Navya Sarovar
NAVYA DEVELOPERS · Sangareddy · RERA P01100000202
NAVYA SAROVAR is a plotted development at Rameshwar Banda, PATANCHERU, Sangareddy. The registered promoter is NAVYA DEVELOPERS. The site area is 58960.48 Sq.m; the supplied record does not state a complete plot count, plot-size range, or tower or floor configuration. The TG-RERA registration is P01100000202, and the proposed completion date is 30/05/2021.
More from Navya Developers · 19 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
14 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | NAVYA SAROVAR RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for the project identified as NAVYA SAROVAR. |
| TG-RERA registration | P01100000202; issued 21/01/2019; registration certificate states validity through 30/05/2021 and says it may be extended by the Authority. Approvals record |
| Registered promoter | NAVYA DEVELOPERS; entity type recorded as partnership. RERA record Corporate record RERA filing |
| RERA status | The project is listed as “On-Going Project” in the supplied project record. Registration validity ended 30/05/2021; no extension is recorded in the supplied certificate. RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Rameshwar Banda; also rendered as Rameshwar Banda Village in the HMDA draft layout letter. RERA record |
| Mandal / district / PIN | PATANCHERU; Sangareddy; 502319. RERA record |
| Project survey number(s) | Survey No. 182. The cadastral record identifies the whole survey as 182; title documents also refer to subdivisions, including 182/8, 182C, 182/60, 182/G, 182/6, 182/48, 182/e81, 182/B and 182/f. These are preserved as recorded; the supplied records do not reconcile each subdivision to the full project boundary. RERA filing Cadastral map Title record |
| Registered site area | 58960.48 Sq.m in the HMDA draft layout letter. It records the same figure as net site area and zero master plan road-affected area. |
| Boundaries | North: SY NO 26; South: SY NO 181; East: SY NO 183; West: INDRESHAM VILLAGE BOUNDARY. RERA filing |
| Survey-level cadastral extent | Survey No. 182: 62608.07 sqm, identified by the cadastral record as the whole survey; this is not stated there to be the project’s registered site area. Cadastral map |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal layout approval | Draft layout letter 000103/LO/Plg/HMDA/2018, approved 31 May 2018; application 010763/SKP/LT/U6/HMDA/17042018. Approvals record |
| Later layout number identified in completion form | 043004/LT/SKP/FLT/U6/HMDA/13022021; the architect’s Form–1A identifies this as the HMDA final layout number. Approvals record |
| Land-use allocation in draft layout letter | Total/net site area 58960.48; plotted area 36742.37; layout roads 15957.02; open space 4771.92; social infrastructure 1489.24; amenities area 0; master plan road-affected area 0. The letter also lists park area 4771.92. |
| Buildings / floors | Not applicable to the plotted-layout approval as described in the supplied project record; no sanctioned residential building or floor configuration is provided. |
| Mortgage condition | HMDA draft letter records 5621.72 Sq.Mtr—15.30% of plotted area—as mortgaged to the Metropolitan Commissioner, HMDA: plots 83–97 and 186–207, 37 plots in total. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; plot-size range and complete plot schedule are not available in the supplied evidence. RERA record Layout record |
| Plot count | The draft layout letter identifies plot numbers 83–97 and 186–199, 200–207 in its plot-number field; its mortgage condition separately identifies plots 83–97 and 186–207. A complete count of all plots for sale is not established by the supplied material. |
| Booked / available | Not disclosed in the supplied project data. RERA filing |
| Development progress | RERA project record reports 80% completeness; this is a filed/recorded figure, not an independent site inspection. RERA record |
| Original / revised completion | Both recorded as 30/05/2021. The Form B declaration undertakes completion within 3 years from registration. RERA record |
| Completion evidence | Architect’s Form–1A states development work was completed in all aspects and lists 23.03.2021 as the completion date; its certificate is dated 31/03/2021. This is an architect’s certificate, not an occupancy certificate. |
| Occupancy / completion certificate status | An occupancy certificate is not identified in the supplied record. The available completion evidence is the architect’s Form–1A and the final layout number it cites. Document index |
2. The project story
NAVYA SAROVAR is registered with TG-RERA as a plotted development on Survey No. 182 at Rameshwar Banda, Patancheru Mandal, Sangareddy District. HMDA’s supplied 2018 draft layout letter describes a site of 58960.48 Sq.m and allocates land to plotted area, roads, open space and social infrastructure. The letter also requires development works and provides for roads, open space and social-infrastructure land to be gifted to the local body before release of the final layout plan. RERA record
The project is presented in the RERA record as “On-Going Project,” with a recorded completion date of 30/05/2021 and 80% completeness. Separately, an architect’s Form–1A dated 31/03/2021 states that the development work was completed in all aspects and gives 23.03.2021 as the completion date. These are distinct records: the progress figure is recorded in the project data, while the completion statement is the architect’s certification; neither establishes an occupancy certificate in the supplied material. RERA filing RERA record
The available evidence concerns a plotted layout, not apartment or villa construction. Plot-level saleable sizes, booking status and a complete plot schedule are not supplied. The draft layout letter identifies 37 plots reserved as an HMDA mortgage; it says mortgaged plots cannot be sold and requires specified layout areas to be handed over by registered gift deed before final layout release. Layout record
3. Master plan, architecture & building design
The project’s documented physical plan is a plotted layout rather than a multi-storey building scheme. HMDA’s draft layout letter records a total and net site area of 58960.48 Sq.m, with 36742.37 allotted to plotted area, 15957.02 to layout roads, 4771.92 to open space, and 1489.24 to social infrastructure. It records 0 for amenities area and 0 for master plan road-affected area; the letter also identifies 4771.92 as park area.
The letter’s conditions call for internal roads to be opened for access to neighbouring sites, prohibit a compound wall/fencing around the site, and require the roads, open space and social-infrastructure area to be handed to the local body by registered gift deed before final layout release. It also says the applicant shall not construct buildings on the plots.
The approved-drawing record is incomplete for detailed design review: the layout drawing is identified in the file, but plot extraction is marked incomplete and no plot sizes are available in the supplied layout data. Building footprints, building count, floor configuration, plot-size bands and detailed circulation geometry are therefore not established here. Layout record
4. Homes, configurations & floor plans
This is a plotted development; the supplied evidence does not provide RERA-filed plot-size bands, plot-wise saleable areas, booked/available plot counts or a complete sale inventory. The draft layout letter identifies plot numbers 83 to 97, 186 to 199, and 200 to 207 in its plot-number field, while separately naming 83 to 97 and 186 to 207 as the 37 plots mortgaged to HMDA. Layout record
The layout record says plot extraction from the drawing is incomplete and reports no plots with a measured size. Consequently, no plot-size table or plot-specific floor-plan measurements can be presented. Layout record The supplied floor-plan dataset contains no measured drawings suitable for unit-area reporting. Floor plans
5. Parking & vehicle circulation
The supplied project evidence does not establish sanctioned parking counts, visitor or accessible parking, parking allocation to particular plots, or a parking-level arrangement. The draft layout letter provides for 15957.02 Sq.Mts of layout roads and requires roads to be opened for access to neighbouring sites, but does not specify road widths, vehicle-entry arrangements or pedestrian separation.
6. Amenities, recreation & open spaces
| Description / size | 4771.92; the draft letter lists this as park area and also records it as open-space area (8.09 %). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Included in the draft layout allocation; completed status is not independently verified in the supplied evidence. |
| Description / size | 1489.24 Sq.Mts (2.53 %). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | The letter requires transfer to the local body by registered gift deed before final layout release; transfer evidence is not supplied. |
| Description / size | Listed as a required development work. |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Completion not independently verified. |
| Description / size | Listed as a required development work. |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Completion not independently verified. |
The RERA amenities record marks internal roads and footpaths, water supply, green strip/TOT LOT/park, street lighting and rainwater harvesting as YES, 100%. The same record shows 0% for sewerage, storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, and aggregate recreational open-space area. These are filed amenity-progress entries; the supplied data does not provide independent site verification. RERA amenities
The HMDA draft layout letter lists common septic tank/STP, internal water-supply pipelines, overhead tank, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits as development works. The letter describes these as required works; it does not establish that they were completed.
7. Utilities, building services & safety
HMDA’s draft layout letter lists internal water-supply pipelines and an overhead tank, street lighting, a transformer, rainwater-harvesting pits, and a common septic tank/STP among the layout development works. These are stated as planned/required works in the approval record; capacities, operational status and independent completion evidence are not supplied.
The RERA amenities record marks water supply, street lighting and rainwater harvesting as YES, 100%. It records 0% for sewerage, storm-water drains, treatment and disposal of sewage/sullage, solid-waste management, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station. These entries describe the supplied RERA progress record and do not by themselves establish current operational condition or statutory compliance. RERA amenities
No lift, building fire-system, backup-power, CCTV, access-control or accessibility specifications are supplied for this plotted layout. Document index RERA amenities
8. Location, access & connectivity
The registered project location is Rameshwar Banda, Patancheru Mandal, Sangareddy District, PIN 502319. HMDA’s draft layout letter identifies Rameshwar Banda Village and requires layout roads to be opened for access to neighbouring sites. RERA record
The supplied location record lists these measured distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are supplied location-record distances; travel times and public-transport service details are not provided. Location record
9. Developer & development status
The registered promoter is NAVYA DEVELOPERS, identified as a partnership in the RERA project record. Its supplied GSTIN is 36AAIFN5015G1ZF. The project record lists the promoter address as Plot No. 104, Block 4, Navya Nagar Colony, Rameshwar Banda, Patancheru, Sangareddy, PIN 502319; the TG-RERA certificate separately gives the promoter office as Bheeramguda, Ameenpur Mandal, Sangareddy, PIN 502032. Corporate record RERA filing
The RERA record reports 80% completeness and a revised proposed completion date of 30/05/2021. Those are project-record entries. The architect’s Form–1A, dated 31/03/2021, states that the development work was completed in all aspects and lists 23.03.2021 as the completion date. No occupancy certificate is identified in the supplied documents. RERA record Document index
The Form B declaration, executed for NAVYA DEVELOPERS by Mr. P. Siva Sridhara Reddy and dated 08°d day of ctober2018 as extracted, undertakes completion within three years from project registration and records declarations concerning title, encumbrances, project funds and pending approvals. These are promoter declarations.
10. Approvals, official records & documents
| Identifier / date | P01100000202; issued 21/01/2019; validity through 30/05/2021. |
|---|---|
| What the supplied document establishes | Form ‘C’ records registration of NAVYA SAROVAR and includes conditions on agreement for sale, conveyance and a separate account. |
| Identifier / date | 000103/LO/Plg/HMDA/2018; approved 31 May 2018; application 010763/SKP/LT/U6/HMDA/17042018. |
|---|---|
| What the supplied document establishes | Draft plotted-layout permission for Survey No. 182, with site-area allocation, development works and conditions. The letter says the permission is not proof of title. |
| Identifier / date | 043004/LT/SKP/FLT/U6/HMDA/13022021; completion date listed as 23.03.2021. |
|---|---|
| What the supplied document establishes | Architect’s Form–1A states the project’s development work was completed in all aspects; certificate dated 31/03/2021. |
| Identifier / date | Dated as extracted: 08°d day of ctober2018. |
|---|---|
| What the supplied document establishes | Promoter declaration for NAVYA DEVELOPERS, including a three-year completion undertaking and statements about land, finance, approvals and allottee treatment. |
| Identifier / date | Document 9064; search period shown as 01-01-1983 to 10-04-2018. |
|---|---|
| What the supplied document establishes | Filed encumbrance material; the supplied record cautions that absence of an entry is not a current clearance. |
| Identifier / date | Documents 9072, 9073, 9074, 9075, 9076, 9077, 9078. |
|---|---|
| What the supplied document establishes | Project-filed title-report material, including sale deeds and development-agreement/GPA instruments concerning Survey No. 182 and its recorded subdivisions. Document index |
| Identifier / date | Document 9063. |
|---|---|
| What the supplied document establishes | Partially completed RERA-form agreement; allottee, land, project, unit, price and execution particulars are blank in the extraction. |
| Identifier / date | Document 9066. |
|---|---|
| What the supplied document establishes | Layout drawing is in the file; plot extraction is incomplete and the supplied drawing-derived data does not establish plot sizes. Layout record |
The supplied materials do not identify an occupancy certificate, a complete plot-wise sales inventory, or evidence of transfer of the required roads, open space and social-infrastructure areas to the local body.
1. Project at a glance
Project identity
Registered project name: NAVYA SAROVAR
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; registration is for the project identified as NAVYA SAROVAR.
TG-RERA registration: P01100000202; issued 21/01/2019; registration certificate states validity through 30/05/2021 and says it may be extended by the Authority.
Registered promoter: NAVYA DEVELOPERS; entity type recorded as partnership.
RERA status: The project is listed as “On-Going Project” in the supplied project record. Registration validity ended 30/05/2021; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality / revenue village: Rameshwar Banda; also rendered as Rameshwar Banda Village in the HMDA draft layout letter.
Mandal / district / PIN: PATANCHERU; Sangareddy; 502319.
Project survey number(s): Survey No. 182. The cadastral record identifies the whole survey as 182; title documents also refer to subdivisions, including 182/8, 182C, 182/60, 182/G, 182/6, 182/48, 182/e81, 182/B and 182/f. These are preserved as recorded; the supplied records do not reconcile each subdivision to the full project boundary.
Registered site area: 58960.48 Sq.m in the HMDA draft layout letter. It records the same figure as net site area and zero master plan road-affected area.
Boundaries: North: SY NO 26; South: SY NO 181; East: SY NO 183; West: INDRESHAM VILLAGE BOUNDARY.
Survey-level cadastral extent: Survey No. 182: 62608.07 sqm, identified by the cadastral record as the whole survey; this is not stated there to be the project’s registered site area.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval: Draft layout letter 000103/LO/Plg/HMDA/2018, approved 31 May 2018; application 010763/SKP/LT/U6/HMDA/17042018.
Later layout number identified in completion form: 043004/LT/SKP/FLT/U6/HMDA/13022021; the architect’s Form–1A identifies this as the HMDA final layout number.
Land-use allocation in draft layout letter: Total/net site area 58960.48; plotted area 36742.37; layout roads 15957.02; open space 4771.92; social infrastructure 1489.24; amenities area 0; master plan road-affected area 0. The letter also lists park area 4771.92.
Buildings / floors: Not applicable to the plotted-layout approval as described in the supplied project record; no sanctioned residential building or floor configuration is provided.
Mortgage condition: HMDA draft letter records 5621.72 Sq.Mtr—15.30% of plotted area—as mortgaged to the Metropolitan Commissioner, HMDA: plots 83–97 and 186–207, 37 plots in total.
Offering and status
Unit type: Plots; plot-size range and complete plot schedule are not available in the supplied evidence.
Plot count: The draft layout letter identifies plot numbers 83–97 and 186–199, 200–207 in its plot-number field; its mortgage condition separately identifies plots 83–97 and 186–207. A complete count of all plots for sale is not established by the supplied material.
Booked / available: Not disclosed in the supplied project data.
Development progress: RERA project record reports 80% completeness; this is a filed/recorded figure, not an independent site inspection.
Original / revised completion: Both recorded as 30/05/2021. The Form B declaration undertakes completion within 3 years from registration.
Completion evidence: Architect’s Form–1A states development work was completed in all aspects and lists 23.03.2021 as the completion date; its certificate is dated 31/03/2021. This is an architect’s certificate, not an occupancy certificate.
Occupancy / completion certificate status: An occupancy certificate is not identified in the supplied record. The available completion evidence is the architect’s Form–1A and the final layout number it cites.
2. The project story
NAVYA SAROVAR is registered with TG-RERA as a plotted development on Survey No. 182 at Rameshwar Banda, Patancheru Mandal, Sangareddy District. HMDA’s supplied 2018 draft layout letter describes a site of 58960.48 Sq.m and allocates land to plotted area, roads, open space and social infrastructure. The letter also requires development works and provides for roads, open space and social-infrastructure land to be gifted to the local body before release of the final layout plan.
The project is presented in the RERA record as “On-Going Project,” with a recorded completion date of 30/05/2021 and 80% completeness. Separately, an architect’s Form–1A dated 31/03/2021 states that the development work was completed in all aspects and gives 23.03.2021 as the completion date. These are distinct records: the progress figure is recorded in the project data, while the completion statement is the architect’s certification; neither establishes an occupancy certificate in the supplied material.
The available evidence concerns a plotted layout, not apartment or villa construction. Plot-level saleable sizes, booking status and a complete plot schedule are not supplied. The draft layout letter identifies 37 plots reserved as an HMDA mortgage; it says mortgaged plots cannot be sold and requires specified layout areas to be handed over by registered gift deed before final layout release.
3. Master plan, architecture & building design
The project’s documented physical plan is a plotted layout rather than a multi-storey building scheme. HMDA’s draft layout letter records a total and net site area of 58960.48 Sq.m, with 36742.37 allotted to plotted area, 15957.02 to layout roads, 4771.92 to open space, and 1489.24 to social infrastructure. It records 0 for amenities area and 0 for master plan road-affected area; the letter also identifies 4771.92 as park area.
The letter’s conditions call for internal roads to be opened for access to neighbouring sites, prohibit a compound wall/fencing around the site, and require the roads, open space and social-infrastructure area to be handed to the local body by registered gift deed before final layout release. It also says the applicant shall not construct buildings on the plots.
The approved-drawing record is incomplete for detailed design review: the layout drawing is identified in the file, but plot extraction is marked incomplete and no plot sizes are available in the supplied layout data. Building footprints, building count, floor configuration, plot-size bands and detailed circulation geometry are therefore not established here.
4. Homes, configurations & floor plans
This is a plotted development; the supplied evidence does not provide RERA-filed plot-size bands, plot-wise saleable areas, booked/available plot counts or a complete sale inventory. The draft layout letter identifies plot numbers 83 to 97, 186 to 199, and 200 to 207 in its plot-number field, while separately naming 83 to 97 and 186 to 207 as the 37 plots mortgaged to HMDA.
The layout record says plot extraction from the drawing is incomplete and reports no plots with a measured size. Consequently, no plot-size table or plot-specific floor-plan measurements can be presented. The supplied floor-plan dataset contains no measured drawings suitable for unit-area reporting.
5. Parking & vehicle circulation
The supplied project evidence does not establish sanctioned parking counts, visitor or accessible parking, parking allocation to particular plots, or a parking-level arrangement. The draft layout letter provides for 15957.02 Sq.Mts of layout roads and requires roads to be opened for access to neighbouring sites, but does not specify road widths, vehicle-entry arrangements or pedestrian separation.
6. Amenities, recreation & open spaces
| Description / size | 4771.92; the draft letter lists this as park area and also records it as open-space area (8.09 %). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Included in the draft layout allocation; completed status is not independently verified in the supplied evidence. |
| Description / size | 1489.24 Sq.Mts (2.53 %). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | The letter requires transfer to the local body by registered gift deed before final layout release; transfer evidence is not supplied. |
| Description / size | Listed as a required development work. |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Completion not independently verified. |
| Description / size | Listed as a required development work. |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Completion not independently verified. |
The RERA amenities record marks internal roads and footpaths, water supply, green strip/TOT LOT/park, street lighting and rainwater harvesting as YES, 100%. The same record shows 0% for sewerage, storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, and aggregate recreational open-space area. These are filed amenity-progress entries; the supplied data does not provide independent site verification.
The HMDA draft layout letter lists common septic tank/STP, internal water-supply pipelines, overhead tank, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits as development works. The letter describes these as required works; it does not establish that they were completed.
7. Utilities, building services & safety
HMDA’s draft layout letter lists internal water-supply pipelines and an overhead tank, street lighting, a transformer, rainwater-harvesting pits, and a common septic tank/STP among the layout development works. These are stated as planned/required works in the approval record; capacities, operational status and independent completion evidence are not supplied.
The RERA amenities record marks water supply, street lighting and rainwater harvesting as YES, 100%. It records 0% for sewerage, storm-water drains, treatment and disposal of sewage/sullage, solid-waste management, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station. These entries describe the supplied RERA progress record and do not by themselves establish current operational condition or statutory compliance.
No lift, building fire-system, backup-power, CCTV, access-control or accessibility specifications are supplied for this plotted layout.
8. Location, access & connectivity
The registered project location is Rameshwar Banda, Patancheru Mandal, Sangareddy District, PIN 502319. HMDA’s draft layout letter identifies Rameshwar Banda Village and requires layout roads to be opened for access to neighbouring sites.
The supplied location record lists these measured distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are supplied location-record distances; travel times and public-transport service details are not provided.
9. Developer & development status
The registered promoter is NAVYA DEVELOPERS, identified as a partnership in the RERA project record. Its supplied GSTIN is 36AAIFN5015G1ZF. The project record lists the promoter address as Plot No. 104, Block 4, Navya Nagar Colony, Rameshwar Banda, Patancheru, Sangareddy, PIN 502319; the TG-RERA certificate separately gives the promoter office as Bheeramguda, Ameenpur Mandal, Sangareddy, PIN 502032.
The RERA record reports 80% completeness and a revised proposed completion date of 30/05/2021. Those are project-record entries. The architect’s Form–1A, dated 31/03/2021, states that the development work was completed in all aspects and lists 23.03.2021 as the completion date. No occupancy certificate is identified in the supplied documents.
The Form B declaration, executed for NAVYA DEVELOPERS by Mr. P. Siva Sridhara Reddy and dated 08°d day of ctober2018 as extracted, undertakes completion within three years from project registration and records declarations concerning title, encumbrances, project funds and pending approvals. These are promoter declarations.
10. Approvals, official records & documents
| Identifier / date | P01100000202; issued 21/01/2019; validity through 30/05/2021. |
|---|---|
| What the supplied document establishes | Form ‘C’ records registration of NAVYA SAROVAR and includes conditions on agreement for sale, conveyance and a separate account. |
| Identifier / date | 000103/LO/Plg/HMDA/2018; approved 31 May 2018; application 010763/SKP/LT/U6/HMDA/17042018. |
|---|---|
| What the supplied document establishes | Draft plotted-layout permission for Survey No. 182, with site-area allocation, development works and conditions. The letter says the permission is not proof of title. |
| Identifier / date | 043004/LT/SKP/FLT/U6/HMDA/13022021; completion date listed as 23.03.2021. |
|---|---|
| What the supplied document establishes | Architect’s Form–1A states the project’s development work was completed in all aspects; certificate dated 31/03/2021. |
| Identifier / date | Dated as extracted: 08°d day of ctober2018. |
|---|---|
| What the supplied document establishes | Promoter declaration for NAVYA DEVELOPERS, including a three-year completion undertaking and statements about land, finance, approvals and allottee treatment. |
| Identifier / date | Document 9064; search period shown as 01-01-1983 to 10-04-2018. |
|---|---|
| What the supplied document establishes | Filed encumbrance material; the supplied record cautions that absence of an entry is not a current clearance. |
| Identifier / date | Documents 9072, 9073, 9074, 9075, 9076, 9077, 9078. |
|---|---|
| What the supplied document establishes | Project-filed title-report material, including sale deeds and development-agreement/GPA instruments concerning Survey No. 182 and its recorded subdivisions. |
| Identifier / date | Document 9063. |
|---|---|
| What the supplied document establishes | Partially completed RERA-form agreement; allottee, land, project, unit, price and execution particulars are blank in the extraction. |
| Identifier / date | Document 9066. |
|---|---|
| What the supplied document establishes | Layout drawing is in the file; plot extraction is incomplete and the supplied drawing-derived data does not establish plot sizes. |
The supplied materials do not identify an occupancy certificate, a complete plot-wise sales inventory, or evidence of transfer of the required roads, open space and social-infrastructure areas to the local body.
Frequently asked questions
Is NAVYA SAROVAR registered with Telangana RERA?
Yes. NAVYA SAROVAR is registered with the Telangana Real Estate Regulatory Authority as P01100000202; the registration status is On-Going Project.
Who is the developer of NAVYA SAROVAR?
The promoter named in the RERA registration is NAVYA DEVELOPERS.
Where is NAVYA SAROVAR located?
NAVYA SAROVAR is in RAMESHWAR BANDA, PATANCHERU, Sangareddy, Telangana (502319).
When will NAVYA SAROVAR be completed?
The promoter's proposed date of completion filed with RERA is 30/05/2021. This is the promoter's declaration, not a guarantee.