Sri Tirumala Millennium Phase-III

ENGINEERS ASSOCIATES PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200003746

SRI TIRUMALA MILLENNIUM PHASE-III is a residential apartment project in MALLAPUR, Uppal mandal, Medchal-Malkajgiri district, developed by the registered promoter ENGINEERS ASSOCIATES PRIVATE LIMITED. The registered site extent is 16,689.43 sq.m.; the project has three residential blocks, with Block F comprising 1 Cellar + Stilt + 5 upper floors and Blocks E and D comprising 1 Stilt + 5 upper floors, plus one amenities building, A-1, with 1 Ground + 4 upper floors. The TG-RERA unit record lists 395 apartments: 142 2BHK and 253 3BHK. It is registered under TG-RERA P02200003746, with proposed completion on 21/02/2028.

More from Engineers Associates Pvt Ltd · 5 projects →

01What we found

RegisteredTG-RERA - valid till 21 Oct 2027
13documents on file - each fact links to its page
1court case on this project's land (survey 160, Mallapur)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSRI TIRUMALA MILLENNIUM PHASE-III RERA record
Project typeResidential apartment project RERA record
Registered portion / phasePhase-III; the registration identifies the project as this phase. RERA record
TG-RERA registrationP02200003746; Form C records registration under section 5, issued 20/12/2021. Approvals record
Registration validity20/12/2021–21/10/2027, unless extended by the Authority; the certificate records no extension. This is registration validity, not the construction deadline. Approvals record
Registered promoterENGINEERS ASSOCIATES PRIVATE LIMITED, a company. RERA record Corporate record
RERA statusThe project record labels the project “New Project”; the registration certificate records it as registered. RERA filing

Land and geographic identity

ItemRecord
Registered localityMALLAPUR, KAPRA CIRCLE, GHMC - HYDERABAD RERA record RERA filing
Revenue villageMallapur RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500076 RERA record
Project survey numberSy.No. 160 PART RERA filing Land records
Registered site extent16,689.43 sq.m. RERA filing
Net area16,028.18 sq.m. RERA filing
Road-affected / Nala-affected areaThe RERA land record reports 661.25 sq.m. as affected in Road widening/FTL of Tanks/Nala Widening; the building-permit extraction labels 661.25 sq.m. “Nala affected area” and 0 “Road affected area.” RERA filing
Boundaries as filedEast: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: OTHERS LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permitApproval No. 1/C1/09982/2021; File No. 1/C1/11223/2020; approved 21 October, 2021 Approvals record
Approved built-up areaRERA fields report 39,669 sq.m. RERA filing
Residential buildingsThree: Block F—1 Cellar + Stilt + 5 upper floors; Block E—1 Stilt + 5 upper floors; Block D—1 Stilt + 5 upper floors
Amenities buildingOne: Building A-1, described in the permit as commercial, with 1 Ground + 4 upper floors
Approved building heightsF: 14.85 m; E: 14.95 m; D: 14.95 m; A-1: 14.95 m
Parking provisionPermit specifies cellar and stilt areas approved for parking; the extracted record gives Cellar 1: 6,062.86 m² and Stilt: 3,340.92 m². The available evidence does not establish a sanctioned parking-space count.
Approved versus RERA-declared unitsRERA land details report 3 total building units as per approved plan and 3 proposed building units as per agreement; the RERA unit record lists 395 apartments. The supplied evidence does not explain the difference in what those “building units” represent. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK: 142 units; 3BHK: 253 units RERA unit table RERA unit details
RERA-filed saleable area2BHK: 48.4 sq.m.; 3BHK: 93.05 sq.m. RERA unit table RERA unit details
Booked / available2BHK: 20 booked / 122 available; 3BHK: 68 booked / 185 available. Counts are from the TG-RERA portal record, which has no as-of date; treat them as indicative. RERA unit table RERA unit details
Construction stageA vendor record describes the project as under construction. No independently verified site-progress report is supplied. Promoter website
Completion datesThe RERA header gives proposed completion 21/02/2028. The GHMC permit states construction to be completed before 21 October, 2027; the Form B declaration states completion by 3O/O612026. The supplied records do not identify a revised completion approval. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate for the project or any tower is supplied in this evidence. GHMC’s permit requires an occupancy certificate before occupation. Document index

2. The project story

SRI TIRUMALA MILLENNIUM PHASE-III is registered as a residential apartment project on part of Sy.No. 160 PART, Mallapur, in Uppal mandal, Medchal-Malkajgiri district. The GHMC permit covers three residential blocks—D, E and F—and a separate amenities building, A-1. The permit describes the residential blocks as stilt-and-five-upper-floor buildings, with a cellar also specified for Block F; A-1 is described as ground plus four upper floors. RERA record Land records

The RERA unit record lists 395 apartments in two configurations. The portal’s recorded booking snapshot is 88 booked and 307 available in total, but it is not dated in the supplied record. The vendor record calls the project under construction; no verified construction percentage or tower-by-tower progress evidence is provided here. The registration validity, the completion dates recorded in separate documents, and the absence of a supplied occupancy certificate are distinct matters. RERA unit table RERA unit details Promoter website Approvals record

3. Master plan, architecture & building design

The registered land record gives a site extent of 16,689.43 sq.m. and net area of 16,028.18 sq.m. GHMC’s permit extraction records 1,769.38 sq.m. as tot-lot and 661.25 sq.m. as Nala-affected area. The RERA land record also reports 661.25 sq.m. as affected in its combined road-widening/FTL/Nala field. RERA filing

The permit identifies Blocks D, E and F for residential use and Building A-1 as an amenities building, with its permit description listing commercial ground and upper-floor areas. The extracted permit area figures are: Block F residential upper floors 14,620.22 m²; Block E 12,435.64 m²; Block D 12,614.51 m²; A-1 commercial ground 291.84 m² and upper floors 1,167.36 m². Separately, the RERA field reports approved built-up area of 39,669 sq.m. These are reported as recorded; the evidence does not define a common measurement basis for reconciling the area figures. RERA filing

The supplied permit extraction gives building heights of 14.85 m for F and 14.95 m for E, D and A-1. It specifies setback distances for each building. It also records a 1,769.38 m² tot-lot, 16 rainwater-harvesting pits, 830 trees, a transformer space, garbage house, ETP and STP requirements. No floor plans suitable for measuring apartment layouts were extracted: the two drawing records are listed as having no flats and no measured configurations. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1422012248.4 sq.m.Not measured in supplied drawingsNot supplied
3BHK2536818593.05 sq.m.Not measured in supplied drawingsNot supplied

Unit counts, booking figures and saleable areas are from the TG-RERA unit record; the booking snapshot has no supplied as-of date. The floor-plan record says the available drawings were not measured and contain no flats for measurement. Accordingly, no drawing-based carpet areas, room dimensions, balcony or utility measurements, or typical floor arrangements can be stated. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet-area figure. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

GHMC’s permit states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. Its extracted area figures are 6,062.86 m² for Cellar 1 and 3,340.92 m² for Stilt. The permit extraction provides no count of parking spaces, and the supplied documents do not establish resident, visitor or accessible-space counts or unit-specific parking allocations. Promoter website

The permit also records an 18 mt. road width and a road along the project’s northern boundary as filed in the RERA land record. No ramp layout, internal driveway dimensions, pedestrian/vehicle separation, EV-charging provision or parking-allotment terms are established by the available evidence. RERA filing

6. Amenities, recreation & open spaces

Tot-lot
Description / size1,769.38 m²; permit says it is to be fenced and maintained as greenery
Evidence sourceGHMC building permit
Declared progress / verified statusSanctioned requirement; delivery not verified
Rainwater harvesting
Description / size16 rainwater-harvesting pits / structures
Evidence sourceGHMC building permit
Declared progress / verified statusPermit requirement; completion not verified
Tree planting
Description / size830 trees recorded
Evidence sourceGHMC building permit
Declared progress / verified statusPermit record; planting status not verified
Community buildings
Description / sizeThe permit includes a separate amenities building, A-1, Ground + 4 upper floors.
Evidence sourceGHMC building permit
Declared progress / verified statusSanctioned building; facility-by-facility fit-out or completion not established
Water supply, sewerage, storm-water drains, street lighting
Description / sizeListed as available in the RERA amenities record
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal entries report 100%; independent completion verification not supplied RERA amenities
Green strip / tot-lot / park
Description / sizeListed as available in the RERA amenities record
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal entry reports 100%; independent completion verification not supplied RERA amenities
Water conservation / rainwater harvesting
Description / sizeListed as available in the RERA amenities record
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal entry reports 100%; independent completion verification not supplied RERA amenities
Car wash area, waiting lounge
Description / sizeListed in vendor amenities
Evidence sourceVendor record
Declared progress / verified statusMarketing/vendor listing; not established here as a sanctioned or delivered facility Promoter website

The RERA amenities record lists Internal Roads & Footpaths at 0%, and Community Buildings, Treatment and Disposal of Sewage and Sullage Water, Solid Waste Management and Disposal, Energy Management, Fire Protection and Fire Safety Requirements, and Aggregate area of recreational Open Space at 0%. These are recorded portal entries, not independent site inspections. RERA amenities

7. Utilities, building services & safety

GHMC’s permit requires rainwater-harvesting structures and space for a transformer, and calls for STP and ETP provision. It also requires a garbage house within the premises. The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available; the supplied record does not give system capacities, water sources, treatment specifications or independent verification of operation. RERA amenities

The permit requires an occupancy certificate before any building is occupied and an occupancy Fire NOC before issue of the occupancy certificate. It also calls for a compliance report after completion of the first-floor level and after roofs are laid. No fire-system details, lift numbers or capacities, accessible-circulation details, CCTV/security arrangements or verified utility commissioning records are supplied. RERA amenities

8. Location, access & connectivity

The registered location is MALLAPUR, KAPRA CIRCLE, GHMC - HYDERABAD, in Mallapur revenue village, Uppal mandal, Medchal-Malkajgiri district, PIN 500076. The cadastral record supplies a centroid for survey 160, but it is a whole-survey point rather than a verified project-parcel access coordinate. The RERA land record gives the northern boundary as a road; the permit extraction records an 18 mt. road width. RERA record RERA filing RERA filing Cadastral map

No verified public-transport routes, measured distances to landmarks, or travel-time evidence for this registered location is supplied. The vendor record lists Noma Function Hall, Mallapur Shiva Hotel and Noma Bus Stop with distances, but those are vendor-provided details and are not adopted here as verified connectivity measurements. Location record Promoter website

9. Developer & development status

The registered promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED, a company. The supplied corporate identifier is GSTIN 36AAACE7931K1ZG. The RERA record gives the promoter’s address as Flat No. 507, Sri Thirumala Milleenium, Road No. 12, Manikchand Road, Mallapur, Uppal, Medchal-Malkajgiri, Telangana, PIN 500076. No official promoter website or contact details are supplied. Corporate record Parties record RERA filing

The RERA record identifies A RAMESH GOUD as the landowner/promoter participant under a revenue-share arrangement; the GHMC permit describes Engineers Associates Private Limited as DAGPA holder for the owners. The RERA header proposes completion on 21/02/2028; the GHMC permit states completion before 21 October, 2027, while the Form B declaration states completion by 3O/O612026. No independently verified construction-progress percentage, extension order or project/tower occupancy certificate is supplied. Parties record RERA filing

10. Approvals, official records & documents

TG-RERA Form C registration certificate
Identifier / dateP02200003746; issued 20/12/2021; valid to 21/10/2027
What the supplied record establishesRegistration of SRI TIRUMALA MILLENNIUM PHASE-III under section 5, with stated registration conditions.
GHMC building permit order
Identifier / dateApproval 1/C1/09982/2021; File 1/C1/11223/2020; 21 October, 2021
What the supplied record establishesConditional building permission for construction at Sy.No. 160 PART, Mallapur, covering residential Blocks D, E, F and Building A-1. The permit states that it does not confer ownership rights.
Form B promoter declaration
Identifier / dateDeclaration dated 3 December 2021
What the supplied record establishesPromoter declaration concerning title, encumbrances, project completion and regulatory obligations.
Layout plan record
Identifier / dateDocument 202241
What the supplied record establishesThe RERA document list requests layout approval or a stamped layout plan; the supplied entry is not an extracted approved layout document. Document index
Occupancy/completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo project- or tower-scoped certificate is available in the supplied records. Document index

The principal GHMC permit conditions include adherence to the sanctioned plan, a commencement notice before construction, completion notice and occupancy certificate after construction, fencing and maintaining the tot-lot, STP provision, transformer space, parking-only use of cellar/stilt areas, and occupancy Fire NOC before issue of the occupancy certificate. This overview records the available evidence; it does not assess compliance with those conditions.

Other registrations of Sri Tirumala Millennium

Frequently asked questions

Is SRI TIRUMALA MILLENNIUM PHASE-III registered with Telangana RERA?

Yes. SRI TIRUMALA MILLENNIUM PHASE-III is registered with the Telangana Real Estate Regulatory Authority as P02200003746; the registration status is New Project.

Who is the developer of SRI TIRUMALA MILLENNIUM PHASE-III?

The promoter named in the RERA registration is ENGINEERS ASSOCIATES PRIVATE LIMITED.

Where is SRI TIRUMALA MILLENNIUM PHASE-III located?

SRI TIRUMALA MILLENNIUM PHASE-III is in MALLAPUR , KAPRA CIRCLE,GHMC -HYDERABAD, Uppal, Medchal-Malkajgiri, Telangana (500076).

When will SRI TIRUMALA MILLENNIUM PHASE-III be completed?

The promoter's proposed date of completion filed with RERA is 21/02/2028. This is the promoter's declaration, not a guarantee.