Sri Laxmi Narasimha Swamy Developers
NANDIKONDA BALPEER AND OTHERS · Wanaparthy · RERA P01500008489
SRI LAXMI NARASIMHA SWAMY DEVELOPERS is a new plotted development in Wanaparthy, Wanaparthy Mandal, Wanaparthy District. The registered promoter is NANDIKONDA BALPEER AND OTHERS. The layout covers 15089.35 sq.m. and contains 58 plots, with plot sizes ranging from 73.1 sq.m. to 238.09 sq.m.; no towers or floors are disclosed. It is registered under TG-RERA number P01500008489, with a proposed completion date of 14/08/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI LAXMI NARASIMHA SWAMY DEVELOPERS RERA record |
| Project type / registered portion | New plotted development; the registered project covers the layout described below RERA record |
| TG-RERA registration | P01500008489 |
| Registration validity | 15/07/2024–14/08/2025; the supplied certificate states a one-year period. No extension is recorded in the supplied registration-certificate data. |
| Registered promoter | NANDIKONDA BALPEER AND OTHERS RERA record |
| RERA status | The project is recorded as a New Project. The registration validity dates are distinct from the completion date stated below. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / address | Wanaparthy; the filed layout drawing identifies CHITYAL ROAD, WANAPARTHY TOWN. RERA record |
| Revenue village | WANAPARTHY Revenue Village is stated in the tentative-layout approval and RERA certificate. |
| Mandal / district / PIN | Wanaparthy / Wanaparthy / 509103 RERA record |
| Project survey numbers | 311C/1, 311B2 (also printed as 311B2 in the approval records) RERA record |
| Registered site extent | 15089.35 sq.m. RERA filing |
| Net / total area | The filed layout drawing gives both Net Area of Plot: 15089.35 sq.mt. and Total Layout Area: 15089.35 sq.mt. |
| Boundaries | East, west, north and south are each recorded as OTHERS LAND. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Wanapartrhy Municipality/Municipal Corporation is named on the tentative-layout approval. The RERA record lists DTCP as the authority name. RERA filing |
| Principal layout approval | Tentative Layout Plan 0025/LO/3067/2023, approved 28 August, 2023, for 58 plots. |
| Other filed layout reference | Drawing reference TS/062159/2022, dated 04-10-2022. |
| Approved built-up area | 7903.91 sq.m. is recorded in the RERA built-up-area field; the layout drawing labels the same figure as plotted area. RERA filing |
| Buildings / floors | Not applicable to the supplied plotted-layout record; no building or floor configuration is disclosed. |
| Parking | The layout drawing records Proposed number of parkings: 0 and Common Parking Area: 0.00. |
| Plot count | 58 plots in the Wanaparthy tentative layout approval and drawing. |
Offering and status
| Field | Record |
|---|---|
| Offered unit type | Open plots; the filed layout plan identifies a plotted layout. |
| Plot sizes / availability | The drawing-derived schedule contains 58 plots; software-read plot sizes range from 73.1 sq.m. to 238.09 sq.m. Booked and available counts are not supplied. Layout record |
| Construction stage | The project header labels it New Project. No independently verified on-site progress is supplied. RERA record |
| Completion date | The RERA project record gives 14/08/2025 as the proposed completion date. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project records; no building phase or tower scope is disclosed. Document index Approvals record |
2. The project story
This is a plotted layout registered with TG-RERA as P01500008489, at Wanaparthy in Wanaparthy Mandal and District, Telangana. The registered survey references are 311C/1 and 311B2. The approval record describes a tentative residential layout of 58 plots on Chityal Road, Wanaparthy Town.
The layout drawing allocates land to plots, roads, park/open space, social infrastructure, utilities and a buffer zone. The supplied records do not establish the current construction or infrastructure-completion stage through an independent site inspection. Although a vendor description calls the development completed, that is a vendor claim rather than verified progress; this overview therefore does not treat the layout as completed. RERA amenities Promoter website
The RERA record states a proposed completion date of 14/08/2025. That date is separate from the registration validity period, which ended on 14/08/2025 according to the supplied certificate; the evidence provided here does not record an extension or completion certification. RERA record
3. Master plan, architecture & building design
The registered project is a land layout rather than a building scheme. Its filed drawing states a total and net layout area of 15089.35 sq.m. and shows 58 plots. It does not disclose towers, building footprints, floors, lifts or apartment arrangements.
The drawing’s land-use schedule is:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 7903.91 sq.m. | 52.38% |
| Roads | 5011.89 sq.m. | 33.21% |
| Organized open space / park | 1463.39 sq.m. | 9.70% |
| Social infrastructure | 472.26 sq.m. | 3.13% |
| Utility area | 156.97 sq.m. | 1.04% |
| Buffer-zone area | 80.57 sq.m. | 0.53% |
| Amenity area | 0.00 sq.m. | 0.00% |
| Common parking area | 0.00 sq.m. | 0.00% |
These are values transcribed from the filed layout drawing; they are not a separate site measurement. The drawing also notes 9 M WIDE ROAD, 18.00 MT WIDE EXISTING ROAD, 18.00 MT WIDE PROPOSED ROAD, 60'-0" WIDE ROAD, 40'-0" ROAD and 100'-0" R&B ROAD. The supplied material does not establish which of these labels applies to each individual road segment.
A mortgage area of 1292.14 sq.m. is recorded in the RERA built-up-area details and layout drawing. The layout approval identifies plots reserved under mortgage to the approving authority; this overview does not treat that area as freely available plot inventory. RERA filing
4. Homes, configurations & floor plans
This is a plotted development, so the RERA offering is plots rather than apartment configurations. The approved layout schedule contains 58 plots. A software-read schedule from the drawing reports 58 plot sizes, from 73.1 sq.m. (87.4 sq.yd.) to 238.09 sq.m. (284.8 sq.yd.); the median is 133.58 sq.m. (159.8 sq.yd.). These are drawing-derived measurements, not RERA-filed apartment saleable or carpet areas. Layout record
| Plot size band | Number of plots |
|---|---|
| 0–100 sq.yd. (0–84 sq.m.) | 2 |
| 100–150 sq.yd. (84–125 sq.m.) | 24 |
| 150–200 sq.yd. (125–167 sq.m.) | 26 |
| 200–250 sq.yd. (167–209 sq.m.) | 3 |
| 250–300 sq.yd. (209–251 sq.m.) | 3 |
The layout drawing’s text-and-schedule extraction is software-read and should be checked against the original drawing. Booked and available plot counts are not supplied. No apartment floor plans or carpet-area measurements are available for this project. Layout record Floor plans
5. Parking & vehicle circulation
The filed layout drawing records 0 proposed parking spaces and 0.00 common parking area. No separate resident or visitor parking allocation, accessible parking, mechanical parking, EV charging, or plot-specific parking entitlement is documented in the supplied evidence.
Roads are included in the layout plan, with several road-width labels shown on the drawing. The available record does not establish individual driveway, ramp, pedestrian-separation or plot-allocation arrangements beyond those plan labels.
6. Amenities, recreation & open spaces
The layout drawing identifies park/open space, social infrastructure and utility land. The tentative-layout approval also lists development works and infrastructure to be carried out by the layout applicant; the records do not independently verify that these works have been completed. The amenity progress fields supplied by RERA show 0% where a percentage is recorded. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1463.39 sq.m.; drawing labels this as 9.70% of layout area | Listed in layout; completion not independently verified. RERA amenity progress: 0% where recorded. | |
| Social infrastructure | 472.26 sq.m. | Reserved land shown; facility delivery/status not verified. | |
| Utility area | 156.97 sq.m. | Reserved land shown; utility installation/status not verified. | |
| Tot-lot / green strip / park | Listed in the approval drawing and RERA amenity fields | RERA amenities | Listed; completion not independently verified. |
| Community buildings | Listed in RERA amenity fields; no size or building details supplied | RERA amenities | Progress field records 0%; completion not verified. |
Vendor-listed facilities such as CCTV, power backup and a sewage treatment plant are not treated here as sanctioned or delivered amenities because the supplied project records do not verify their project-specific status. Promoter website
7. Utilities, building services & safety
The tentative-layout approval specifies proposed layout-development works including road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions or required development works, not evidence that the facilities have been installed or are operational.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. No capacities, detailed engineering designs, clearance documents or verified completion records for these services are supplied. RERA amenities
The approval drawing refers to a 2.0 MTS BUFFER and a buffer-zone area of 80.57 sq.mt. No project-specific evidence supplied here establishes a fire-safety clearance, waste-management operating arrangement, accessibility features, or completed security systems.
8. Location, access & connectivity
The project is recorded at Wanaparthy, Wanaparthy Mandal, Wanaparthy District, PIN 509103; the approved layout drawing places it at Chityal Road, Wanaparthy Town. The supplied cadastral centroid is 16.37548, 78.06820. RERA record Location record
The location data identifies the nearest sampled Outer Ring Road interchange at approximately 102.5 km. No additional measured distances to public transport, schools, airports, or other landmarks are supplied. A vendor statement describes access to public amenities and transport, but does not give verifiable routes, distances or travel times. Location record Promoter website
9. Developer & development status
The registered promoter is NANDIKONDA BALPEER AND OTHERS. The supplied RERA record gives the organization type as Others and does not identify a more specific legal entity type. The RERA registration certificate lists the promoter office location as Wanaparthy, Wanaparthy District, PIN 509103; a full registered-office address, official contact details and official website are not supplied in the project record. RERA record Corporate record
The tentative-layout approval names Sri Nandikonda Balpeer and Smt. Veerabomma Saritha as applicants and identifies the promoter’s responsibility for layout development works. The RERA project record states a proposed completion date of 14/08/2025. No independently verified construction-progress assessment, updated completion schedule, or occupancy/completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM ‘C’ certificate for project P01500008489, issued 15/07/2024, valid through 14/08/2025; certificate names SRI LAXMI NARASIMHA SWAMY DEVELOPERS and registered promoter NANDIKONDA BALPEER AND OTHERS. |
| Tentative layout approval | Wanapartrhy Municipality/Municipal Corporation approval for Tentative LP No. 0025/LO/3067/2023, dated 28 August, 2023, concerning Sy. Nos. 311C/1 and 311B2 and 58 plots. |
| Layout plan | Plan reference TS/062159/2022, dated 04-10-2022, showing the open-plots layout, land-use schedule, road labels and mortgage area. |
| Form B declarations | Promoter declarations filed on 16 2gthdayof MAY 2024 and 3 SEP 2024, including completion undertakings of 14.08.2025 and 06-04-2025, respectively. |
| Other layout-related records | Draft Technical Layout Pattern Draft-TLP.No.104/2022/W concerns a separate proposed layout at Nellutla, Jangaon District, for 118 plots; the supplied records do not identify it as part of the Wanaparthy project. |
| Occupancy / completion certificate | No project occupancy or completion certificate is identified in the supplied records. Document index |
The supplied records do not include a project-specific certificate of completed layout works or an independently verified site-status report. The approval and declaration conditions are summarized here as filed; the detailed approval conditions and title implications are addressed in the relevant report sections.
1. Project at a glance
Project identity
Registered project name: SRI LAXMI NARASIMHA SWAMY DEVELOPERS
Project type / registered portion: New plotted development; the registered project covers the layout described below
TG-RERA registration: P01500008489
Registration validity: 15/07/2024–14/08/2025; the supplied certificate states a one-year period. No extension is recorded in the supplied registration-certificate data.
Registered promoter: NANDIKONDA BALPEER AND OTHERS
RERA status: The project is recorded as a New Project. The registration validity dates are distinct from the completion date stated below.
Land and geographic identity
Locality / address: Wanaparthy; the filed layout drawing identifies CHITYAL ROAD, WANAPARTHY TOWN.
Revenue village: WANAPARTHY Revenue Village is stated in the tentative-layout approval and RERA certificate.
Mandal / district / PIN: Wanaparthy / Wanaparthy / 509103
Project survey numbers: 311C/1, 311B2 (also printed as 311B2 in the approval records)
Registered site extent: 15089.35 sq.m.
Net / total area: The filed layout drawing gives both Net Area of Plot: 15089.35 sq.mt. and Total Layout Area: 15089.35 sq.mt.
Boundaries: East, west, north and south are each recorded as OTHERS LAND.
Development identity
Sanctioning authority: Wanapartrhy Municipality/Municipal Corporation is named on the tentative-layout approval. The RERA record lists DTCP as the authority name.
Principal layout approval: Tentative Layout Plan 0025/LO/3067/2023, approved 28 August, 2023, for 58 plots.
Other filed layout reference: Drawing reference TS/062159/2022, dated 04-10-2022.
Approved built-up area: 7903.91 sq.m. is recorded in the RERA built-up-area field; the layout drawing labels the same figure as plotted area.
Buildings / floors: Not applicable to the supplied plotted-layout record; no building or floor configuration is disclosed.
Parking: The layout drawing records Proposed number of parkings: 0 and Common Parking Area: 0.00.
Plot count: 58 plots in the Wanaparthy tentative layout approval and drawing.
Offering and status
Offered unit type: Open plots; the filed layout plan identifies a plotted layout.
Plot sizes / availability: The drawing-derived schedule contains 58 plots; software-read plot sizes range from 73.1 sq.m. to 238.09 sq.m. Booked and available counts are not supplied.
Construction stage: The project header labels it New Project. No independently verified on-site progress is supplied.
Completion date: The RERA project record gives 14/08/2025 as the proposed completion date.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project records; no building phase or tower scope is disclosed.
2. The project story
This is a plotted layout registered with TG-RERA as P01500008489, at Wanaparthy in Wanaparthy Mandal and District, Telangana. The registered survey references are 311C/1 and 311B2. The approval record describes a tentative residential layout of 58 plots on Chityal Road, Wanaparthy Town.
The layout drawing allocates land to plots, roads, park/open space, social infrastructure, utilities and a buffer zone. The supplied records do not establish the current construction or infrastructure-completion stage through an independent site inspection. Although a vendor description calls the development completed, that is a vendor claim rather than verified progress; this overview therefore does not treat the layout as completed.
The RERA record states a proposed completion date of 14/08/2025. That date is separate from the registration validity period, which ended on 14/08/2025 according to the supplied certificate; the evidence provided here does not record an extension or completion certification.
3. Master plan, architecture & building design
The registered project is a land layout rather than a building scheme. Its filed drawing states a total and net layout area of 15089.35 sq.m. and shows 58 plots. It does not disclose towers, building footprints, floors, lifts or apartment arrangements.
The drawing’s land-use schedule is:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 7903.91 sq.m. | 52.38% |
| Roads | 5011.89 sq.m. | 33.21% |
| Organized open space / park | 1463.39 sq.m. | 9.70% |
| Social infrastructure | 472.26 sq.m. | 3.13% |
| Utility area | 156.97 sq.m. | 1.04% |
| Buffer-zone area | 80.57 sq.m. | 0.53% |
| Amenity area | 0.00 sq.m. | 0.00% |
| Common parking area | 0.00 sq.m. | 0.00% |
These are values transcribed from the filed layout drawing; they are not a separate site measurement. The drawing also notes 9 M WIDE ROAD, 18.00 MT WIDE EXISTING ROAD, 18.00 MT WIDE PROPOSED ROAD, 60'-0" WIDE ROAD, 40'-0" ROAD and 100'-0" R&B ROAD. The supplied material does not establish which of these labels applies to each individual road segment.
A mortgage area of 1292.14 sq.m. is recorded in the RERA built-up-area details and layout drawing. The layout approval identifies plots reserved under mortgage to the approving authority; this overview does not treat that area as freely available plot inventory.
4. Homes, configurations & floor plans
This is a plotted development, so the RERA offering is plots rather than apartment configurations. The approved layout schedule contains 58 plots. A software-read schedule from the drawing reports 58 plot sizes, from 73.1 sq.m. (87.4 sq.yd.) to 238.09 sq.m. (284.8 sq.yd.); the median is 133.58 sq.m. (159.8 sq.yd.). These are drawing-derived measurements, not RERA-filed apartment saleable or carpet areas.
0–100 sq.yd. (0–84 sq.m.): 2
100–150 sq.yd. (84–125 sq.m.): 24
150–200 sq.yd. (125–167 sq.m.): 26
200–250 sq.yd. (167–209 sq.m.): 3
250–300 sq.yd. (209–251 sq.m.): 3
The layout drawing’s text-and-schedule extraction is software-read and should be checked against the original drawing. Booked and available plot counts are not supplied. No apartment floor plans or carpet-area measurements are available for this project.
5. Parking & vehicle circulation
The filed layout drawing records 0 proposed parking spaces and 0.00 common parking area. No separate resident or visitor parking allocation, accessible parking, mechanical parking, EV charging, or plot-specific parking entitlement is documented in the supplied evidence.
Roads are included in the layout plan, with several road-width labels shown on the drawing. The available record does not establish individual driveway, ramp, pedestrian-separation or plot-allocation arrangements beyond those plan labels.
6. Amenities, recreation & open spaces
The layout drawing identifies park/open space, social infrastructure and utility land. The tentative-layout approval also lists development works and infrastructure to be carried out by the layout applicant; the records do not independently verify that these works have been completed. The amenity progress fields supplied by RERA show 0% where a percentage is recorded.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1463.39 sq.m.; drawing labels this as 9.70% of layout area | Listed in layout; completion not independently verified. RERA amenity progress: 0% where recorded. | |
| Social infrastructure | 472.26 sq.m. | Reserved land shown; facility delivery/status not verified. | |
| Utility area | 156.97 sq.m. | Reserved land shown; utility installation/status not verified. | |
| Tot-lot / green strip / park | Listed in the approval drawing and RERA amenity fields | Listed; completion not independently verified. | |
| Community buildings | Listed in RERA amenity fields; no size or building details supplied | Progress field records 0%; completion not verified. |
Vendor-listed facilities such as CCTV, power backup and a sewage treatment plant are not treated here as sanctioned or delivered amenities because the supplied project records do not verify their project-specific status.
7. Utilities, building services & safety
The tentative-layout approval specifies proposed layout-development works including road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions or required development works, not evidence that the facilities have been installed or are operational.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. No capacities, detailed engineering designs, clearance documents or verified completion records for these services are supplied.
The approval drawing refers to a 2.0 MTS BUFFER and a buffer-zone area of 80.57 sq.mt. No project-specific evidence supplied here establishes a fire-safety clearance, waste-management operating arrangement, accessibility features, or completed security systems.
8. Location, access & connectivity
The project is recorded at Wanaparthy, Wanaparthy Mandal, Wanaparthy District, PIN 509103; the approved layout drawing places it at Chityal Road, Wanaparthy Town. The supplied cadastral centroid is 16.37548, 78.06820.
The location data identifies the nearest sampled Outer Ring Road interchange at approximately 102.5 km. No additional measured distances to public transport, schools, airports, or other landmarks are supplied. A vendor statement describes access to public amenities and transport, but does not give verifiable routes, distances or travel times.
9. Developer & development status
The registered promoter is NANDIKONDA BALPEER AND OTHERS. The supplied RERA record gives the organization type as Others and does not identify a more specific legal entity type. The RERA registration certificate lists the promoter office location as Wanaparthy, Wanaparthy District, PIN 509103; a full registered-office address, official contact details and official website are not supplied in the project record.
The tentative-layout approval names Sri Nandikonda Balpeer and Smt. Veerabomma Saritha as applicants and identifies the promoter’s responsibility for layout development works. The RERA project record states a proposed completion date of 14/08/2025. No independently verified construction-progress assessment, updated completion schedule, or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: FORM ‘C’ certificate for project P01500008489, issued 15/07/2024, valid through 14/08/2025; certificate names SRI LAXMI NARASIMHA SWAMY DEVELOPERS and registered promoter NANDIKONDA BALPEER AND OTHERS.
Tentative layout approval: Wanapartrhy Municipality/Municipal Corporation approval for Tentative LP No. 0025/LO/3067/2023, dated 28 August, 2023, concerning Sy. Nos. 311C/1 and 311B2 and 58 plots.
Layout plan: Plan reference TS/062159/2022, dated 04-10-2022, showing the open-plots layout, land-use schedule, road labels and mortgage area.
Form B declarations: Promoter declarations filed on 16 2gthdayof MAY 2024 and 3 SEP 2024, including completion undertakings of 14.08.2025 and 06-04-2025, respectively.
Other layout-related records: Draft Technical Layout Pattern Draft-TLP.No.104/2022/W concerns a separate proposed layout at Nellutla, Jangaon District, for 118 plots; the supplied records do not identify it as part of the Wanaparthy project.
Occupancy / completion certificate: No project occupancy or completion certificate is identified in the supplied records.
The supplied records do not include a project-specific certificate of completed layout works or an independently verified site-status report. The approval and declaration conditions are summarized here as filed; the detailed approval conditions and title implications are addressed in the relevant report sections.
Frequently asked questions
Is SRI LAXMI NARASIMHA SWAMY DEVELOPERS registered with Telangana RERA?
Yes. SRI LAXMI NARASIMHA SWAMY DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P01500008489; the registration status is New Project.
Who is the developer of SRI LAXMI NARASIMHA SWAMY DEVELOPERS?
The promoter named in the RERA registration is NANDIKONDA BALPEER AND OTHERS.
Where is SRI LAXMI NARASIMHA SWAMY DEVELOPERS located?
SRI LAXMI NARASIMHA SWAMY DEVELOPERS is in WANAPARTHY, Telangana (509103).
When will SRI LAXMI NARASIMHA SWAMY DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 14/08/2025. This is the promoter's declaration, not a guarantee.
More projects in Wanaparthy