Metro City
MOHAMMED · Mahabubnagar · RERA P01400011010
METRO CITY is a plotted development at Yedira (Part), Mahabubnagar Rural, Mahabubnagar. The registered promoter is MOHAMMED ABDUL RAZZAK. The site extent is 17,542.55 sq.m., with 66 residential plots ranging from 100.88–220.29 sq.m.; towers and floors are not disclosed. Its TG-RERA registration number is P01400011010, and the RERA header lists proposed completion as 30/11/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | METRO CITY |
| Project type / phase | Plotted development; the RERA record identifies a new project. A separately numbered phase is not disclosed. RERA record |
| TG-RERA registration | P01400011010 |
| Registration validity | 31/07/2025 to 31/07/2027, unless extended by the Authority. This is the registration period, not the completion deadline. |
| Registered promoter | MOHAMMED ABDUL RAZZAK |
| RERA status | Registered; the supplied certificate records a two-year validity period. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Yedira (Part), also described in filed layout records as Yedira Village / Yedira Revenue Ward. |
| Mandal / district / PIN | Mahabubnagar Rural / Mahabubnagar / 509002 |
| Survey numbers and subdivisions | 66/U, 66/66/AA1, 66/A1, 66/A2, 66/UU2, 66/EE1, 66/UU1, 66/EE2, 66/UU3, 66/EE3, 66/UU4, 66/RU, 66RU/E, 66/YA/1, 66/AA4/1/2 |
| Filed site extent | 17,542.55 sq.m. |
| Net / total layout area | 17,542.55 sq.m.; the supplied drawing record lists the same figure for total and net layout area. |
| Boundaries | East: SY NO 66 AND SY NO 93; West: SY NO 61; North: SY NO 65 AND SY NO 66; South: REMAINING 19 GUNTAS LAND LEFT FOR BUFFER ZONE. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Mahaboobnagar Municipal Corporation; the filed layout material also identifies DTCP and delegation to Mahabub Nagar Municipal Corporation. |
| Principal approval | Tentative layout plan, application/file number 003700/MAHB/00014/SWDL/2025; application dated 31/07/2025 and approval dated 18/10/2025 15:54:48 in the municipal record. |
| Approved built-up area | 9,315.81 sq.m. is recorded in the RERA project fields as approved built-up area; the supplied layout plan is for plotted development and does not provide building or floor configuration. RERA filing |
| Development form / plot count | Tentative layout for open plots; 66 plots are stated in the approval record and counted from the drawing’s plot schedule. Layout record |
| Buildings, floors and parking levels | Not disclosed for this plotted layout. The approval record identifies a mortgage area reserved as security for layout works; it does not establish residential building floors or parking levels. |
| Layout approval stage | Tentative layout approval is recorded; final layout approval is not established by the supplied records. |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots; 66 plots are recorded. Layout record |
| Plot size range | Software-read from the approved layout drawing: 100.88–220.29 sq.m. (120.7–263.5 sq.yd.). Verify against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied project data. |
| Construction / development stage | RERA header labels the project “New Project”; no independently verified on-site progress is supplied. RERA record |
| Completion dates | RERA Form-B declaration: completion by 31st July 2027. The project header lists proposed completion as 30/11/2027. The supplied records do not establish an approved extension. RERA record |
| Occupancy / completion certificate | Not supplied. For this plotted project, no project completion or occupancy certificate is established by the supplied evidence. |
2. The project story
METRO CITY is registered with TG-RERA as a new plotted development at Yedira (Part), Mahabubnagar Rural, Mahabubnagar. Its registration identifies the project land by the survey numbers listed above and records a site extent of 17,542.55 sq.m. The filed layout approval material describes an open-plot layout with 66 plots, internal roads, open space, social infrastructure and utility land.
The municipal record describes the permission as a tentative layout plan and places responsibility for completing layout infrastructure and amenities on the applicant/developer. It does not evidence that those works are complete. The RERA record labels the project “New Project,” while the supplied evidence contains no independent site inspection or verified construction-progress report. The promoter’s Form-B declaration undertakes completion by 31st July 2027; that is a promoter declaration, not proof of delivery or a certificate of completion. RERA record
3. Master plan, architecture & building design
This is a plotted layout rather than a documented multi-building development. The supplied drawing-derived record identifies 66 plots and a total/net layout area of 17,542.55 sq.m. The RERA project fields list approved built-up area of 9,315.81 sq.m.; no building count, building footprint, floor configuration, tower arrangement or floor plans are supplied. Layout record RERA filing Floor plans
The layout plan’s own area statement allocates land as follows:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 9,315.81 sq.m. | 53.10 % |
| Road area | 5,946.27 sq.m. | 33.90 % |
| Open space area | 1,587.32 sq.m. | 9.05 % |
| Social infrastructure area | 516.93 sq.m. | 2.95 % |
| Utility area | 175.81 sq.m. | 1.00 % |
| Total layout area | 17,542.55 sq.m. | 100 % |
These figures are from the filed layout drawing’s area statement; plot count and plot-size readings are software-derived and should be checked against the drawing. The plan record also lists road widths of 9.14m and 18.29m, and “30'0\"”; these are drawing-recorded dimensions, not independent road surveys. Layout record
The floor-plan set contains two layout sheets and no residential-unit floor plans. No apartment carpet areas, room layouts or building services arrangement can be established from the supplied drawings. Floor plans
4. Homes, configurations & floor plans
The RERA offering evidenced here is residential plots, not apartments. The layout drawing’s plot schedule is software-read as 66 plots, with sizes from 100.88 to 220.29 sq.m. (120.7 to 263.5 sq.yd.). The plot-size bands below are also drawing-derived and should be verified against the plan. Layout record
| Plot size band | Plot count |
|---|---|
| 100–150 sq.yd. | 15 |
| 150–200 sq.yd. | 37 |
| 200–250 sq.yd. | 12 |
| 250–300 sq.yd. | 2 |
No booked or available inventory, plot-specific saleable areas, or unit-level allotments are supplied. The software-read plot areas are not a substitute for the area and boundaries recorded in a specific plot’s registered sale documents. The supplied floor-plan set has no apartment plans or measured carpet-area data. Layout record Floor plans
5. Parking & vehicle circulation
The supplied layout area statement records 0.00 sq.m. as common parking area. The municipal approval conditions require roads to remain accessible to neighboring sites and describe road formation as part of the layout works. The supplied evidence does not establish vehicle-space counts, visitor parking, accessible parking, plot-specific parking allocations, or a completed driveway/parking arrangement.
The layout approval material identifies a mortgage area of 1,407.83 sq.m. in the RERA fields, while the approval-plan parameters state 1,397.37 sq.m. required and 1,407.83 sq.m. proposed; the separate mortgage deed describes 1,683.75 sq.yd. The mortgage-area details are documented in the approval and title records.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists several layout infrastructure items as available, but shows 0% progress entries and provides no independent verification of completion. The municipal approval conditions require the developer to undertake layout development works; the supplied evidence does not verify delivery. RERA amenities
| Description / size | Open space area shown as 1,587.32 sq.m. in the layout area statement. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed in RERA amenity schedule; progress shown as 0%. Not independently verified complete. |
| Description / size | 516.93 sq.m. in the layout area statement. |
|---|---|
| Declared progress / verified status | Included in layout area statement; delivery status not verified. |
| Description / size | Road area 5,946.27 sq.m.; the plan records road widths including 9.14m and 18.29m. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed in RERA amenity schedule; progress shown as 0%. Not independently verified complete. |
| Description / size | Not sized in the supplied project amenity schedule. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Municipal conditions call for plantation and greenery; the vendor also lists landscaping and avenue plantation. Completion not verified. |
| Description / size | No size or facility detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No availability status or progress evidence supplied. |
The vendor lists parks with landscaping, avenue plantation, security, an entrance gate and a compound wall, among other claims. These are vendor statements, not evidence of sanctioned or completed facilities. Promoter website
7. Utilities, building services & safety
The municipal layout approval conditions describe intended layout works that include internal water-supply pipelines, an overhead tank or sump, an assured water source, underground drainage, storm-water drains, common septic tank/STP, electrical supply lines, street lighting, transformer, solid-waste management, avenue plantation and rainwater-harvesting pits. They also state that development works and amenities are the applicant’s responsibility. These are approval-condition requirements, not evidence that the infrastructure has been installed or is operating.
| Evidence in the record | RERA amenity schedule lists water supply; municipal conditions refer to internal pipelines, an assured water source and an overhead tank/sump. RERA amenities |
|---|---|
| Status limitation | Source, capacity, storage and delivery status not independently verified. |
| Evidence in the record | RERA amenity schedule lists sewerage, storm-water drains and sewage/sullage treatment and disposal; municipal conditions refer to underground drainage and a common septic tank/STP. RERA amenities |
|---|---|
| Status limitation | No capacity, commissioning or completion evidence supplied. |
| Evidence in the record | RERA schedule lists street lighting and an electrical meter room/sub-station/receiving station; municipal conditions refer to electrical supply lines, street lights and a transformer. RERA amenities |
|---|---|
| Status limitation | No capacity or completed-service verification supplied. |
| Evidence in the record | Listed in the RERA schedule and municipal layout conditions. RERA amenities |
|---|---|
| Status limitation | Installation and operation not verified. |
| Evidence in the record | RERA schedule lists solid-waste management and disposal; municipal conditions refer to solid-waste management and a garbage house. RERA amenities |
|---|---|
| Status limitation | Facility size and completed status not supplied. |
| Evidence in the record | No project-specific site-completion or accessibility evidence supplied. |
|---|---|
| Status limitation | Do not infer compliance or completed safety measures from general approval conditions. |
8. Location, access & connectivity
The registered project location is Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana 509002. The filed layout material also identifies Yedira Village / Yedira Revenue Ward.
The supplied location data gives a geocode of 16.7073843, 77.9078413 and lists these sampled nearby points:
| Location reference | Category | Distance |
|---|---|---|
| Outer Ring Road (nearest sampled interchange, approx) | Anchor | 80.4 km |
| Primary Health Centre, Manikonda | Hospital | 3.0 km |
| Manyamkonda | Railway station | 2.7 km |
| Telangana Girls Residential School | School | 2.7 km |
These are supplied distance observations; no travel-time estimate or route verification is provided. Location record
9. Developer & development status
The TG-RERA registration certificate names MOHAMMED ABDUL RAZZAK as the registered promoter. The supplied certificate identifies him as the promoter but does not establish an entity type or corporate identifier. Its stated address is House No. 1-335, Village: Mandal: Jadcherla, District: Mahabubnagar, PIN 509301.
The project filing identifies A. Anand Kumar Goud as landowner and cites Development Agreement cum General Power of Attorney No. 4317/2025 as the development-rights document. The promoter’s Form-B affidavit states that he is authorized for METRO CITY and declares completion by 31st July 2027.
The project is a single registered plotted development in the supplied record; no separate phase or phase-wise progress is stated. The RERA header labels the project “New Project.” No independently verified construction progress or completion certificate is supplied. RERA record
10. Approvals, official records & documents
| Supplied evidence | Certificate for METRO CITY, P01400011010. |
|---|---|
| What it establishes | Registration validity from 31/07/2025 to 31/07/2027, subject to any Authority extension. |
| Supplied evidence | Mahaboobnagar Municipal Corporation approval for tentative layout plan; application/file 003700/MAHB/00014/SWDL/2025. |
|---|---|
| What it establishes | Tentative plotted-layout approval for 66 plots, subject to stated conditions. |
| Supplied evidence | Filed layout drawing, file number 003700/MAHB/00014/SWDL/2025. |
|---|---|
| What it establishes | Drawing-derived layout and land-use information; the drawing text is noted as requiring review. |
| Supplied evidence | Document No. 4317/2025, cited in the title and Form-B material. |
|---|---|
| What it establishes | Promoter’s stated development authority; not a unit-specific conveyance. |
| Supplied evidence | Telangana Registration & Stamps encumbrance statements. |
|---|---|
| What it establishes | Transaction listings in the statements’ stated search records; they are not a nil-encumbrance certificate. |
| Supplied evidence | Registered mortgage without possession in favour of the Municipal Corporation, relating to plots reserved as security for layout works. |
|---|---|
| What it establishes | Records the stated security for completion of layout works. |
| Supplied evidence | Not supplied. |
|---|---|
| What it establishes | No completion or occupancy certificate is established by the provided documents. |
The supplied evidence does not include a final layout approval, a project completion certificate, or an occupancy certificate. The municipal approval record states that infrastructure and amenities are to be completed and the mortgaged plots released under the applicable process; the status of those steps is not established here.
1. Project at a glance
Project identity
Registered project name: METRO CITY
Project type / phase: Plotted development; the RERA record identifies a new project. A separately numbered phase is not disclosed.
TG-RERA registration: P01400011010
Registration validity: 31/07/2025 to 31/07/2027, unless extended by the Authority. This is the registration period, not the completion deadline.
Registered promoter: MOHAMMED ABDUL RAZZAK
RERA status: Registered; the supplied certificate records a two-year validity period.
Land and geographic identity
Locality / revenue village: Yedira (Part), also described in filed layout records as Yedira Village / Yedira Revenue Ward.
Mandal / district / PIN: Mahabubnagar Rural / Mahabubnagar / 509002
Survey numbers and subdivisions: 66/U, 66/66/AA1, 66/A1, 66/A2, 66/UU2, 66/EE1, 66/UU1, 66/EE2, 66/UU3, 66/EE3, 66/UU4, 66/RU, 66RU/E, 66/YA/1, 66/AA4/1/2
Filed site extent: 17,542.55 sq.m.
Net / total layout area: 17,542.55 sq.m.; the supplied drawing record lists the same figure for total and net layout area.
Boundaries: East: SY NO 66 AND SY NO 93; West: SY NO 61; North: SY NO 65 AND SY NO 66; South: REMAINING 19 GUNTAS LAND LEFT FOR BUFFER ZONE.
Development identity
Sanctioning authority: Mahaboobnagar Municipal Corporation; the filed layout material also identifies DTCP and delegation to Mahabub Nagar Municipal Corporation.
Principal approval: Tentative layout plan, application/file number 003700/MAHB/00014/SWDL/2025; application dated 31/07/2025 and approval dated 18/10/2025 15:54:48 in the municipal record.
Approved built-up area: 9,315.81 sq.m. is recorded in the RERA project fields as approved built-up area; the supplied layout plan is for plotted development and does not provide building or floor configuration.
Development form / plot count: Tentative layout for open plots; 66 plots are stated in the approval record and counted from the drawing’s plot schedule.
Buildings, floors and parking levels: Not disclosed for this plotted layout. The approval record identifies a mortgage area reserved as security for layout works; it does not establish residential building floors or parking levels.
Layout approval stage: Tentative layout approval is recorded; final layout approval is not established by the supplied records.
Offering and status
Unit type: Residential plots; 66 plots are recorded.
Plot size range: Software-read from the approved layout drawing: 100.88–220.29 sq.m. (120.7–263.5 sq.yd.). Verify against the drawing.
Booked / available counts: Not disclosed in the supplied project data.
Construction / development stage: RERA header labels the project “New Project”; no independently verified on-site progress is supplied.
Completion dates: RERA Form-B declaration: completion by 31st July 2027. The project header lists proposed completion as 30/11/2027. The supplied records do not establish an approved extension.
Occupancy / completion certificate: Not supplied. For this plotted project, no project completion or occupancy certificate is established by the supplied evidence.
2. The project story
METRO CITY is registered with TG-RERA as a new plotted development at Yedira (Part), Mahabubnagar Rural, Mahabubnagar. Its registration identifies the project land by the survey numbers listed above and records a site extent of 17,542.55 sq.m. The filed layout approval material describes an open-plot layout with 66 plots, internal roads, open space, social infrastructure and utility land.
The municipal record describes the permission as a tentative layout plan and places responsibility for completing layout infrastructure and amenities on the applicant/developer. It does not evidence that those works are complete. The RERA record labels the project “New Project,” while the supplied evidence contains no independent site inspection or verified construction-progress report. The promoter’s Form-B declaration undertakes completion by 31st July 2027; that is a promoter declaration, not proof of delivery or a certificate of completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a documented multi-building development. The supplied drawing-derived record identifies 66 plots and a total/net layout area of 17,542.55 sq.m. The RERA project fields list approved built-up area of 9,315.81 sq.m.; no building count, building footprint, floor configuration, tower arrangement or floor plans are supplied.
The layout plan’s own area statement allocates land as follows:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 9,315.81 sq.m. | 53.10 % |
| Road area | 5,946.27 sq.m. | 33.90 % |
| Open space area | 1,587.32 sq.m. | 9.05 % |
| Social infrastructure area | 516.93 sq.m. | 2.95 % |
| Utility area | 175.81 sq.m. | 1.00 % |
| Total layout area | 17,542.55 sq.m. | 100 % |
These figures are from the filed layout drawing’s area statement; plot count and plot-size readings are software-derived and should be checked against the drawing. The plan record also lists road widths of 9.14m and 18.29m, and “30'0\"”; these are drawing-recorded dimensions, not independent road surveys.
The floor-plan set contains two layout sheets and no residential-unit floor plans. No apartment carpet areas, room layouts or building services arrangement can be established from the supplied drawings.
4. Homes, configurations & floor plans
The RERA offering evidenced here is residential plots, not apartments. The layout drawing’s plot schedule is software-read as 66 plots, with sizes from 100.88 to 220.29 sq.m. (120.7 to 263.5 sq.yd.). The plot-size bands below are also drawing-derived and should be verified against the plan.
100–150 sq.yd.: 15
150–200 sq.yd.: 37
200–250 sq.yd.: 12
250–300 sq.yd.: 2
No booked or available inventory, plot-specific saleable areas, or unit-level allotments are supplied. The software-read plot areas are not a substitute for the area and boundaries recorded in a specific plot’s registered sale documents. The supplied floor-plan set has no apartment plans or measured carpet-area data.
5. Parking & vehicle circulation
The supplied layout area statement records 0.00 sq.m. as common parking area. The municipal approval conditions require roads to remain accessible to neighboring sites and describe road formation as part of the layout works. The supplied evidence does not establish vehicle-space counts, visitor parking, accessible parking, plot-specific parking allocations, or a completed driveway/parking arrangement.
The layout approval material identifies a mortgage area of 1,407.83 sq.m. in the RERA fields, while the approval-plan parameters state 1,397.37 sq.m. required and 1,407.83 sq.m. proposed; the separate mortgage deed describes 1,683.75 sq.yd. The mortgage-area details are documented in the approval and title records.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists several layout infrastructure items as available, but shows 0% progress entries and provides no independent verification of completion. The municipal approval conditions require the developer to undertake layout development works; the supplied evidence does not verify delivery.
| Description / size | Open space area shown as 1,587.32 sq.m. in the layout area statement. |
|---|---|
| Declared progress / verified status | Listed in RERA amenity schedule; progress shown as 0%. Not independently verified complete. |
| Description / size | 516.93 sq.m. in the layout area statement. |
|---|---|
| Declared progress / verified status | Included in layout area statement; delivery status not verified. |
| Description / size | Road area 5,946.27 sq.m.; the plan records road widths including 9.14m and 18.29m. |
|---|---|
| Declared progress / verified status | Listed in RERA amenity schedule; progress shown as 0%. Not independently verified complete. |
| Description / size | Not sized in the supplied project amenity schedule. |
|---|---|
| Declared progress / verified status | Municipal conditions call for plantation and greenery; the vendor also lists landscaping and avenue plantation. Completion not verified. |
| Description / size | No size or facility detail supplied. |
|---|---|
| Declared progress / verified status | No availability status or progress evidence supplied. |
The vendor lists parks with landscaping, avenue plantation, security, an entrance gate and a compound wall, among other claims. These are vendor statements, not evidence of sanctioned or completed facilities.
7. Utilities, building services & safety
The municipal layout approval conditions describe intended layout works that include internal water-supply pipelines, an overhead tank or sump, an assured water source, underground drainage, storm-water drains, common septic tank/STP, electrical supply lines, street lighting, transformer, solid-waste management, avenue plantation and rainwater-harvesting pits. They also state that development works and amenities are the applicant’s responsibility. These are approval-condition requirements, not evidence that the infrastructure has been installed or is operating.
| Evidence in the record | RERA amenity schedule lists water supply; municipal conditions refer to internal pipelines, an assured water source and an overhead tank/sump. |
|---|---|
| Status limitation | Source, capacity, storage and delivery status not independently verified. |
| Evidence in the record | RERA amenity schedule lists sewerage, storm-water drains and sewage/sullage treatment and disposal; municipal conditions refer to underground drainage and a common septic tank/STP. |
|---|---|
| Status limitation | No capacity, commissioning or completion evidence supplied. |
| Evidence in the record | RERA schedule lists street lighting and an electrical meter room/sub-station/receiving station; municipal conditions refer to electrical supply lines, street lights and a transformer. |
|---|---|
| Status limitation | No capacity or completed-service verification supplied. |
| Evidence in the record | Listed in the RERA schedule and municipal layout conditions. |
|---|---|
| Status limitation | Installation and operation not verified. |
| Evidence in the record | RERA schedule lists solid-waste management and disposal; municipal conditions refer to solid-waste management and a garbage house. |
|---|---|
| Status limitation | Facility size and completed status not supplied. |
| Evidence in the record | No project-specific site-completion or accessibility evidence supplied. |
|---|---|
| Status limitation | Do not infer compliance or completed safety measures from general approval conditions. |
8. Location, access & connectivity
The registered project location is Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana 509002. The filed layout material also identifies Yedira Village / Yedira Revenue Ward.
The supplied location data gives a geocode of 16.7073843, 77.9078413 and lists these sampled nearby points:
| Location reference | Category | Distance |
|---|---|---|
| Outer Ring Road (nearest sampled interchange, approx) | Anchor | 80.4 km |
| Primary Health Centre, Manikonda | Hospital | 3.0 km |
| Manyamkonda | Railway station | 2.7 km |
| Telangana Girls Residential School | School | 2.7 km |
These are supplied distance observations; no travel-time estimate or route verification is provided.
9. Developer & development status
The TG-RERA registration certificate names MOHAMMED ABDUL RAZZAK as the registered promoter. The supplied certificate identifies him as the promoter but does not establish an entity type or corporate identifier. Its stated address is House No. 1-335, Village: Mandal: Jadcherla, District: Mahabubnagar, PIN 509301.
The project filing identifies A. Anand Kumar Goud as landowner and cites Development Agreement cum General Power of Attorney No. 4317/2025 as the development-rights document. The promoter’s Form-B affidavit states that he is authorized for METRO CITY and declares completion by 31st July 2027.
The project is a single registered plotted development in the supplied record; no separate phase or phase-wise progress is stated. The RERA header labels the project “New Project.” No independently verified construction progress or completion certificate is supplied.
10. Approvals, official records & documents
| Supplied evidence | Certificate for METRO CITY, P01400011010. |
|---|---|
| What it establishes | Registration validity from 31/07/2025 to 31/07/2027, subject to any Authority extension. |
| Supplied evidence | Mahaboobnagar Municipal Corporation approval for tentative layout plan; application/file 003700/MAHB/00014/SWDL/2025. |
|---|---|
| What it establishes | Tentative plotted-layout approval for 66 plots, subject to stated conditions. |
| Supplied evidence | Filed layout drawing, file number 003700/MAHB/00014/SWDL/2025. |
|---|---|
| What it establishes | Drawing-derived layout and land-use information; the drawing text is noted as requiring review. |
| Supplied evidence | Document No. 4317/2025, cited in the title and Form-B material. |
|---|---|
| What it establishes | Promoter’s stated development authority; not a unit-specific conveyance. |
| Supplied evidence | Telangana Registration & Stamps encumbrance statements. |
|---|---|
| What it establishes | Transaction listings in the statements’ stated search records; they are not a nil-encumbrance certificate. |
| Supplied evidence | Registered mortgage without possession in favour of the Municipal Corporation, relating to plots reserved as security for layout works. |
|---|---|
| What it establishes | Records the stated security for completion of layout works. |
| Supplied evidence | Not supplied. |
|---|---|
| What it establishes | No completion or occupancy certificate is established by the provided documents. |
The supplied evidence does not include a final layout approval, a project completion certificate, or an occupancy certificate. The municipal approval record states that infrastructure and amenities are to be completed and the mortgaged plots released under the applicable process; the status of those steps is not established here.
Frequently asked questions
Is METRO CITY registered with Telangana RERA?
Yes. METRO CITY is registered with the Telangana Real Estate Regulatory Authority as P01400011010; the registration status is New Project.
Who is the developer of METRO CITY?
The promoter named in the RERA registration is MOHAMMED.
Where is METRO CITY located?
METRO CITY is in Yedira, Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana (509002).
When will METRO CITY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2027. This is the promoter's declaration, not a guarantee.