Sign in

West Winds

QUBIC INFRA · Rangareddy · RERA P02400006628

West Winds is a residential apartment project in Phase II, Peeramchruvu village, Gandipet mandal, Ranga Reddy district, developed by registered promoter QUBIC INFRA, a partnership. The project occupies 889.16 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 20 apartments: 10 2BHK units of 117.98 sq. m each and 10 3BHK units of 87.52 sq. m each. It is registered under TG-RERA number P02400006628, with registration from 26/07/2023 to 31/03/2025; the promoter’s stated completion deadline was before 31st March, 2025.

01What we found

Period endedTG-RERA registration ran to 31 Mar 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered name and typeWest Winds; residential apartment project. RERA record
Phase / registered portionPhase II is stated in the project land and RERA-filed Form B description; the registration certificate lists survey no. 24. The registered portion is not otherwise separately named. RERA filing
TG-RERA registrationP02400006628; registered from 26/07/2023 to 31/03/2025. The supplied registration record does not show an extension. Registration validity is distinct from the promoter’s completion undertaking and from occupancy certification. RERA record
Registered promoterQUBIC INFRA, a partnership. RERA filing Corporate record
RERA status in supplied recordRegistration certificate issued. The registration validity ended on 31/03/2025; no extension is recorded in the supplied evidence.

Land and geographic identity

ItemProject record
Locality / villageLocality: Phase II; revenue village: Peeramchruvu. The building-permit extraction also spells the village “Peeramcheruvu.” RERA record RERA filing
Mandal / district / PINGandipet, Ranga Reddy, 500086. RERA record
Project survey and subdivisionSurvey No. 24, Part No. 24; plot no. 180. RERA filing
Site areaRERA land record: 889.16 sq. m total and net area. The building-permit extraction also states an extent of 889.16 Sq. Mt. RERA filing
BoundariesEast: 40 Ft Road; West: Plot No179; North: Plot No 191; South: 30 Ft Road. RERA filing
Project plan approval number49/LO/Plg/HMDA/2022 is the approval number shown in the project header; the building permit for plot 180 is separately identified below. RERA record Approvals record

Development identity

ItemProject record
Sanctioning authority / building-permit referenceHMDA building permit, issued through Bandlaguda Jagir Municipal Corporation; approval no. 008235/BP/HMDA/1678/SKP/2022, dated 29 November, 2022; proceedings no. 001863/BP/HMDA/SKP/2022. Approvals record
Approved built-up area2,569.97 (the building-permit extraction labels the unit as Sq.mts).
Building count and sanctioned floorsOne residential building; 1 Stilt + 5 upper floors. Basement, podium, and floor-by-floor unit arrangement are not established in the supplied extracts. RERA unit table
Mortgage recorded in building permit208.01 Sq.mts of built-up area is recorded as mortgaged in favour of MC, HMDA; the permit states this area is registrable only after an Occupancy Certificate.
Approved versus RERA-filed unitsRERA land details state 1 total building unit and 1 proposed building unit. The RERA unit schedule lists 20 apartments (10 2BHK and 10 3BHK). The meaning of the “building units” field is not further explained in the supplied record. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configurations and saleable areas2BHK: 10 units, 117.98 sq. m each; 3BHK: 10 units, 87.52 sq. m each. RERA unit table
Booked / availablePortal-derived figures, with no as-of date supplied: 0 booked / 10 available for each configuration. Treat as indicative, not a current availability confirmation. RERA unit table
Completion deadlineQUBIC INFRA’s Form B states completion before 31st March, 2025.
Construction stageThe supplied evidence does not state a verified current construction stage. The amenity/progress schedule reports 0% against each listed item; this is a reported record value, not independent site verification. RERA amenities
Occupancy Certificate (OC)The building-permit record makes an OC compulsory before occupation and marks the building not completion-certified. No OC is evidenced in the supplied documents.

2. The project story

West Winds is registered as a residential apartment project on plot 180 in Survey No. 24, Part No. 24, in Peeramchruvu village, Gandipet mandal. The RERA land record identifies an 889.16 sq. m site and a single building; the HMDA building-permit extract describes that building as 1 Stilt + 5 upper floors. RERA record RERA filing

The RERA unit schedule records 20 apartments: 10 2BHK and 10 3BHK. It shows no bookings at the time reflected by the portal record, but supplies no “as of” date, so it cannot establish present availability. RERA unit table

The available evidence does not establish construction completion or current on-site progress. The project’s stated completion deadline was 31 March 2025, while the building-permit extract records no completion certification and requires an occupancy certificate before occupation.

3. Master plan, architecture & building design

The project-specific building permit is for one residential building on plot 180, with 1 Stilt + 5 upper floors and an approved built-up area of 2,569.97 Sq.mts. The record does not provide a verified breakdown of FSI-counted area, building footprint, apartments per floor, lift and stair arrangements, circulation, open-space area, or residential/common-area distribution.

The same document specifies one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. It also states that the minimum approach-road width is as indicated in the plan; that width is not available in the extracted text.

A separate HMDA document, no. 307767, concerns a draft gated-community residential layout at Bhanoor, in Survey Nos. 353/AA1 and 353/AA2, covering 4,008.78 Sq. Mt. It identifies M/s. Creative Homes as DAGPA holder. It is not the building permit for plot 180 in Peeramchruvu, so its layout details are not treated here as West Winds building design.

4. Homes, configurations & floor plans

The RERA filing supplies the unit counts and saleable areas. Software measurements from the approved floor-plan drawing are a separate, drawing-based measure—not a RERA disclosure—and are flagged as needing review. Carpet area is distinct from saleable area, which may also include the home’s share of common areas; balcony area is excluded from the software carpet measurement. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010117.98 sq. m74.9 sq. m (806 sq. ft), software-measured37%
3BHK1001087.52 sq. m86.9–87.1 sq. m (936–937 sq. ft), software-measuredNot supplied

The measurements use drawing 309995. For the illustrated 2BHK, the drawing labels a living room, dining area, kitchen, two bedrooms, two toilets, wash area and a 1.26 M. WIDE BALC. For the illustrated 3BHK, it labels living and dining areas, kitchen, three bedrooms, two toilets, wash area and a balcony measuring 1.99 × 2.91 m. These are drawing-based measurements and room labels, not a substitute for checking the approved drawing and the buyer’s final unit documents. RERA unit details

The floor-plan review covers three drawings, of which one was measured and two scans remain pending; some measured designs are marked for review. Floor plans

5. Parking & vehicle circulation

The building permit specifies a single entry and exit, minimum 4.5mts. wide with 5mts. height clearance. It also states that parking or construction is not permitted in setback areas.

The supplied extracts do not establish sanctioned parking-space counts, visitor or accessible parking, parking-level layout, ramp or internal-driveway arrangement, EV charging, or unit-specific parking allocations. A vendor listing mentions reserved and covered parking, but that is a third-party claim and does not establish sanctioned provision or a buyer’s exclusive allocation. Promoter website

6. Amenities, recreation & open spaces

The project’s RERA progress schedule lists the following facilities or works with 0% reported progress. The table distinguishes those portal-reported values from completion verified on site; no independent completion evidence is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA project progress schedule RERA amenities0% reported; not independently verified
Green Strip/TOT LOT/ParkSize not statedRERA project progress schedule RERA amenities0% reported; not independently verified
Community BuildingsDetails and size not statedRERA project progress schedule RERA amenities0% reported; not independently verified

Vendor-listed facilities include a clubhouse, swimming pool, gym, children’s play area, indoor games and other recreational features. These are vendor claims, not established here as sanctioned, RERA-declared, or delivered facilities. Promoter website

7. Utilities, building services & safety

The building-permit extract specifies a separate underground static water storage tank capacity of 25,000 lts. and a separate terrace tank of 25,000 lts. It also lists a transformer, STP, garbage house, rainwater-harvesting structures and a requirement to provide an STP to standard specification. The extracted document does not state water source, treatment capacity, backup-power capacity, or whether these services are installed and operational.

Fire protection and fire safety requirements, energy management, electrical meter room/sub-station/receiving station, storm-water drainage and sewage/sullage treatment appear in the RERA progress schedule with 0% reported progress. That schedule does not establish their completion or operational status. RERA amenities

The vendor also advertises fire systems, CCTV, power backup, rainwater harvesting and sewage treatment; these remain vendor claims in the supplied evidence. Promoter website

No verified lift count or capacity, service lift, escape-stair details, accessibility arrangements, waste-segregation system, or CCTV/access-control installation is established by the supplied project documents. RERA amenities Promoter website

8. Location, access & connectivity

The registered site identity is plot 180, Survey No. 24, Part No. 24, in Peeramchruvu village, Gandipet mandal, Ranga Reddy district, PIN 500086. The RERA filing places it in Phase II. RERA record RERA filing

The supplied location record gives the cadastral parcel-centroid coordinates as 17.41528, 78.35459 and identifies the Financial District (Nanakramguda) at 1.2 km. Location record

The building permit refers to an approach road and states that its minimum width is as indicated in the plan, but that width is not available in the extracted material.

9. Developer & development status

The TG-RERA registered promoter is QUBIC INFRA, recorded as a partnership, with GSTIN 36AABFQ0267E1ZJ. The project record gives the promoter address as Kakateeya Arcade, Pragathi Nagar, Snehita Hills, Phase II, Gandipet, Ranga Reddy, 500086. The Form B filing describes its principal place of business as Flat No. 103, Kakateeya Arcade, Plot No. 1882, Pragathi Nagar, Hyderabad – 500090. Corporate record RERA filing

The Form B affidavit states that the project would be completed before 31st March, 2025 and includes the promoter’s declarations on the separate account, proportional withdrawals, audit and pending approvals. These are promoter declarations, not independent confirmation of performance.

See the Occupancy Certificate (OC) status above.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C for West Winds, P02400006628, granted under section 5; validity 26/07/2023–31/03/2025.
HMDA building permitBuilding permit for QUBIC INFRA’s residential building on plot 180, Survey No. 24, Part No. 24, Peeramchruvu; approval 008235/BP/HMDA/1678/SKP/2022, dated 29 November 2022; proceedings 001863/BP/HMDA/SKP/2022.
RERA Form BPromoter affidavit and declarations for the Survey No. 24, Part No. 24 project, including a stated completion deadline before 31 March 2025.
Separate HMDA layout recordDraft residential gated-community layout at Bhanoor, Survey Nos. 353/AA1 and 353/AA2, under 49/LO/Plg/HMDA/2022, dated 30-12-2022; the document identifies Creative Homes as DAGPA holder. Its stated village and survey numbers are separate from the plot 180 building-permit record.
Occupancy / completion certificateNo project OC or completion certificate is evidenced in the supplied records; the building-permit extract states an OC is compulsory before occupation.

Frequently asked questions

Is West Winds registered with Telangana RERA?

Yes. West Winds is registered with the Telangana Real Estate Regulatory Authority as P02400006628; the registration status is New Project.

Who is the developer of West Winds?

The promoter named in the RERA registration is QUBIC INFRA.

Where is West Winds located?

West Winds is in Phase II, Peeramchruvu, Gandipet, Rangareddy, Telangana (500086).

When will West Winds be completed?

The promoter's proposed date of completion filed with RERA is 31/03/2025. This is the promoter's declaration, not a guarantee.

More projects in Peeramchruvu