Sign in

Urban Ville

ADITI HOMES INDIA PRIVATE LIMITED · Sangareddy · RERA P01100009125

URBAN VILLE is a residential apartment project in Tellapur, RC PURAM Mandal, Sangareddy District, registered under TG-RERA **P01100009125** and developed by **ADITI HOMES INDIA PRIVATE LIMITED**. The project covers **24,026.15 sq.m.** and comprises 10 residential blocks, A to J, and an Amenities Block; the residential blocks are Ground + 2 Upper floors, and the Amenities Block is Cellar + Ground + 3 Upper floors. The RERA filing lists 63 4BHK homes. The project record gives a proposed completion date of **01/02/2028**.

📘 Project brochure from the promoter’s website ↗

01What we found

RegisteredTG-RERA - valid till 1 Oct 2027
74documents on file - each fact links to its page
53court cases on this project's land (survey 83, 85, 86, 88, 95, Tellapur)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameURBAN VILLE RERA record [REGCERT-63009]
Project typeResidential; TG-RERA filing classifies the project as an apartment project. RERA record RERA filing
Phase / registered portionThe certificate identifies URBAN VILLE; a separate phase name is not disclosed. The municipality letter covers A to J Blocks and an Amenities Block. [REGCERT-63009]
TG-RERA registrationP01100009125 [REGCERT-63009]
Registration validity01/10/2024–01/10/2027; the certificate says three years and records no extension. This is registration validity, not the completion deadline. [REGCERT-63009]
Registered promoterADITI HOMES INDIA PRIVATE LIMITED RERA record Corporate record [REGCERT-63009]
RERA statusNew Project; registration certificate issued. RERA record [REGCERT-63009]

Land and geographic identity

ItemRecord
LocalityTellapur RERA record [REGCERT-63009]
Revenue villageTellapur / Tellapur Village RERA record
MandalRC PURAM in the project record; the HMDA permission also names Ramachandrapuram Mandal. RERA record
DistrictSangareddy RERA record
PIN502032 RERA record [REGCERT-63009]
Project survey numbers and subdivisions83, 83/A, 85, 85/A/1, 85/P, 86, 86/A/2, 86/AA/2, 88, 88/P, 88/AA/2, 88/AA/3, 88/A/1, 95/AA/2 and 95/A/1. RERA record Land records [REGCERT-63009]
Registered site extent24,026.15 sq.m. as recorded in the project filing and commencement-permission documents. RERA filing
Net / total areaRERA land details record total and net area as 24,026.15 sq.m., with affected area recorded as 0. The HMDA permission separately refers to an existing NALA-affected area to be handed over before OC release. RERA filing
BoundariesEast: ROAD; West, North and South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the municipality letter records permission to commence construction. Approvals record
Principal approvalHMDA proceedings / file 049752/HCA/LT/U6/HMDA/22102021, approved 01-10-2024. The approval record also gives the file as 049752/HCA/L T/U6/HMDA/22102021. Approvals record
Municipality letterTellapur Municipality Lr. No.2370/MCT/TP/2024, dated 19.11.2024. Approvals record
Approved built-up areaThe available extracted RERA fields record 22,193.65 sq.m. as approved built-up area. RERA filing
Buildings11 in the project record: 10 home blocks and one amenities block. RERA filing RERA unit table
Sanctioned configurationHMDA permission: A to J Blocks, Ground + 2 Upper floors; Amenities Block, Cellar + Ground + 3 Upper floors.
Parking levelsThe amenities-block sanction includes a cellar; the supplied record does not provide a complete project-wide parking count or allocation schedule.
Unit countRERA filing: 63 4BHK homes and an amenities row of 4 units (not homes for sale). The land-details record lists 11 total building units; the HMDA permission describes 10 residential blocks plus an amenities block. RERA unit table RERA unit table

Offering and status

ItemRecord
RERA-filed configuration4BHK; 63 units, 0 booked, 63 available in the portal data, which has no stated as-of date. RERA unit table RERA unit details
RERA-filed saleable area559.19 sq.m. for the 4BHK configuration. RERA unit table RERA unit details
Construction stageRERA amenities schedule records internal roads and footpaths at 15% and the other listed common infrastructure items at 0%. These are filed progress figures, not independent site verification. RERA amenities
Completion undertakingForm B declares completion by 01-Oct-2027.
Proposed completion date in project record01/02/2028. RERA record RERA filing
Occupancy / completion certificateNo OC or completion certificate is identified in the supplied project documents. The HMDA permission makes OC subject to stated conditions. Document index

2. The project story

  • URBAN VILLE is registered as a residential project in Tellapur, Sangareddy District, on land recorded across the project survey numbers listed above. The RERA-filed scheme comprises ten residential blocks, identified in the permission as A to J, with a separate amenities block. HMDA’s permission describes the residential blocks as Ground plus two upper floors and the amenities block as Cellar plus Ground plus three upper floors. RERA record Land records
  • The project filing lists 63 4BHK homes. RERA progress data reports internal roads and footpaths at 15%, with the other listed common infrastructure items at 0%; these are portal-reported percentages and do not independently establish the condition of the site. The supplied documents do not establish completed or occupancy-certified buildings. RERA unit table RERA amenities Document index
  • The registered completion undertaking and the project-record proposed completion date are both shown in the overview table because they are separate source fields. The materials supplied do not explain the difference; no conclusion about a revised deadline is drawn here. RERA record

3. Master plan, architecture & building design

  • The HMDA permission and Tellapur Municipality letter describe A to J residential blocks, each Ground plus two upper floors, and an Amenities Block with a cellar, Ground and three upper floors. The approved project land extent recorded in those documents is 24,026.15 sq.m. The available RERA field separately records approved built-up area of 22,193.65 sq.m. RERA filing
  • The sanctioned plans identify building services and site provisions including a transformer, garbage house, STP, generator room, A/C plant room, electrical installations, laundry, solar water-heating and solar-lighting systems, refuse chute, water storage tanks, rainwater-harvesting structures, sump and septic tank. The permission also calls for a detailed drainage, sewerage and water-supply network plan before OC release.
  • The supplied HMDA conditions include maintaining setbacks free of parking and construction, developing rainwater-harvesting structures, obtaining Fire Services clearance before applying for OC, and handing over the existing NALA-affected area to the local body by registered gift deed before OC release. The permission also requires the open space and internal circulation pattern to be maintained as approved.
  • The extracted plan sheets describe the clubhouse as Cellar plus Ground plus three floors and record a basement area (parking) of 836.65 sq.m. The project record does not supply a complete drawing-based account of building footprints, flats per floor, lifts, stairs, internal road dimensions, or residential versus common-area floor-area allocation. No software-measured apartment floor areas are available: two drawings are listed, both pending scan measurement. Floor plans

4. Homes, configurations & floor plans

  • The RERA filing records 63 4BHK homes, none booked and 63 available in the portal snapshot; the snapshot has no stated as-of date. The filed saleable area is 559.19 sq.m. The amenities row in the unit table is not a home offering. RERA unit table RERA unit details RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
4BHK63063559.19 sq.m.Not measured in supplied drawingsNot supplied
  • Carpet area is not available from the supplied floor-plan measurement data: both drawings are still listed as scans pending. RERA saleable area is the filed figure and should not be treated as a drawing-measured carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The sanctioned Amenities Block includes a cellar, and the extracted clubhouse plan records 836.65 sq.m. of basement parking area. The HMDA permission states that parking or construction must not be placed in setback areas.
  • A project-wide number of car or two-wheeler spaces, visitor or accessible-space provision, ramp and driveway arrangements, EV charging provision, and unit-specific parking allocations are not established by the supplied records. A parking area shown in a plan does not by itself establish an exclusive parking entitlement for a particular buyer. Document index

6. Amenities, recreation & open spaces

The RERA amenities schedule lists common facilities and records their progress as follows. The percentages are portal-reported; they are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenities schedule RERA amenities15% filed; not independently verified
Water SupplySize or capacity not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Size or capacity not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Storm Water DrainsSize not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Green Strip / TOT LOT / ParkSize not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Street LightingQuantity not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Community BuildingsSize or capacity not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Treatment and Disposal of Sewage and Sullage WaterSize or capacity not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Solid Waste Management and DisposalDetails not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Water Conservation / Rainwater HarvestingDetails not suppliedRERA amenities schedule RERA amenities; HMDA permission0% filed; not independently verified
Energy ManagementDetails not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Fire Protection and Fire Safety RequirementsDetails not suppliedRERA amenities schedule RERA amenities0% filed; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not suppliedRERA amenities schedule RERA amenities; HMDA permission0% filed; not independently verified
Aggregate recreational open spaceArea not stated in the RERA amenities scheduleRERA amenities schedule RERA amenities0% filed; not independently verified
Amenities BlockCellar + Ground + 3 Upper floorsHMDA permissionSanctioned; construction progress not independently verified
ClubhouseCellar + G+3 floors; basement parking area recorded as 836.65 sq.m.Extracted planPlan evidence; completion not established
  • The promoter brochure lists additional recreation and clubhouse features, including a swimming pool, kids’ pool, tennis court, gym, indoor sports and landscaped areas. These are promoter-marketed claims, not evidence in the supplied records that the facilities are sanctioned as shown or delivered.

7. Utilities, building services & safety

  • HMDA’s permission identifies planned water storage, a sump, STP, septic tank, rainwater-harvesting structures, transformer, garbage house and electrical installations. It calls for a detailed water-supply, sewerage and drainage plan before OC release and states that recycled STP water is to be used for gardening. These are approval conditions or plan provisions; the supplied material does not establish installation or commissioning.
  • The same permission requires Fire Services clearance for the proposed complex before applying for OC, refers to fire-safety requirements under the National Building Code, and makes occupation subject to completion in accordance with the technically approved plans and an HMDA “Fit for Occupancy” certificate. No such project OC or fire-clearance certificate is included in the supplied documents.
  • The plans list a generator room, solar water heating, solar lighting and refuse chute. The promoter brochure separately claims backup power, water softeners, security and other services; these remain marketing claims in this overview. The supplied evidence does not specify lift capacity in the RERA-filed records, project-wide water storage capacity as a verified value, electrical backup capacity, accessibility provisions, or CCTV and access-control installation status.

8. Location, access & connectivity

  • The registered project location is Tellapur Village, RC PURAM Mandal, Sangareddy District, PIN 502032. The site boundary information in the RERA record identifies a road to the east and other land on the remaining three sides. RERA record RERA filing
  • The supplied location data identifies Financial District (Nanakramguda), 1.2 km from the cadastral parcel centroid. Location record This is a supplied distance, not a travel-time estimate. The evidence does not provide a verified approach-road description, public-transport details, or independently measured distances to other landmarks.

9. Developer & development status

  • The registered promoter is ADITI HOMES INDIA PRIVATE LIMITED, a private limited company. Its supplied corporate identifier is GSTIN 36AANCA2494G1ZG. The RERA record identifies Kanchumarti Mohana Vamsi as an authorized signatory and Anuj Odaniyil as a director. Corporate record Parties record
  • The Form B affidavit-cum-declaration, verified at Hyderabad on 21-October-2024, is made by Mohana Vamsi Kanchumarti as authorized signatory. It declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 01-Oct-2027. These are promoter declarations, not independent title findings.
  • The project record separately gives a proposed completion date of 01/02/2028. The supplied records do not identify an OC or completion certificate, and do not establish independently verified construction completion. RERA record Document index
  • The promoter website supplied in the project record is https://aditihomes.co/urban_ville.html. The brochure gives [email protected] and 040 29300510 as marketing contacts; these are brochure contacts, not identified here as official RERA contact details. Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100009125; valid 01/10/2024–01/10/2027; certificate issued 11/12/2024
What the supplied material establishesFORM C registration for URBAN VILLE, subject to certificate conditions. [REGCERT-63009]
HMDA building-permission proceedings
Identifier / date049752/HCA/LT/U6/HMDA/22102021; 01-10-2024
What the supplied material establishesPermission for A to J Blocks and an Amenities Block on the stated Tellapur land; includes conditions relevant to OC and site works.
Tellapur Municipality letter
Identifier / dateLr. No.2370/MCT/TP/2024; 19.11.2024
What the supplied material establishesLetter states that construction may commence for A to J Blocks and the Amenities Block.
Building-plan sheets
Identifier / dateDocuments 508570 and 508571
What the supplied material establishesExtracted proposed floor plans and clubhouse plan; the supplied extracts are plan evidence, not independent confirmation of completed work.
Form B declaration
Identifier / dateDocument 508022; verified 21-October-2024
What the supplied material establishesPromoter’s declarations on title, encumbrances, completion undertaking, accounts and other commitments.
HMDA mortgage records identified in permission
Identifier / date3130 of 2023, 3129/2023, 3131 of 2023; dated 28.01.2023
What the supplied material establishesHMDA permission records three mortgage deeds in favour of MC HMDA and identifies associated mortgage areas.
Environmental-clearance reference in permission
Identifier / dateSIA/TG/INFRA2/425476/2023; 12.06.2023
What the supplied material establishesReference appears in the permission’s listed document numbers; the supplied extract does not establish the scope of the underlying clearance.
Irrigation & CAD NOC references
Identifier / dateSE/IC/SRD/DSE/DEE 1/TS4/2633 (16.10.2023); SE/IC/SRD/DSE/DEE 1/TS4/2671 (17.10.2023); SE/IC/SRD/DSE/DEE 1/TS4/1035 (04.05.2024)
What the supplied material establishesReferences recorded in the HMDA permission.
Occupancy / completion certificate
Identifier / dateNot identified in the supplied documents
What the supplied material establishesHMDA permission lists requirements before occupancy; no project OC or completion certificate is supplied.

The supplied materials do not include an independently verified site-progress inspection or a completed occupancy certificate. The HMDA approval conditions and full legal and title implications are addressed in the relevant approvals, land-and-title and risk sections.

Frequently asked questions

Is URBAN VILLE registered with Telangana RERA?

Yes. URBAN VILLE is registered with the Telangana Real Estate Regulatory Authority as P01100009125; the registration status is New Project.

Who is the developer of URBAN VILLE?

The promoter named in the RERA registration is ADITI HOMES INDIA PRIVATE LIMITED.

Where is URBAN VILLE located?

URBAN VILLE is in TELLAPUR, RC PURAM, Sangareddy, Telangana (502032).

When will URBAN VILLE be completed?

The promoter's proposed date of completion filed with RERA is 01/02/2028. This is the promoter's declaration, not a guarantee.

More projects in Telapur