Silpa Greenfield is a plotted development in Jogipet Revenue Village, Andole Mandal, Sangareddy District, developed by registered promoter SILPA INFRATECH LIMITED. The tentative layout covers 24 Acer 24.01 Gts; 119068 Sq. Yds and comprises 309 plots; buildings and floors are not applicable to the filed plotted-layout description. TG-RERA registration number P01100005789 records validity from 15/03/2023 to 20/05/2025, and the promoter-declared completion date is 20th day of MAY 2025.
More from Silpa Infratech Ltd · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | Silpa Greenfield RERA record |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | Not separately identified in the supplied registration record; the registration covers survey numbers 617, 618, 623, 624, 625, 626 and 630 |
| TG-RERA registration | P01100005789 RERA record |
| Registration validity | 15/03/2023 to 20/05/2025; the certificate says validity is two years and may be extended by the Authority under the Act and Rules. No extension is recorded in the supplied evidence |
| Registered promoter | SILPA INFRATECH LIMITED RERA record |
| Registration status in supplied record | Certificate records registration; validity ended on 20/05/2025. Current registration status is not established by the supplied record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Jogipet / Jogipet Revenue Village |
| Mandal | Andole Mandal |
| District | Sangareddy District |
| PIN | 502270 RERA record |
| Project survey numbers | 617, 618, 623, 624, 625, 626 and 630 |
| Registered site extent | 24 Acer 24.01 Gts; 119068 Sq. Yds |
| RERA-filed total and net area | Total: 99553.00 sqmts; area affected in road widening/FTL of tanks/nala widening: 517.51 sqmts; net: 99035.49 sqmts Land records |
| Boundaries | East, west, north and south: Others Land Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | ANDOLE-JOGIPET Municipality/ Municipal Corporation; the RERA filing also identifies DTCP as the authority for plan approval Approvals record |
| Principal layout approval | 0001/LO/3050/2022, approved 20 May, 2022; application 001366/LO/DTCP/3050/0001/2022 |
| Layout approval scope | Tentative residential layout for 309 plots |
| Approved built-up area | 51500.68 sqmts is recorded in the RERA filing; its measurement basis is not specified in the supplied extract RERA filing |
| Buildings, floors and parking levels | Not applicable to the filed plotted-layout description, or not disclosed in the supplied evidence |
| Plot count | 309 No's, as stated in the tentative layout approval |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots |
| RERA-filed plot size range / count by size | Not available in the supplied evidence |
| Marketing-listed size information | A vendor listing gives 875 - 6280 sq.ft. for “Residential Plots”; this is marketing information, not the RERA-filed plot schedule Promoter website |
| Booked / available counts | Not available in the supplied evidence |
| Construction stage | RERA amenity entries show 0% progress for the listed items; this is a filed progress figure, not an independent site inspection RERA amenities |
| Promoter-declared completion date | 20th day of MAY 2025 in the Form B declaration |
| Occupancy / completion certificate | Not applicable to the plotted-layout record as supplied; no completion certificate or occupancy certificate is provided in the evidence Document index |
The project story
- Silpa Greenfield is registered as a plotted development at Jogipet Revenue Village, Andole Mandal, Sangareddy District. Its registered land identity includes survey numbers 617, 618, 623, 624, 625, 626 and 630. RERA record
- The municipal document is an approval for a tentative layout plan for 309 plots over 24 Acer 24.01 Gts; 119068 Sq. Yds. It allocates land to plots, roads, open space, social infrastructure and utilities, subject to development conditions.
- The promoter’s Form B declaration sets a completion undertaking of 20th day of MAY 2025; this is a promoter declaration, not evidence that development was completed.
- The RERA amenity schedule records 0% progress against the listed infrastructure and open-space items. That figure is the supplied RERA-filed progress information; no independent site inspection or verified completion evidence is provided here. RERA amenities
Master plan, architecture & building design
- The supplied approval describes a 309-plot tentative layout, rather than an apartment or multi-storey building scheme. Its recorded land-use allocation is: Plotted Area — 12 Acer 29.05 Gts; 61596 Sq. Yds (52%); Road Area — 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%); Area reserved for Open space (Park) — 2 Acer 8.71 Gts; 10734 Sq. Yds (9.06%); Site reserved for Social Infrastructure — 0 Acer 25.34 Gts; 3067 Sq. Yds (2.59%); and Site reserved for Utilities — 0 Acer 9.91 Gts; 1200 Sq. Yds (1.01%). These are figures as stated in the approval extract.
- The approval also records a Mortgage Area of 0 Acer 77.7 Gts; 9402 Sq. Yds, described as 15.2% of plotted area. It identifies 46 plots—Plot Nos. 236,239,238,237,240,245,244,241,242, 243, 281,260, 261,280,279,262, 263,278, 264,277,276,265,266,275, 274,267,268,273,272, 269,270,271,283,258,259,282, 284,285,286,287,288,289,290,291, 292,235—as mortgaged to the Andole-Jogipet Municipality/Municipal Corporation under Mortgage Deed No. 563, dated 13 May, 2022.
- The approval requires the developer to carry out infrastructure and amenities, keep roads open for access to neighbouring sites, and hand over designated open-space, utility and road areas to the Municipality by registered gift deed before release of the tentative layout. It also states that the tentative approval is not proof of land title and that the final layout is subject to the stated conditions.
- No plot-by-plot schedule, plot size-band count, layout drawing measurements, or detailed internal arrangement is available in the supplied extracts. The 51500.68 sqmts approved built-up-area figure appears in the RERA filing, but the supplied record does not explain its measurement basis for this plotted development. RERA filing
Homes, configurations & floor plans
- This is a plotted development, so the offering is plots rather than apartment configurations. The municipal tentative-layout approval states 309 No's. The supplied documents do not provide RERA plot counts by size, booked/available inventory, or plot-wise saleable areas.
- A vendor listing describes “Residential Plots” of 875 - 6280 sq.ft.; this is attributed marketing information and is not a RERA-filed plot schedule. Promoter website
- The supplied floor-plan record contains two drawings, both still pending scan review; no plot measurements were software-measured. Floor plans
Parking & vehicle circulation
- The supplied layout approval allocates 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%) to roads and requires roads to be opened for access to neighbouring sites.
- The supplied evidence does not state a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-entry arrangements. No exclusive parking entitlement can be established from the available record.
Amenities, recreation & open spaces
| Description / size | 2 Acer 8.71 Gts; 10734 Sq. Yds (9.06%); approval requires handover to the Municipality by registered gift deed |
|---|---|
| Declared progress / verified status | RERA amenity schedule lists aggregate recreational open space at 0%; no independent completion verification supplied RERA amenities |
| Description / size | 0 Acer 25.34 Gts; 3067 Sq. Yds (2.59%) |
|---|---|
| Declared progress / verified status | No facility-specific completion status supplied |
| Description / size | Road area: 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%) |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule records 0% progress for Internal Roads & Footpaths; no independent completion verification supplied |
| Description / size | Facility is listed without a size or description |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; no independent completion verification supplied |
| Description / size | Vendor lists a restaurant, gymnasium, green parks, central pond, children’s areas, sports areas, swimming pool, clubhouse, banquet hall, landscaped green spaces and recreation facilities |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor descriptions only; supplied evidence does not establish approval, delivery, size or completion |
Utilities, building services & safety
The tentative layout approval lists utility infrastructure including a water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, Solid Waste Management, storm water drains, underground drainage lines, internal water supply pipelines, overhead tank, street lights, avenue plantation and rain water harvesting pits. It allocates 0 Acer 9.91 Gts; 1200 Sq. Yds (1.01%) for utilities and requires the specified utility land and infrastructure areas to be handed over to the Municipality by registered gift deed.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, street lighting, sewage treatment and disposal, solid-waste management, water conservation/rainwater harvesting and energy management; each applicable listed item shows 0% progress. It also lists fire protection and electrical meter-room/sub-station/receiving-station items without an “available” value, and with 0% progress. These are filed schedule entries, not verification of installed or operating services. RERA amenities
No capacities, water source, treatment or reuse details, electrical backup, EV provision, security system, or detailed fire and accessibility arrangements are supplied.
Location, access & connectivity
- The registered location is Jogipet Revenue Village, Andole Mandal, Sangareddy District, Telangana, PIN 502270.
- A location record provides a project geocode of 17.8684342, 77.8227189 and lists the nearest sampled Outer Ring Road interchange at 59.7 km. Location record
- A vendor listing names Dakoor as a nearby landmark and says bus stops and railway stations are in close proximity, but provides no measured distances; these are vendor statements, not verified connectivity measurements. Promoter website
Developer & development status
The registered promoter is SILPA INFRATECH LIMITED, identified as a Company in the RERA filing. Its GSTIN is 36AALCS4085R2ZD. RERA record Corporate record The supplied promoter contact/address record gives PLOT NO 57 3RD FLOOR, VENKAT SAI BUILDINGS, KAVURI HILLS, ANDOLE, Masaipet, Sangareddy, 502270. RERA filing The registration certificate separately records the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500081.”
The Form B declaration, dated 27.07.2022, is signed by CHANDRAMOHAN REDDY SINGAREDDY as authorized signatory and states the promoter’s completion undertaking as 20th day of MAY 2025. The registration certificate records validity through 20/05/2025; the supplied evidence does not establish an extension, current registration status, completed layout works, or a completion certificate.
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records Silpa Greenfield, registration P01100005789, promoter Silpa Infratech Limited, and validity from 15/03/2023 to 20/05/2025. |
| Principal layout approval | Approval for Tentative Layout Plan, approval 0001/LO/3050/2022, dated 20 May, 2022, issued by ANDOLE-JOGIPET Municipality/ Municipal Corporation; application 001366/LO/DTCP/3050/0001/2022. |
| Tentative layout | Approval extract identifies 309 plots across survey numbers 617, 618, 623, 624, 625, 626 and 630, with land-use allocations and development/handover conditions. |
| Promoter declaration | Form B affidavit-cum-declaration dated 27.07.2022, including the promoter’s completion undertaking and RERA account declarations. |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied in the reviewed evidence. Document index |
Project at a glance
Project identity
Registered project name: Silpa Greenfield
Project type: Plotted development / tentative residential layout
Phase or registered portion: Not separately identified in the supplied registration record; the registration covers survey numbers 617, 618, 623, 624, 625, 626 and 630
TG-RERA registration: P01100005789
Registration validity: 15/03/2023 to 20/05/2025; the certificate says validity is two years and may be extended by the Authority under the Act and Rules. No extension is recorded in the supplied evidence
Registered promoter: SILPA INFRATECH LIMITED
Registration status in supplied record: Certificate records registration; validity ended on 20/05/2025. Current registration status is not established by the supplied record
Land and geographic identity
Locality / revenue village: Jogipet / Jogipet Revenue Village
Mandal: Andole Mandal
District: Sangareddy District
PIN: 502270
Project survey numbers: 617, 618, 623, 624, 625, 626 and 630
Registered site extent: 24 Acer 24.01 Gts; 119068 Sq. Yds
RERA-filed total and net area: Total: 99553.00 sqmts; area affected in road widening/FTL of tanks/nala widening: 517.51 sqmts; net: 99035.49 sqmts
Boundaries: East, west, north and south: Others Land
Development identity
Sanctioning authority: ANDOLE-JOGIPET Municipality/ Municipal Corporation; the RERA filing also identifies DTCP as the authority for plan approval
Principal layout approval: 0001/LO/3050/2022, approved 20 May, 2022; application 001366/LO/DTCP/3050/0001/2022
Layout approval scope: Tentative residential layout for 309 plots
Approved built-up area: 51500.68 sqmts is recorded in the RERA filing; its measurement basis is not specified in the supplied extract
Buildings, floors and parking levels: Not applicable to the filed plotted-layout description, or not disclosed in the supplied evidence
Plot count: 309 No's, as stated in the tentative layout approval
Offering and status
Unit type: Plots
RERA-filed plot size range / count by size: Not available in the supplied evidence
Marketing-listed size information: A vendor listing gives 875 - 6280 sq.ft. for “Residential Plots”; this is marketing information, not the RERA-filed plot schedule
Booked / available counts: Not available in the supplied evidence
Construction stage: RERA amenity entries show 0% progress for the listed items; this is a filed progress figure, not an independent site inspection
Promoter-declared completion date: 20th day of MAY 2025 in the Form B declaration
Occupancy / completion certificate: Not applicable to the plotted-layout record as supplied; no completion certificate or occupancy certificate is provided in the evidence
The project story
- Silpa Greenfield is registered as a plotted development at Jogipet Revenue Village, Andole Mandal, Sangareddy District. Its registered land identity includes survey numbers 617, 618, 623, 624, 625, 626 and 630.
- The municipal document is an approval for a tentative layout plan for 309 plots over 24 Acer 24.01 Gts; 119068 Sq. Yds. It allocates land to plots, roads, open space, social infrastructure and utilities, subject to development conditions.
- The promoter’s Form B declaration sets a completion undertaking of 20th day of MAY 2025; this is a promoter declaration, not evidence that development was completed.
- The RERA amenity schedule records 0% progress against the listed infrastructure and open-space items. That figure is the supplied RERA-filed progress information; no independent site inspection or verified completion evidence is provided here.
Master plan, architecture & building design
- The supplied approval describes a 309-plot tentative layout, rather than an apartment or multi-storey building scheme. Its recorded land-use allocation is: Plotted Area — 12 Acer 29.05 Gts; 61596 Sq. Yds (52%); Road Area — 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%); Area reserved for Open space (Park) — 2 Acer 8.71 Gts; 10734 Sq. Yds (9.06%); Site reserved for Social Infrastructure — 0 Acer 25.34 Gts; 3067 Sq. Yds (2.59%); and Site reserved for Utilities — 0 Acer 9.91 Gts; 1200 Sq. Yds (1.01%). These are figures as stated in the approval extract.
- The approval also records a Mortgage Area of 0 Acer 77.7 Gts; 9402 Sq. Yds, described as 15.2% of plotted area. It identifies 46 plots—Plot Nos. 236,239,238,237,240,245,244,241,242, 243, 281,260, 261,280,279,262, 263,278, 264,277,276,265,266,275, 274,267,268,273,272, 269,270,271,283,258,259,282, 284,285,286,287,288,289,290,291, 292,235—as mortgaged to the Andole-Jogipet Municipality/Municipal Corporation under Mortgage Deed No. 563, dated 13 May, 2022.
- The approval requires the developer to carry out infrastructure and amenities, keep roads open for access to neighbouring sites, and hand over designated open-space, utility and road areas to the Municipality by registered gift deed before release of the tentative layout. It also states that the tentative approval is not proof of land title and that the final layout is subject to the stated conditions.
- No plot-by-plot schedule, plot size-band count, layout drawing measurements, or detailed internal arrangement is available in the supplied extracts. The 51500.68 sqmts approved built-up-area figure appears in the RERA filing, but the supplied record does not explain its measurement basis for this plotted development.
Homes, configurations & floor plans
- This is a plotted development, so the offering is plots rather than apartment configurations. The municipal tentative-layout approval states 309 No's. The supplied documents do not provide RERA plot counts by size, booked/available inventory, or plot-wise saleable areas.
- A vendor listing describes “Residential Plots” of 875 - 6280 sq.ft.; this is attributed marketing information and is not a RERA-filed plot schedule.
- The supplied floor-plan record contains two drawings, both still pending scan review; no plot measurements were software-measured.
Parking & vehicle circulation
- The supplied layout approval allocates 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%) to roads and requires roads to be opened for access to neighbouring sites.
- The supplied evidence does not state a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-entry arrangements. No exclusive parking entitlement can be established from the available record.
Amenities, recreation & open spaces
| Description / size | 2 Acer 8.71 Gts; 10734 Sq. Yds (9.06%); approval requires handover to the Municipality by registered gift deed |
|---|---|
| Declared progress / verified status | RERA amenity schedule lists aggregate recreational open space at 0%; no independent completion verification supplied |
| Description / size | 0 Acer 25.34 Gts; 3067 Sq. Yds (2.59%) |
|---|---|
| Declared progress / verified status | No facility-specific completion status supplied |
| Description / size | Road area: 8 Acer 12.42 Gts; 40224 Sq. Yds (33.96%) |
|---|---|
| Declared progress / verified status | RERA schedule records 0% progress for Internal Roads & Footpaths; no independent completion verification supplied |
| Description / size | Facility is listed without a size or description |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; no independent completion verification supplied |
| Description / size | Vendor lists a restaurant, gymnasium, green parks, central pond, children’s areas, sports areas, swimming pool, clubhouse, banquet hall, landscaped green spaces and recreation facilities |
|---|---|
| Declared progress / verified status | Marketing/vendor descriptions only; supplied evidence does not establish approval, delivery, size or completion |
Utilities, building services & safety
The tentative layout approval lists utility infrastructure including a water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, Solid Waste Management, storm water drains, underground drainage lines, internal water supply pipelines, overhead tank, street lights, avenue plantation and rain water harvesting pits. It allocates 0 Acer 9.91 Gts; 1200 Sq. Yds (1.01%) for utilities and requires the specified utility land and infrastructure areas to be handed over to the Municipality by registered gift deed.
The RERA amenity schedule lists water supply, sewerage, storm-water drains, street lighting, sewage treatment and disposal, solid-waste management, water conservation/rainwater harvesting and energy management; each applicable listed item shows 0% progress. It also lists fire protection and electrical meter-room/sub-station/receiving-station items without an “available” value, and with 0% progress. These are filed schedule entries, not verification of installed or operating services.
No capacities, water source, treatment or reuse details, electrical backup, EV provision, security system, or detailed fire and accessibility arrangements are supplied.
Location, access & connectivity
- The registered location is Jogipet Revenue Village, Andole Mandal, Sangareddy District, Telangana, PIN 502270.
- A location record provides a project geocode of 17.8684342, 77.8227189 and lists the nearest sampled Outer Ring Road interchange at 59.7 km.
- A vendor listing names Dakoor as a nearby landmark and says bus stops and railway stations are in close proximity, but provides no measured distances; these are vendor statements, not verified connectivity measurements.
Developer & development status
The registered promoter is SILPA INFRATECH LIMITED, identified as a Company in the RERA filing. Its GSTIN is 36AALCS4085R2ZD. The supplied promoter contact/address record gives PLOT NO 57 3RD FLOOR, VENKAT SAI BUILDINGS, KAVURI HILLS, ANDOLE, Masaipet, Sangareddy, 502270. The registration certificate separately records the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500081.”
The Form B declaration, dated 27.07.2022, is signed by CHANDRAMOHAN REDDY SINGAREDDY as authorized signatory and states the promoter’s completion undertaking as 20th day of MAY 2025. The registration certificate records validity through 20/05/2025; the supplied evidence does not establish an extension, current registration status, completed layout works, or a completion certificate.
Approvals, official records & documents
TG-RERA registration: Form C records Silpa Greenfield, registration P01100005789, promoter Silpa Infratech Limited, and validity from 15/03/2023 to 20/05/2025.
Principal layout approval: Approval for Tentative Layout Plan, approval 0001/LO/3050/2022, dated 20 May, 2022, issued by ANDOLE-JOGIPET Municipality/ Municipal Corporation; application 001366/LO/DTCP/3050/0001/2022.
Tentative layout: Approval extract identifies 309 plots across survey numbers 617, 618, 623, 624, 625, 626 and 630, with land-use allocations and development/handover conditions.
Promoter declaration: Form B affidavit-cum-declaration dated 27.07.2022, including the promoter’s completion undertaking and RERA account declarations.
Occupancy/completion certificate: No occupancy or completion certificate is supplied in the reviewed evidence.
Frequently asked questions
Is Silpa Greenfield registered with Telangana RERA?
Yes. Silpa Greenfield is registered with the Telangana Real Estate Regulatory Authority as P01100005789; the registration status is New Project.
Who is the developer of Silpa Greenfield?
The promoter named in the RERA registration is SILPA INFRATECH LIMITED.
Where is Silpa Greenfield located?
Silpa Greenfield is in ANDOLE, JOGIPET, Masaipet, Sangareddy, Telangana (502270).
When will Silpa Greenfield be completed?
The promoter's proposed date of completion filed with RERA is 20/05/2025. This is the promoter's declaration, not a guarantee.