SRI SOUDHA ADVIK AVENUE is a plotted development in Koheda, Abdullapurmet, Ranga Reddy. The registered promoter is SRI SOUDHA BUILDERS. The project has a registered site area of 62160.93 sq.m and 209 plots/villas, with individual plot areas from 125.61 sq.m to 376.95 sq.m; no towers or floors are disclosed. It is registered under TG-RERA number P02400004700, and the declared completion date is 11/05/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI SOUDHA ADVIK AVENUE RERA record |
| Project type | Plotted development / open plotted layout RERA record |
| Phase or registered portion | New project; registered portion is identified as Survey No. 177P at Koheda. A separately named phase is not disclosed. RERA record |
| TG-RERA registration | P02400004700 RERA record |
| Registration validity | Certificate states 19/07/2022 to 11/05/2025; no extension is recorded in the supplied evidence. Registration validity is distinct from the completion undertaking. Approvals record |
| Registered promoter | SRI SOUDHA BUILDERS; entity type is shown as partnership in the RERA project information. Parties record RERA filing |
| RERA status | Registration certificate issued under section 5; current registration status is not independently established by the supplied records. Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Koheda (also rendered “Kohda” in one title instrument); one revenue village is identified for the project. RERA record Land records |
| Mandal / district / PIN | Abdullapurmet, Ranga Reddy, 501512 RERA record |
| Project survey number(s) | 177P; no project subdivision is stated in the registration identity. RERA record Land records |
| Registered land extent | Total site area 62160.93 sq.m; road-affected area 1638.21 sq.m; net site area 60522.72 sq.m. RERA filing |
| Boundaries | East: land in Sy. No. 178; West: land in Sy. Nos. 176 and 177; North: remaining land in Sy. No. 177A; South: land in Sy. No. 165. RERA filing |
| Survey-record extent note | Bhu Bharati record lists survey 177P as a whole-survey extent of 98261.61 sq.m; the project’s registered site extent is separately stated above. Cadastral map |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 001416/LO/HMDA/0220/GHT/2022; HMDA approval document gives approved date 11 May, 2022. A filed draft layout letter also records proceedings under this number dated 11 July, 2022. Approvals record |
| Approved built-up area | The layout approval extraction states Total Built up Area 0; the layout is a plotted development. No separate building or villa construction area is established in the supplied record. |
| Plots | 209 plots/villas in the HMDA layout record; the drawing-based plot schedule also records 209 plots. Layout record |
| Buildings / floors / parking levels | No apartment towers, floor configuration, or structured parking levels are disclosed for this plotted layout. Layout record |
| Mortgage area | 5742.57 sq.m in 31 identified plots, recorded as mortgage security in favour of the Metropolitan Commissioner, HMDA. |
Offering and status
| Item | Record |
|---|---|
| Offered product | Plots in a plotted layout; individual plot sizes read from the approved drawing range from 125.61 sq.m to 376.95 sq.m. Layout record |
| Plot count and size bands | 209 plots: 55 in 150–200 sq.yd, 131 in 200–250 sq.yd, 15 in 250–300 sq.yd, 6 in 300–400 sq.yd, and 2 in 400–500 sq.yd. Drawing-derived figures; verify against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. RERA filing |
| Completion commitment | Form B declares completion by 11/05/2025. |
| Construction / development stage | RERA filing records overall completeness as 80%; the date and independent site verification of this figure are not supplied. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; this is a plotted layout, and the record provided does not establish final layout release. Document index |
The project story
SRI SOUDHA ADVIK AVENUE is registered as a plotted development on Survey No. 177P in Koheda village, Abdullapurmet Mandal, Ranga Reddy District. HMDA’s layout record describes an open layout with 209 plots/villas, rather than an apartment or tower development. RERA record
The approved layout land-use schedule allocates 36969.77 sq.m to plotted area, 16892.88 sq.m to layout roads, 4539.79 sq.m to open space, 606.35 sq.m to utilities and 1513.93 sq.m to social infrastructure. The schedule records no separate amenities area and no total built-up area.
The RERA filing reports 80% completeness, but the supplied evidence does not provide a dated, independently verified site inspection establishing which works are complete. The promoter’s Form B completion undertaking is 11/05/2025; the supplied record does not establish a completion or occupancy certificate or final layout release. RERA record Document index
Master plan, architecture & building design
The approved drawing is a three-sheet plotted-layout plan, with a schedule of 209 plots. Software extraction from the drawing records plot sizes from 125.61 sq.m to 376.95 sq.m; the size measurements and schedule extraction are drawing-derived and should be checked against the original plan. Layout record
| Layout use | Area | Share stated in approval |
|---|---|---|
| Plotted area | 36969.77 sq.m | 61.08% |
| Layout roads | 16892.88 sq.m | 27.91% |
| Open space | 4539.79 sq.m | 7.50% |
| Utilities | 606.35 sq.m | 1.00% |
| Social infrastructure | 1513.93 sq.m | 2.50% |
| Amenities area | 0 | 0 |
Layout record
The HMDA record lists road widths including 30 mtrs, 18 mts and 60 feet; the approval conditions refer to road formation, drainage, footpaths, underground utility ducting and access to neighbouring sites. These are approval requirements, not evidence that the works have been completed.
No apartment plans, tower arrangement, floor configuration, building footprint, lift or stair design, or building-level phase arrangement is provided. The approval extract records total built-up area as 0. Floor plans
Homes, configurations & floor plans
This is a plotted project, so apartment configuration and carpet-area comparisons are not applicable. The layout schedule records 209 plots. Layout record
| Plot-size band | Plot count |
|---|---|
| 150–200 sq.yd (125–167 sq.m) | 55 |
| 200–250 sq.yd (167–209 sq.m) | 131 |
| 250–300 sq.yd (209–251 sq.m) | 15 |
| 300–400 sq.yd (251–334 sq.m) | 6 |
| 400–500 sq.yd (334–418 sq.m) | 2 |
Layout record
The supplied drawing-derived schedule gives individual plot areas from 125.61 sq.m to 376.95 sq.m. No plot-specific allotment, booked inventory, available inventory, or agreement-linked plot schedule is supplied. Layout record RERA filing
Parking & vehicle circulation
The supplied records do not state a total number of parking spaces, visitor or accessible parking, parking allocation to individual plots, or EV charging provision. No apartment-style basement, stilt, podium or mechanical parking is disclosed. Layout record
The layout approval requires internal roads and road access, and identifies road widths including 30 mtrs, 18 mts and 60 feet. It also requires access to neighbouring sites. These approval conditions do not establish completed road or circulation works.
Amenities, recreation & open spaces
The layout approval identifies open space, social infrastructure and utilities land. The amenities register lists infrastructure categories but records 0% progress for each; this is a reported register value, not independent verification of site conditions. Layout record RERA amenities
| Facility / area | Open space |
|---|---|
| Description / size | 4539.79 sq.m (7.50%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Required by layout record; completed status not established |
| Facility / area | Social infrastructure land |
|---|---|
| Description / size | 1513.93 sq.m (2.50%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Required for transfer to local body before final layout release; completion not established |
| Facility / area | Park development |
|---|---|
| Description / size | Area is not specified; the layout schedule records park area as 0 |
| Evidence source | HMDA draft layout conditions |
| Declared progress / verified status | Approval condition; completion not established |
| Facility / area | Utilities land |
|---|---|
| Description / size | 606.35 sq.m (1.00%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Area identified; installed facilities not independently verified |
A third-party listing names facilities including a jogging track, gym, children’s play area, common garden and waste management. These are vendor-listed, not established by the supplied HMDA layout record as sanctioned or delivered project facilities. Promoter website
Utilities, building services & safety
HMDA’s draft layout conditions describe proposed layout infrastructure, including internal water-supply lines, an overhead tank, transformer, street lighting, underground drainage, storm-water drains, a common septic tank/STP, rainwater-harvesting pits and solid-waste disposal arrangements. The approval also refers to underground utility ducting, a transformer yard, LED lighting and a bio-compost unit. These are recorded as development requirements or proposed facilities; the evidence supplied does not independently verify installation, capacity, commissioning or operation.
| Service | Record and status |
|---|---|
| Water | Approval conditions call for internal water-supply lines, an overhead tank and an assured water source; connection to Mission Bhagiratha or another approved source is to be arranged. Storage capacity and a commissioned source are not established. |
| Sewerage and drainage | Approval conditions refer to underground drainage, a common septic tank/STP, storm-water drainage and NALA channelisation. Completion and operating status are not established. |
| Electrical and lighting | A transformer/transformer yard and street lighting, including LED lighting, are specified in the approval conditions. Installed capacity and completion are not established. |
| Waste | Approval conditions refer to solid-waste disposal space, source segregation and a bio-compost unit. Delivered status is not established. |
| Fire, lifts and accessibility | The supplied layout evidence does not specify fire systems, lifts, accessible routes or building-level safety provisions. Document index |
Location, access & connectivity
The registered location is Koheda village, Abdullapurmet Mandal, Ranga Reddy District, PIN 501512. RERA record
A Turkayamjal Municipality letter concerning an inspection of the proposed site in Survey No. 177P states that a 30' feet wide road abuts the site and describes an approach from Gandicheruvu Road toward the Nehru Outer Ring Road toll road from Bonguloor to Peddamberpet Village. The letter is an inspection communication, not a layout or building approval.
Supplied location records list the nearest sampled Outer Ring Road interchange at approximately 7.4 km, AVN Institute of Engineering and Technology at 0.5 km, and an unnamed school at 2.1 km. These are location-record measurements; no travel times are supplied. Location record
Developer & development status
The TG-RERA registered promoter is SRI SOUDHA BUILDERS, recorded as a partnership. Its GSTIN is 36AEFFS7453A1Z3. The RERA filing names KOLANU KRISHNA REDDY as an authorised signatory. Parties record Corporate record RERA filing
The Form B affidavit-cum-declaration is made by Krishna Reddy Kolanu on behalf of Sri Soudha Builders, dated 23-05-2022. It declares a title basis, states that the land is free from encumbrances, and undertakes completion by 11/05/2025. These are promoter declarations.
The supplied filing reports 80% completeness. No dated progress certificate or independently verified completion status is supplied. No extension of the RERA registration is recorded in the supplied certificate data; registration validity and the promoter’s completion undertaking are separate dates and records. RERA record
The registration certificate gives the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500072”; a complete street address and official contact details are not supplied there.
Approvals, official records & documents
| Identifier / date | P02400004700; issued 19/07/2022 |
|---|---|
| What the supplied record establishes | Form C registration for SRI SOUDHA ADVIK AVENUE; validity stated through 11/05/2025. |
| Identifier / date | 001416/LO/HMDA/0220/GHT/2022; approved date 11 May, 2022 |
|---|---|
| What the supplied record establishes | Layout record for Survey No. 177P, Koheda, with 209 plots/villas and stated layout areas and conditions. |
| Identifier / date | Proceedings 001416/LO/HMDA/0220/GHT/2022; dated 11 July, 2022 in the extraction |
|---|---|
| What the supplied record establishes | Draft layout letter and development/land-transfer conditions. |
| Identifier / date | Document No. 4084/2022, dated 27.04.2022 |
|---|---|
| What the supplied record establishes | HMDA mortgage over 5742.57 sq.m in 31 specified plots, as recorded in the layout approval. |
| Identifier / date | Document No. 4083 of 2022, dated 27.04.2022 |
|---|---|
| What the supplied record establishes | Approval records transfer of road-affected land associated with the proposed 30 mtrs master-plan road. |
| Identifier / date | 820/TPS/TYML/2022, dated 28/02/2022 |
|---|---|
| What the supplied record establishes | Reports the site inspection and abutting-road description; it is not a layout approval. |
| Identifier / date | Dated 23-05-2022 |
|---|---|
| What the supplied record establishes | Promoter declaration and completion undertaking. |
| Identifier / date | Report doc 238188; supporting documents 238184–238187 |
|---|---|
| What the supplied record establishes | Title-report and deed materials filed with the project. Document index |
The public HMDA DPMS layout-status lookup was unavailable in the supplied research record; no independent portal confirmation of current final-layout status is available here. HMDA
Project at a glance
Project identity
Registered project name: SRI SOUDHA ADVIK AVENUE
Project type: Plotted development / open plotted layout
Phase or registered portion: New project; registered portion is identified as Survey No. 177P at Koheda. A separately named phase is not disclosed.
TG-RERA registration: P02400004700
Registration validity: Certificate states 19/07/2022 to 11/05/2025; no extension is recorded in the supplied evidence. Registration validity is distinct from the completion undertaking.
Registered promoter: SRI SOUDHA BUILDERS; entity type is shown as partnership in the RERA project information.
RERA status: Registration certificate issued under section 5; current registration status is not independently established by the supplied records.
Land and geographic identity
Locality / revenue village: Koheda (also rendered “Kohda” in one title instrument); one revenue village is identified for the project.
Mandal / district / PIN: Abdullapurmet, Ranga Reddy, 501512
Project survey number(s): 177P; no project subdivision is stated in the registration identity.
Registered land extent: Total site area 62160.93 sq.m; road-affected area 1638.21 sq.m; net site area 60522.72 sq.m.
Boundaries: East: land in Sy. No. 178; West: land in Sy. Nos. 176 and 177; North: remaining land in Sy. No. 177A; South: land in Sy. No. 165.
Survey-record extent note: Bhu Bharati record lists survey 177P as a whole-survey extent of 98261.61 sq.m; the project’s registered site extent is separately stated above.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 001416/LO/HMDA/0220/GHT/2022; HMDA approval document gives approved date 11 May, 2022. A filed draft layout letter also records proceedings under this number dated 11 July, 2022.
Approved built-up area: The layout approval extraction states Total Built up Area 0; the layout is a plotted development. No separate building or villa construction area is established in the supplied record.
Plots: 209 plots/villas in the HMDA layout record; the drawing-based plot schedule also records 209 plots.
Buildings / floors / parking levels: No apartment towers, floor configuration, or structured parking levels are disclosed for this plotted layout.
Mortgage area: 5742.57 sq.m in 31 identified plots, recorded as mortgage security in favour of the Metropolitan Commissioner, HMDA.
Offering and status
Offered product: Plots in a plotted layout; individual plot sizes read from the approved drawing range from 125.61 sq.m to 376.95 sq.m.
Plot count and size bands: 209 plots: 55 in 150–200 sq.yd, 131 in 200–250 sq.yd, 15 in 250–300 sq.yd, 6 in 300–400 sq.yd, and 2 in 400–500 sq.yd. Drawing-derived figures; verify against the drawing.
Booked / available counts: Not disclosed in the supplied evidence.
Completion commitment: Form B declares completion by 11/05/2025.
Construction / development stage: RERA filing records overall completeness as 80%; the date and independent site verification of this figure are not supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; this is a plotted layout, and the record provided does not establish final layout release.
The project story
SRI SOUDHA ADVIK AVENUE is registered as a plotted development on Survey No. 177P in Koheda village, Abdullapurmet Mandal, Ranga Reddy District. HMDA’s layout record describes an open layout with 209 plots/villas, rather than an apartment or tower development.
The approved layout land-use schedule allocates 36969.77 sq.m to plotted area, 16892.88 sq.m to layout roads, 4539.79 sq.m to open space, 606.35 sq.m to utilities and 1513.93 sq.m to social infrastructure. The schedule records no separate amenities area and no total built-up area.
The RERA filing reports 80% completeness, but the supplied evidence does not provide a dated, independently verified site inspection establishing which works are complete. The promoter’s Form B completion undertaking is 11/05/2025; the supplied record does not establish a completion or occupancy certificate or final layout release.
Master plan, architecture & building design
The approved drawing is a three-sheet plotted-layout plan, with a schedule of 209 plots. Software extraction from the drawing records plot sizes from 125.61 sq.m to 376.95 sq.m; the size measurements and schedule extraction are drawing-derived and should be checked against the original plan.
| Layout use | Area | Share stated in approval |
|---|---|---|
| Plotted area | 36969.77 sq.m | 61.08% |
| Layout roads | 16892.88 sq.m | 27.91% |
| Open space | 4539.79 sq.m | 7.50% |
| Utilities | 606.35 sq.m | 1.00% |
| Social infrastructure | 1513.93 sq.m | 2.50% |
| Amenities area | 0 | 0 |
The HMDA record lists road widths including 30 mtrs, 18 mts and 60 feet; the approval conditions refer to road formation, drainage, footpaths, underground utility ducting and access to neighbouring sites. These are approval requirements, not evidence that the works have been completed.
No apartment plans, tower arrangement, floor configuration, building footprint, lift or stair design, or building-level phase arrangement is provided. The approval extract records total built-up area as 0.
Homes, configurations & floor plans
This is a plotted project, so apartment configuration and carpet-area comparisons are not applicable. The layout schedule records 209 plots.
150–200 sq.yd (125–167 sq.m): 55
200–250 sq.yd (167–209 sq.m): 131
250–300 sq.yd (209–251 sq.m): 15
300–400 sq.yd (251–334 sq.m): 6
400–500 sq.yd (334–418 sq.m): 2
The supplied drawing-derived schedule gives individual plot areas from 125.61 sq.m to 376.95 sq.m. No plot-specific allotment, booked inventory, available inventory, or agreement-linked plot schedule is supplied.
Parking & vehicle circulation
The supplied records do not state a total number of parking spaces, visitor or accessible parking, parking allocation to individual plots, or EV charging provision. No apartment-style basement, stilt, podium or mechanical parking is disclosed.
The layout approval requires internal roads and road access, and identifies road widths including 30 mtrs, 18 mts and 60 feet. It also requires access to neighbouring sites. These approval conditions do not establish completed road or circulation works.
Amenities, recreation & open spaces
The layout approval identifies open space, social infrastructure and utilities land. The amenities register lists infrastructure categories but records 0% progress for each; this is a reported register value, not independent verification of site conditions.
| Facility / area | Open space |
|---|---|
| Description / size | 4539.79 sq.m (7.50%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Required by layout record; completed status not established |
| Facility / area | Social infrastructure land |
|---|---|
| Description / size | 1513.93 sq.m (2.50%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Required for transfer to local body before final layout release; completion not established |
| Facility / area | Park development |
|---|---|
| Description / size | Area is not specified; the layout schedule records park area as 0 |
| Evidence source | HMDA draft layout conditions |
| Declared progress / verified status | Approval condition; completion not established |
| Facility / area | Utilities land |
|---|---|
| Description / size | 606.35 sq.m (1.00%) |
| Evidence source | HMDA layout land-use schedule |
| Declared progress / verified status | Area identified; installed facilities not independently verified |
A third-party listing names facilities including a jogging track, gym, children’s play area, common garden and waste management. These are vendor-listed, not established by the supplied HMDA layout record as sanctioned or delivered project facilities.
Utilities, building services & safety
HMDA’s draft layout conditions describe proposed layout infrastructure, including internal water-supply lines, an overhead tank, transformer, street lighting, underground drainage, storm-water drains, a common septic tank/STP, rainwater-harvesting pits and solid-waste disposal arrangements. The approval also refers to underground utility ducting, a transformer yard, LED lighting and a bio-compost unit. These are recorded as development requirements or proposed facilities; the evidence supplied does not independently verify installation, capacity, commissioning or operation.
Water: Approval conditions call for internal water-supply lines, an overhead tank and an assured water source; connection to Mission Bhagiratha or another approved source is to be arranged. Storage capacity and a commissioned source are not established.
Sewerage and drainage: Approval conditions refer to underground drainage, a common septic tank/STP, storm-water drainage and NALA channelisation. Completion and operating status are not established.
Electrical and lighting: A transformer/transformer yard and street lighting, including LED lighting, are specified in the approval conditions. Installed capacity and completion are not established.
Waste: Approval conditions refer to solid-waste disposal space, source segregation and a bio-compost unit. Delivered status is not established.
Fire, lifts and accessibility: The supplied layout evidence does not specify fire systems, lifts, accessible routes or building-level safety provisions.
Location, access & connectivity
The registered location is Koheda village, Abdullapurmet Mandal, Ranga Reddy District, PIN 501512.
A Turkayamjal Municipality letter concerning an inspection of the proposed site in Survey No. 177P states that a 30' feet wide road abuts the site and describes an approach from Gandicheruvu Road toward the Nehru Outer Ring Road toll road from Bonguloor to Peddamberpet Village. The letter is an inspection communication, not a layout or building approval.
Supplied location records list the nearest sampled Outer Ring Road interchange at approximately 7.4 km, AVN Institute of Engineering and Technology at 0.5 km, and an unnamed school at 2.1 km. These are location-record measurements; no travel times are supplied.
Developer & development status
The TG-RERA registered promoter is SRI SOUDHA BUILDERS, recorded as a partnership. Its GSTIN is 36AEFFS7453A1Z3. The RERA filing names KOLANU KRISHNA REDDY as an authorised signatory.
The Form B affidavit-cum-declaration is made by Krishna Reddy Kolanu on behalf of Sri Soudha Builders, dated 23-05-2022. It declares a title basis, states that the land is free from encumbrances, and undertakes completion by 11/05/2025. These are promoter declarations.
The supplied filing reports 80% completeness. No dated progress certificate or independently verified completion status is supplied. No extension of the RERA registration is recorded in the supplied certificate data; registration validity and the promoter’s completion undertaking are separate dates and records.
The registration certificate gives the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500072”; a complete street address and official contact details are not supplied there.
Approvals, official records & documents
| Identifier / date | P02400004700; issued 19/07/2022 |
|---|---|
| What the supplied record establishes | Form C registration for SRI SOUDHA ADVIK AVENUE; validity stated through 11/05/2025. |
| Identifier / date | 001416/LO/HMDA/0220/GHT/2022; approved date 11 May, 2022 |
|---|---|
| What the supplied record establishes | Layout record for Survey No. 177P, Koheda, with 209 plots/villas and stated layout areas and conditions. |
| Identifier / date | Proceedings 001416/LO/HMDA/0220/GHT/2022; dated 11 July, 2022 in the extraction |
|---|---|
| What the supplied record establishes | Draft layout letter and development/land-transfer conditions. |
| Identifier / date | Document No. 4084/2022, dated 27.04.2022 |
|---|---|
| What the supplied record establishes | HMDA mortgage over 5742.57 sq.m in 31 specified plots, as recorded in the layout approval. |
| Identifier / date | Document No. 4083 of 2022, dated 27.04.2022 |
|---|---|
| What the supplied record establishes | Approval records transfer of road-affected land associated with the proposed 30 mtrs master-plan road. |
| Identifier / date | 820/TPS/TYML/2022, dated 28/02/2022 |
|---|---|
| What the supplied record establishes | Reports the site inspection and abutting-road description; it is not a layout approval. |
| Identifier / date | Dated 23-05-2022 |
|---|---|
| What the supplied record establishes | Promoter declaration and completion undertaking. |
| Identifier / date | Report doc 238188; supporting documents 238184–238187 |
|---|---|
| What the supplied record establishes | Title-report and deed materials filed with the project. |
The public HMDA DPMS layout-status lookup was unavailable in the supplied research record; no independent portal confirmation of current final-layout status is available here.
Frequently asked questions
Is SRI SOUDHA ADVIK AVENUE registered with Telangana RERA?
Yes. SRI SOUDHA ADVIK AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02400004700; the registration status is New Project.
Who is the developer of SRI SOUDHA ADVIK AVENUE?
The promoter named in the RERA registration is SRI SOUDHA BUILDERS.
Where is SRI SOUDHA ADVIK AVENUE located?
SRI SOUDHA ADVIK AVENUE is in ABDULLAPURMET, Koheda, Rangareddy, Telangana (501512).
When will SRI SOUDHA ADVIK AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 11/05/2025. This is the promoter's declaration, not a guarantee.