BHAVANAS GLC CRIBS PHASE 3 is a residential project in DUNDIGAL, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is LAKSHMI SRINIVASA CONSTRUCTIONS. The project has a site area of 4932.45 sq.m and comprises 30 proposed units in a gated-community housing layout, with 3BHK configurations and a RERA-filed saleable area of 124.96 sq.m per unit; the supplied record does not state the number of towers or floors. It is registered with TG-RERA as P02200002242, with a proposed completion date of 20-09-2025.

More from Lakshmi Srinivasa Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 20 Sep 2025 - check its extension on TG-RERA
9documents on file - each fact links to its page
9court cases on this project's land (survey 170, Dundigal)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com
Dundigal, Dundigal Gandimaisamma, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameBHAVANAS GLC CRIBS PHASE 3 RERA record
Project typeResidential; the RERA filing describes 30 proposed building units, while the filed layout documents describe a gated-community housing layout. RERA filing RERA filing
Phase / registered portionPhase 3; the registration is for this named phase. The supplied record does not separately describe the full development or the boundaries of other phases. RERA record
TG-RERA registrationP02200002242, granted under section 5; issue/valid-from date 30/10/2020. RERA record
Registration validityCertificate states validity from 30/10/2020 to 20/09/2025, unless extended by the Authority. No extension is recorded in the supplied certificate.
Registered promoterLAKSHMI SRINIVASA CONSTRUCTIONS. RERA record RERA filing
RERA status in supplied recordRegistration certificate on file; its stated validity ended 20/09/2025. The supplied record does not establish a later extension, current registration status, or completion/occupancy certification.

Land and geographic identity

ItemProject record
Registered localityDUNDIGAL. The RERA certificate also records Dundigal Gandimaisamma as locality. RERA record RERA filing
Revenue villageDundigal in the project identity record. The filed layout and title documents identify the land as Mallampet / Mallampet-ORRGC; the supplied records do not reconcile these locality/village labels. RERA record RERA filing
Mandal / district / PINDundigal Gandimaisamma; Medchal-Malkajgiri; 501401. RERA record
Project survey number and subdivision170/5. The RERA certificate, land details, and filed layout records identify this survey subdivision. RERA filing
Registered site extent4932.45 sq.m total site area; 3749.38 sq.m net area and 1183.07 sq.m recorded as affected by road widening/FTL/Nala widening in the RERA land details. RERA filing
Layout area statementFiled layout extraction records 4932.45 sq.m total site area and net site area; plotted area 3748.75 sq.m, layout road area 664.02 sq.m, park 395.65 sq.m, and social infrastructure 124.03 sq.m.
BoundariesNorth: ROAD WIDTH 12; south, east and west: NEIGHBOURS LAND. RERA filing

Development identity

ItemProject record
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the filed plan reference is 000283/LO/Plg/HMDA/2019, dated 20 September, 2019. Approvals record
Final layout proceedingsDundigal Municipality, proceedings Proc.No.G/838/TPO/Dun/Mpl/2019.ois. T.S., dated 12-12-2019, recording release of the final layout. Approvals record
Layout typeFiled documents describe a draft layout with housing and a later final layout release for land in Sy.No. 170/5.
Approved built-up area3749.38 sq.m is listed as “Approved Built up Area” in the RERA filing. The supplied material does not provide a separate gross built-up-area schedule. RERA filing
Buildings / unitsRERA filing: 30 total building units as per approved plan and 30 proposed units as per agreement. The layout drawing extraction identifies plots numbered 1 to 30; the plotted layout is not a building-by-building floor schedule. RERA filing Layout record
Floor configuration and parking levelsBasement, stilt, podium and upper-floor configuration, parking levels, and building heights are not disclosed in the supplied records. Document index Approvals record
Authority mortgage areaRERA filing records 246.66 sq.m mortgage area. The filed approval documents describe mortgage security over plots in favour of HMDA; see the approval record for the plan-document description. RERA filing

Offering and status

ItemProject record
Unit type3BHK; 30 units are filed. RERA unit table RERA unit details
RERA-filed saleable area124.96 sq.m per unit (the filed minimum and maximum are both 124.96 sq.m). RERA unit table RERA unit details
Booked / available0 booked / 30 available as read from the TG-RERA portal; the supplied record has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details
Construction stageNo independently verified site-progress record or stage-by-stage construction update is supplied. The RERA filing lists infrastructure and facilities, but the amenity progress entries are 0%, except the electrical meter room/sub-station/receiving station entry at 10%. RERA amenities
Completion deadlinePromoter’s Form B declaration states completion by 20-09-2025. This is a promoter undertaking, distinct from registration validity.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. Status is therefore not established for this phase or any individual unit. Document index

2. The project story

  • This is a residential development registered as BHAVANAS GLC CRIBS PHASE 3, on land identified in the RERA and approval records as Sy.No. 170/5. The RERA filing describes 30 proposed units, and the filed layout records 30 numbered plots. The approval material describes a gated-community layout with housing rather than providing a detailed apartment-tower or floor-by-floor schedule. RERA record RERA filing Layout record
  • The registered identity gives the locality as DUNDIGAL, while the title and layout documents use Mallampet or Mallampet-ORRGC. The supplied evidence does not resolve these geographic labels; both are retained here for identification. RERA record
  • The RERA certificate records registration through 20/09/2025, and the promoter’s declaration gives the same date as the completion undertaking. Neither date establishes that construction was completed or that an occupancy/completion certificate was issued. No verified on-site progress assessment is supplied. Document index

3. Master plan, architecture & building design

  • The filed layout material gives a site area of 4932.45 sq.m and a land-use schedule comprising 3748.75 sq.m plotted area, 664.02 sq.m roads, 395.65 sq.m park, and 124.03 sq.m social infrastructure. The layout drawing extraction records 30 plot numbers, 1 to 30; plot sizes are not available in the supplied extraction. These are layout-derived figures, not a floor-area or building design schedule. Layout record
  • The RERA filing lists 3749.38 sq.m as approved built-up area and records 30 units as per the approved plan and 30 proposed units. The supplied material does not provide floor plans with measurable flats, a building footprint schedule, floor count, height, lifts, stairs, or a separate gross built-up-area figure. RERA filing RERA filing Floor plans
  • The filed approval documents describe a housing layout, roads, park/open-space and social-infrastructure areas, and development works. They do not establish that the listed facilities are complete.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK30030124.96 sq.mNot measured in supplied drawingsNot supplied
  • The 3BHK count, inventory and saleable area are TG-RERA filing figures; the portal reading has no supplied as-of date. The drawing review reports two sheets, neither containing flats, and no software-measured carpet area. Carpet area, balcony/utility area and the unit’s share of common areas are not separately quantified in the supplied evidence; the filed saleable area should not be read as a carpet-area measurement. RERA unit details RERA unit table Floor plans
  • The layout extraction identifies plot numbers 1 to 30, but it does not provide plot-size bands or a complete plot-by-plot schedule. Layout record

5. Parking & vehicle circulation

The supplied RERA and approval extracts do not establish sanctioned car or two-wheeler parking counts, visitor or accessible spaces, parking levels, ramps, or unit-specific parking allocations. The layout records internal roads, but not detailed vehicle circulation or pedestrian separation. Any parking arrangement or exclusive allocation should be confirmed against the current sanctioned layout and the buyer’s registered sale documents. RERA filing Layout record Document index

6. Amenities, recreation & open spaces

Park / open space
Description / size395.65 sq.m; layout extraction labels this as park and the approval document describes parks/utility area.
Evidence sourceLayout record
Declared progress / verified statusApproval document directs development and transfer to the local body; completion is not independently verified.
Social infrastructure
Description / size124.03 sq.m.
Evidence sourceLayout record
Declared progress / verified statusRecorded in the filed layout area statement; delivered status not established.
Community buildings
Description / sizeListed as YES in the RERA amenity record; no size or capacity supplied.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity progress recorded as 0%; completion not independently verified.
Internal roads and footpaths
Description / sizeListed as YES; layout road area 664.02 sq.m.
Evidence sourceRERA amenities Layout record
Declared progress / verified statusProgress recorded as 0% in the RERA amenity record; completion not independently verified.
Green strip / tot lot / park
Description / sizeListed as YES.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not independently verified.
Open space
Description / sizeLayout records plotted area, roads, park and social infrastructure; no separate amenity area is recorded (0).
Evidence sourceLayout record
Declared progress / verified statusLayout-recorded; delivery status not established.

7. Utilities, building services & safety

  • The RERA amenity record lists water supply, sewerage (chambers, lines, septic tank/STP), storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, street lighting, energy management, solid-waste management, and electrical meter room/sub-station/receiving station. The record marks these facilities as available in its filing fields, but does not provide capacities or independent completion verification; progress is recorded as 0% for these listed facilities except electrical meter room/sub-station/receiving station at 10%. RERA amenities
  • The HMDA draft-layout letter specifies development of common septic tank/STP, internal water-supply pipelines, a Hydro Pneumatic System, electrical supply lines, street lights, transformer, avenue plantation, park, rainwater-harvesting pits, and sump/OHT. It also specifies 4 nos per Acre for harvesting pits and says amenities are to be developed before release of the final layout. These are approval conditions or listed works, not evidence of completed services.
  • The supplied material does not establish water source or storage capacity, STP capacity or reuse arrangements, electrical backup, EV charging, lift provision, detailed fire systems, security/CCTV, waste-segregation arrangements, or accessibility features. The RERA amenity list includes fire protection and fire-safety requirements but gives no detailed system or completion status. RERA amenities

8. Location, access & connectivity

  • The project is registered under locality DUNDIGAL, in Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 501401. The filed layout and title records identify the land as Mallampet / Mallampet-ORRGC. RERA record
  • The registered site boundary record identifies a ROAD WIDTH 12 along the north and neighbours’ land on the other three sides. The supplied evidence does not provide a verified approach-road description or measured distances to public transport or landmarks. RERA filing Location record

9. Developer & development status

  • The registered promoter is LAKSHMI SRINIVASA CONSTRUCTIONS, identified in the RERA filing as a Partnership. The Form B declaration was made by GURRAM VIJAYA LAKSHMI as authorised signatory/managing partner and states that the project would be completed by 20-09-2025. RERA filing Corporate record
  • The supplied registration certificate records the project as P02200002242, valid from 30/10/2020 to 20/09/2025 unless extended. No extension, independently assessed construction progress, or occupancy/completion certificate is included in the evidence supplied for this overview. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for BHAVANAS GLC CRIBS PHASE 3, registration P02200002242, issued 30/10/2020, with stated validity through 20/09/2025 unless extended.
HMDA layout approvalDraft layout letter, Layout Permit No. 000283/LO/Plg/HMDA/2019, dated 20 September, 2019, for housing in Sy.No. 170/5.
Local-body final layout recordDundigal Municipality proceedings Proc.No.G/838/TPO/Dun/Mpl/2019.ois. T.S., dated 12-12-2019, described in the extraction as final layout release.
Promoter declarationForm B affidavit by GURRAM VIJAYA LAKSHMI, dated 24th June, 2020, including the promoter’s completion undertaking of 20-09-2025.
Occupancy/completion certificateNo such certificate is identified in the supplied document set. Document index
Current public plan lookupHMDA’s approved-layout lookup is reported unavailable through the public channel; the supplied evidence says an official/HMDA-internal request is needed. This is an access limitation, not evidence of refusal. HMDA

Other registrations of Bhavanas Glc Cribs

Frequently asked questions

Is BHAVANAS GLC CRIBS PHASE 3 registered with Telangana RERA?

Yes. BHAVANAS GLC CRIBS PHASE 3 is registered with the Telangana Real Estate Regulatory Authority as P02200002242; the registration status is New Project.

Who is the developer of BHAVANAS GLC CRIBS PHASE 3?

The promoter named in the RERA registration is LAKSHMI SRINIVASA CONSTRUCTIONS.

Where is BHAVANAS GLC CRIBS PHASE 3 located?

BHAVANAS GLC CRIBS PHASE 3 is in DUNDIGAL, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (501401).

When will BHAVANAS GLC CRIBS PHASE 3 be completed?

The promoter's proposed date of completion filed with RERA is 20/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Dundigal