layout approval. | Listed as an approval-document provision; completion is not verified. | |
| Convenience / community | Social infrastructure site: 205.57 sq.m (2.57%). | RERA amenity record lists community buildings at 0%; independent completion verification not supplied. | |
| Utilities land | Utility area: 89.74 sq.m (1.12%). | Land reservation shown in the drawing; facility completion not verified. |
The layout land-use statement shows 0.00 for amenity area, separately from its park/open-space, social-infrastructure and utility allocations.
7. Utilities, building services & safety
The tentative layout approval lists the following proposed infrastructure: water reservoir, overhead tank and internal water-supply pipelines; septic tank, Sewerage Treatment Plant and underground drainage lines; storm-water drains and rainwater-harvesting pits; electric transformer, low-tension electricity lines and street lights; and solid-waste management. It also lists avenue plantation. These are documented provisions for the layout; the supplied records do not establish installed capacities or independent completion.
The RERA amenity record reports 0% progress for its listed water, sewerage, storm-water, lighting, waste-management and rainwater-harvesting items. No capacities, water source, power-backup arrangement, fire-system detail, CCTV/security system or accessibility specification is supplied.
8. Location, access & connectivity
The registered location is Doudarpally, Gadwal, Jogulamba Gadwal, 509125, in Gadwal Mandal, Jogulamba Gadwal District. The project’s RERA land record identifies EXISTING 18M WIDE ROAD on the eastern boundary. The approved layout drawing also identifies existing and proposed road widths of 18.00 MT and 9 M.
The location record supplies one sampled distance: the nearest sampled Outer Ring Road interchange is approximately 131.1 km away. No public-transport route, additional measured landmark distances or verified travel times are supplied.
9. Developer & development status
The registered promoter is PARUMALA RAJU AND PARUMALA SRIVANI. The RERA record describes the organization type as “Others” and the description as “Partners”; the precise legal-entity form is not established in the supplied record. The registration certificate gives the promoters’ address at village/mandal Gadwal, district Jogulamba Gadwal, PIN 509125; a fuller promoter address in the project record is Ram Nagar, DOUDARPALLY, Gadwal, Jogulamba Gadwal, 509125.
The RERA Form B affidavit, dated 15th February, 2024, is signed by Parumala Raju on behalf of the named promoters and undertakes completion by 29th January, 2026. The supplied progress record shows 0% for its listed amenities, but provides no independently verified construction-stage assessment. No official promoter website or contact details are supplied.
10. Approvals, official records & documents
TG-RERA registration certificate, P01700007898: Form C identifies the project and promoter and states registration validity commencing 17/03/2024 and ending 29/01/2026 unless extended.
Tentative layout approval, 0018/LO/3059/2024: Issued by Gadwal Municipality/Municipal Corporation, dated 29 January 2024; covers a tentative layout of 33 plots in 1028/PARTS, Doudarpally Revenue Village.
Drawing / permit record, TS/001420/2023: Approved-layout drawing dated 05-01-2023, with file no. G1/TP/06/1049/2020-21 and a schedule of 33 plots and layout land uses.
Application reference: 012664/LO/DTCP/3059/0024/2022 appears in the tentative layout approval.
Form B promoter declaration: Form B affidavit dated 15 February 2024 identifies the promoters, records their declarations and gives a completion undertaking of 29 January 2026.
Completion / occupancy certificate: None supplied.
The approval document describes the layout approval as tentative and records development conditions. The supplied document index does not include a completion or occupancy certificate.
Frequently asked questions
Is SRI LAKSHMI VENKATESWARA COLONY registered with Telangana RERA?
Yes. SRI LAKSHMI VENKATESWARA COLONY is registered with the Telangana Real Estate Regulatory Authority as P01700007898; the registration status is New Project.
Who is the developer of SRI LAKSHMI VENKATESWARA COLONY?
The promoter named in the RERA registration is PARUMALA RAJU AND PARUMALA SRIVANI.
Where is SRI LAKSHMI VENKATESWARA COLONY located?
SRI LAKSHMI VENKATESWARA COLONY is in DOUDARPALLY, Gadwal, Jogulamba Gadwal, Telangana (509125).
When will SRI LAKSHMI VENKATESWARA COLONY be completed?
The promoter's proposed date of completion filed with RERA is 29/01/2026. This is the promoter's declaration, not a guarantee.