Sunny Side

ANUHAR HOMES PRIVATE LIMITED · Rangareddy · RERA P02400000239

SUNNY SIDE is a residential apartment project in Alkapuri Township, Gandipet Mandal, Ranga Reddy District, developed by registered promoter ANUHAR HOMES PRIVATE LIMITED. It is on plots 146, 147 and 148, Sector III, Block B, Survey No. 235, with a land area of 1,254.01 sq. m and one building of 1 Stilt + 5 upper floors. The RERA-filed inventory lists 20 3BHK apartments with a saleable area of 54.84 sq. m. The project is registered under TG-RERA number P02400000239, with a proposed completion date of 16/02/2020.

More from Anuhar Homes Pvt Ltd · 7 projects →

01What we found

Period endedTG-RERA registration ran to 16 Feb 2020 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSUNNY SIDE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record. The registration concerns the project on plots 146, 147 and 148, Sector III, Block B.
TG-RERA registrationP02400000239 RERA record
Registration validity22/01/2019 to 16/02/2020; certificate says it remains subject to extension by the Authority. The supplied registration record marks it as not extended. This is the registration period, not an occupancy certificate or a verified completion date. Approvals record
Registered promoterANUHAR HOMES PRIVATE LIMITED, a company RERA record Corporate record
RERA statusRecorded as “On-Going Project.” RERA filing

Land and geographic identity

ItemProject record
LocalityAlkapuri Township RERA record RERA filing
Revenue villageProject record: Alkapuri Township. The filed title report and HMDA technical approval refer to Puppalaguda Village; both location descriptions are retained here because the available records use them. RERA record
Mandal / districtGandipet / Ranga Reddy RERA record RERA filing
PIN500074 RERA record
Survey number(s) / subdivision(s)Survey No. 235; no subdivision is stated. Land records
Plots and blockPlots 146, 147, 148, Sector III, Block B RERA filing
Registered site extent1,254.01 sq. m in the project and approval records RERA filing
Net / total land areaTotal area 1,254.01 sq. m; net area 1,254.01 sq. m; recorded affected area 0 sq. m. RERA filing
BoundariesNorth: 12 metres wide road; South: plots 136, 137, 138; East: plot 145; West: plot 149. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) technical approval Approvals record
Principal approvalTechnical approval No. 002242/SKP/R1/U6/HMDA/22072017, dated 24/10/2017 Approvals record
Approved built-up areaThe HMDA record lists total built-up area of 3,545.17 sq. m. It separately lists 2,854.7 sq. m as built-up area in the sanctioned parameters; these are the distinct figures stated in that record.
Building countOne building is recorded in the RERA project information. RERA filing
Sanctioned configuration1 Stilt + 5 upper floors for the proposed residential building.
Height14.8 (the approval’s stated figure; unit not specified in the supplied extraction).
ParkingApproval refers to a simple mortgage of 10% of built-up area in favour of HMDA; the supplied material does not establish a count or arrangement of resident, visitor, or accessible parking spaces.
Approved versus RERA-declared unitsRERA record lists 1 total building unit and 1 proposed building unit; the filed unit inventory lists 20 3BHK apartments. The supplied records do not explain the “building units” field as apartment count. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK RERA unit table RERA unit details
RERA-filed saleable area54.84 sq. m RERA unit table RERA unit details
Filed inventory20 units; 7 booked and 13 available. Counts are portal-recorded and have no stated as-of date, so treat them as indicative. RERA unit table RERA unit details
Construction stageRERA status is “On-Going Project”; no independently verified site-progress assessment is supplied. RERA filing
Completion datesOriginal and revised proposed completion dates are both 16/02/2020. These are promoter-filed dates, not proof of completion. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents; tower-wise or phase-wise OC status is not established. Document index

2. The project story

SUNNY SIDE is a residential apartment project registered under TG-RERA number P02400000239, on plots 146, 147 and 148 in Sector III, Block B, Survey No. 235. The project record identifies the locality as Alkapuri Township, in Gandipet Mandal, Ranga Reddy District; the filed title report and HMDA technical approval describe the site as being in Puppalaguda Village. RERA record RERA filing

The HMDA technical approval describes one proposed residential building with 1 Stilt + 5 upper floors. The RERA unit inventory lists 20 3BHK units. The supplied information records the project as on-going and gives 16/02/2020 as both its original and revised proposed completion date; it does not provide independently verified construction progress or establish an occupancy certificate. RERA unit table RERA filing

3. Master plan, architecture & building design

The RERA-filed land area is 1,254.01 sq. m. HMDA’s technical approval describes a proposed residential building on plots 146, 147 and 148, with 1 Stilt + 5 upper floors and a stated height of 14.8 (unit not provided in the supplied extraction). The approval records total built-up area of 3,545.17 sq. m and separately lists 2,854.7 sq. m in its sanctioned parameters; the supplied evidence does not further define those two measures. RERA filing

No measured floor-plan drawings, floor-by-floor apartment arrangement, building footprint, lifts/stairs count, common-area schedule, or internal circulation drawings are available in the supplied material. The four floor-plan drawings are recorded as scans pending measurement. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK2071354.84 sq. mNot measuredNot supplied

Unit counts, bookings and saleable area are from the TG-RERA filing; booking counts have no stated as-of date and are indicative. No carpet area has been measured from the drawings: all four supplied floor-plan drawings are awaiting measurement. Carpet area is therefore not available to compare with the RERA-filed saleable area. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval refers to a simple mortgage of 10% of built-up area in favour of HMDA. It specifies one entry and one exit, each with a minimum width of 4.5 metres, and a height clearance of 5 metres, and states that no parking or construction is to be made in setback areas. The supplied evidence does not establish the number or location of parking bays, parking levels beyond the approved stilt configuration, visitor or accessible parking provision, or unit-specific parking allocations; a parking-space count or spaces-per-home ratio cannot be confirmed from the available records.

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 items. The table below reflects the supplied portal status percentages; these are recorded progress fields, not independent verification of completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, storage or capacity statedRERA amenitiesAvailable: YES; 100% recorded; not independently verified
Sewerage (chamber, lines, septic tank, STP)No capacity statedRERA amenitiesAvailable: YES; 100% recorded; not independently verified
Storm-water drainsNo extent or capacity statedRERA amenitiesAvailable: YES; 100% recorded; not independently verified
Water conservation / rainwater harvestingNo quantity or capacity statedRERA amenitiesAvailable: YES; 100% recorded; not independently verified
Electrical meter room / sub-station / receiving stationNo capacity statedRERA amenitiesAvailable: YES; 100% recorded; not independently verified
Internal roads and footpathsNo dimensions statedRERA amenities0% recorded
Green strip / tot lot / parkNo size statedRERA amenitiesAvailable field not stated; 0% recorded
Street lightingNo details statedRERA amenities0% recorded
Community buildingsNo details or size statedRERA amenities0% recorded
Treatment and disposal of sewage and sullage waterNo facility details statedRERA amenities0% recorded
Solid-waste management and disposalNo facility details statedRERA amenities0% recorded
Energy managementNo details statedRERA amenities0% recorded
Fire protection and fire-safety requirementsNo system details statedRERA amenities0% recorded
Recreational open spaceAggregate area not statedRERA amenities0% recorded

The HMDA technical approval also lists a garbage house and rainwater-harvesting structures; it does not supply their dimensions or confirm completion.

7. Utilities, building services & safety

HMDA’s technical approval lists a septic tank, ETP, rainwater-harvesting structures, transformer, generator and emergency lighting. It also requires fire-resistant swing doors for collapsible lifts on all floors and an automatic sprinkler system if the basement area exceeds 200 sq. m. The approval calls for compliance with Fire Service Department norms under Act 1999; the supplied material does not establish the basement area, installation of the listed systems, or a fire clearance.

No water-source or storage details, sewerage-treatment capacity, generator capacity, lift count or capacity, waste-segregation details, CCTV/access-control provision, or accessibility arrangements are supplied.

8. Location, access & connectivity

The registered project location is Alkapuri Township, Gandipet Mandal, Ranga Reddy District, PIN 500074, on Survey No. 235. The filed title report and HMDA technical approval identify Puppalaguda Village; the project’s land-record entry describes the locality as Alkapuri Township. RERA record RERA filing

The HMDA approval describes the north boundary as a 12 metres wide road and specifies one entry and one exit to the premises. A project-location record places the parcel centroid at 17.41528, 78.35459. The supplied connectivity record lists Financial District (Nanakramguda) at 1.2 km. No public-transport details or other verified approach-road information are supplied. RERA filing Location record

9. Developer & development status

The registered legal promoter is ANUHAR HOMES PRIVATE LIMITED, recorded as a company. Its RERA-filed address is ZEENATH RESIDENCY, SRINAGAR COLONY, ALKAPUR TOWNSHIP, ALKAPURI TOWNSHIP, Gandipet, Ranga Reddy, 500074. The project record names Harsha Vardhana Reddy Yerrapureddy as Managing Director and Authorized Signatory, and Anupama Devi Sadhu as Director. No official website or contact details are supplied. Corporate record Parties record

The promoter’s Form B declaration, signed by Mr. Harshavardhan Reddy as an authorized Managing Director, gives 16 February 2020 as the undertaking for project completion and declares that 70% of amounts realized from allottees would be placed in a separate scheduled-bank account for construction and land cost, with withdrawals proportionate to completion and professional certification. These are promoter declarations, not evidence of actual progress or account operation.

The RERA record lists the project as on-going. The supplied evidence does not establish current construction progress, completion, or occupancy-certificate status. RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
What the supplied evidence establishesForm C registration of SUNNY SIDE, number P02400000239, issued 22/01/2019, valid to 16/02/2020; the certificate includes a 70% separate-account condition.
HMDA technical building approval
What the supplied evidence establishesTechnical approval 002242/SKP/R1/U6/HMDA/22072017, dated 24/10/2017, for a residential building on plots 146, 147 and 148, Sector III, Block B, Survey No. 235; records 1 Stilt + 5 upper floors.
Form B declaration
What the supplied evidence establishesPromoter declaration concerning title basis, project funds, approvals, audits, completion undertaking and allottee treatment.
Legal title report
What the supplied evidence establishesAdvocate’s title approval note dated 19.12.2018, concerning plots 146, 147 and 148, stated as 1,500 sq. yd. in Sy. No. 235 at Alakaapoor Township, Puppalaguda Village.
Agreement for Sale
What the supplied evidence establishesPartially filled Telangana RERA-form agreement for the SUNNY SIDE apartment project; allottee, apartment particulars, price, execution date and registration details are blank in the supplied extraction.
Completion / occupancy certificate
What the supplied evidence establishesNo project completion or occupancy certificate is identified in the supplied document set.
SourceDocument index
Layout approval record
What the supplied evidence establishesNo layout number is disclosed in the RERA record; the public HMDA layout lookup was unavailable in the supplied evidence.
SourceHMDA

Frequently asked questions

Is SUNNY SIDE registered with Telangana RERA?

Yes. SUNNY SIDE is registered with the Telangana Real Estate Regulatory Authority as P02400000239; the registration status is On-Going Project.

Who is the developer of SUNNY SIDE?

The promoter named in the RERA registration is ANUHAR HOMES PRIVATE LIMITED.

Where is SUNNY SIDE located?

SUNNY SIDE is in ALKAPURI TOWNSHIP, Gandipet, Rangareddy, Telangana (500074).

When will SUNNY SIDE be completed?

The promoter's proposed date of completion filed with RERA is 16/02/2020. This is the promoter's declaration, not a guarantee.