Sruthi Constructions
SRUTHI CONSTRUCTIONS · Kamareddy · RERA P00200006685
SRUTHI CONSTRUCTIONS is a residential apartment project in Vidya Nagar Colony, Kamareddy mandal, Kamareddy district. The registered promoter developing it is SRUTHI CONSTRUCTIONS, recorded as a partnership. The project occupies 536.40 sq m and comprises one building, Building A, with 1 Stilt + 5 upper floors and 10 3BHK units. It is registered with TG-RERA under P00200006685, and the promoter’s proposed completion date is 20 June 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRUTHI CONSTRUCTIONS RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; registration relates to the project/building recorded as Building A. |
| TG-RERA registration | P00200006685 RERA record |
| Registration validity | 17 August 2023 to 20 June 2025; the supplied registration certificate says “extended: false.” This is the registration-validity period, distinct from the completion date. RERA record |
| Registered promoter | SRUTHI CONSTRUCTIONS; recorded as a partnership. RERA record Corporate record |
| RERA status in supplied record | “New Project”; no later extension is shown. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Vidya Nagar Colony RERA record |
| Revenue village | Kamareddy RERA record |
| Mandal / district / PIN | Kamareddy / Kamareddy / 503111 RERA record |
| Project survey numbers and subdivisions as filed | 770, 77/A, 776, 776/A RERA record |
| Sanction document’s survey-number rendering | 770, 770/A, 776, 776/A |
| Site area | Total area 536.40 sq m; net area 536.40 sq m; road-affected area 0.00 sq m, as recorded in the project filing. RERA filing |
| Building-permit extent | 536.4 m² |
| Boundaries filed | North: 50 feet wide road; South: building of neighbours; East: building of Ramesh; West: plot of neighbours. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Kamareddy Municipality/Municipal Corporation; the RERA filing identifies DTCP as authority. Approvals record |
| Principal approval | Building permit 0019/BP/3071/2022, approved 20 June 2022; file no. 001473/BP/DTCP/3071/0011/2022. |
| Building | Building A (SRUTHI CONSTRUCTIONS), residential apartment use |
| Sanctioned configuration | 1 Stilt + 5 upper floors; building height 14.8 m. No basement or podium is stated in the supplied approval. |
| Area recorded in the approval | Approved built-up area in the project filing: 1,438.6 sq m. The permit’s sanctioned parameters separately state residential upper floors 1,195.60 m² and stilt 212.87 m². RERA filing |
| Building and unit counts | One building; 10 residential units are shown in the RERA unit record. The permit states that the number of sanctioned units must not be increased without prior approval, but a separate sanctioned unit total is not supplied in the extracted permit details. RERA record RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; RERA-filed saleable area 239.12 sq m per unit RERA unit table |
| Unit count and portal inventory | 10 total; 0 booked and 10 available in the last-read portal record. The portal record has no as-of date, so counts are indicative. RERA unit table |
| Completion deadline | Promoter’s Form B undertaking: 20 June 2025; the building permit also states construction was to be completed before 20 June 2025. |
| Construction stage | No independently verified site progress or completion status is supplied. RERA amenity records show varied declared percentages; these are not independent site verification. RERA amenities |
| Occupancy / completion certificate | The supplied permit extraction records completion_certified: false; no occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation. |
2. The project story
The RERA record describes a single-building residential apartment project in Vidya Nagar Colony, Kamareddy village, Kamareddy mandal and district. Its registered parcel is identified in the filing by survey numbers 770, 77/A, 776 and 776/A, with a recorded net and total site area of 536.40 sq m. The building permit describes Building A as a stilt level with five upper floors. RERA record RERA filing
The project offers ten 3BHK units in the supplied RERA inventory, all shown as available and none booked in the portal record read for this report; that record is undated, so inventory should be reconfirmed with TG-RERA and the promoter before purchase. The promoter’s declared completion date was 20 June 2025. The supplied material does not establish current construction progress, completion, or an issued occupancy certificate. RERA unit table
3. Master plan, architecture & building design
The supplied building-permit extraction describes one residential building, Building A, on a 536.4 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.8 m. The RERA filing records approved built-up area of 1,438.6 sq m. The permit’s extracted area figures separately list 1,195.60 m² for residential upper floors and 212.87 m² for the stilt; these are presented as recorded, not as interchangeable area measures. RERA filing
The approval extraction gives setbacks as “Front 4.00,” “3.51,” “Rear 3.50,” and “Side I 3.50,” without fully identifying the second setback label in the extracted text. It records 5% open space and requires a tot-lot to be fenced and maintained as greenery, but the same approval’s amenity parameter lists tot-lot area as “NA.” No floor-by-floor flat arrangement, footprint, lift or stair count, internal circulation drawing, or phase layout is available in the supplied material.
The approval also records one rainwater-harvesting pit, a transformer space, and a garbage house. Detailed design and construction compliance cannot be established from the permit summary alone.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 239.12 sq m | 97.7 sq m (software-measured) | 59% |
RERA records the configuration, unit counts and saleable area; the booking figures are from a portal read with no supplied as-of date. The 97.7 sq m carpet-area figure was software-measured from the supplied approved floor-plan drawing, not disclosed by RERA, and is marked as needing review. The drawing record measures one 3BHK design. RERA unit table RERA unit details Floor plans
The measured drawing labels three bedrooms, a hall, a drawing room, a kitchen, two toilets and balconies, including one balcony labelled “1.05 M. WIDE BALC.” These drawing-based room and area measurements should be checked against the original plan. Carpet area, balcony area, common-area share and saleable area are distinct; the supplied record does not provide a separate RERA-filed carpet area. RERA unit details
5. Parking & vehicle circulation
The building permit states that stilt parking is approved and that the stilt area is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not provide a parking-space count, parking allocation by apartment, visitor or accessible parking provision, or a documented unit-specific parking right. No basement or podium parking is stated in the supplied approval. The RERA filing records a mortgage area of 146.18 sq m; it does not establish an individual purchaser’s parking allocation. RERA filing Land records
6. Amenities, recreation & open spaces
The following are RERA amenity-record entries. Percentages are declared progress values in that record, not independent verification of delivery. A percentage of 0% or a missing percentage is not evidence that a facility has been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or further description supplied | RERA amenities | 0%; not independently verified |
| Green strip / tot-lot / park | Permit records 5% open space; permit amenity parameter lists tot-lot area as “NA” and separately requires fenced greenery | RERA amenities | 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities | 0%; not independently verified |
| Internal roads & footpaths | No dimensions supplied | RERA amenities | 0%; not independently verified |
| Water supply | No source, storage or treatment details supplied | RERA amenities | “YES”; 60%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Specific system or capacity not identified | RERA amenities | “YES”; 0%; not independently verified |
| Storm-water drains | No layout or capacity supplied | RERA amenities | 0%; not independently verified |
| Street lighting | No details supplied | RERA amenities | 0%; not independently verified |
| Sewage and sullage treatment/disposal | No process or capacity supplied | RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | No method or capacity supplied | RERA amenities | “YES”; 0%; not independently verified |
| Water conservation / rainwater harvesting | Permit specifies one rainwater-harvesting structure (percolation pit) | RERA amenities | “YES”; 10%; not independently verified |
| Energy management | No system described | RERA amenities | “YES”; 0%; not independently verified |
| Fire protection and fire safety | No system details supplied | RERA amenities | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Permit requires transformer space; further specifications not supplied | RERA amenities | “YES”; 20%; not independently verified |
No clubhouse or indoor recreation facility, sports facility, or convenience facility is specifically identified in the supplied RERA amenity list. RERA amenities
7. Utilities, building services & safety
The RERA amenity record lists water supply as “YES” with 60% declared progress, and sewerage as “YES” with 0%; it does not identify the water source, storage or treatment, or provide sewerage/STP capacity. Storm-water drainage, sewage treatment/disposal and waste management are listed with 0% progress. The permit requires one rainwater-harvesting percolation pit and a garbage house within the premises. RERA amenities
The permit requires space for a transformer and refers to sanitation, plumbing, fire-safety systems, lifts and electrical installations being executed under qualified technical supervision. The supplied record does not state lift numbers or capacities, backup-power provision, fire-system specifications, emergency access or evacuation arrangements, CCTV, security controls, or accessibility features. These requirements and references in the permit do not by themselves establish that the systems have been installed or that statutory clearances have been issued.
8. Location, access & connectivity
The registered location is Vidya Nagar Colony, Kamareddy village, Kamareddy mandal, Kamareddy district, Telangana 503111. The permit describes the site’s northern boundary as a 50 feet wide road; the other filed boundaries are neighbouring buildings to the south and east, and a neighbours’ plot to the west. RERA record RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 78.7 km from the cadastral parcel centroid. This is a recorded approximate distance, not a travel-time estimate. The supplied material does not identify public-transport services or other verified nearby landmarks. Location record
9. Developer & development status
The registered promoter is SRUTHI CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ACSFS3507Q1ZA. The project filing lists partners PRABHAKAR REDDY CHINDHRALA, SRINIVAS REDDY KATIPALLY, NAVEEN REDDY MANDA and SRIKAR REDDY CHINDRALA, and lists SRINIVAS REDDY CHINDRALA as authorized signatory. The registered promoter address is recorded as Gudem Village, Sai Baba Temple Road, Vidya Nagar Colony, Kamareddy, Telangana 503111. Corporate record Parties record RERA record
In Form B, the promoter undertook to complete the project by 20 June 2025 and declared the land free from encumbrances, alongside project-account, audit and approval obligations. These are promoter declarations, not independent confirmation of title, completion, or performance. No current construction-progress report or occupancy/completion certificate is included in the supplied material.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records project SRUTHI CONSTRUCTIONS, registration P00200006685, issued 17 August 2023 and valid to 20 June 2025. |
| Building permit / commencement approval | Kamareddy Municipality/Municipal Corporation approval 0019/BP/3071/2022, dated 20 June 2022; file no. 001473/BP/DTCP/3071/0011/2022. |
| Sanctioned building description | Building A; residential; 1 Stilt + 5 upper floors; 14.8 m stated height. |
| Promoter’s declaration | Form B undertaking records a completion date of 20 June 2025 and promoter declarations concerning title basis, encumbrances and project-account obligations. |
| Occupancy / completion certificate | None supplied; the permit extraction records completion_certified as false and states that an occupancy certificate is compulsory before occupation. |
| Other listed documents | Title-search report (doc. 342316), title-report materials (docs. 336366–336374), encumbrance statement (doc. 339703), and registration certificate (doc. REGCERT-47998). Document index |
| Layout / master-plan lookup | No approved-layout lookup result is supplied; the HMDA land-use sheet could not be confidently assigned for this Kamareddy location. HMDA |
The supplied records do not include an occupancy certificate or a current construction-stage certification. The project profile above therefore reports the recorded approval and promoter undertaking without treating the project as completed or occupancy-certified.
1. Project at a glance
Project identity
Registered project name: SRUTHI CONSTRUCTIONS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration relates to the project/building recorded as Building A.
TG-RERA registration: P00200006685
Registration validity: 17 August 2023 to 20 June 2025; the supplied registration certificate says “extended: false.” This is the registration-validity period, distinct from the completion date.
Registered promoter: SRUTHI CONSTRUCTIONS; recorded as a partnership.
RERA status in supplied record: “New Project”; no later extension is shown.
Land and geographic identity
Locality: Vidya Nagar Colony
Revenue village: Kamareddy
Mandal / district / PIN: Kamareddy / Kamareddy / 503111
Project survey numbers and subdivisions as filed: 770, 77/A, 776, 776/A
Sanction document’s survey-number rendering: 770, 770/A, 776, 776/A
Site area: Total area 536.40 sq m; net area 536.40 sq m; road-affected area 0.00 sq m, as recorded in the project filing.
Building-permit extent: 536.4 m²
Boundaries filed: North: 50 feet wide road; South: building of neighbours; East: building of Ramesh; West: plot of neighbours.
Development identity
Sanctioning authority: Kamareddy Municipality/Municipal Corporation; the RERA filing identifies DTCP as authority.
Principal approval: Building permit 0019/BP/3071/2022, approved 20 June 2022; file no. 001473/BP/DTCP/3071/0011/2022.
Building: Building A (SRUTHI CONSTRUCTIONS), residential apartment use
Sanctioned configuration: 1 Stilt + 5 upper floors; building height 14.8 m. No basement or podium is stated in the supplied approval.
Area recorded in the approval: Approved built-up area in the project filing: 1,438.6 sq m. The permit’s sanctioned parameters separately state residential upper floors 1,195.60 m² and stilt 212.87 m².
Building and unit counts: One building; 10 residential units are shown in the RERA unit record. The permit states that the number of sanctioned units must not be increased without prior approval, but a separate sanctioned unit total is not supplied in the extracted permit details.
Offering and status
RERA-filed configuration: 3BHK; RERA-filed saleable area 239.12 sq m per unit
Unit count and portal inventory: 10 total; 0 booked and 10 available in the last-read portal record. The portal record has no as-of date, so counts are indicative.
Completion deadline: Promoter’s Form B undertaking: 20 June 2025; the building permit also states construction was to be completed before 20 June 2025.
Construction stage: No independently verified site progress or completion status is supplied. RERA amenity records show varied declared percentages; these are not independent site verification.
Occupancy / completion certificate: The supplied permit extraction records completion_certified: false; no occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation.
2. The project story
The RERA record describes a single-building residential apartment project in Vidya Nagar Colony, Kamareddy village, Kamareddy mandal and district. Its registered parcel is identified in the filing by survey numbers 770, 77/A, 776 and 776/A, with a recorded net and total site area of 536.40 sq m. The building permit describes Building A as a stilt level with five upper floors.
The project offers ten 3BHK units in the supplied RERA inventory, all shown as available and none booked in the portal record read for this report; that record is undated, so inventory should be reconfirmed with TG-RERA and the promoter before purchase. The promoter’s declared completion date was 20 June 2025. The supplied material does not establish current construction progress, completion, or an issued occupancy certificate.
3. Master plan, architecture & building design
The supplied building-permit extraction describes one residential building, Building A, on a 536.4 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.8 m. The RERA filing records approved built-up area of 1,438.6 sq m. The permit’s extracted area figures separately list 1,195.60 m² for residential upper floors and 212.87 m² for the stilt; these are presented as recorded, not as interchangeable area measures.
The approval extraction gives setbacks as “Front 4.00,” “3.51,” “Rear 3.50,” and “Side I 3.50,” without fully identifying the second setback label in the extracted text. It records 5% open space and requires a tot-lot to be fenced and maintained as greenery, but the same approval’s amenity parameter lists tot-lot area as “NA.” No floor-by-floor flat arrangement, footprint, lift or stair count, internal circulation drawing, or phase layout is available in the supplied material.
The approval also records one rainwater-harvesting pit, a transformer space, and a garbage house. Detailed design and construction compliance cannot be established from the permit summary alone.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 239.12 sq m | 97.7 sq m (software-measured) | 59% |
RERA records the configuration, unit counts and saleable area; the booking figures are from a portal read with no supplied as-of date. The 97.7 sq m carpet-area figure was software-measured from the supplied approved floor-plan drawing, not disclosed by RERA, and is marked as needing review. The drawing record measures one 3BHK design.
The measured drawing labels three bedrooms, a hall, a drawing room, a kitchen, two toilets and balconies, including one balcony labelled “1.05 M. WIDE BALC.” These drawing-based room and area measurements should be checked against the original plan. Carpet area, balcony area, common-area share and saleable area are distinct; the supplied record does not provide a separate RERA-filed carpet area.
5. Parking & vehicle circulation
The building permit states that stilt parking is approved and that the stilt area is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not provide a parking-space count, parking allocation by apartment, visitor or accessible parking provision, or a documented unit-specific parking right. No basement or podium parking is stated in the supplied approval. The RERA filing records a mortgage area of 146.18 sq m; it does not establish an individual purchaser’s parking allocation.
6. Amenities, recreation & open spaces
The following are RERA amenity-record entries. Percentages are declared progress values in that record, not independent verification of delivery. A percentage of 0% or a missing percentage is not evidence that a facility has been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or further description supplied | 0%; not independently verified | |
| Green strip / tot-lot / park | Permit records 5% open space; permit amenity parameter lists tot-lot area as “NA” and separately requires fenced greenery | 0%; not independently verified | |
| Aggregate recreational open space | No area supplied | 0%; not independently verified | |
| Internal roads & footpaths | No dimensions supplied | 0%; not independently verified | |
| Water supply | No source, storage or treatment details supplied | “YES”; 60%; not independently verified | |
| Sewerage (chamber, lines, septic tank, STP) | Specific system or capacity not identified | “YES”; 0%; not independently verified | |
| Storm-water drains | No layout or capacity supplied | 0%; not independently verified | |
| Street lighting | No details supplied | 0%; not independently verified | |
| Sewage and sullage treatment/disposal | No process or capacity supplied | 0%; not independently verified | |
| Solid-waste management and disposal | No method or capacity supplied | “YES”; 0%; not independently verified | |
| Water conservation / rainwater harvesting | Permit specifies one rainwater-harvesting structure (percolation pit) | “YES”; 10%; not independently verified | |
| Energy management | No system described | “YES”; 0%; not independently verified | |
| Fire protection and fire safety | No system details supplied | 0%; not independently verified | |
| Electrical meter room / sub-station / receiving station | Permit requires transformer space; further specifications not supplied | “YES”; 20%; not independently verified |
No clubhouse or indoor recreation facility, sports facility, or convenience facility is specifically identified in the supplied RERA amenity list.
7. Utilities, building services & safety
The RERA amenity record lists water supply as “YES” with 60% declared progress, and sewerage as “YES” with 0%; it does not identify the water source, storage or treatment, or provide sewerage/STP capacity. Storm-water drainage, sewage treatment/disposal and waste management are listed with 0% progress. The permit requires one rainwater-harvesting percolation pit and a garbage house within the premises.
The permit requires space for a transformer and refers to sanitation, plumbing, fire-safety systems, lifts and electrical installations being executed under qualified technical supervision. The supplied record does not state lift numbers or capacities, backup-power provision, fire-system specifications, emergency access or evacuation arrangements, CCTV, security controls, or accessibility features. These requirements and references in the permit do not by themselves establish that the systems have been installed or that statutory clearances have been issued.
8. Location, access & connectivity
The registered location is Vidya Nagar Colony, Kamareddy village, Kamareddy mandal, Kamareddy district, Telangana 503111. The permit describes the site’s northern boundary as a 50 feet wide road; the other filed boundaries are neighbouring buildings to the south and east, and a neighbours’ plot to the west.
The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 78.7 km from the cadastral parcel centroid. This is a recorded approximate distance, not a travel-time estimate. The supplied material does not identify public-transport services or other verified nearby landmarks.
9. Developer & development status
The registered promoter is SRUTHI CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ACSFS3507Q1ZA. The project filing lists partners PRABHAKAR REDDY CHINDHRALA, SRINIVAS REDDY KATIPALLY, NAVEEN REDDY MANDA and SRIKAR REDDY CHINDRALA, and lists SRINIVAS REDDY CHINDRALA as authorized signatory. The registered promoter address is recorded as Gudem Village, Sai Baba Temple Road, Vidya Nagar Colony, Kamareddy, Telangana 503111.
In Form B, the promoter undertook to complete the project by 20 June 2025 and declared the land free from encumbrances, alongside project-account, audit and approval obligations. These are promoter declarations, not independent confirmation of title, completion, or performance. No current construction-progress report or occupancy/completion certificate is included in the supplied material.
10. Approvals, official records & documents
TG-RERA registration: Form C records project SRUTHI CONSTRUCTIONS, registration P00200006685, issued 17 August 2023 and valid to 20 June 2025.
Building permit / commencement approval: Kamareddy Municipality/Municipal Corporation approval 0019/BP/3071/2022, dated 20 June 2022; file no. 001473/BP/DTCP/3071/0011/2022.
Sanctioned building description: Building A; residential; 1 Stilt + 5 upper floors; 14.8 m stated height.
Promoter’s declaration: Form B undertaking records a completion date of 20 June 2025 and promoter declarations concerning title basis, encumbrances and project-account obligations.
Occupancy / completion certificate: None supplied; the permit extraction records completion_certified as false and states that an occupancy certificate is compulsory before occupation.
Other listed documents: Title-search report (doc. 342316), title-report materials (docs. 336366–336374), encumbrance statement (doc. 339703), and registration certificate (doc. REGCERT-47998).
Layout / master-plan lookup: No approved-layout lookup result is supplied; the HMDA land-use sheet could not be confidently assigned for this Kamareddy location.
The supplied records do not include an occupancy certificate or a current construction-stage certification. The project profile above therefore reports the recorded approval and promoter undertaking without treating the project as completed or occupancy-certified.
Frequently asked questions
Is SRUTHI CONSTRUCTIONS registered with Telangana RERA?
Yes. SRUTHI CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P00200006685; the registration status is New Project.
Who is the developer of SRUTHI CONSTRUCTIONS?
The promoter named in the RERA registration is SRUTHI CONSTRUCTIONS.
Where is SRUTHI CONSTRUCTIONS located?
SRUTHI CONSTRUCTIONS is in VIDYA NAGAR COLONY, Kamareddy, Telangana (503111).
When will SRUTHI CONSTRUCTIONS be completed?
The promoter's proposed date of completion filed with RERA is 20/06/2025. This is the promoter's declaration, not a guarantee.
More projects in Kamareddy