Sign in

Tree Tops

VIJAYSENA CONSTRUCTION COMPANY · Medchal-Malkajgiri · RERA P02200002910

TREE TOPS is a residential villa project in SHAMIRPET-ORRGC, Shamirpet mandal, Medchal-Malkajgiri district, developed by the registered promoter VIJAYSENA CONSTRUCTION COMPANY. The project has a total site area of 50,156.11 sq.m and 120 units, with the RERA filing specifying 3BHK homes of 304.71 sq.m saleable area per unit; floor configuration is not disclosed. It is registered with TG-RERA under P02200002910, and the promoter’s Form B undertaking gives a proposed completion date of 31/01/2024.

01What we found

Period endedTG-RERA registration ran to 31 Jan 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
1court case on this project's land (survey 839, 840, Shamirpet-Orrgc)
9items to check - 7 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 7 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameTREE TOPS RERA record
Project typeResidential; RERA record identifies the project category as villa. The HMDA approval document describes a final residential layout with open plots. RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration is for TREE TOPS. RERA record
TG-RERA registrationP02200002910 RERA record
Registration validity14/05/2021 to 31/01/2024; certificate states “2 years.” The supplied registration record says no extension. Validity is distinct from the completion undertaking. RERA record
Registered promoterVIJAYSENA CONSTRUCTION COMPANY, recorded as a partnership. RERA record Corporate record
RERA statusThe supplied record identifies the project as “New Project”; the registration validity ended on 31/01/2024. Current registration status beyond that recorded validity is not established by the supplied materials. RERA record

Land and geographic identity

ItemRecord
Locality / recorded villageSHAMIRPET-ORRGC; the filed HMDA document identifies Upperpalli-ORRGC and specifies Upperpalli, Hamlet of Shamirpet Village in the title documents. These are the locality/village descriptions present in the project records. RERA record RERA filing
MandalShamirpet (also recorded as Shamirpet-ORRGC in the approval extraction). RERA record
District / PINMedchal-Malkajgiri / 500048. RERA record
Project survey numbersSY NO 839 AND 840; the registration certificate lists SY NO 839 and 840. The supplied title material also refers to 839 part, 839 Part, and lands in Sy.No. 839 and 840. RERA record RERA filing
Total site area50,156.11 sq.m RERA filing Land records
Road-widening / affected area5,067.06 sq.m RERA filing Land records
Net area45,089.05 sq.m in the RERA land details; the layout drawing area statement records 45,089.04 sq.m as net layout area. RERA filing Land records Layout record
HMDA layout extent45,089.05 Sqm
Declared mortgage area3,849.36 sq.m RERA filing Land records
BoundariesEast: Survey No. 927; West: road width 30; North: road width 150; South: Survey No. 902. RERA filing Land records

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA). Approvals record
Principal layout approvalFinal Layout Permit 000189/LO/Plg/HMDA/2018, approved 17 September, 2020. Approvals record
Approved built-up area36,565.10 sq.m is recorded in the project filing as approved built-up area. RERA filing
Building / unit countThe RERA project record lists 120 total building units and 120 proposed building units; layout records also list 120 units. The supplied HMDA document is a final layout approval, not a building-floor schedule. RERA filing Layout record
Floor configuration / parking levelsNot disclosed in the supplied evidence.
Approval-record qualifierThe filing lists a plan approval number as 000189/LO/Plg/HMDA/2; the HMDA document extraction identifies 000189/LO/Plg/HMDA/2018. RERA record Approvals record

Offering and status

ItemRecord
RERA-filed unit type3BHK, 120 units. RERA unit table RERA unit details
RERA-filed saleable area304.71 sq.m per unit (also recorded as 3280 sq.ft in the project unit summary). RERA unit table RERA unit table
Booked / available21 booked and 99 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative. RERA unit table
Construction stageThe RERA filing records 90% completeness; this is a filed/recorded progress figure, not independent site verification. RERA record
Completion datePromoter’s Form B undertaking: 31/01/2024. This is separate from registration validity.
OC / completion certificateNo occupancy or completion certificate for the project is established in the supplied materials. Building- or phase-specific OC status is not disclosed. Document index Approvals record

2. The project story

TREE TOPS is a residential development registered with TG-RERA as a 120-unit project and classified in the supplied RERA record as a villa project. Its registered land identity is Survey Nos. 839 and 840, in the Shamirpet/Upperpalli locality descriptions recorded above. The project record gives a total site area of 50,156.11 sq.m, including 5,067.06 sq.m identified as affected by road widening/other listed impacts, and a net area of 45,089.05 sq.m. RERA record RERA filing Land records RERA unit table

The project filing records 120 3BHK units, with 21 booked and 99 available in the portal data provided; the booking count has no stated as-of date. The RERA record gives 304.71 sq.m saleable area per unit. The supplied HMDA document is a final residential layout approval with open plots, and its conditions describe residential use and public access to roads. It does not provide a building-by-building or floor-by-floor design schedule. RERA unit table RERA unit table

The filing records 90% completeness, while the promoter’s Form B states a completion undertaking of 31/01/2024. Neither the progress percentage nor the completion undertaking independently verifies construction status. The supplied documents do not establish issuance of an occupancy or completion certificate, or the status of individual buildings or phases. RERA record Document index Approvals record

3. Master plan, architecture & building design

The RERA record identifies a total site area of 50,156.11 sq.m, net area of 45,089.05 sq.m, and approved built-up area of 36,565.10 sq.m. These are separate filed figures; the approved built-up area should not be treated as carpet area or saleable area. RERA filing RERA filing

The layout drawing’s software-read area statement uses a 45,089.04 sq.m net-layout-area base and records:

Layout useAreaShare of drawing’s net-area baseEvidence
Plots25,338.24 sq.m56.2%Software-read from approved layout drawing; verify against drawing. Layout record
Roads14,756.30 sq.m32.7%Software-read from approved layout drawing; verify against drawing. Layout record
Parks / open space3,863.49 sq.m8.6%Software-read from approved layout drawing; verify against drawing. Layout record
Social infrastructure1,131.39 sq.m2.5%Software-read from approved layout drawing; verify against drawing. Layout record
Amenities0.00 sq.m0.0%Software-read from approved layout drawing; verify against drawing. Layout record

The drawing data identifies plot numbers 1 to 7, but the plot extraction is incomplete and supplies no plot-size schedule. The HMDA document is a final layout letter; detailed building plans, floor configuration, footprints, heights, floor-wise unit arrangement, lifts, stairs, and parking-level plans are not established in the supplied record. Layout record

HMDA’s approval conditions state that building sites are to be used for residential dwelling houses, that individual building permission is to be considered under the applicable building rules, and that the local authority is to maintain specified civic services and roads/open spaces. These are approval conditions, not evidence that each service or individual building approval has been completed.

4. Homes, configurations & floor plans

The TG-RERA filing records one configuration: 3BHK, with 120 units, 21 booked, 99 available, and filed saleable area of 304.71 sq.m per unit. The counts are portal figures without an as-of date in the supplied data. RERA unit details RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1202199304.71 sq.mNot availableNot supplied

The supplied floor-plan data reports two drawings, both layout sheets with no flats measured; therefore no software-measured carpet area, room dimensions, or unit-level plan measurements are available. Saleable area is the filed area measure; carpet area and any balcony/utility area or common-area loading are not quantified in the supplied evidence. Floor plans RERA unit details

5. Parking & vehicle circulation

The supplied project data does not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, ramps, EV charging, or unit-specific parking allocations. The HMDA layout letter requires roads to remain open for free public access and states that no compound wall is permitted on the layout roads; it does not provide detailed vehicle-circulation or parking arrangements. Document index

6. Amenities, recreation & open spaces

The layout drawing’s software-read area statement identifies 3,863.49 sq.m for parks/open space and 1,131.39 sq.m for social infrastructure; it lists 0.00 sq.m as amenity area. The drawing extraction is incomplete and should be checked against the approved drawing. Layout record

The TG-RERA progress record lists infrastructure and community-facility items with declared percentages. These are filing entries, not independent verification of delivery.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size suppliedRERA project progress data RERA amenities100% declared; not independently verified
Water supplyNo capacity or source suppliedRERA project progress data RERA amenities70% declared; not independently verified
Sewerage (chamber, lines, septic tank, STP)No capacity suppliedRERA project progress data RERA amenities80% declared; not independently verified
Storm-water drainsNo size suppliedRERA project progress data RERA amenities100% declared; not independently verified
Green strip / tot lot / parkLayout drawing records parks/open space of 3,863.49 sq.mRERA project progress data; layout drawing RERA amenities Layout record100% declared for the RERA item; not independently verified
Street lightingNo quantity suppliedRERA project progress data RERA amenities100% declared; not independently verified
Community buildingsNo size or facility schedule suppliedRERA project progress data RERA amenities20% declared; not independently verified
Treatment and disposal of sewage and sullage waterNo capacity suppliedRERA project progress data RERA amenities20% declared; not independently verified
Solid-waste management and disposalNo system details suppliedRERA project progress data RERA amenities0% recorded
Water conservation / rainwater harvestingNo capacity suppliedRERA project progress data; HMDA conditions RERA amenities100% declared; not independently verified
Energy managementNo system details suppliedRERA project progress data RERA amenities0% recorded
Fire protection and fire-safety requirementsNo system details suppliedRERA project progress data RERA amenities0% recorded
Electrical meter room / sub-station / receiving stationNo capacity suppliedRERA project progress data RERA amenities20% declared; not independently verified
Aggregate recreational open spaceNo additional area supplied in this progress itemRERA project progress data RERA amenities0% recorded

A vendor listing names facilities such as a clubhouse, gym, swimming pool, children’s play area, indoor games and tennis courts. These are third-party/marketing claims, not established as TG-RERA-filed, sanctioned, or delivered facilities in the supplied project documents. Promoter website

7. Utilities, building services & safety

The HMDA final layout letter describes the layout as provided with water supply, sewerage and drainage disposal systems, street lighting, rainwater-harvesting structure and civic amenities, and assigns maintenance of those services to the local body. The RERA progress data separately records progress percentages for several infrastructure items; those percentages are promoter-filed progress figures, not independent inspection results. RERA amenities

No capacities or detailed system designs are supplied for water sourcing/storage/treatment, STP, sewage reuse, storm-water management, electrical supply or backup, lifts, fire-fighting equipment, CCTV/security, waste segregation, or accessibility. The HMDA letter includes a condition requiring a minimum 3m (10’0”) vertical and horizontal safety distance between a building and high-tension electricity lines when individual residential building approval is considered; this does not establish project-wide fire or statutory-safety compliance.

8. Location, access & connectivity

The project is recorded in the locality SHAMIRPET-ORRGC, Shamirpet mandal, Medchal-Malkajgiri district, PIN 500048. The HMDA approval document identifies the approved layout as being in Upperpalli-ORRGC. The supplied project boundaries identify roads on the west (road width 30) and north (road width 150), and Survey Nos. 927 and 902 on the east and south respectively. RERA record RERA filing

HMDA’s final layout conditions require roads to be kept open for free public access and state that no compound wall is permitted. No verified distances to transport, employment centres, schools, hospitals, or other landmarks are supplied for this project. Location record

9. Developer & development status

The registered promoter is VIJAYSENA CONSTRUCTION COMPANY, recorded as a partnership, with GSTIN 36AASFV1071G1ZX. The RERA filing lists its address as PRAJAY CORPORATE HOUSE, CHIKOTI GARDENS, UPPERPALLY-ORRGC, SHAMIRPET-ORRGC, Shamirpet, Medchal-Malkajgiri, 500048. Corporate record RERA record

The filing identifies Rohit Reddy Dantapalli as authorized signatory and lists him and Sharmila Reddy Dantapally as partners. Form B is a promoter affidavit by Dantapalli Rohit Reddy, dated 29th January, 2021, and records a completion undertaking of 31/01/2024. The portal record reports 90% completeness, but the supplied materials do not provide independent construction verification, tower-wise progress, or an occupancy/completion certificate. Parties record RERA record Document index Approvals record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002910; issued 14/05/2021; validity to 31/01/2024
What the supplied evidence establishesForm C registration for TREE TOPS, with stated separate-account and other registration conditions.
HMDA final layout letter
Identifier / dateApproval 000189/LO/Plg/HMDA/2018; approved 17 September, 2020; file/application 033240/LT/ZOB/FLT/U6/HMDA/25012020
What the supplied evidence establishesFinal residential layout approval for Survey Nos. 839 and 840, extent 45,089.05 Sqm, subject to stated conditions.
RERA Form B declaration
Identifier / dateDated 29th January, 2021
What the supplied evidence establishesPromoter declaration covering the land-title basis, encumbrance statement, project funds, approvals and completion undertaking.
Title report
Identifier / dateDocument 151258, dated 07.10.2020
What the supplied evidence establishesAdvocate’s title investigation report concerning lands in Sy.Nos. 839 and 840 at Upperpally, Shamirpet.
Encumbrance statement
Identifier / dateDocument 151259; search period 01-05-1995 to 17-01-2021
What the supplied evidence establishesFiled statement of encumbrances for the described property and search period.
Layout drawing
Identifier / dateDocument 165772; two layout sheets
What the supplied evidence establishesDrawing-derived layout and area data; supplied extraction notes that plot details are incomplete and measurements should be verified against the drawing. Layout record
Agreement-for-sale form
Identifier / dateDocument 151263
What the supplied evidence establishesPartially filled form with allottee, unit and consideration particulars blank; it is not a completed unit-specific agreement.
Occupancy / completion certificate
Identifier / dateNot established in supplied records
What the supplied evidence establishesNo project-, phase-, or building-specific certificate is identified in the supplied evidence. Document index Approvals record

Frequently asked questions

Is TREE TOPS registered with Telangana RERA?

Yes. TREE TOPS is registered with the Telangana Real Estate Regulatory Authority as P02200002910; the registration status is New Project.

Who is the developer of TREE TOPS?

The promoter named in the RERA registration is VIJAYSENA CONSTRUCTION COMPANY.

Where is TREE TOPS located?

TREE TOPS is in SHAMIRPET-ORRGC, Shamirpet, Medchal-Malkajgiri, Telangana (500048).

When will TREE TOPS be completed?

The promoter's proposed date of completion filed with RERA is 31/01/2024. This is the promoter's declaration, not a guarantee.

More projects in Shamirpet Orrgc