Dnr Elite
SR CONSTRUCTIONS · Karimnagar · RERA P02700005489
DNR ELITE is a residential apartment project in VAVILALAPALLY, Karimnagar urban, Karimnagar district, developed by Sr Constructions. The project has a site extent of 997.55 m² and one building, Building - A (B), with 1 Stilt + 5 upper floors and 20 3BHK units. Its TG-RERA registration is P02700005489, granted effective 07/12/2022 through 11/05/2025, and the proposed completion date is 11 May, 2025.
More from Sr Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | DNR ELITE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | A single registered project is shown; the registration record identifies Survey No. 1312. Separate phase details are not disclosed. |
| TG-RERA registration | P02700005489; granted under section 5, effective 07/12/2022 through 11/05/2025. The certificate records no extension. |
| Registered promoter | Sr Constructions on the TG-RERA certificate; the project filing and approval identify SR CONSTRUCTIONS. RERA record |
| RERA status | The certificate confirms registration for the stated validity period. The supplied record does not establish a subsequent extension or current registration status. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | VAVILALAPALLY; certificate location: Vavilalapally (47th ward) RERA record |
| Revenue village | The project filing identifies Vavilalapally (47th ward); the building approval describes the locality as Vavilalapally and district as Karimnagar. RERA record |
| Mandal / district / PIN | Karimnagar urban / Karimnagar / 505001 RERA record |
| Project survey number(s) and subdivisions | Survey No. 1312; no subdivision is disclosed. Land records |
| Plot numbers | 3-7-366, 3-7-367, 3-7-368, 3-7-369, 3-7-370 |
| Site extent | 997.55 m²; the approval records total site area and net area as 997.55 m² and road-affected area as 0 m². Land records |
| Boundaries | East: ROAD; west, north and south: OTHERS LAND RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation |
| Principal building approval | 0008/BP/3011/2022, approved 11 May, 2022; file number 002204/BP/DTCP/3011/0025/2022. Approvals record |
| Approved built-up area | 2,252.85 m² residential area; the approval separately lists 541.99 m² for the stilt. |
| Building count and sanctioned configuration | One residential building, identified as Building - A (B): 1 Stilt + 5 upper floors, height 15.00 m. |
| Parking levels | The approval identifies the stilt as parking space and requires approved cellar/stilt parking areas, where provided in the plan, to remain exclusively for vehicle parking. No parking-space count is supplied here. |
| Units | 20 units are listed in the TG-RERA unit record; the approval states that the sanctioned number of units must not be increased without prior approval. The extracted approval does not state a unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK; RERA-filed saleable area 156.07 m² RERA unit table |
| Booked / available | 6 booked / 14 available, as shown in the TG-RERA portal data supplied; no as-of date is provided, so counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress report is supplied. The project amenity record contains promoter-reported percentage-completion entries; these are summarized below and are not independent verification. RERA amenities |
| Completion date | The sanctioned approval specifies construction to be completed before 11 May, 2025. The promoter’s Form B also undertakes completion by 11-05-2025. |
| Occupancy / completion certificate | The supplied approval requires an occupancy certificate before occupation and a completion notice after construction. No project occupancy or completion certificate is supplied; the approval extraction marks completion as not certified. |
The project story
DNR ELITE is registered as a residential apartment project on Survey No. 1312 at Vavilalapally (47th ward), Karimnagar urban, Karimnagar. The registration certificate also identifies plot numbers 3-7-366 through 3-7-370. RERA record
The building approval describes one building, Building - A (B), with one stilt and five upper floors, for residential use, at a stated height of 15 metres. The project unit record lists twenty 3BHK apartments. RERA unit table
The supplied records do not provide independent confirmation of the building’s current construction stage or completion. The portal amenity percentages are reported progress figures, not an independently verified site inspection. RERA amenities
The approval and promoter Form B state a completion deadline of 11 May 2025; the TG-RERA registration certificate states validity through the same date. These are separate record dates: neither establishes that construction was completed or that an occupancy certificate was issued.
Master plan, architecture & building design
The building-construction approval records a site area and net area of 997.55 m², residential built-up area of 2,252.85 m², and a 541.99 m² stilt. It identifies one building, Building - A (B), configured as 1 Stilt + 5 upper floors, with a height of 15.00 m. These are approval-record figures; no separate FSI-counted area or gross built-up area is supplied.
The approval lists a 5% open-space figure and a tot-lot of 51.48 m². It also requires peripheral tree planting and greenery and states that the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate. No building arrangement drawing, flat-per-floor count, lift or stair details, internal circulation plan, or detailed landscaping plan is available in the supplied extracted records.
An approved floor-plan document is identified in the RERA filing as document 264213. Its supplied drawing-derived measurements are software measurements, not RERA disclosures; see “Homes, configurations & floor plans.”
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 6 | 14 | 156.07 m² | Software-measured range: 92.5–96.2 m²; median 93.8 m² | 40% |
Unit counts, booking counts and saleable area are from the TG-RERA filing data; booking counts have no supplied as-of date and are indicative. The carpet-area range and loading figure are software measurements from four flat designs in the approved floor-plan drawings, not RERA-filed figures, and the measurement record says they need review against the drawing. The filing does not state that its 156.07 m² saleable area is carpet area. Saleable area and measured carpet area are different measures; the supplied drawing-measurement note says saleable area also counts the home’s share of common areas. RERA unit table RERA unit details Floor plans
The measured second-floor plan for flat 04 shows three bedrooms, a living room, a combined dining/kitchen space, three toilets, balconies and a utility area. The drawing extraction records two balconies as 1.22 m wide; balcony and utility areas are excluded from the software-measured carpet area. Room dimensions shown in the extraction include a living room of 3.0 × 5.83 m, a combined dining/kitchen area of 4.23 × 9.61 m, and bedrooms of 3.12 × 4.41 m, 3.0 × 3.3 m and 3.0 × 3.13 m. These are drawing-based measurements, not RERA disclosures. RERA unit details
Parking & vehicle circulation
The approval identifies the stilt as a parking level and requires cellar and stilt areas approved for parking to be used exclusively for vehicles, without partition walls or rolling shutters and without conversion to another use. The available extracted records do not establish the number of car or two-wheeler spaces, visitor or accessible parking, ramp layout, vehicle-entry arrangements, EV charging, or unit-wise parking allocation. A parking bay shown on a plan would not, by itself, establish exclusive ownership.
Amenities, recreation & open spaces
The TG-RERA amenity data contains these progress entries. The percentages are portal-reported figures; the supplied evidence does not independently verify completion.
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | Approval lists tot-lot 51.48 m² and 5% open space. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress: 20%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No size or further description supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Internal roads and footpaths |
|---|---|
| Description / size | No dimensions supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Street lighting |
|---|---|
| Description / size | No further details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Water supply |
|---|---|
| Description / size | No source or capacity supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | The record gives no system type or capacity beyond the listed category. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Storm-water drains |
|---|---|
| Description / size | No further details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Treatment and disposal of sewage and sullage water |
|---|---|
| Description / size | No system details or capacity supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Solid-waste management and disposal |
|---|---|
| Description / size | No further details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Approval requires a rainwater-harvesting percolation pit and lists 9 rainwater-harvesting structures. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Energy management |
|---|---|
| Description / size | No further details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Fire protection and fire-safety requirements |
|---|---|
| Description / size | No system details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported. |
| Facility | Electrical meter room / sub-station / receiving station |
|---|---|
| Description / size | Approval requires space for a transformer; capacity is not supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked available “YES”; 0% reported. |
No clubhouse or indoor recreational facilities, sports facilities, or additional convenience facilities are identified in the supplied amenity records. RERA amenities
Utilities, building services & safety
The building approval requires construction of rainwater-harvesting percolation pits and lists 9 rainwater-harvesting structures. The portal amenity entry for water conservation/rainwater harvesting is marked “YES” with 80% progress; no water source, storage or treatment capacity is supplied. RERA amenities
The RERA amenity record lists water supply and a sewerage category covering chambers, lines, septic tank and STP, each marked “YES” at 80% progress. It separately reports storm-water drains and treatment/disposal of sewage and sullage water at 0%. The supplied records do not specify sewerage arrangements, reuse, drainage capacities or system commissioning. RERA amenities
The approval requires space for a transformer and lists an electrical meter room/sub-station/receiving station as available, with 0% reported progress. No power-supply capacity, backup system, EV charging, lift details or lift capacities are supplied. RERA amenities
The approval makes fire and structural safety the responsibility of the owner, builder/developer, architect and site engineer, and requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical personnel. The portal reports fire protection and fire-safety requirements at 0%. These records do not establish that the required systems are complete or that statutory compliance has been independently verified. RERA amenities
The approval also requires a garbage house within the premises. The supplied material does not specify waste-segregation arrangements, security systems, accessibility provisions, or completed service status.
Location, access & connectivity
The registered project location is Vavilalapally (47th ward), Karimnagar urban mandal, Karimnagar district, Telangana, PIN 505001. The project filing identifies Survey No. 1312 and plot numbers 3-7-366, 3-7-367, 3-7-368, 3-7-369 and 3-7-370. RERA record
The approval records an abutting road width of 18M. The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 112.9 km; this is a supplied distance estimate, not a travel-time claim. No further approach-road, public-transport or landmark details are provided. Location record
Developer & development status
The TG-RERA certificate names Sr Constructions as promoter; the project filing and building approval identify SR CONSTRUCTIONS, an organization recorded as a partnership in the project filing. The approval identifies M/s. SR CONSTRUCTIONS, Registration No. 18/2021, Karimnagar, represented by managing partner Sri Dasari Sripal Reddy. The RERA registration filing identifies Sanjeev Reddy Duvvuri as authorized signatory and Sripal Reddy Dasari as partner. Corporate record
The promoter’s Form B, signed by D. Sanjeev Reddy as authorized signatory, declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 11-05-2025. These are promoter declarations in the filed document.
The supplied records do not provide a verified construction-progress assessment, promoter contact telephone or email, or official website. The RERA registration certificate gives the promoter’s office location as Village Ramnagar (42 ward), Karimnagar urban mandal, Karimnagar district, PIN 505001.
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for DNR ELITE, registration P02700005489, issued 07/12/2022, valid through 11/05/2025; certificate records no extension. |
| Building approval | Karimnagar Municipal Corporation approval 0008/BP/3011/2022, dated 11 May, 2022, file no. 002204/BP/DTCP/3011/0025/2022; approval extraction identifies one building, 1 Stilt + 5 upper floors. |
| Commencement / building-construction approval | Document 264214, titled “Commencement Certificates for each building in each phase”; extracted as a building-construction approval. It states construction should commence before 11 November, 2022, be completed before 11 May, 2025, and that an occupancy certificate is compulsory before occupation. |
| Approved plan / drawing record | Layout-plan document 264213 is listed in the RERA filing; the supplied floor-plan measurement data is drawn from this document. |
| Title and land declarations | Form B document 264626 contains promoter declarations about title, encumbrances and completion. This overview reports them as declarations, not as independent title verification. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the approval extraction marks completion as not certified. |
Project at a glance
Project identity
Registered project name: DNR ELITE
Project type: Residential apartment project
Phase / registered portion: A single registered project is shown; the registration record identifies Survey No. 1312. Separate phase details are not disclosed.
TG-RERA registration: P02700005489; granted under section 5, effective 07/12/2022 through 11/05/2025. The certificate records no extension.
Registered promoter: Sr Constructions on the TG-RERA certificate; the project filing and approval identify SR CONSTRUCTIONS.
RERA status: The certificate confirms registration for the stated validity period. The supplied record does not establish a subsequent extension or current registration status.
Land and geographic identity
Locality: VAVILALAPALLY; certificate location: Vavilalapally (47th ward)
Revenue village: The project filing identifies Vavilalapally (47th ward); the building approval describes the locality as Vavilalapally and district as Karimnagar.
Mandal / district / PIN: Karimnagar urban / Karimnagar / 505001
Project survey number(s) and subdivisions: Survey No. 1312; no subdivision is disclosed.
Plot numbers: 3-7-366, 3-7-367, 3-7-368, 3-7-369, 3-7-370
Site extent: 997.55 m²; the approval records total site area and net area as 997.55 m² and road-affected area as 0 m².
Boundaries: East: ROAD; west, north and south: OTHERS LAND
Development identity
Sanctioning authority: Karimnagar Municipal Corporation
Principal building approval: 0008/BP/3011/2022, approved 11 May, 2022; file number 002204/BP/DTCP/3011/0025/2022.
Approved built-up area: 2,252.85 m² residential area; the approval separately lists 541.99 m² for the stilt.
Building count and sanctioned configuration: One residential building, identified as Building - A (B): 1 Stilt + 5 upper floors, height 15.00 m.
Parking levels: The approval identifies the stilt as parking space and requires approved cellar/stilt parking areas, where provided in the plan, to remain exclusively for vehicle parking. No parking-space count is supplied here.
Units: 20 units are listed in the TG-RERA unit record; the approval states that the sanctioned number of units must not be increased without prior approval. The extracted approval does not state a unit count.
Offering and status
Configuration: 3BHK; RERA-filed saleable area 156.07 m²
Booked / available: 6 booked / 14 available, as shown in the TG-RERA portal data supplied; no as-of date is provided, so counts are indicative.
Construction stage: No independently verified site-progress report is supplied. The project amenity record contains promoter-reported percentage-completion entries; these are summarized below and are not independent verification.
Completion date: The sanctioned approval specifies construction to be completed before 11 May, 2025. The promoter’s Form B also undertakes completion by 11-05-2025.
Occupancy / completion certificate: The supplied approval requires an occupancy certificate before occupation and a completion notice after construction. No project occupancy or completion certificate is supplied; the approval extraction marks completion as not certified.
The project story
DNR ELITE is registered as a residential apartment project on Survey No. 1312 at Vavilalapally (47th ward), Karimnagar urban, Karimnagar. The registration certificate also identifies plot numbers 3-7-366 through 3-7-370.
The building approval describes one building, Building - A (B), with one stilt and five upper floors, for residential use, at a stated height of 15 metres. The project unit record lists twenty 3BHK apartments.
The supplied records do not provide independent confirmation of the building’s current construction stage or completion. The portal amenity percentages are reported progress figures, not an independently verified site inspection.
The approval and promoter Form B state a completion deadline of 11 May 2025; the TG-RERA registration certificate states validity through the same date. These are separate record dates: neither establishes that construction was completed or that an occupancy certificate was issued.
Master plan, architecture & building design
The building-construction approval records a site area and net area of 997.55 m², residential built-up area of 2,252.85 m², and a 541.99 m² stilt. It identifies one building, Building - A (B), configured as 1 Stilt + 5 upper floors, with a height of 15.00 m. These are approval-record figures; no separate FSI-counted area or gross built-up area is supplied.
The approval lists a 5% open-space figure and a tot-lot of 51.48 m². It also requires peripheral tree planting and greenery and states that the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate. No building arrangement drawing, flat-per-floor count, lift or stair details, internal circulation plan, or detailed landscaping plan is available in the supplied extracted records.
An approved floor-plan document is identified in the RERA filing as document 264213. Its supplied drawing-derived measurements are software measurements, not RERA disclosures; see “Homes, configurations & floor plans.”
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 6 | 14 | 156.07 m² | Software-measured range: 92.5–96.2 m²; median 93.8 m² | 40% |
Unit counts, booking counts and saleable area are from the TG-RERA filing data; booking counts have no supplied as-of date and are indicative. The carpet-area range and loading figure are software measurements from four flat designs in the approved floor-plan drawings, not RERA-filed figures, and the measurement record says they need review against the drawing. The filing does not state that its 156.07 m² saleable area is carpet area. Saleable area and measured carpet area are different measures; the supplied drawing-measurement note says saleable area also counts the home’s share of common areas.
The measured second-floor plan for flat 04 shows three bedrooms, a living room, a combined dining/kitchen space, three toilets, balconies and a utility area. The drawing extraction records two balconies as 1.22 m wide; balcony and utility areas are excluded from the software-measured carpet area. Room dimensions shown in the extraction include a living room of 3.0 × 5.83 m, a combined dining/kitchen area of 4.23 × 9.61 m, and bedrooms of 3.12 × 4.41 m, 3.0 × 3.3 m and 3.0 × 3.13 m. These are drawing-based measurements, not RERA disclosures.
Parking & vehicle circulation
The approval identifies the stilt as a parking level and requires cellar and stilt areas approved for parking to be used exclusively for vehicles, without partition walls or rolling shutters and without conversion to another use. The available extracted records do not establish the number of car or two-wheeler spaces, visitor or accessible parking, ramp layout, vehicle-entry arrangements, EV charging, or unit-wise parking allocation. A parking bay shown on a plan would not, by itself, establish exclusive ownership.
Amenities, recreation & open spaces
The TG-RERA amenity data contains these progress entries. The percentages are portal-reported figures; the supplied evidence does not independently verify completion.
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | Approval lists tot-lot 51.48 m² and 5% open space. |
| Declared progress / verified status | Portal progress: 20%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | No size or further description supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Internal roads and footpaths |
|---|---|
| Description / size | No dimensions supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Street lighting |
|---|---|
| Description / size | No further details supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Water supply |
|---|---|
| Description / size | No source or capacity supplied. |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | The record gives no system type or capacity beyond the listed category. |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Storm-water drains |
|---|---|
| Description / size | No further details supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Treatment and disposal of sewage and sullage water |
|---|---|
| Description / size | No system details or capacity supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Solid-waste management and disposal |
|---|---|
| Description / size | No further details supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Approval requires a rainwater-harvesting percolation pit and lists 9 rainwater-harvesting structures. |
| Declared progress / verified status | Marked available “YES”; 80% reported. |
| Facility | Energy management |
|---|---|
| Description / size | No further details supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Fire protection and fire-safety requirements |
|---|---|
| Description / size | No system details supplied. |
| Declared progress / verified status | 0% reported. |
| Facility | Electrical meter room / sub-station / receiving station |
|---|---|
| Description / size | Approval requires space for a transformer; capacity is not supplied. |
| Declared progress / verified status | Marked available “YES”; 0% reported. |
No clubhouse or indoor recreational facilities, sports facilities, or additional convenience facilities are identified in the supplied amenity records.
Utilities, building services & safety
The building approval requires construction of rainwater-harvesting percolation pits and lists 9 rainwater-harvesting structures. The portal amenity entry for water conservation/rainwater harvesting is marked “YES” with 80% progress; no water source, storage or treatment capacity is supplied.
The RERA amenity record lists water supply and a sewerage category covering chambers, lines, septic tank and STP, each marked “YES” at 80% progress. It separately reports storm-water drains and treatment/disposal of sewage and sullage water at 0%. The supplied records do not specify sewerage arrangements, reuse, drainage capacities or system commissioning.
The approval requires space for a transformer and lists an electrical meter room/sub-station/receiving station as available, with 0% reported progress. No power-supply capacity, backup system, EV charging, lift details or lift capacities are supplied.
The approval makes fire and structural safety the responsibility of the owner, builder/developer, architect and site engineer, and requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical personnel. The portal reports fire protection and fire-safety requirements at 0%. These records do not establish that the required systems are complete or that statutory compliance has been independently verified.
The approval also requires a garbage house within the premises. The supplied material does not specify waste-segregation arrangements, security systems, accessibility provisions, or completed service status.
Location, access & connectivity
The registered project location is Vavilalapally (47th ward), Karimnagar urban mandal, Karimnagar district, Telangana, PIN 505001. The project filing identifies Survey No. 1312 and plot numbers 3-7-366, 3-7-367, 3-7-368, 3-7-369 and 3-7-370.
The approval records an abutting road width of 18M. The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 112.9 km; this is a supplied distance estimate, not a travel-time claim. No further approach-road, public-transport or landmark details are provided.
Developer & development status
The TG-RERA certificate names Sr Constructions as promoter; the project filing and building approval identify SR CONSTRUCTIONS, an organization recorded as a partnership in the project filing. The approval identifies M/s. SR CONSTRUCTIONS, Registration No. 18/2021, Karimnagar, represented by managing partner Sri Dasari Sripal Reddy. The RERA registration filing identifies Sanjeev Reddy Duvvuri as authorized signatory and Sripal Reddy Dasari as partner.
The promoter’s Form B, signed by D. Sanjeev Reddy as authorized signatory, declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 11-05-2025. These are promoter declarations in the filed document.
The supplied records do not provide a verified construction-progress assessment, promoter contact telephone or email, or official website. The RERA registration certificate gives the promoter’s office location as Village Ramnagar (42 ward), Karimnagar urban mandal, Karimnagar district, PIN 505001.
Approvals, official records & documents
TG-RERA registration: Form C certificate for DNR ELITE, registration P02700005489, issued 07/12/2022, valid through 11/05/2025; certificate records no extension.
Building approval: Karimnagar Municipal Corporation approval 0008/BP/3011/2022, dated 11 May, 2022, file no. 002204/BP/DTCP/3011/0025/2022; approval extraction identifies one building, 1 Stilt + 5 upper floors.
Commencement / building-construction approval: Document 264214, titled “Commencement Certificates for each building in each phase”; extracted as a building-construction approval. It states construction should commence before 11 November, 2022, be completed before 11 May, 2025, and that an occupancy certificate is compulsory before occupation.
Approved plan / drawing record: Layout-plan document 264213 is listed in the RERA filing; the supplied floor-plan measurement data is drawn from this document.
Title and land declarations: Form B document 264626 contains promoter declarations about title, encumbrances and completion. This overview reports them as declarations, not as independent title verification.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the approval extraction marks completion as not certified.
Frequently asked questions
Is DNR ELITE registered with Telangana RERA?
Yes. DNR ELITE is registered with the Telangana Real Estate Regulatory Authority as P02700005489; the registration status is New Project.
Who is the developer of DNR ELITE?
The promoter named in the RERA registration is SR CONSTRUCTIONS.
Where is DNR ELITE located?
DNR ELITE is in VAVILALAPALLY, Vavilalapally ( 47th ward), Karimnagar urban, Karimnagar, Telangana (505001).
When will DNR ELITE be completed?
The promoter's proposed date of completion filed with RERA is 11/05/2025. This is the promoter's declaration, not a guarantee.
More projects in Vavilalapally

