Avani Township
Sri. VEMPATI PITCHESWAR RAO AND OTHERS · Suryapet · RERA P01900011248
AVANI TOWNSHIP is a plotted development in Thammarabanda Pallem, Kodad Mandal, Suryapet District, developed by SRI. VEMPATI PITCHESWAR RAO AND OTHERS. The layout covers 7953.26 sq.m and comprises 22 open plots, with plot sizes of 127.74–474.7 sq.m. It is registered under TG-RERA number P01900011248, with completion stated by 22nd June 2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | AVANI TOWNSHIP RERA record |
| Project type | Plotted development / tentative plotted layout RERA record |
| Phase or registered portion | Not separately identified; registration concerns the layout on the survey numbers listed below |
| TG-RERA registration | P01900011248 |
| Registration validity | 22/06/2026 to 22/06/2028; certificate records a two-year validity. This is registration validity, not confirmation of completion or occupancy. |
| Registered promoter | SRI. VEMPATI PITCHESWAR RAO AND OTHERS |
| RERA status | RERA certificate records the project as registered. The project evidence identifies it as on-going; no completed or occupancy-certified portion is documented here. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kodad; the RERA certificate also identifies the project locality as Thammarabanda Pallem. Promoter website |
| Revenue village | Thammarabanda Pallem (also rendered in the filed layout records as Thammarabandapalem / Village Tamarabandapalem). RERA record |
| Mandal / district / PIN | Kodad / Suryapet / 508206 RERA record |
| Survey numbers and subdivisions | 463/A/1, 463/A/1/1, 463/AA3/2 RERA record |
| Registered site extent | 7953.26 sq.m in the RERA project record and the filed layout-plan area statement. Land records Layout record |
| Net / total layout area | Net layout area 7953.26 sq.m; total layout area 7953.26 sq.m. Layout record |
| Boundaries recorded in the RERA project details | North: Land of Kolli Viswanadham and others; South: Land of Kodati Srinivasa Rao and others; East: 30 Mts Wide Main Road; West: Land of Gutha Narasamma. RERA filing |
| Road widths shown in layout-plan extraction | 30.0 m and 9.14m |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority recorded in project details | DTCP; the approval record identifies Kodada Municipality as delegated authority. RERA record Approvals record |
| Principal layout approval | Tentative LP No. 0030/KODD/SWDL/2026, approved 22/06/2026 Approvals record |
| Application / file number | 015644/KODD/00036/SWDL/2026 Approvals record |
| Approved layout area | 7953.26 sq.m |
| Plot count | 22 plots, as recorded in the tentative-layout approval and plot schedule. Layout record |
| Built-up area / buildings / floors | Not applicable as a residential building configuration in the supplied evidence: this is a plotted layout. No building count, floor configuration, or approved building built-up area is stated for individual plot construction. RERA record |
| Parking | The layout area statement records Common Parking Area: 0.00 sq.m. Plot-level or individual-building parking arrangements are not provided. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Open plots in a 22-plot layout Layout record |
| Plot-size range | Software-measured from the layout drawing: 127.74–474.7 sq.m ( 152.8–567.7 sq yd); verify against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied project evidence. RERA unit table |
| Construction / development stage | The project is identified as On-Going Project. The supplied records do not give independently verified on-site completion progress. RERA record RERA amenities |
| Completion date | Promoter’s Form-B declaration states completion by 22nd June 2028; the RERA certificate validity also ends 22/06/2028. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. For this plotted-layout project, no building-specific OC status is stated. Document index |
2. The project story
AVANI TOWNSHIP is registered as a plotted development at Thammarabanda Pallem, Kodad Mandal, Suryapet District, on Survey Nos. 463/A/1, 463/A/1/1 and 463/AA3/2. The RERA-filed layout record describes 22 open plots within a total and net layout area of 7953.26 sq.m. RERA record Land records Layout record
The filed tentative-layout plan allocates land to plots, roads, open space, social infrastructure and utilities. The promoter’s Form-B declaration gives 22 June 2028 as the project completion undertaking. The supplied evidence does not establish how much infrastructure work has been completed at the site; the amenity schedule records zero progress for listed items, so these should be read as recorded provision/status fields, not independent site verification. No occupancy or completion certificate is supplied. RERA amenities Document index
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey residential building development in the supplied records. The filed drawing-derived area statement gives a total/net layout area of 7953.26 sq.m and the following land-use allocation:
| Layout component | Area | Share shown in layout |
|---|---|---|
| Plotted Area | 5221.58 sq.m | 65.65 % |
| Road Area | 1733.86 sq.m | 21.80 % |
| Open Space Area | 717.64 sq.m | 9.02 % |
| Social Infrastructure Area | 200.20 sq.m | 2.52 % |
| Utility Area | 79.98 sq.m | 1.01 % |
| Green Strip Area | 0.00 sq.m | 0 % |
| Buffer Area | 0.00 sq.m | 0 % |
| Common Parking Area | 0.00 sq.m | 0 % |
| Facilities Area | 0.00 sq.m | 0 % |
| Amenities Area | 0.00 sq.m | 0 % |
| Green Belt Area | 0.00 sq.m | 0 % |
| Future Development Area | 0.00 sq.m | 0 % |
| Total Layout Area | 7953.26 sq.m | 100 % |
Layout record
The drawing records 22 plots and road widths of 30.0 m and 9.14m. The layout extraction identifies a plot width of 68.83 and depth of 141.3; the supplied record does not state a measurement unit for those two figures. Plot-size readings from the drawing are software-measured and should be checked against the approved drawing. Layout record
No building footprints, floor plans, tower or block organization, or individual plot building designs are supplied. The tentative-layout approval describes development infrastructure including roads, drains, water-supply lines, a water tank, transformer, street lighting, park development and rainwater-harvesting pits; these are approval-record requirements or described works, not confirmation of completion.
4. Homes, configurations & floor plans
The offer recorded is for 22 plots, not flats. Plot-size readings below are software-measured from the layout drawing, not RERA-filed saleable areas; verify them against the drawing. Booked and available plot counts are not supplied. Layout record RERA unit table
| Plot-size band | Plots |
|---|---|
| 150-200 sq yd (125-167 sq.m) | 3 |
| 200-250 sq yd (167-209 sq.m) | 10 |
| 250-300 sq yd (209-251 sq.m) | 3 |
| 300-400 sq yd (251-334 sq.m) | 2 |
| 400-500 sq yd (334-418 sq.m) | 1 |
| 500-1000 sq yd (418-836 sq.m) | 3 |
The smallest measured plot is 127.74 sq.m (152.8 sq yd), the median is 187.29 sq.m (224.0 sq yd), and the largest is 474.7 sq.m (567.7 sq yd). Six plots are recorded at the common drawing-measured size of 187.29 sq.m (224.0 sq yd). These are drawing-derived measurements, not independent survey measurements. No apartment carpet-area, balcony, or common-area loading information applies in the supplied plotted-layout records. Layout record
5. Parking & vehicle circulation
The filed layout area statement records Common Parking Area: 0.00 sq.m. No sanctioned count of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual plots, or EV-charging installation is documented in the supplied project evidence.
The drawing-derived records identify layout roads, including widths of 30.0 m and 9.14m. The tentative-layout approval describes roads as to be kept open for access to neighbouring sites and prohibits a compound wall or fencing around the site under the stated approval condition. The supplied material does not establish completed roads, ramps, vehicle entries or exits, or separation of pedestrian and vehicle circulation.
6. Amenities, recreation & open spaces
The layout-plan area statement allocates 717.64 sq.m to open space, 200.20 sq.m to social infrastructure and 79.98 sq.m to utilities. The project amenity schedule lists facilities, but records 0% progress for each listed item; those entries do not independently verify that the facilities have been built. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 717.64 sq.m; layout area statement shows 9.02 % | Area is shown in layout record; completion not verified | |
| Green Strip / TOT LOT / Park | No separate size stated; layout area statement records Green Strip Area 0.00 sq.m | RERA amenities | Amenity schedule: 0% |
| Community Buildings | No size or description stated | RERA amenities | 0%; not independently verified |
| Social infrastructure | 200.20 sq.m | Area is shown in layout record; completion not verified |
7. Utilities, building services & safety
The tentative-layout approval describes development works and reserved utility land, including water supply and storage, sewerage and drainage, electricity infrastructure, street lighting, solid-waste management and rainwater harvesting. The approval record does not establish that these works are complete; the project amenity schedule lists several corresponding items at 0% progress. RERA amenities
| What the supplied record says | Approval describes internal water-supply pipelines, an assured water-supply source, an overhead tank and a sump/water reservoir. |
|---|---|
| Status limitation | Capacities and completed status are not supplied. |
| What the supplied record says | Approval describes underground drainage lines, storm-water drains, and a common septic tank / STP. |
|---|---|
| Status limitation | Capacity, operating status and completion are not supplied. |
| What the supplied record says | Approval describes rainwater-harvesting pits; the layout approval also includes a rainwater-harvesting condition. |
|---|---|
| Status limitation | Number, capacity and completion are not supplied. |
| What the supplied record says | Approval describes electrical supply lines, street lights and a transformer; the layout reserves 79.98 sq.m for utilities. |
|---|---|
| Status limitation | Supply capacity and completed status are not supplied. |
| What the supplied record says | Approval describes solid-waste management; the amenity schedule lists solid-waste management and disposal at 0% progress. |
|---|---|
| Status limitation | Operating arrangements and completion are not verified. RERA amenities |
| What the supplied record says | The amenity schedule includes fire protection and fire-safety requirements at 0%; no project-specific installed fire systems or clearance is documented. |
|---|---|
| Status limitation | No statutory-compliance conclusion can be drawn from the supplied schedule. RERA amenities |
| What the supplied record says | No project-specific lift or accessibility details are supplied for this plotted layout. |
|---|---|
| Status limitation | Not disclosed in the supplied evidence. Document index |
8. Location, access & connectivity
The project is recorded in Thammarabanda Pallem (also rendered in filed layout records as Thammarabandapalem / Tamarabandapalem), Kodad Mandal, Suryapet District, Telangana, PIN 508206. The RERA filing’s locality is Kodad. RERA record Promoter website
The project boundaries recorded in the RERA project details identify a 30 Mts Wide Main Road along the east boundary. The layout-plan extraction also records road widths of 30.0 m and 9.14m. A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 146.6 km; no other measured distances or public-transport details are provided. RERA filing Location record
9. Developer & development status
The registered promoter is SRI. VEMPATI PITCHESWAR RAO AND OTHERS. The RERA filing identifies the organization type as Others and describes it as JOINT DEVELOPMENT; a more specific legal-entity type, corporate registration identifier, registered office details beyond the supplied address, and official contact or website are not established in the evidence provided. The RERA certificate gives the promoter office location as Kodad, Suryapet, PIN 508206. RERA record RERA filing RERA filing
The project is identified as on-going, and the promoter’s Form-B declaration undertakes completion by 22nd June 2028. The supplied records do not provide independently verified construction progress or an occupancy/completion certificate. The registration period is stated separately in the certificate as 22/06/2026 to 22/06/2028. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records AVANI TOWNSHIP, registration P01900011248, issued 22/09/2026, with validity 22/06/2026–22/06/2028. |
| Tentative layout approval | Tentative LP No. 0030/KODD/SWDL/2026, dated 22/06/2026, for 22 plots in the stated survey numbers; approval record identifies Kodada Municipality. |
| Layout-plan filing | Layout plan record identifies DTCP, file no. 015644/KODD/00036/SWDL/2026, and area statement of 7953.26 sq.m. |
| Promoter declaration | Form-B declaration by authorized signatory Sri. VEMPATI PITCHESWAR RAO records the completion undertaking and fund-management declarations. |
| Layout infrastructure and conditions | Tentative-layout approval describes development works and approval conditions for the layout. |
| Occupancy / completion certificate | None supplied in the reviewed evidence. Document index |
| Building plans / construction drawings | No building-specific plans or floor plans are supplied; the drawing evidence is a layout sheet. Floor plans Layout record |
1. Project at a glance
Project identity
Registered name: AVANI TOWNSHIP
Project type: Plotted development / tentative plotted layout
Phase or registered portion: Not separately identified; registration concerns the layout on the survey numbers listed below
TG-RERA registration: P01900011248
Registration validity: 22/06/2026 to 22/06/2028; certificate records a two-year validity. This is registration validity, not confirmation of completion or occupancy.
Registered promoter: SRI. VEMPATI PITCHESWAR RAO AND OTHERS
RERA status: RERA certificate records the project as registered. The project evidence identifies it as on-going; no completed or occupancy-certified portion is documented here.
Land and geographic identity
Locality: Kodad; the RERA certificate also identifies the project locality as Thammarabanda Pallem.
Revenue village: Thammarabanda Pallem (also rendered in the filed layout records as Thammarabandapalem / Village Tamarabandapalem).
Mandal / district / PIN: Kodad / Suryapet / 508206
Survey numbers and subdivisions: 463/A/1, 463/A/1/1, 463/AA3/2
Registered site extent: 7953.26 sq.m in the RERA project record and the filed layout-plan area statement.
Net / total layout area: Net layout area 7953.26 sq.m; total layout area 7953.26 sq.m.
Boundaries recorded in the RERA project details: North: Land of Kolli Viswanadham and others; South: Land of Kodati Srinivasa Rao and others; East: 30 Mts Wide Main Road; West: Land of Gutha Narasamma.
Road widths shown in layout-plan extraction: 30.0 m and 9.14m
Development identity
Sanctioning authority recorded in project details: DTCP; the approval record identifies Kodada Municipality as delegated authority.
Principal layout approval: Tentative LP No. 0030/KODD/SWDL/2026, approved 22/06/2026
Application / file number: 015644/KODD/00036/SWDL/2026
Approved layout area: 7953.26 sq.m
Plot count: 22 plots, as recorded in the tentative-layout approval and plot schedule.
Built-up area / buildings / floors: Not applicable as a residential building configuration in the supplied evidence: this is a plotted layout. No building count, floor configuration, or approved building built-up area is stated for individual plot construction.
Parking: The layout area statement records Common Parking Area: 0.00 sq.m. Plot-level or individual-building parking arrangements are not provided.
Offering and status
Offering: Open plots in a 22-plot layout
Plot-size range: Software-measured from the layout drawing: 127.74–474.7 sq.m ( 152.8–567.7 sq yd); verify against the drawing.
Booked / available counts: Not disclosed in the supplied project evidence.
Construction / development stage: The project is identified as On-Going Project. The supplied records do not give independently verified on-site completion progress.
Completion date: Promoter’s Form-B declaration states completion by 22nd June 2028; the RERA certificate validity also ends 22/06/2028.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. For this plotted-layout project, no building-specific OC status is stated.
2. The project story
AVANI TOWNSHIP is registered as a plotted development at Thammarabanda Pallem, Kodad Mandal, Suryapet District, on Survey Nos. 463/A/1, 463/A/1/1 and 463/AA3/2. The RERA-filed layout record describes 22 open plots within a total and net layout area of 7953.26 sq.m.
The filed tentative-layout plan allocates land to plots, roads, open space, social infrastructure and utilities. The promoter’s Form-B declaration gives 22 June 2028 as the project completion undertaking. The supplied evidence does not establish how much infrastructure work has been completed at the site; the amenity schedule records zero progress for listed items, so these should be read as recorded provision/status fields, not independent site verification. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey residential building development in the supplied records. The filed drawing-derived area statement gives a total/net layout area of 7953.26 sq.m and the following land-use allocation:
| Layout component | Area | Share shown in layout |
|---|---|---|
| Plotted Area | 5221.58 sq.m | 65.65 % |
| Road Area | 1733.86 sq.m | 21.80 % |
| Open Space Area | 717.64 sq.m | 9.02 % |
| Social Infrastructure Area | 200.20 sq.m | 2.52 % |
| Utility Area | 79.98 sq.m | 1.01 % |
| Green Strip Area | 0.00 sq.m | 0 % |
| Buffer Area | 0.00 sq.m | 0 % |
| Common Parking Area | 0.00 sq.m | 0 % |
| Facilities Area | 0.00 sq.m | 0 % |
| Amenities Area | 0.00 sq.m | 0 % |
| Green Belt Area | 0.00 sq.m | 0 % |
| Future Development Area | 0.00 sq.m | 0 % |
| Total Layout Area | 7953.26 sq.m | 100 % |
The drawing records 22 plots and road widths of 30.0 m and 9.14m. The layout extraction identifies a plot width of 68.83 and depth of 141.3; the supplied record does not state a measurement unit for those two figures. Plot-size readings from the drawing are software-measured and should be checked against the approved drawing.
No building footprints, floor plans, tower or block organization, or individual plot building designs are supplied. The tentative-layout approval describes development infrastructure including roads, drains, water-supply lines, a water tank, transformer, street lighting, park development and rainwater-harvesting pits; these are approval-record requirements or described works, not confirmation of completion.
4. Homes, configurations & floor plans
The offer recorded is for 22 plots, not flats. Plot-size readings below are software-measured from the layout drawing, not RERA-filed saleable areas; verify them against the drawing. Booked and available plot counts are not supplied.
150-200 sq yd (125-167 sq.m): 3
200-250 sq yd (167-209 sq.m): 10
250-300 sq yd (209-251 sq.m): 3
300-400 sq yd (251-334 sq.m): 2
400-500 sq yd (334-418 sq.m): 1
500-1000 sq yd (418-836 sq.m): 3
The smallest measured plot is 127.74 sq.m (152.8 sq yd), the median is 187.29 sq.m (224.0 sq yd), and the largest is 474.7 sq.m (567.7 sq yd). Six plots are recorded at the common drawing-measured size of 187.29 sq.m (224.0 sq yd). These are drawing-derived measurements, not independent survey measurements. No apartment carpet-area, balcony, or common-area loading information applies in the supplied plotted-layout records.
5. Parking & vehicle circulation
The filed layout area statement records Common Parking Area: 0.00 sq.m. No sanctioned count of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual plots, or EV-charging installation is documented in the supplied project evidence.
The drawing-derived records identify layout roads, including widths of 30.0 m and 9.14m. The tentative-layout approval describes roads as to be kept open for access to neighbouring sites and prohibits a compound wall or fencing around the site under the stated approval condition. The supplied material does not establish completed roads, ramps, vehicle entries or exits, or separation of pedestrian and vehicle circulation.
6. Amenities, recreation & open spaces
The layout-plan area statement allocates 717.64 sq.m to open space, 200.20 sq.m to social infrastructure and 79.98 sq.m to utilities. The project amenity schedule lists facilities, but records 0% progress for each listed item; those entries do not independently verify that the facilities have been built.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 717.64 sq.m; layout area statement shows 9.02 % | Area is shown in layout record; completion not verified | |
| Green Strip / TOT LOT / Park | No separate size stated; layout area statement records Green Strip Area 0.00 sq.m | Amenity schedule: 0% | |
| Community Buildings | No size or description stated | 0%; not independently verified | |
| Social infrastructure | 200.20 sq.m | Area is shown in layout record; completion not verified |
7. Utilities, building services & safety
The tentative-layout approval describes development works and reserved utility land, including water supply and storage, sewerage and drainage, electricity infrastructure, street lighting, solid-waste management and rainwater harvesting. The approval record does not establish that these works are complete; the project amenity schedule lists several corresponding items at 0% progress.
| What the supplied record says | Approval describes internal water-supply pipelines, an assured water-supply source, an overhead tank and a sump/water reservoir. |
|---|---|
| Status limitation | Capacities and completed status are not supplied. |
| What the supplied record says | Approval describes underground drainage lines, storm-water drains, and a common septic tank / STP. |
|---|---|
| Status limitation | Capacity, operating status and completion are not supplied. |
| What the supplied record says | Approval describes rainwater-harvesting pits; the layout approval also includes a rainwater-harvesting condition. |
|---|---|
| Status limitation | Number, capacity and completion are not supplied. |
| What the supplied record says | Approval describes electrical supply lines, street lights and a transformer; the layout reserves 79.98 sq.m for utilities. |
|---|---|
| Status limitation | Supply capacity and completed status are not supplied. |
| What the supplied record says | Approval describes solid-waste management; the amenity schedule lists solid-waste management and disposal at 0% progress. |
|---|---|
| Status limitation | Operating arrangements and completion are not verified. |
| What the supplied record says | The amenity schedule includes fire protection and fire-safety requirements at 0%; no project-specific installed fire systems or clearance is documented. |
|---|---|
| Status limitation | No statutory-compliance conclusion can be drawn from the supplied schedule. |
| What the supplied record says | No project-specific lift or accessibility details are supplied for this plotted layout. |
|---|---|
| Status limitation | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The project is recorded in Thammarabanda Pallem (also rendered in filed layout records as Thammarabandapalem / Tamarabandapalem), Kodad Mandal, Suryapet District, Telangana, PIN 508206. The RERA filing’s locality is Kodad.
The project boundaries recorded in the RERA project details identify a 30 Mts Wide Main Road along the east boundary. The layout-plan extraction also records road widths of 30.0 m and 9.14m. A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 146.6 km; no other measured distances or public-transport details are provided.
9. Developer & development status
The registered promoter is SRI. VEMPATI PITCHESWAR RAO AND OTHERS. The RERA filing identifies the organization type as Others and describes it as JOINT DEVELOPMENT; a more specific legal-entity type, corporate registration identifier, registered office details beyond the supplied address, and official contact or website are not established in the evidence provided. The RERA certificate gives the promoter office location as Kodad, Suryapet, PIN 508206.
The project is identified as on-going, and the promoter’s Form-B declaration undertakes completion by 22nd June 2028. The supplied records do not provide independently verified construction progress or an occupancy/completion certificate. The registration period is stated separately in the certificate as 22/06/2026 to 22/06/2028.
10. Approvals, official records & documents
TG-RERA registration: Form C records AVANI TOWNSHIP, registration P01900011248, issued 22/09/2026, with validity 22/06/2026–22/06/2028.
Tentative layout approval: Tentative LP No. 0030/KODD/SWDL/2026, dated 22/06/2026, for 22 plots in the stated survey numbers; approval record identifies Kodada Municipality.
Layout-plan filing: Layout plan record identifies DTCP, file no. 015644/KODD/00036/SWDL/2026, and area statement of 7953.26 sq.m.
Promoter declaration: Form-B declaration by authorized signatory Sri. VEMPATI PITCHESWAR RAO records the completion undertaking and fund-management declarations.
Layout infrastructure and conditions: Tentative-layout approval describes development works and approval conditions for the layout.
Occupancy / completion certificate: None supplied in the reviewed evidence.
Building plans / construction drawings: No building-specific plans or floor plans are supplied; the drawing evidence is a layout sheet.
Frequently asked questions
Is AVANI TOWNSHIP registered with Telangana RERA?
Yes. AVANI TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01900011248; the registration status is On-Going Project.
Who is the developer of AVANI TOWNSHIP?
The promoter named in the RERA registration is Sri. VEMPATI PITCHESWAR RAO AND OTHERS.
Where is AVANI TOWNSHIP located?
AVANI TOWNSHIP is in Kodad, Thammarabanda Pallem, Suryapet, Telangana (508206).
When will AVANI TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 22/06/2028. This is the promoter's declaration, not a guarantee.
More projects in Thammarabanda Pallem