TIGER LINE is a plotted development in Chennaram, Thalakondapally mandal, Ranga Reddy district, developed by registered promoter Florina Developers Private Limited. The draft layout approval describes an extent of Ac. 20-10 Guntas or Ac.20.25 Cents; 98010.00 Sq. Yds. and 229 plots; no plot-size configurations are stated. The project is registered with TG-RERA under P02400006301, with proposed completion recorded as 23/03/2025.
More from Florina Developers Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | TIGER LINE RERA record |
| Project type | Plotted development / layout RERA record RERA filing |
| Phase / registered portion | No phase designation is disclosed. TG-RERA identifies survey 19/P. |
| TG-RERA registration | P02400006301; granted under section 5. |
| Registration validity | 07/07/2023 to 23/03/2025; the certificate states validity could be extended by the Authority. The supplied record shows no extension. Registration validity is distinct from the project completion date. |
| Registered promoter | Florina Developers Private Limited, a company. Corporate record |
| RERA record status | The supplied project record labels this a “New Project.” Registration was issued; its stated validity has ended, and no extension is shown in the supplied evidence. RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Chennaram; the approval describes Chennaram Gram Panchayat. RERA record |
| Mandal | Thalakondapally; the layout approval uses the spelling “Talakondapally.” RERA record |
| District / PIN | Ranga Reddy / 509206. RERA record |
| Project survey number(s) / subdivision(s) | Sy.No. 19/P. The supplied project identity gives no further subdivision. RERA record Land records |
| Registered layout extent | Ac. 20-10 Guntas or Ac.20.25 Cents; 98010.00 Sq. Yds., as stated in the draft technical layout approval. |
| RERA land area | Total and net area each recorded as 81948.84 sqmts; affected area recorded as 0. RERA filing |
| Boundaries recorded in RERA filing | East: EXISTING ROAD; west, north and south: OWNERS LAND in SY No 19 (north recorded as “OWNERS LAND IN SY NO 19”). RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the approval delegates the draft layout process to Chennaram Gram Panchayat. Approvals record |
| Principal layout approval | Draft - TLP.No.70/2023/H, approved 23-03-2023; file Lr.Roc.No.20182/1530/2023/e-Panchayat; application/e-Panchayat reference 20182/1530. Approvals record |
| Layout description | Draft technical layout pattern for 229 plots in Sy.No. 19/P. |
| Land-use split in draft approval | Layout area: Ac. 20.25 Cents; 98010.00 Sq. Yds.; plotted area 58.89% (Ac. 11.924 Cents; 57712.16 Sq. Yds.); roads 31.11% (Ac. 6.301 Cents; 30496.84 Sq. Yds.); open space 10.00% (Ac. 2.025 Cents; 9801.00 Sq. Yds.). Mortgage area is listed as 15.64% (Ac. 1.866 Cents; 9031.44 Sq. Yds.). |
| Buildings / floor configuration | Not applicable to the supplied plotted-layout description; no building, tower or floor configuration is disclosed. |
| Approved built-up area | 48245.72 sqmts is listed in the RERA record as “Approved Built up Area”; its detailed scope is not explained in the supplied material. RERA filing |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; the RERA record does not provide plot-size bands, individual plot inventory, or unit-level saleable areas in the supplied data. RERA filing |
| Plot count | 229 in the draft layout approval. |
| Booked / available counts | Not disclosed in the supplied project data. |
| Promoter-declared completion | The Form-B declaration undertakes completion by 28th February, 2025. The RERA header separately records proposed completion 23/03/2025. RERA record |
| Construction / development stage | RERA project information labels the project “New Project”; the supplied material provides no independently verified site-progress measurement. RERA filing |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is included in the supplied documents. For this plotted development, no phase- or plot-specific certificate status is established by the supplied record. Document index |
2. The project story
TIGER LINE is registered as a plotted development at Chennaram, in Thalakondapally mandal, Ranga Reddy district. Its registered survey identification is 19/P. The filed project land area is 81948.84 sqmts, while the draft technical layout approval describes a 229-plot layout and allocates land to plots, roads and open space. RERA record RERA filing
The approval describes the project’s physical organization as a land layout rather than a building or apartment scheme. It identifies 58.89% as plotted area, 31.11% as roads and 10.00% as open space, and specifies plots 45 to 77 as mortgage security for development obligations. The approval also lists infrastructure works including roads, drains, street lighting, protected water supply and sewerage disposal. These are approval-recorded provisions, not evidence that the works have been completed.
The RERA project record calls the status “New Project.” No construction-stage report, site inspection or independently verified completion evidence is supplied here. Accordingly, the supplied material does not establish which layout infrastructure has been built or whether any portion has been completed or certified. RERA filing Document index
3. Master plan, architecture & building design
The principal design evidence is the Draft Technical Layout Pattern approval, not a building plan. It records a 229-plot layout in Sy.No. 19/P, with the following land-use allocation:
| Layout component | Area / share stated in approval |
|---|---|
| Total layout area | Ac. 20-10 Guntas or Ac.20.25 Cents; 98010.00 Sq. Yds. |
| Plotted area | 58.89% — Ac. 11.924 Cents; 57712.16 Sq. Yds. |
| Road area | 31.11% — Ac. 6.301 Cents; 30496.84 Sq. Yds. |
| Open space | 10.00% — Ac. 2.025 Cents; 9801.00 Sq. Yds. |
| Mortgage area | 15.64% — Ac. 1.866 Cents; 9031.44 Sq. Yds.; identified as Plot Nos. 45 to 77 |
The approval calls for demarcation of plots and open space on the ground, opening roads for access to neighboring sites, and handing over roads and open space to the Gram Panchayat by registered gift deed before release of the final layout. These are approval conditions; the supplied material does not confirm their completion.
No building count, building footprint, floors, parking levels, tower arrangement, residential/commercial mix or FSI-counted area is disclosed. The 48245.72 sqmts figure is recorded as “Approved Built up Area” in the RERA filing; the supplied evidence does not clarify its scope or establish that it is a building-design measurement. RERA filing
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration in the supplied record. The draft layout approval lists 229 plots, but the supplied RERA data does not provide plot-size bands, plot-wise areas, booked or available plot counts, or a RERA-filed saleable-area schedule. RERA filing
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 229 in the draft layout approval | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Two drawing records are indicated, but both are scans pending measurement and neither is identified as a plot-area schedule. No software-measured plot or home areas are available. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not state a car-parking or two-wheeler-parking count, visitor or accessible parking provision, or a plot-wise parking allocation. No parking level, ramp, vehicle-entry arrangement or EV-charging provision is documented. RERA amenities
The draft layout approval records a 31.11% road area and requires roads to be opened for access to neighboring sites. It does not, by itself, establish individual parking rights or completed vehicle-circulation works.
6. Amenities, recreation & open spaces
The RERA amenity record lists facilities as available (“YES”) for some items, but shows 0 progress for the listed items; it provides no independent completion verification. The draft layout approval separately specifies certain infrastructure works and open-space allocation. RERA amenities
| Description / size | Listed; no dimensions supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | “YES”; progress 0; completion not independently verified |
| Description / size | Listed; no size or quantity supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | “YES”; progress 0; completion not independently verified |
| Description / size | Listed; no size or description supplied |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Progress 0; completion not independently verified |
| Description / size | 10.00%, stated as Ac. 2.025 Cents; 9801.00 Sq. Yds. in the draft approval |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | Approval allocation; handover is a condition; completion/handover not established |
| Description / size | Specified as a layout development work; no quantity supplied |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | Approval-recorded provision; progress not established |
The RERA amenity list also includes water supply, sewerage, storm-water drains, street lighting, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire-safety requirements and electrical meter/sub-station/receiving station. Their recorded status is detailed under utilities below. RERA amenities
7. Utilities, building services & safety
The RERA amenity record and draft layout approval identify proposed or listed infrastructure, but the supplied material does not establish installation, capacity, commissioning or independent verification. RERA amenities
| Evidence in supplied record | “Water Supply” is listed as “YES”; the draft approval specifies a protected water supply system. |
|---|---|
| Status limitation | No source, storage, treatment capacity or completion evidence supplied. RERA amenities |
| Evidence in supplied record | Sewerage, sewage/sullage treatment and disposal, and storm-water drains are listed; approval specifies a sewerage disposal system, side drains and construction/channelization of nalas. |
|---|---|
| Status limitation | No STP capacity, reuse arrangement, network details or completion evidence supplied. RERA amenities |
| Evidence in supplied record | Water conservation/rainwater harvesting is listed; approval specifies rain water harvesting pits. |
|---|---|
| Status limitation | No number, size or completion evidence supplied. RERA amenities |
| Evidence in supplied record | Street lighting and energy management are listed; approval specifies Street lighting and Electricity facilities. The RERA amenity record lists an electrical meter room, sub-station and receiving station. |
|---|---|
| Status limitation | No electrical capacity, backup or installation/commissioning evidence supplied. RERA amenities |
| Evidence in supplied record | Solid-waste management and disposal are listed. |
|---|---|
| Status limitation | No collection, processing or disposal details or completion evidence supplied. RERA amenities |
| Evidence in supplied record | Fire protection and fire-safety requirements are listed. |
|---|---|
| Status limitation | No system description, clearance, access dimensions or completion evidence supplied. RERA amenities |
| Evidence in supplied record | The approval requires roads to be opened for access to neighboring sites. |
|---|---|
| Status limitation | No pedestrian-separation, accessible-route or accessibility specification supplied. |
8. Location, access & connectivity
The registered location is Chennaram, Thalakondapally mandal, Ranga Reddy district, Telangana, PIN 509206. The approval describes the locality as Chennaram Gram Panchayat. The supplied geocode is identified as the cadastral parcel centroid at 16.89491, 78.49347. RERA record Location record
The RERA land-boundary record identifies an EXISTING ROAD on the east and owners’ land in Sy.No. 19 on the west, north and south. The draft approval requires roads within the layout to be opened for neighboring-site access. RERA filing
The nearest sampled Outer Ring Road interchange is listed at approximately 37.9 km. No public-transport routes, additional measured distances, or verified travel times are supplied. Location record
9. Developer & development status
The registered legal promoter is FLORINA DEVELOPERS PRIVATE LIMITED, a company. The supplied corporate identifier is GSTIN 36AAFCF2741K1ZK. The RERA certificate gives the promoter office as Village: TELAPUR, Mandal: RC PURAM, District: Sangareddy, Pin: 502032. The project record separately lists an address at 384, 385 and 426, Ground Floor, Aliens Space Station, Kolluru Road, Chennaram, with Chennaram locality and PIN 509206. Corporate record RERA filing
The Form-B declaration, made by Hari Challa as authorized signatory, undertakes project completion by 28th February, 2025. The RERA header records proposed completion as 23/03/2025; the supplied evidence does not include a project progress report or independently verified site status. No RERA registration extension is shown in the supplied certificate record. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400006301; issued 07/07/2023; stated validity through 23/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for TIGER LINE under section 5; the certificate includes conditions concerning sale agreements, conveyance and the separate account. |
| Identifier / date | Draft - TLP.No.70/2023/H; 23-03-2023 |
|---|---|
| What the supplied record establishes | Director of Town and Country Planning approval of a draft technical layout pattern for 229 plots in Sy.No. 19/P. |
| Identifier / date | Lr.Roc.No.20182/1530/2023/e-Panchayat; application/e-Panchayat reference 20182/1530 |
|---|---|
| What the supplied record establishes | References associated with the draft layout approval. |
| Identifier / date | 24th May, 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration including the completion undertaking and separate-account commitments. |
| Identifier / date | RERA document 329078 |
|---|---|
| What the supplied record establishes | Listed as a layout plan or layout approval document, but the supplied extraction is not available. Document index |
| Identifier / date | Documents 329084, 329093, 329094, 329095 |
|---|---|
| What the supplied record establishes | Filed title opinion and supporting title-related documents; their substantive title analysis is addressed in the Land & Title section. Document index |
| Identifier / date | Statement 140244121, document 333415 |
|---|---|
| What the supplied record establishes | RERA-filed encumbrance statement. |
No final layout-release evidence or completion/occupancy certificate is included in the supplied document set. The draft approval’s listed infrastructure, mortgage, NOC and gift-deed conditions are not evidence that those requirements have been completed. Document index
1. Project at a glance
Project identity
Registered project name: TIGER LINE
Project type: Plotted development / layout
Phase / registered portion: No phase designation is disclosed. TG-RERA identifies survey 19/P.
TG-RERA registration: P02400006301; granted under section 5.
Registration validity: 07/07/2023 to 23/03/2025; the certificate states validity could be extended by the Authority. The supplied record shows no extension. Registration validity is distinct from the project completion date.
Registered promoter: Florina Developers Private Limited, a company.
RERA record status: The supplied project record labels this a “New Project.” Registration was issued; its stated validity has ended, and no extension is shown in the supplied evidence.
Land and geographic identity
Locality / revenue village: Chennaram; the approval describes Chennaram Gram Panchayat.
Mandal: Thalakondapally; the layout approval uses the spelling “Talakondapally.”
District / PIN: Ranga Reddy / 509206.
Project survey number(s) / subdivision(s): Sy.No. 19/P. The supplied project identity gives no further subdivision.
Registered layout extent: Ac. 20-10 Guntas or Ac.20.25 Cents; 98010.00 Sq. Yds., as stated in the draft technical layout approval.
RERA land area: Total and net area each recorded as 81948.84 sqmts; affected area recorded as 0.
Boundaries recorded in RERA filing: East: EXISTING ROAD; west, north and south: OWNERS LAND in SY No 19 (north recorded as “OWNERS LAND IN SY NO 19”).
Development identity
Sanctioning authority: Director of Town and Country Planning; the approval delegates the draft layout process to Chennaram Gram Panchayat.
Principal layout approval: Draft - TLP.No.70/2023/H, approved 23-03-2023; file Lr.Roc.No.20182/1530/2023/e-Panchayat; application/e-Panchayat reference 20182/1530.
Layout description: Draft technical layout pattern for 229 plots in Sy.No. 19/P.
Land-use split in draft approval: Layout area: Ac. 20.25 Cents; 98010.00 Sq. Yds.; plotted area 58.89% (Ac. 11.924 Cents; 57712.16 Sq. Yds.); roads 31.11% (Ac. 6.301 Cents; 30496.84 Sq. Yds.); open space 10.00% (Ac. 2.025 Cents; 9801.00 Sq. Yds.). Mortgage area is listed as 15.64% (Ac. 1.866 Cents; 9031.44 Sq. Yds.).
Buildings / floor configuration: Not applicable to the supplied plotted-layout description; no building, tower or floor configuration is disclosed.
Approved built-up area: 48245.72 sqmts is listed in the RERA record as “Approved Built up Area”; its detailed scope is not explained in the supplied material.
Offering and status
Offering: Plots; the RERA record does not provide plot-size bands, individual plot inventory, or unit-level saleable areas in the supplied data.
Plot count: 229 in the draft layout approval.
Booked / available counts: Not disclosed in the supplied project data.
Promoter-declared completion: The Form-B declaration undertakes completion by 28th February, 2025. The RERA header separately records proposed completion 23/03/2025.
Construction / development stage: RERA project information labels the project “New Project”; the supplied material provides no independently verified site-progress measurement.
Completion / occupancy certificate: No completion certificate or occupancy certificate is included in the supplied documents. For this plotted development, no phase- or plot-specific certificate status is established by the supplied record.
2. The project story
TIGER LINE is registered as a plotted development at Chennaram, in Thalakondapally mandal, Ranga Reddy district. Its registered survey identification is 19/P. The filed project land area is 81948.84 sqmts, while the draft technical layout approval describes a 229-plot layout and allocates land to plots, roads and open space.
The approval describes the project’s physical organization as a land layout rather than a building or apartment scheme. It identifies 58.89% as plotted area, 31.11% as roads and 10.00% as open space, and specifies plots 45 to 77 as mortgage security for development obligations. The approval also lists infrastructure works including roads, drains, street lighting, protected water supply and sewerage disposal. These are approval-recorded provisions, not evidence that the works have been completed.
The RERA project record calls the status “New Project.” No construction-stage report, site inspection or independently verified completion evidence is supplied here. Accordingly, the supplied material does not establish which layout infrastructure has been built or whether any portion has been completed or certified.
3. Master plan, architecture & building design
The principal design evidence is the Draft Technical Layout Pattern approval, not a building plan. It records a 229-plot layout in Sy.No. 19/P, with the following land-use allocation:
Total layout area: Ac. 20-10 Guntas or Ac.20.25 Cents; 98010.00 Sq. Yds.
Plotted area: 58.89% — Ac. 11.924 Cents; 57712.16 Sq. Yds.
Road area: 31.11% — Ac. 6.301 Cents; 30496.84 Sq. Yds.
Open space: 10.00% — Ac. 2.025 Cents; 9801.00 Sq. Yds.
Mortgage area: 15.64% — Ac. 1.866 Cents; 9031.44 Sq. Yds.; identified as Plot Nos. 45 to 77
The approval calls for demarcation of plots and open space on the ground, opening roads for access to neighboring sites, and handing over roads and open space to the Gram Panchayat by registered gift deed before release of the final layout. These are approval conditions; the supplied material does not confirm their completion.
No building count, building footprint, floors, parking levels, tower arrangement, residential/commercial mix or FSI-counted area is disclosed. The 48245.72 sqmts figure is recorded as “Approved Built up Area” in the RERA filing; the supplied evidence does not clarify its scope or establish that it is a building-design measurement.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration in the supplied record. The draft layout approval lists 229 plots, but the supplied RERA data does not provide plot-size bands, plot-wise areas, booked or available plot counts, or a RERA-filed saleable-area schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 229 in the draft layout approval | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Two drawing records are indicated, but both are scans pending measurement and neither is identified as a plot-area schedule. No software-measured plot or home areas are available.
5. Parking & vehicle circulation
The supplied evidence does not state a car-parking or two-wheeler-parking count, visitor or accessible parking provision, or a plot-wise parking allocation. No parking level, ramp, vehicle-entry arrangement or EV-charging provision is documented.
The draft layout approval records a 31.11% road area and requires roads to be opened for access to neighboring sites. It does not, by itself, establish individual parking rights or completed vehicle-circulation works.
6. Amenities, recreation & open spaces
The RERA amenity record lists facilities as available (“YES”) for some items, but shows 0 progress for the listed items; it provides no independent completion verification. The draft layout approval separately specifies certain infrastructure works and open-space allocation.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Listed; no dimensions supplied | RERA amenity record | “YES”; progress 0; completion not independently verified |
| Green strip / tot lot / park | Listed; no size or quantity supplied | RERA amenity record | “YES”; progress 0; completion not independently verified |
| Community buildings | Listed; no size or description supplied | RERA amenity record | Progress 0; completion not independently verified |
| Aggregate recreational open space | 10.00%, stated as Ac. 2.025 Cents; 9801.00 Sq. Yds. in the draft approval | Draft layout approval | Approval allocation; handover is a condition; completion/handover not established |
| Avenue plantation | Specified as a layout development work; no quantity supplied | Draft layout approval | Approval-recorded provision; progress not established |
The RERA amenity list also includes water supply, sewerage, storm-water drains, street lighting, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire-safety requirements and electrical meter/sub-station/receiving station. Their recorded status is detailed under utilities below.
7. Utilities, building services & safety
The RERA amenity record and draft layout approval identify proposed or listed infrastructure, but the supplied material does not establish installation, capacity, commissioning or independent verification.
| Evidence in supplied record | “Water Supply” is listed as “YES”; the draft approval specifies a protected water supply system. |
|---|---|
| Status limitation | No source, storage, treatment capacity or completion evidence supplied. |
| Evidence in supplied record | Sewerage, sewage/sullage treatment and disposal, and storm-water drains are listed; approval specifies a sewerage disposal system, side drains and construction/channelization of nalas. |
|---|---|
| Status limitation | No STP capacity, reuse arrangement, network details or completion evidence supplied. |
| Evidence in supplied record | Water conservation/rainwater harvesting is listed; approval specifies rain water harvesting pits. |
|---|---|
| Status limitation | No number, size or completion evidence supplied. |
| Evidence in supplied record | Street lighting and energy management are listed; approval specifies Street lighting and Electricity facilities. The RERA amenity record lists an electrical meter room, sub-station and receiving station. |
|---|---|
| Status limitation | No electrical capacity, backup or installation/commissioning evidence supplied. |
| Evidence in supplied record | Solid-waste management and disposal are listed. |
|---|---|
| Status limitation | No collection, processing or disposal details or completion evidence supplied. |
| Evidence in supplied record | Fire protection and fire-safety requirements are listed. |
|---|---|
| Status limitation | No system description, clearance, access dimensions or completion evidence supplied. |
| Evidence in supplied record | The approval requires roads to be opened for access to neighboring sites. |
|---|---|
| Status limitation | No pedestrian-separation, accessible-route or accessibility specification supplied. |
8. Location, access & connectivity
The registered location is Chennaram, Thalakondapally mandal, Ranga Reddy district, Telangana, PIN 509206. The approval describes the locality as Chennaram Gram Panchayat. The supplied geocode is identified as the cadastral parcel centroid at 16.89491, 78.49347.
The RERA land-boundary record identifies an EXISTING ROAD on the east and owners’ land in Sy.No. 19 on the west, north and south. The draft approval requires roads within the layout to be opened for neighboring-site access.
The nearest sampled Outer Ring Road interchange is listed at approximately 37.9 km. No public-transport routes, additional measured distances, or verified travel times are supplied.
9. Developer & development status
The registered legal promoter is FLORINA DEVELOPERS PRIVATE LIMITED, a company. The supplied corporate identifier is GSTIN 36AAFCF2741K1ZK. The RERA certificate gives the promoter office as Village: TELAPUR, Mandal: RC PURAM, District: Sangareddy, Pin: 502032. The project record separately lists an address at 384, 385 and 426, Ground Floor, Aliens Space Station, Kolluru Road, Chennaram, with Chennaram locality and PIN 509206.
The Form-B declaration, made by Hari Challa as authorized signatory, undertakes project completion by 28th February, 2025. The RERA header records proposed completion as 23/03/2025; the supplied evidence does not include a project progress report or independently verified site status. No RERA registration extension is shown in the supplied certificate record.
10. Approvals, official records & documents
| Identifier / date | P02400006301; issued 07/07/2023; stated validity through 23/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for TIGER LINE under section 5; the certificate includes conditions concerning sale agreements, conveyance and the separate account. |
| Identifier / date | Draft - TLP.No.70/2023/H; 23-03-2023 |
|---|---|
| What the supplied record establishes | Director of Town and Country Planning approval of a draft technical layout pattern for 229 plots in Sy.No. 19/P. |
| Identifier / date | Lr.Roc.No.20182/1530/2023/e-Panchayat; application/e-Panchayat reference 20182/1530 |
|---|---|
| What the supplied record establishes | References associated with the draft layout approval. |
| Identifier / date | 24th May, 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration including the completion undertaking and separate-account commitments. |
| Identifier / date | RERA document 329078 |
|---|---|
| What the supplied record establishes | Listed as a layout plan or layout approval document, but the supplied extraction is not available. |
| Identifier / date | Documents 329084, 329093, 329094, 329095 |
|---|---|
| What the supplied record establishes | Filed title opinion and supporting title-related documents; their substantive title analysis is addressed in the Land & Title section. |
| Identifier / date | Statement 140244121, document 333415 |
|---|---|
| What the supplied record establishes | RERA-filed encumbrance statement. |
No final layout-release evidence or completion/occupancy certificate is included in the supplied document set. The draft approval’s listed infrastructure, mortgage, NOC and gift-deed conditions are not evidence that those requirements have been completed.
Frequently asked questions
Is TIGER LINE registered with Telangana RERA?
Yes. TIGER LINE is registered with the Telangana Real Estate Regulatory Authority as P02400006301; the registration status is New Project.
Who is the developer of TIGER LINE?
The promoter named in the RERA registration is FLORINA DEVELOPERS PRIVATE LIMITED.
Where is TIGER LINE located?
TIGER LINE is in Chennaram, Thalakondapally, Rangareddy, Telangana (509206).
When will TIGER LINE be completed?
The promoter's proposed date of completion filed with RERA is 23/03/2025. This is the promoter's declaration, not a guarantee.