Tjl Township

THANDU · Nalgonda · RERA P01800009164

TJL TOWNSHIP is a residential plotted development in THIPPARTHY, Thipparthy mandal, Nalgonda district, developed by registered promoter Thandu Saidulu Goud. The registered site extent is 17,578.28 sq.m and the layout has 78 residential plots, with software-measured plot sizes of 79.18–257.2 sq.m; building count and floors are not applicable to the plotted layout. The project is registered under TG-RERA number P01800009164, and the project fields state a proposed completion date of 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 11 Mar 2026 - check its extension on TG-RERA
24documents on file - each fact links to its page
9court cases on this project's land (survey 608, 609, 611, 612, Thipparthy)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Thipparthy, Thipparthy, Nalgonda · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameTJL TOWNSHIP RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionA 78-plot layout; no separate phase identifier is disclosed Layout record
TG-RERA registrationP01800009164 RERA record
Registration validity11/03/2024 to 11/03/2026, unless extended by the Authority Approvals record
Registered promoterThandu Saidulu Goud; the project identity record also uses THANDU RERA record
RERA statusOn-going project, as recorded in the supplied project data RERA record

Land and geographic identity

ItemRecord
LocalityTHIPPARTHY RERA record
Revenue villageThipparthy (also rendered “Thipparthi” in approval-document text) RERA record
MandalThipparthy RERA record
DistrictNalgonda RERA record
PIN508247 RERA record
Project survey numbers and subdivisions608/PART, 609/PART, 611/PART, 612/PART and 613/PART Land records
Registered site extent17,578.28 sq.m in the project land record Land records
Layout area17,578.27 sq.m net layout area in the drawing-derived layout record Layout record
Boundaries recorded on RERA project fieldsNorth: 45M EXISTING ROAD HYD TO ADDANKI; South: OWNERS LAND; East and West: OTHERS LAND RERA filing

Development identity

ItemRecord
Layout approvalTentative Layout Plan 279389/LP/GP/208125/0006/2023, dated 11-03-2024; approval document identifies NIUDA Urban Development Authority and delegation to Thiparthy Grampanchayat Approvals record
Drawing referenceTS/024352/2023, dated 06-04-2023, read from the approved drawing’s text layer and marked for review Approvals record
Approved built-up area0.00 proposed built-up area, with 0 proposed parking spaces in the layout-plan parameters; this is an open-plot layout, not a building plan
Plots78 plots, numbered 01 to 78 in the layout-plan parameters Layout record
Building count / floors / parking levelsNot applicable to the registered plotted layout; no residential building or parking-level configuration is disclosed

Offering and status

ItemRecord
Unit typeResidential plots RERA record
Plot-size rangeSoftware-measured from the layout drawing: 79.18–257.2 sq.m (about 94.7–307.6 sq.yd); drawing-derived, not a RERA-filed unit schedule Layout record
Booked / available countsNot supplied in the evidence provided for this overview RERA filing
Declared construction progressThe project fields list completeness as 70%; the amenity register separately reports progress values for selected infrastructure items. These are recorded declarations, not independent site verification RERA record RERA amenities
Completion datesProject fields state proposed and revised completion dates of 30/11/2026. The Form B declaration states completion on or before 11/03/2026 RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed evidence. The registration certificate is not an occupancy or conveyance document

2. The project story

TJL TOWNSHIP is registered as a residential plotted development at Thipparthy village and mandal, Nalgonda district, on the five identified part-survey parcels: 608/PART, 609/PART, 611/PART, 612/PART and 613/PART. The registration certificate names Thandu Saidulu Goud as promoter and records the project under TG-RERA number P01800009164.

The layout drawing identifies 78 plots, internal roads, organized open space/park land, social-infrastructure land and utility land. The plan is described in the approval documents as a Tentative Layout Plan; it sets out infrastructure and development conditions, including completion of development works and submission of a work-completion certificate for final-layout approval. Layout record

The project data labels the project on-going and records 70% completeness, but the supplied evidence does not establish that this percentage was independently inspected. No occupancy or completion certificate is included. The RERA registration-validity dates and the completion dates declared in the project fields and Form B are shown separately above. RERA record

3. Master plan, architecture & building design

This is an open-plot layout, not a multi-storey building scheme. The approved-drawing extraction records a net layout area of 17,578.27 sq.m, 78 plots, and proposed built-up area of 0.00 excluding and including parking. It also records 0 proposed parking spaces.

The layout record’s software-measured land-use schedule allocates:

Layout useAreaShare of net layout area
Plots11,022.76 sq.m62.71%
Roads4,357.08 sq.m24.79%
Parks / open space1,582.95 sq.m9.01%
Social infrastructure439.55 sq.m2.50%
Utilities175.94 sq.m1.00%
Amenities0.00 sq.m0.00%

Layout record

The plan extraction lists a 9.00 mts wide internal road and also identifies 45.00 MT existing and proposed roads and a 100' wide road. Those are drawing-text entries; the supplied material does not establish their on-site completion or provide a detailed circulation or access design.

The layout approval requires infrastructure and amenity works, including road formation and drainage, greenery and rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal and protected water supply. These are approval conditions, not evidence that each item has been completed. The approval also states that final-layout release requires a work-completion certificate from a Licensed Technical Person.

4. Homes, configurations & floor plans

This is a plotted layout, so apartment configurations and apartment floor plans do not apply. The approved layout-plan parameters identify 78 plots, Nos. 01 to 78.

Plot informationRecord
Plot count78; drawing schedule Layout record
Software-measured plot-size range79.18–257.2 sq.m; approximately 94.7–307.6 sq.yd Layout record
Common drawing-measured sizes100.36 sq.m (10 plots); 168.62 sq.m (4); 156.44 sq.m (4); 153.29 sq.m (4); 172.08 sq.m (3) Layout record
RERA-filed plot-wise saleable areas, booked counts and available countsNot supplied in the evidence provided for this overview RERA filing
Floor-plan measurementsNo building floors or flats were measured; the supplied drawing review reports two layout sheets and no flats Floor plans

The plot-size figures above are software-measured from the layout drawing and are not a substitute for the individual plot dimensions and area stated in the approved plan and the eventual registered sale documents. No apartment carpet area, balcony area or common-area loading is applicable to this plotted offering. Layout record Floor plans

5. Parking & vehicle circulation

The layout-plan parameters state 0 proposed parking spaces and 0.00 sq.m common parking area. No resident, visitor or accessible parking provision, plot-wise parking allocation, or EV-charging provision is disclosed in the supplied records.

The drawing extraction lists a 9.00 mts internal road and identifies 45.00 MT existing and proposed roads and a 100' wide road. The supplied material does not establish the completed condition of these roads, parking arrangements within individual plots, or pedestrian-vehicle separation.

6. Amenities, recreation & open spaces

The layout plan identifies open-space/park, social-infrastructure and utility land. The approval also sets out infrastructure and amenity works to be undertaken; the progress figures below come from the RERA amenity register and are declarations, not independent verification. Layout record RERA amenities

Sports/recreation
FacilityTot-lot
Description / sizeListed as a layout provision; no separate size supplied
Evidence sourceApproved layout-plan extraction
Declared progress / verified statusNo item-specific progress figure supplied
Landscape/open space
FacilityOrganized open space / park
Description / size1,582.95 sq.m; 9.01% of net layout area Layout record
Evidence sourceLayout drawing and RERA amenity register
Declared progress / verified statusGreen Strip/TOT LOT/Park: 95% declared; not independently verified RERA amenities
Landscape/open space
FacilityInternal roads and footpaths
Description / sizeRoad area: 4,357.08 sq.m Layout record
Evidence sourceLayout drawing and RERA amenity register
Declared progress / verified status95% declared; not independently verified RERA amenities
Convenience/community
FacilitySocial infrastructure
Description / size439.55 sq.m; 2.50% of net layout area Layout record
Evidence sourceLayout drawing and approval conditions
Declared progress / verified statusCommunity Buildings: 0% in amenity register; no facility-specific completion evidence supplied RERA amenities
Convenience/community
FacilityUtility land
Description / size175.94 sq.m; 1.00% of net layout area Layout record
Evidence sourceLayout drawing and approval conditions
Declared progress / verified statusNo separate progress figure supplied
Convenience/community
FacilityWater-conservation / rainwater harvesting
Description / sizeWater-harvesting pits are listed in the layout plan
Evidence sourceApproved layout-plan extraction and RERA amenity register
Declared progress / verified status95% declared; not independently verified RERA amenities

The approval conditions also refer to fencing of open spaces and greenery, including avenue planting. The supplied evidence does not independently verify delivery of those works.

7. Utilities, building services & safety

The approved-layout conditions call for a protected water-supply system, an overhead tank or sump, septic tank as applicable, sewerage disposal, storm-water drains and nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. The approval’s amenity/utility text also lists a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. These are stated provisions or conditions; the supplied evidence does not establish their capacities or independent completion.

The RERA amenity register reports water supply and sewerage at 95%, and electrical meter room/sub-station/receiving station at 70%. It reports storm-water drains and street lighting at 0%, and solid-waste management at 0%. These percentages are recorded declarations; no inspection record or service-capacity documentation is supplied. RERA amenities

No fire-safety system, building lifts, backup power, CCTV/security system, accessible circulation details or EV-charging facilities are disclosed in the supplied evidence. The layout approval’s reference to a septic tank or sewerage treatment plant does not establish which system is installed or operating. RERA amenities

8. Location, access & connectivity

The registered project location is Thipparthy village, Thipparthy mandal, Nalgonda district, Telangana 508247, at the survey parcels listed in the identity table. The RERA project fields record the north boundary as 45M EXISTING ROAD HYD TO ADDANKI; the drawing extraction also lists existing/proposed roads and a 9.00 mts internal road. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 90.8 km. This is the only measured connectivity distance supplied here; no travel time, public-transport service, or additional landmark distance is provided. Location record

9. Developer & development status

The TG-RERA registration certificate identifies Thandu Saidulu Goud as the registered promoter. The Form B declaration is made by Sri. Thandu Saidulu Goud, described as the promoter, and dated 28/11/2024. The evidence does not establish the promoter’s legal-entity type or provide a verified corporate registration identifier. Corporate record

Project fields show completeness of 70% and proposed and revised completion dates of 30/11/2026. Form B separately records an undertaking to complete on or before 11/03/2026. These are recorded project information and promoter declaration respectively; the supplied evidence contains no independent construction-progress inspection or completion certificate. RERA record RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for TJL TOWNSHIP, P01800009164, valid 11/03/2024–11/03/2026 unless extended
Layout drawing / referenceLayout plan TS/024352/2023, dated 06-04-2023; drawing text extraction marked for review Approvals record
Tentative layout approval279389/LP/GP/208125/0006/2023, dated 11-03-2024; issued by NIUDA Urban Development Authority, delegated to Thiparthy Grampanchayat Approvals record
Form B declarationPromoter declaration dated 28/11/2024, including title, encumbrance, funding and completion statements
Final layout / work-completion certificateNot supplied in the reviewed evidence; the tentative-layout approval calls for a Licensed Technical Person’s work-completion certificate for final-layout approval
Occupancy / completion certificateNot supplied; the project is a plotted layout and the supplied records do not include a project completion certificate Document index

The approval record describes a tentative layout and contains conditions for infrastructure works, public open-space and utility handover, and final-layout approval. The overview does not treat those conditions as proof of completed works or final release.

Frequently asked questions

Is TJL TOWNSHIP registered with Telangana RERA?

Yes. TJL TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01800009164; the registration status is On-Going Project.

Who is the developer of TJL TOWNSHIP?

The promoter named in the RERA registration is THANDU.

Where is TJL TOWNSHIP located?

TJL TOWNSHIP is in THIPPARTHY, Nalgonda, Telangana (508247).

When will TJL TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.