Sunrise Spr Prime
SUNRISE GROUPS · Rangareddy · RERA P02400007660
SUNRISE SPR PRIME is a residential apartment project in MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter SUNRISE GROUPS. The project covers 345.74 sq. m. and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK units. It is registered under TG-RERA number P02400007660, and the promoter’s completion undertaking is 01-10-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SUNRISE SPR PRIME RERA record |
| Project type / status | Residential apartment project; recorded as a New Project RERA record RERA filing |
| Registered portion / phase | TG-RERA record identifies one project; a separate phase designation is not disclosed. The sanctioned plan covers one residential building. RERA record |
| TG-RERA registration | P02400007660 RERA record |
| Registration validity | 31 January 2024 to 1 October 2025, as stated on the certificate; no extension is evidenced in the supplied material. Registration validity is distinct from the completion undertaking and from occupancy certification. RERA record |
| Registered promoter | SUNRISE GROUPS, recorded as a partnership RERA record RERA filing |
| RERA status in supplied record | Registration certificate on file. The supplied record does not establish an extension, cancellation, or current certificate status beyond the stated validity period. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | MADEENAGUDA RERA record RERA filing |
| Revenue village | Madina Guda (also shown as Madeenaguda in project and approval records) RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500049 RERA record |
| Project survey number(s) | Survey No. 74; no project subdivision is stated in the RERA identity. RERA record Land records |
| Survey numbers appearing in the building-permit plan | 74 and 75; the RERA project land identity names Survey No. 74. |
| Site extent | 345.74 sq. m. total and net area in the RERA land record and building-permit extraction. Land records |
| Boundaries recorded in RERA | East: part of land Sy. No. 74; West: land in Sy. No. 75; North: 30 feet wide road; South: neighbours’ land. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number / date | 2587/GHMC/SLP/2022-BP, dated 1 October 2022 Approvals record |
| Approved built-up area | 1,065.09 sq. m. is recorded as the approved built-up area in the project fields and permit extraction. The same permit extraction separately lists residential upper-floor area of 880.85 sq. m. and stilt parking area of 163.3 sq. m. RERA filing |
| Building count and sanctioned configuration | One residential building, 1 Stilt + 5 upper floors; the permit records building height as 14.95 m. |
| Parking provision recorded in plan | 6 proposed parkings; 163.30 sq. m. parking area is also stated. The plan additionally records “NO OF STACK 10”; the number of independently usable spaces and allocation are not established by the supplied record. |
| Approved vs. RERA-declared units | Approved plan: one building and a condition that sanctioned unit numbers must not be increased without GHMC approval; a numeric sanctioned dwelling-unit count is not supplied in the extracted permit facts. RERA unit record: 10 units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 2BHK; 10 units RERA unit table RERA unit details |
| RERA-filed saleable area | 103.83 sq. m. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available in the portal data supplied; the booking record has no stated as-of date, so these counts are indicative. RERA unit table |
| Construction stage | RERA project status is “New Project”; the supplied record does not provide independently verified site progress or a current construction-stage update. RERA record RERA amenities |
| Completion date | Promoter’s Form-B declaration undertakes completion by 01-10-2025; the registration certificate states validity ending 01-10-2025. No revised completion date is supplied. |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project documents; the permit requires an OC before occupation. The absence from this evidence set does not establish whether one has since been issued. |
2. The project story
SUNRISE SPR PRIME is registered as a residential apartment project on Survey No. 74 in Madina Guda, Serilingampally Mandal, Ranga Reddy District. The sanctioned building-permit record describes one building, identified there as “BLDG (PRATAP RAO),” with a stilt level and five upper floors on a 345.74 sq. m. site. The RERA unit schedule lists ten 2BHK apartments. RERA record Land records RERA unit table
The project record gives a promoter completion undertaking of 1 October 2025, while the TG-RERA certificate states the registration validity period ending on that date. The supplied documents do not establish current construction progress, completion, or issue of an occupancy certificate. The building permit requires a completion notice and an occupancy certificate before occupation.
3. Master plan, architecture & building design
The GHMC permit describes a single residential building with 1 Stilt + 5 upper floors and a building height of 14.95 m. The site is recorded as 345.74 sq. m.; the permit extraction lists 880.85 sq. m. of residential upper-floor area, 163.3 sq. m. of stilt parking area, and 1,065.09 sq. m. as built-up area. These are the permit’s separately stated measures; no FSI-counted area or carpet-area schedule is supplied.
A separate layout-plan record is filed under document 377690 and describes the proposed residential building and site conditions. Its extracted information does not provide a floor-by-floor apartment layout, apartment locations, lift or stair details, or a verified drawing-based room schedule. The permit refers to a tot-lot and perimeter greenery conditions; the extracted permit record also states “Tot-lot NA.” No landscaping or open-space completion is independently verified in the supplied material.
The permit records road-width references of 18 m and directs that no front compound wall be provided where the site abuts an 18 m road; the RERA land record separately describes the north boundary as a 30 feet wide road. The permit’s extracted plan also lists a 9.00 m existing road, a 9.00 m proposed road and a 9.00 m (30-foot) road reference. RERA filing
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 103.83 sq. m. | Not measured in the supplied drawing review | Not supplied |
RERA unit table RERA unit details Floor plans
The filed saleable area is the TG-RERA figure. Carpet area is a different measure; the supplied floor-plan review contains two drawings, but none is identified as a measured apartment plan. No software-measured carpet area, room dimensions, balcony or utility measurements, or unit-by-unit floor arrangement is available in this evidence set. The booking and availability counts are portal figures without an as-of date. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC plan records 6 proposed parkings and 163.30 sq. m. of parking area, and describes the building as having a stilt parking level. The plan also contains the entry “NO OF STACK 10”; the supplied extraction does not establish whether this represents a number of stack-parking positions, how the six proposed parkings relate to it, or how many vehicles can actually be accommodated.
The permit condition states that the stilt parking area is to be used for vehicle parking and not converted or misused for another purpose. No visitor, accessible, or two-wheeler parking count, ramp or driveway layout, pedestrian separation, EV charging provision, or unit-specific parking allocation is evidenced. A parking bay in a plan or a general parking provision does not establish an exclusive unit entitlement.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | Permit records a rainwater-harvesting structure; another permit extraction specifies 4 rain water harvesting pits. | Required / specified in permit; completion not verified. | |
| Transformer space | Space for transformer is listed. | Specified; installation or operation not verified. | |
| Garbage house | A garbage house within the premises is required by the permit. | Required; completion not verified. | |
| Tot-lot / greenery | The permit conditions refer to a fenced and maintained tot-lot and perimeter greenery; the permit extraction also records “Tot-lot NA.” | Not verified as delivered. | |
| Internal roads and footpaths | Listed in the RERA amenities record; no dimensions or progress evidence supplied. | RERA amenities | Progress shown as 0%; not independently verified. |
| Community buildings / recreational open space | Listed in the RERA amenities record; no size or facility detail supplied. | RERA amenities | Progress shown as 0%; not independently verified. |
The RERA amenities schedule also lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and an electrical meter room/substation/receiving station. These entries are project disclosures, not evidence that the facilities are complete or independently inspected. RERA amenities
7. Utilities, building services & safety
The permit lists a separate underground static water-storage tank with capacity 25,000 litres and a separate terrace tank with capacity 25,000 litres for residential buildings. It also lists a generator, emergency lighting, a transformer space, a garbage house and rainwater-harvesting structures. The RERA amenities schedule marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station as available; the same schedule shows progress as 0%, and does not establish operational completion. RERA amenities
The permit lists hose reels, down corners, an automatic sprinkler system and fire-fighting installations. The building-permit conditions state that a fire NOC from the Director (EV&DM) is to be obtained before issue of an occupancy certificate. No fire NOC, OC, water-treatment plant, STP capacity, backup-generation capacity, lift count or capacity, CCTV installation verification, or accessibility design details are supplied.
8. Location, access & connectivity
The registered project location is Madina Guda, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500049. The RERA land description gives a 30 feet wide road on the north boundary. The building-permit extraction refers to an 18 m road and the plan record includes 9.00 m road references; these records do not provide a verified route or access arrangement for buyers. RERA record RERA filing
A supplied location record lists HITEC City — 4.7 km as a measured distance. No public-transport stops, travel times, or other measured landmark distances are provided. Location record
9. Developer & development status
The registered promoter is SUNRISE GROUPS, recorded as a partnership, with GSTIN 36ADUFS7946NIZT. The project record lists NAYENENI LAKSHMIKANTH as authorized signatory and NAINENI SRINIVAS RAO as partner. The promoter address in the RERA record is BJP Office Lane, Madeenaguda, Serilingampally, Ranga Reddy, 500049. RERA record RERA filing Corporate record Parties record
The RERA Form-B declaration, signed by a representative of SUNRISE GROUPS, undertakes completion by 01-10-2025. The project record does not include a current construction-progress statement or independent site inspection. No revised completion date is supplied, and the evidence set does not establish an issued occupancy certificate. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400007660; valid from 31 January 2024 to 1 October 2025 |
|---|---|
| What the supplied record establishes | Form-C certificate for SUNRISE SPR PRIME, identifying SUNRISE GROUPS as promoter and Survey No. 74 as project land. |
| Identifier / date | 2587/GHMC/SLP/2022-BP; 1 October 2022 |
|---|---|
| What the supplied record establishes | Permit extraction describes one residential building, 1 Stilt + 5 upper floors, on 345.74 sq. m. |
| Identifier / date | Inward TS/024516/2021; document 377690 |
|---|---|
| What the supplied record establishes | Filed layout-plan record with GHMC conditions and references to Survey Nos. 74 and 75. |
| Identifier / date | 001618/GHMC/0943/SLP2/2021-BP |
|---|---|
| What the supplied record establishes | Appears in the building-permit extraction. |
| Identifier / date | Document 377747 |
|---|---|
| What the supplied record establishes | Promoter declaration on title basis, encumbrances and completion undertaking; it is a promoter declaration, not an independent verification. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit requires completion documentation and an occupancy certificate before occupation; no such certificate is present in this evidence set. |
1. Project at a glance
Project identity
Registered project name: SUNRISE SPR PRIME
Project type / status: Residential apartment project; recorded as a New Project
Registered portion / phase: TG-RERA record identifies one project; a separate phase designation is not disclosed. The sanctioned plan covers one residential building.
TG-RERA registration: P02400007660
Registration validity: 31 January 2024 to 1 October 2025, as stated on the certificate; no extension is evidenced in the supplied material. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: SUNRISE GROUPS, recorded as a partnership
RERA status in supplied record: Registration certificate on file. The supplied record does not establish an extension, cancellation, or current certificate status beyond the stated validity period.
Land and geographic identity
Locality: MADEENAGUDA
Revenue village: Madina Guda (also shown as Madeenaguda in project and approval records)
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500049
Project survey number(s): Survey No. 74; no project subdivision is stated in the RERA identity.
Survey numbers appearing in the building-permit plan: 74 and 75; the RERA project land identity names Survey No. 74.
Site extent: 345.74 sq. m. total and net area in the RERA land record and building-permit extraction.
Boundaries recorded in RERA: East: part of land Sy. No. 74; West: land in Sy. No. 75; North: 30 feet wide road; South: neighbours’ land.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 2587/GHMC/SLP/2022-BP, dated 1 October 2022
Approved built-up area: 1,065.09 sq. m. is recorded as the approved built-up area in the project fields and permit extraction. The same permit extraction separately lists residential upper-floor area of 880.85 sq. m. and stilt parking area of 163.3 sq. m.
Building count and sanctioned configuration: One residential building, 1 Stilt + 5 upper floors; the permit records building height as 14.95 m.
Parking provision recorded in plan: 6 proposed parkings; 163.30 sq. m. parking area is also stated. The plan additionally records “NO OF STACK 10”; the number of independently usable spaces and allocation are not established by the supplied record.
Approved vs. RERA-declared units: Approved plan: one building and a condition that sanctioned unit numbers must not be increased without GHMC approval; a numeric sanctioned dwelling-unit count is not supplied in the extracted permit facts. RERA unit record: 10 units.
Offering and status
RERA-filed configuration: 2BHK; 10 units
RERA-filed saleable area: 103.83 sq. m.
Booked / available: 0 booked / 10 available in the portal data supplied; the booking record has no stated as-of date, so these counts are indicative.
Construction stage: RERA project status is “New Project”; the supplied record does not provide independently verified site progress or a current construction-stage update.
Completion date: Promoter’s Form-B declaration undertakes completion by 01-10-2025; the registration certificate states validity ending 01-10-2025. No revised completion date is supplied.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project documents; the permit requires an OC before occupation. The absence from this evidence set does not establish whether one has since been issued.
2. The project story
SUNRISE SPR PRIME is registered as a residential apartment project on Survey No. 74 in Madina Guda, Serilingampally Mandal, Ranga Reddy District. The sanctioned building-permit record describes one building, identified there as “BLDG (PRATAP RAO),” with a stilt level and five upper floors on a 345.74 sq. m. site. The RERA unit schedule lists ten 2BHK apartments.
The project record gives a promoter completion undertaking of 1 October 2025, while the TG-RERA certificate states the registration validity period ending on that date. The supplied documents do not establish current construction progress, completion, or issue of an occupancy certificate. The building permit requires a completion notice and an occupancy certificate before occupation.
3. Master plan, architecture & building design
The GHMC permit describes a single residential building with 1 Stilt + 5 upper floors and a building height of 14.95 m. The site is recorded as 345.74 sq. m.; the permit extraction lists 880.85 sq. m. of residential upper-floor area, 163.3 sq. m. of stilt parking area, and 1,065.09 sq. m. as built-up area. These are the permit’s separately stated measures; no FSI-counted area or carpet-area schedule is supplied.
A separate layout-plan record is filed under document 377690 and describes the proposed residential building and site conditions. Its extracted information does not provide a floor-by-floor apartment layout, apartment locations, lift or stair details, or a verified drawing-based room schedule. The permit refers to a tot-lot and perimeter greenery conditions; the extracted permit record also states “Tot-lot NA.” No landscaping or open-space completion is independently verified in the supplied material.
The permit records road-width references of 18 m and directs that no front compound wall be provided where the site abuts an 18 m road; the RERA land record separately describes the north boundary as a 30 feet wide road. The permit’s extracted plan also lists a 9.00 m existing road, a 9.00 m proposed road and a 9.00 m (30-foot) road reference.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 103.83 sq. m. | Not measured in the supplied drawing review | Not supplied |
The filed saleable area is the TG-RERA figure. Carpet area is a different measure; the supplied floor-plan review contains two drawings, but none is identified as a measured apartment plan. No software-measured carpet area, room dimensions, balcony or utility measurements, or unit-by-unit floor arrangement is available in this evidence set. The booking and availability counts are portal figures without an as-of date.
5. Parking & vehicle circulation
The GHMC plan records 6 proposed parkings and 163.30 sq. m. of parking area, and describes the building as having a stilt parking level. The plan also contains the entry “NO OF STACK 10”; the supplied extraction does not establish whether this represents a number of stack-parking positions, how the six proposed parkings relate to it, or how many vehicles can actually be accommodated.
The permit condition states that the stilt parking area is to be used for vehicle parking and not converted or misused for another purpose. No visitor, accessible, or two-wheeler parking count, ramp or driveway layout, pedestrian separation, EV charging provision, or unit-specific parking allocation is evidenced. A parking bay in a plan or a general parking provision does not establish an exclusive unit entitlement.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | Permit records a rainwater-harvesting structure; another permit extraction specifies 4 rain water harvesting pits. | Required / specified in permit; completion not verified. | |
| Transformer space | Space for transformer is listed. | Specified; installation or operation not verified. | |
| Garbage house | A garbage house within the premises is required by the permit. | Required; completion not verified. | |
| Tot-lot / greenery | The permit conditions refer to a fenced and maintained tot-lot and perimeter greenery; the permit extraction also records “Tot-lot NA.” | Not verified as delivered. | |
| Internal roads and footpaths | Listed in the RERA amenities record; no dimensions or progress evidence supplied. | Progress shown as 0%; not independently verified. | |
| Community buildings / recreational open space | Listed in the RERA amenities record; no size or facility detail supplied. | Progress shown as 0%; not independently verified. |
The RERA amenities schedule also lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and an electrical meter room/substation/receiving station. These entries are project disclosures, not evidence that the facilities are complete or independently inspected.
7. Utilities, building services & safety
The permit lists a separate underground static water-storage tank with capacity 25,000 litres and a separate terrace tank with capacity 25,000 litres for residential buildings. It also lists a generator, emergency lighting, a transformer space, a garbage house and rainwater-harvesting structures. The RERA amenities schedule marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station as available; the same schedule shows progress as 0%, and does not establish operational completion.
The permit lists hose reels, down corners, an automatic sprinkler system and fire-fighting installations. The building-permit conditions state that a fire NOC from the Director (EV&DM) is to be obtained before issue of an occupancy certificate. No fire NOC, OC, water-treatment plant, STP capacity, backup-generation capacity, lift count or capacity, CCTV installation verification, or accessibility design details are supplied.
8. Location, access & connectivity
The registered project location is Madina Guda, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500049. The RERA land description gives a 30 feet wide road on the north boundary. The building-permit extraction refers to an 18 m road and the plan record includes 9.00 m road references; these records do not provide a verified route or access arrangement for buyers.
A supplied location record lists HITEC City — 4.7 km as a measured distance. No public-transport stops, travel times, or other measured landmark distances are provided.
9. Developer & development status
The registered promoter is SUNRISE GROUPS, recorded as a partnership, with GSTIN 36ADUFS7946NIZT. The project record lists NAYENENI LAKSHMIKANTH as authorized signatory and NAINENI SRINIVAS RAO as partner. The promoter address in the RERA record is BJP Office Lane, Madeenaguda, Serilingampally, Ranga Reddy, 500049.
The RERA Form-B declaration, signed by a representative of SUNRISE GROUPS, undertakes completion by 01-10-2025. The project record does not include a current construction-progress statement or independent site inspection. No revised completion date is supplied, and the evidence set does not establish an issued occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02400007660; valid from 31 January 2024 to 1 October 2025 |
|---|---|
| What the supplied record establishes | Form-C certificate for SUNRISE SPR PRIME, identifying SUNRISE GROUPS as promoter and Survey No. 74 as project land. |
| Identifier / date | 2587/GHMC/SLP/2022-BP; 1 October 2022 |
|---|---|
| What the supplied record establishes | Permit extraction describes one residential building, 1 Stilt + 5 upper floors, on 345.74 sq. m. |
| Identifier / date | Inward TS/024516/2021; document 377690 |
|---|---|
| What the supplied record establishes | Filed layout-plan record with GHMC conditions and references to Survey Nos. 74 and 75. |
| Identifier / date | 001618/GHMC/0943/SLP2/2021-BP |
|---|---|
| What the supplied record establishes | Appears in the building-permit extraction. |
| Identifier / date | Document 377747 |
|---|---|
| What the supplied record establishes | Promoter declaration on title basis, encumbrances and completion undertaking; it is a promoter declaration, not an independent verification. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit requires completion documentation and an occupancy certificate before occupation; no such certificate is present in this evidence set. |
Frequently asked questions
Is SUNRISE SPR PRIME registered with Telangana RERA?
Yes. SUNRISE SPR PRIME is registered with the Telangana Real Estate Regulatory Authority as P02400007660; the registration status is New Project.
Who is the developer of SUNRISE SPR PRIME?
The promoter named in the RERA registration is SUNRISE GROUPS.
Where is SUNRISE SPR PRIME located?
SUNRISE SPR PRIME is in MADEENAGUDA, Madina Guda, Serilingampally, Rangareddy, Telangana (500049).
When will SUNRISE SPR PRIME be completed?
The promoter's proposed date of completion filed with RERA is 01/10/2025. This is the promoter's declaration, not a guarantee.