Sign in

Shanthi Residency

SRI VENKATA SHIVA CONSTRUCTIONS · Rangareddy · RERA P02400005062

SHANTHI RESIDENCY is a residential apartment project in NEKNAMPUR , MANIKONDA, Gandipet Mandal, Ranga Reddy District. It is being developed by registered promoter Sri Venkata Shiva Constructions. The project site is 418.06 Sq. Mt. and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 134.7 sqm. It is registered under TG-RERA number P02400005062, with a proposed completion date of 04/02/2025.

More from Sri Venkata Shiva Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 4 Feb 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Neknapur, Gandipet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSHANTHI RESIDENCY RERA record
Project type / phaseResidential apartment project; phase or separately named registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP02400005062; certificate issued 13/09/2022, valid through 04/02/2025. The supplied certificate records no extension. Registration validity is distinct from the project completion date and from occupancy certification. RERA record Approvals record
Registered promoterSri Venkata Shiva Constructions (also styled SRI VENKATA SHIVA CONSTRUCTIONS); partnership. RERA record RERA filing Corporate record
RERA statusRegistration certificate evidence is available; the stated validity has ended, and no extension is recorded in the supplied certificate.

Land and geographic identity

FieldProject record
Locality / address as filedNEKNAMPUR, MANIKONDA; plot no. 42, Alkapuri Township. RERA record RERA filing RERA filing
Revenue villageNeknapur in the project identity and RERA fields; the building-permit extraction calls it Neknampur M Village. RERA record RERA filing
Mandal / district / PINGandipet, Ranga Reddy, 500075. RERA record RERA filing
Survey number(s)Sy. No. 132; no subdivision is stated in the supplied project records. RERA record Land records
Registered site extent418.06 Sq. Mt. (also filed as 418.06 sqmts); RERA land record shows total area and net area each 418.06 sqmts, with affected area 0. RERA filing Land records
BoundariesEast: PLOT NO - 43; west: PLOT NO - 41; north: PLOT NO - 39; south: WIDE ROAD - 40. RERA filing
Survey-scale referenceBhu Bharati cadastral data reports Survey No. 132 as a whole survey with extent 8450.77 sqm; that is a survey-level reference, not the project’s filed site extent. Cadastral map

Development identity

FieldProject record
Sanctioning authorityHMDA; the building-permit record notes delegation to Manikonda Municipality / Municipal Corporation. RERA record Approvals record
Principal approvalBuilding Permit Order 001830/BP/HMDA/0172/SKP/2021, approved 04 February, 2022; proceedings no. 000205/BP/HMDA/SKP/2022. Approvals record
Approved buildingOne proposed residential building, 1 Stilt + 5 upper floors.
Approved built-up area1,340.89 Sq.mts total; the permit extraction separately lists PROP (BLDG) 1,124.10, required mortgage area 112.41, and provided mortgage area 112.87 Sq.mts. These are permit-record figures and should not be treated as carpet or saleable area. RERA record
Buildings / unitsOne building and one proposed building unit are recorded in the RERA fields. The RERA unit schedule lists 10 3BHK units. RERA filing RERA unit table
Parking and circulationThe permit requires no parking or construction in setback areas and refers to a minimum 4.5mts. approach-road width. A sanctioned parking-space count or parking-level arrangement is not established in the supplied records.

Offering and status

FieldProject record
Unit type3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable area134.7 sqm per listed 3BHK configuration. RERA unit table RERA unit details
Booked / available2 booked; 8 available in the portal-derived schedule. The schedule has no as-of date, so counts are indicative rather than a current availability confirmation. RERA unit table
Construction stageRERA project status is New Project; recorded completeness is 90%, but the supplied data does not establish an independently inspected site-progress date or measurement basis. RERA filing RERA record
Completion datePromoter’s Form-B declaration gives 04/02/2025 as the undertaking date; the project record also gives that proposed completion date. RERA record
Occupancy / completion certificateThe supplied permit extraction records completion_certified: false and requires an HMDA fit-for-occupancy/occupancy certificate before occupation. No occupancy certificate is supplied. This describes the available record, not a verified current authority search.

2. The project story

SHANTHI RESIDENCY is registered as a residential apartment project on plot 42, Survey No. 132, in the Neknapur/Neknampur area of Gandipet Mandal, Ranga Reddy District. The filed site extent is 418.06 square metres, and the HMDA permit describes one residential building with a stilt level and five upper floors. RERA record RERA filing

The RERA schedule describes ten 3BHK apartments, of which two are recorded as booked and eight as available; these portal-derived figures have no stated capture date. The project record labels the status “New Project” and reports 90% completeness, but the supplied evidence does not identify the date or method behind that progress figure, nor independently verify construction on site. RERA unit table RERA filing RERA record

The promoter’s declared completion date was 04/02/2025. The certificate supplied records registration validity only through that same date and no extension, while the supplied permit extraction does not record completion certification. No occupancy certificate is included in the available documents.

3. Master plan, architecture & building design

The filed project site is 418.06 Sq. Mt. HMDA’s building-permit extraction describes one proposed residential building, 1 Stilt + 5 upper floors, with total approved built-up area 1,340.89 Sq.mts. It also records PROP (BLDG) 1,124.10, a required mortgage area of 112.41 Sq.mts, and a provided mortgage area of 112.87 Sq.mts. The permit states that 112.87 Sq mtrs on the third floor is mortgaged in favour of the Metropolitan Commissioner, HMDA. RERA filing

The supplied material does not establish building footprint, floor-by-floor unit arrangement, flats per floor, lift or stair numbers, internal circulation, landscaping, open-space provision, or a phase-wise building arrangement. The RERA filing includes a layout-plan document entry, but the supplied entry is not extracted; the approved floor-plan drawing source identified for unit measurement is document 240120. Document index Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1028134.7 sqm89.2–91.0 sqm; median 90.4 sqm (software-measured)33% (drawing-derived)

The RERA-filed configuration is 3BHK, with 10 units and saleable area 134.7 sqm. The carpet-area range and median are software measurements from floor-plan drawings, not RERA disclosures; the measurement record says six flat designs were measured and three require review. The supplied drawing data says the filed area may not be carpet area. Verify the measurements against the drawing and the unit-specific sale documents. RERA unit details Floor plans

A measured example from the third-floor plan, flat 02, shows a living/dining room, three bedrooms, three toilets, kitchen, puja room, wash area and utility. The listed utility area is 6.69 m² and is marked excluded from the carpet measurement. Its room dimensions are drawing-derived software measurements, not RERA-filed specifications. RERA unit details

Carpet area, saleable area and loading are distinct measures in this record: the software-measured carpet area comes from drawing geometry; the RERA schedule supplies saleable area; and the 33% loading is drawing-derived. The available material does not establish a unit-by-unit carpet measurement or a legally documented allocation of common-area share. RERA unit details Floor plans

5. Parking & vehicle circulation

The supplied RERA and permit data do not establish a sanctioned parking-space count, allocation by apartment, visitor or accessible parking, or basement, stilt, surface or mechanical parking capacity. The permit specifies that no parking or construction is to be placed in setback areas and refers to a minimum 4.5mts. approach-road width.

A vendor listing mentions open and closed car parking and reserved parking, but this is third-party information, not confirmation of sanctioned provision or a documented allocation to a home. Promoter website

6. Amenities, recreation & open spaces

The following facilities appear in the HMDA permit or the RERA amenities schedule. The percentages are the supplied RERA-recorded figures; they are not an independent site inspection.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, capacity or storage details supplied.RERA amenitiesRERA schedule: YES, 100%; independent completion verification not supplied.
SewerageSchedule names chamber, lines, septic tank and STP; no capacity or design details supplied.RERA amenitiesRERA schedule: YES, 100%; independent completion verification not supplied.
Storm-water drainsNo system dimensions supplied.RERA amenitiesRERA schedule: 100%; no separate “available” value shown.
Solid-waste management and disposalNo facility size or process details supplied.RERA amenitiesRERA schedule: YES, 100%; independent completion verification not supplied.
Water conservation / rainwater harvestingPermit requires rainwater-harvesting structures; no capacity or layout supplied.RERA amenitiesRERA schedule: YES, 100%; independent completion verification not supplied.
TransformerListed as a permit amenity/utility; capacity not supplied.Permit-listed; completion status not established.
Garbage houseListed in the permit extraction; size and completion status not supplied.Permit-listed; completion status not established.
ETPPermit requires an ETP as per standard specification; no capacity or process details supplied.Permit condition; completion status not established.

The RERA schedule records 0% for internal roads and footpaths, green strip/tot lot/park, street lighting, community buildings, treatment and disposal of sewage and sullage water, energy management, fire protection and fire-safety requirements, and aggregate recreational open space. These are filed percentages, not a physical inspection result. RERA amenities

7. Utilities, building services & safety

  • Water and drainage: The RERA schedule marks water supply, sewerage and storm-water drains as available, and records water conservation/rainwater harvesting at 100%. The permit requires rainwater harvesting and an ETP, but the supplied documents do not specify water source, storage, treatment capacity, sewerage reuse or storm-water design. RERA amenities
  • Electrical: The RERA schedule marks the electrical meter room/sub-station/receiving station as available at 100%; the permit extraction lists a transformer. Capacity, backup power and EV charging are not established. RERA amenities
  • Lifts and access: Lift count, service lifts, capacities, accessible circulation and ramp details are not supplied. Document index Floor plans
  • Fire and life safety: The RERA amenities schedule records 0% for fire protection and fire-safety requirements. The supplied evidence does not establish fire-system specifications or a fire clearance. RERA amenities
  • Waste: The RERA schedule marks solid-waste management and disposal as available at 100%; no segregation or operating details are supplied. RERA amenities
  • Occupancy: The building permit requires a fit-for-occupancy/occupancy certificate before occupation. No such certificate is included in the supplied documents.

8. Location, access & connectivity

The project’s RERA identity places it at NEKNAMPUR, MANIKONDA, plot 42, in revenue village Neknapur, Gandipet Mandal, Ranga Reddy District, PIN 500075. The building-permit extraction identifies Neknampur M Village and a road boundary to the south, WIDE ROAD - 40; it also states a 4.5mts. road-width figure. RERA record RERA filing RERA filing

Supplied location data lists these distances: Fairfields Colony Chidren Park 0.2 km; Rush Clinic 0.5 km; ICICI Bank 0.7 km; Holy Mary College 1.2 km; an unnamed school 1.1 km; Cyient Technologies pvt ltd 2.3 km; and Financial District (Nanakramguda) 4.3 km. The data does not specify a measurement method. Location record

9. Developer & development status

The registered promoter is Sri Venkata Shiva Constructions, identified in the RERA filing as a partnership. The filing lists GSTIN 36AEKFS4974D1ZO and authorized signatory BARAKAM HARINATH REDDY; the supplied corporate identifier also includes xxxxxx974D. Corporate record RERA filing Parties record

The Form-B declaration by the authorized signatory states a completion undertaking of 04/02/2025 and includes project-fund and audit undertakings. These are promoter declarations, not independent evidence of completion.

The registration certificate gives the promoter-office entry as “Village: Mandal: District: Hyderabad, Pin: 500008.” No more complete registered office address, official contact details or promoter website is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeSHANTHI RESIDENCY, P02400005062; issued 13/09/2022, valid through 04/02/2025; no extension recorded in the supplied certificate.
HMDA building permit
Reference and scopeBuilding Permit Order 001830/BP/HMDA/0172/SKP/2021, approved 04 February, 2022; proceedings 000205/BP/HMDA/SKP/2022; Survey No. 132, plot 42.
Permit mortgage reference
Reference and scopeMortgage document 17099/2021, dated 24 December, 2021; permit extraction identifies 112.87 Sq mtrs of built-up area in the third floor in favour of the Metropolitan Commissioner, HMDA.
Form-B promoter declaration
Reference and scopePromoter declaration includes title and encumbrance statements, project-fund undertakings and the stated completion date 04/02/2025.
Title-report and development documents
Reference and scopeRERA-filed title-related documents include an advocate’s title search report, development agreement/GPA material and a sale-deed extraction.
EvidenceDocument index
Layout and occupancy records
Reference and scopeA layout-plan filing entry is present but not extracted in the supplied data. The supplied permit extraction requires an occupancy certificate; no occupancy certificate is included.
EvidenceDocument index

The HMDA permit conditions include construction in accordance with technically approved plans, submission of commencement and completion notices, development of rainwater harvesting and ETP facilities, and obtaining an occupancy certificate before occupation. This overview records those document requirements without determining compliance.

Frequently asked questions

Is SHANTHI RESIDENCY registered with Telangana RERA?

Yes. SHANTHI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400005062; the registration status is New Project.

Who is the developer of SHANTHI RESIDENCY?

The promoter named in the RERA registration is SRI VENKATA SHIVA CONSTRUCTIONS.

Where is SHANTHI RESIDENCY located?

SHANTHI RESIDENCY is in NEKNAMPUR , MANIKONDA, Neknapur, Gandipet, Rangareddy, Telangana (500075).

When will SHANTHI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 04/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Neknapur