MODERN SMART DIAMOND CITY is a plotted residential layout in Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district. Registered promoter Mohammed Suleman is developing the layout on 13 Acer 0.22 Gts (62948 Sq. Yds), with 151 residential plots and measured plot areas of 164.61–415.49 sqm (196.9–496.9 sqyd). The project is registered with TG-RERA under P01400007047, with proposed completion on 13/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MODERN SMART DIAMOND CITY RERA record |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | No separate phase is identified; the registration covers the project on the listed survey land. RERA record |
| TG-RERA registration | P01400007047 |
| Registration validity | Certificate states registration from 04/10/2023 to 13/09/2025; no extension is recorded in the supplied certificate. This is registration validity, not a statement of completion or occupancy. Approvals record |
| Registered promoter | Mohammed Suleman |
| RERA status | Listed as an On-Going Project in the supplied project record. RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address | Yedira Revenue Village; locality also recorded as MAHABOOBNAGAR MANDAL AND DISTRICT. RERA record RERA filing |
| Revenue village | Yedira (Part) in the RERA identity record; the approval and filed declaration refer to YEDIRA Revenue Village / Yedira Revenue Village. RERA record |
| Mandal | Mahabubnagar Rural in the RERA identity record; MAHABOOBNAGAR Mandal in the layout approval. RERA record |
| District / PIN | Mahabubnagar / 509001 RERA record |
| Survey numbers and subdivisions | 313/P, 332/A, 332/E and 333/RU Land records |
| Registered site extent | Approval states 13 Acer 0.22 Gts (62948 Sq. Yds). The Form B declaration states Ac. 13-0.22 Gts or 62948.00 sqyds. |
| Area recorded in RERA land details | Total area 52630.50 sqmts; affected area 636.39 sqmts; net area 51994.11 sqmts. RERA filing |
| Boundaries recorded in RERA | East: land in Survey Nos. 314 and 317; west: land in Survey Nos. 332 and 333; north: GANGOJI KUNTA; south: 188M PROPOSED ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | MAHABOOBNAGAR Municipality/Municipal Corporation |
| Principal approval | Tentative layout approval 0059/LO/3063/2022, dated 13 September, 2022 Approvals record |
| Application number | 007428/LO/DTCP/3063/0074/2022, dated 15/02/2022 Approvals record |
| Approved built-up area | 29122.63 sqmts is recorded in the RERA project fields; the supplied project documents do not explain this figure as a building area for the plotted layout. RERA filing |
| Buildings / floors | Not disclosed in the supplied record; this is a plotted layout, not an apartment-building plan. RERA record |
| Approved layout scale | 151 plots are stated in the tentative layout approval. |
| Parking | No project parking count or parking-level information is disclosed for the plotted layout. |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots; approval states 151 plots. RERA record |
| Plot area range | Software-measured from the layout drawing: 164.61–415.49 sqm (196.9–496.9 sqyd); plot-size extraction is incomplete and should be checked against the drawing. Layout record |
| Booked / available | Not disclosed in the supplied project data. RERA filing |
| Construction / development stage | RERA amenity entries show several layout works at 60% and other listed works at 0%; these are filed progress figures, not independent site verification. RERA amenities |
| Promoter-declared completion date | Form B undertaking states completion on or before 13/09/2025; the RERA project record gives original and revised proposed completion as 13/09/2025. RERA filing |
| Completion / occupancy certificate | No completion or occupancy certificate is identified in the supplied project records. The registration certificate’s end date is not evidence of completion or occupancy. Document index |
2. The project story
MODERN SMART DIAMOND CITY is registered as a plotted residential layout in Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district. Its registered land identity comprises Survey Nos. 313/P, 332/A, 332/E and 333/RU. The tentative layout approval describes a 151-plot development on 13 Acer 0.22 Gts (62948 Sq. Yds). RERA record Land records
The approval allocates land to plots, roads, open space, social infrastructure and utilities. It also records a mortgage over specified plots in favour of the Municipality as security for layout development works. The approval conditions assign the development of the layout infrastructure and amenities to the applicant.
The supplied RERA amenity information records some infrastructure items at 60% progress and others at 0%. These are project-filed progress entries; the supplied evidence does not include an independent site inspection establishing current completion. No occupancy certificate is identified for this plotted development. RERA amenities Document index
3. Master plan, architecture & building design
The supplied approved drawing is a tentative layout plan, not a building or apartment floor plan. The layout approval identifies 151 plots and allocates the site as follows:
| Layout use | Area stated in approval | Share stated in approval |
|---|---|---|
| Plotted area | 7 Acer 7.86 Gts; 34832 Sq. Yds | 56.01% |
| Roads | 3 Acer 15.75 Gts; 16427 Sq. Yds | 26.42% |
| Open space (park) | 1 Acer 7.22 Gts; 5714 Sq. Yds | 9.19% |
| Social infrastructure | 0 Acer 14.05 Gts; 1700 Sq. Yds | 2.73% |
| Utilities | 0 Acer 6.98 Gts; 845 Sq. Yds | 1.36% |
| Mortgage area, within plotted area | 0 Acer 44.65 Gts; 5402 Sq. Yds | 15.45% of plotted area |
The drawing-derived plot count is based on plot numbers printed as 1 to 151. Software identified sizes for 147 plots; the extraction is incomplete. The measured range is 164.61–415.49 sqm (196.9–496.9 sqyd), and the software-measured plot areas sum to the plotted area in the drawing’s area statement. Verify individual plot numbers and areas against the approved drawing before relying on them. Layout record
The approval states that the mortgage covers 26 plots—plot Nos. 9 to 18 and 113 to 128—with the listed reserved-plot schedule totaling 5402 Sq. Yds. This mortgage is recorded as security for layout development obligations. Approvals record
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment project. The supplied record does not provide booked or available counts by plot. Layout record
| Plot information | Supplied figure |
|---|---|
| Plots stated in tentative layout approval | 151 |
| Plot areas measured by software | 147 |
| Smallest measured plot | 164.61 sqm / 196.9 sqyd |
| Median measured plot | 167.23 sqm / 200.0 sqyd |
| Largest measured plot | 415.49 sqm / 496.9 sqyd |
Drawing-derived size bands (software-measured; verify against the layout drawing): Layout record
| Size band | Plot count |
|---|---|
| 150–200 sqyd | 12 |
| 200–250 sqyd | 110 |
| 250–300 sqyd | 17 |
| 300–400 sqyd | 6 |
| 400–500 sqyd | 2 |
The supplied floor-plan record contains two layout sheets and no measured apartment floor plans. Therefore, no apartment configuration, carpet area, room arrangement or apartment saleable-area table applies here. Floor plans
5. Parking & vehicle circulation
The approval allocates 26.42% of the stated layout area to roads and requires roads to be opened for access to neighbouring sites. It does not specify a parking-space count, visitor parking, accessible parking, parking levels, ramps or plot-specific parking allocations.
The supplied material does not establish exclusive parking rights for any plot. Confirm any parking arrangement from the plot-specific allotment and registered agreement documents. Document index
6. Amenities, recreation & open spaces
The tentative layout approval identifies an open-space park, social-infrastructure land and utilities land. Its conditions describe planned infrastructure works; the separate RERA amenity entries provide filed progress percentages, which should not be read as independent verification of delivery. RERA amenities
| Description / size | 1 Acer 7.22 Gts; 5714 Sq. Yds; 9.19% of layout area |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | RERA amenity entry “Green Strip/TOT LOT/Park”: 60%; not independently verified. RERA amenities |
| Description / size | 0 Acer 14.05 Gts; 1700 Sq. Yds; 2.73% |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Community Buildings: 0% in RERA amenity data. RERA amenities |
| Description / size | Layout roads; approval allocates 3 Acer 15.75 Gts; 16427 Sq. Yds; 26.42% to roads |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | 60% in RERA amenity data; not independently verified. RERA amenities |
| Description / size | Described as a layout development work; no separate area or quantity stated |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | No separate progress figure supplied. |
| Description / size | Listed as a layout development work |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | 60% in RERA amenity data; not independently verified. RERA amenities |
7. Utilities, building services & safety
The tentative layout approval describes the planned layout services and assigns their development to the applicant. The RERA amenity entries supply progress percentages for selected services; the evidence does not independently verify completion or provide system capacities. RERA amenities
| Supplied project information | Internal water-supply pipelines, an overhead tank and an assured water-supply source are specified in the approval conditions. No source capacity or storage volume is stated. |
|---|---|
| Filed progress / status | Water Supply: 60%. RERA amenities |
| Supplied project information | Underground drainage lines and a common septic tank / STP are specified. Capacity and treatment details are not supplied. |
|---|---|
| Filed progress / status | Sewerage (chamber, lines, septic tank, STP): 60%; treatment and disposal of sewage and sullage water: 0%. RERA amenities |
| Supplied project information | Storm-water drains and rain-water-harvesting pits are specified. |
|---|---|
| Filed progress / status | Storm Water Drains: 0%; Water Conservation, Rain water Harvesting: 60%. RERA amenities |
| Supplied project information | Electrical supply lines, a transformer and street lights are specified. A utility area is reserved for utilities including an electric transformer. |
|---|---|
| Filed progress / status | Electrical Meter Room, Sub-Station, Receiving Station: 60%; Street Lighting: 60%. RERA amenities |
| Supplied project information | Solid-waste management is identified in the approval’s utility and development conditions. |
|---|---|
| Filed progress / status | Solid Waste Management and Disposal: 0%. RERA amenities |
| Supplied project information | No project-specific fire-system details or fire clearance are identified in the supplied material. |
|---|---|
| Filed progress / status | Fire Protection and Fire Safety Requirements: 0%. RERA amenities |
| Supplied project information | No project-specific system is described. |
|---|---|
| Filed progress / status | Energy management: 0%. RERA amenities |
| Supplied project information | No lifts, building systems, accessible circulation or related capacities are disclosed; the approval concerns a plotted layout. |
|---|---|
| Filed progress / status | Not disclosed. |
8. Location, access & connectivity
The registered location is Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district, Telangana, PIN 509001. The filed address describes the locality as MAHABOOBNAGAR MANDAL AND DISTRICT. The RERA land record identifies GANGOJI KUNTA to the north and a 188M PROPOSED ROAD to the south. RERA record RERA filing RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 80.4 km. No other measured access distances, public-transport details, travel times or project approach-road descriptions are supplied. Location record
9. Developer & development status
The TG-RERA certificate names Mohammed Suleman as the registered promoter. The supplied evidence does not verify a separate legal entity type, corporate registration number, registered office or official project contact details. Corporate record
The Form B affidavit dated 18-07-2023 is made by promoter MOHAMMED SULEMAN and states that MOHAMMED SULEMAN and MOHAMMED FAIZUDDIN hold legal title to the stated project land, with an agreement between the landowners and promoter for development said to be enclosed. It also declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account and states a completion undertaking on or before 13/09/2025. These are promoter-filed declarations.
The RERA project record lists 80% completeness, but the supplied data does not define the basis or date of that figure. RERA amenity progress entries separately list some works at 60% and others at 0%; neither set of figures is independent site verification. No completion or occupancy certificate is identified. RERA record RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for MODERN SMART DIAMOND CITY, registration P01400007047, issued 04/10/2023, valid through 13/09/2025 as stated in the certificate. |
| Principal layout approval | Tentative layout approval 0059/LO/3063/2022, dated 13 September, 2022, issued by MAHABOOBNAGAR Municipality/Municipal Corporation. |
| Layout application | 007428/LO/DTCP/3063/0074/2022, dated 15/02/2022. |
| Mortgage recorded with layout approval | Mortgage Deed No. 10938/2022, dated 05 September, 2022, in favour of the Municipality; the approval identifies 26 plots and a total mortgage area of 5402 Sq. Yds. |
| Promoter declaration | Form B affidavit dated 18-07-2023, naming Mohammed Suleman as promoter and stating the project land, title basis, encumbrance declaration and completion undertaking. |
| Completion / occupancy record | No completion certificate or occupancy certificate is identified in the supplied project documents. Document index |
| Other project-specific records | The supplied project file includes an advocate’s title search report, an irrigation/cadastral NOC and demarcation material; these are listed here as filed documents, without a conclusion about title or regulatory sufficiency. Document index |
The tentative layout approval expressly describes itself as not proof of title and places responsibility for layout development works on the applicant.
1. Project at a glance
Project identity
Registered name: MODERN SMART DIAMOND CITY
Project type: Plotted development / tentative residential layout
Phase or registered portion: No separate phase is identified; the registration covers the project on the listed survey land.
TG-RERA registration: P01400007047
Registration validity: Certificate states registration from 04/10/2023 to 13/09/2025; no extension is recorded in the supplied certificate. This is registration validity, not a statement of completion or occupancy.
Registered promoter: Mohammed Suleman
RERA status: Listed as an On-Going Project in the supplied project record.
Land and geographic identity
Locality / address: Yedira Revenue Village; locality also recorded as MAHABOOBNAGAR MANDAL AND DISTRICT.
Revenue village: Yedira (Part) in the RERA identity record; the approval and filed declaration refer to YEDIRA Revenue Village / Yedira Revenue Village.
Mandal: Mahabubnagar Rural in the RERA identity record; MAHABOOBNAGAR Mandal in the layout approval.
District / PIN: Mahabubnagar / 509001
Survey numbers and subdivisions: 313/P, 332/A, 332/E and 333/RU
Registered site extent: Approval states 13 Acer 0.22 Gts (62948 Sq. Yds). The Form B declaration states Ac. 13-0.22 Gts or 62948.00 sqyds.
Area recorded in RERA land details: Total area 52630.50 sqmts; affected area 636.39 sqmts; net area 51994.11 sqmts.
Boundaries recorded in RERA: East: land in Survey Nos. 314 and 317; west: land in Survey Nos. 332 and 333; north: GANGOJI KUNTA; south: 188M PROPOSED ROAD.
Development identity
Sanctioning authority: MAHABOOBNAGAR Municipality/Municipal Corporation
Principal approval: Tentative layout approval 0059/LO/3063/2022, dated 13 September, 2022
Application number: 007428/LO/DTCP/3063/0074/2022, dated 15/02/2022
Approved built-up area: 29122.63 sqmts is recorded in the RERA project fields; the supplied project documents do not explain this figure as a building area for the plotted layout.
Buildings / floors: Not disclosed in the supplied record; this is a plotted layout, not an apartment-building plan.
Approved layout scale: 151 plots are stated in the tentative layout approval.
Parking: No project parking count or parking-level information is disclosed for the plotted layout.
Offering and status
Unit type: Residential plots; approval states 151 plots.
Plot area range: Software-measured from the layout drawing: 164.61–415.49 sqm (196.9–496.9 sqyd); plot-size extraction is incomplete and should be checked against the drawing.
Booked / available: Not disclosed in the supplied project data.
Construction / development stage: RERA amenity entries show several layout works at 60% and other listed works at 0%; these are filed progress figures, not independent site verification.
Promoter-declared completion date: Form B undertaking states completion on or before 13/09/2025; the RERA project record gives original and revised proposed completion as 13/09/2025.
Completion / occupancy certificate: No completion or occupancy certificate is identified in the supplied project records. The registration certificate’s end date is not evidence of completion or occupancy.
2. The project story
MODERN SMART DIAMOND CITY is registered as a plotted residential layout in Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district. Its registered land identity comprises Survey Nos. 313/P, 332/A, 332/E and 333/RU. The tentative layout approval describes a 151-plot development on 13 Acer 0.22 Gts (62948 Sq. Yds).
The approval allocates land to plots, roads, open space, social infrastructure and utilities. It also records a mortgage over specified plots in favour of the Municipality as security for layout development works. The approval conditions assign the development of the layout infrastructure and amenities to the applicant.
The supplied RERA amenity information records some infrastructure items at 60% progress and others at 0%. These are project-filed progress entries; the supplied evidence does not include an independent site inspection establishing current completion. No occupancy certificate is identified for this plotted development.
3. Master plan, architecture & building design
The supplied approved drawing is a tentative layout plan, not a building or apartment floor plan. The layout approval identifies 151 plots and allocates the site as follows:
| Layout use | Area stated in approval | Share stated in approval |
|---|---|---|
| Plotted area | 7 Acer 7.86 Gts; 34832 Sq. Yds | 56.01% |
| Roads | 3 Acer 15.75 Gts; 16427 Sq. Yds | 26.42% |
| Open space (park) | 1 Acer 7.22 Gts; 5714 Sq. Yds | 9.19% |
| Social infrastructure | 0 Acer 14.05 Gts; 1700 Sq. Yds | 2.73% |
| Utilities | 0 Acer 6.98 Gts; 845 Sq. Yds | 1.36% |
| Mortgage area, within plotted area | 0 Acer 44.65 Gts; 5402 Sq. Yds | 15.45% of plotted area |
The drawing-derived plot count is based on plot numbers printed as 1 to 151. Software identified sizes for 147 plots; the extraction is incomplete. The measured range is 164.61–415.49 sqm (196.9–496.9 sqyd), and the software-measured plot areas sum to the plotted area in the drawing’s area statement. Verify individual plot numbers and areas against the approved drawing before relying on them.
The approval states that the mortgage covers 26 plots—plot Nos. 9 to 18 and 113 to 128—with the listed reserved-plot schedule totaling 5402 Sq. Yds. This mortgage is recorded as security for layout development obligations.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment project. The supplied record does not provide booked or available counts by plot.
Plots stated in tentative layout approval: 151
Plot areas measured by software: 147
Smallest measured plot: 164.61 sqm / 196.9 sqyd
Median measured plot: 167.23 sqm / 200.0 sqyd
Largest measured plot: 415.49 sqm / 496.9 sqyd
Drawing-derived size bands (software-measured; verify against the layout drawing):
150–200 sqyd: 12
200–250 sqyd: 110
250–300 sqyd: 17
300–400 sqyd: 6
400–500 sqyd: 2
The supplied floor-plan record contains two layout sheets and no measured apartment floor plans. Therefore, no apartment configuration, carpet area, room arrangement or apartment saleable-area table applies here.
5. Parking & vehicle circulation
The approval allocates 26.42% of the stated layout area to roads and requires roads to be opened for access to neighbouring sites. It does not specify a parking-space count, visitor parking, accessible parking, parking levels, ramps or plot-specific parking allocations.
The supplied material does not establish exclusive parking rights for any plot. Confirm any parking arrangement from the plot-specific allotment and registered agreement documents.
6. Amenities, recreation & open spaces
The tentative layout approval identifies an open-space park, social-infrastructure land and utilities land. Its conditions describe planned infrastructure works; the separate RERA amenity entries provide filed progress percentages, which should not be read as independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 1 Acer 7.22 Gts; 5714 Sq. Yds; 9.19% of layout area | Tentative layout approval | RERA amenity entry “Green Strip/TOT LOT/Park”: 60%; not independently verified. |
| Social infrastructure | 0 Acer 14.05 Gts; 1700 Sq. Yds; 2.73% | Tentative layout approval | Community Buildings: 0% in RERA amenity data. |
| Internal roads and footpaths | Layout roads; approval allocates 3 Acer 15.75 Gts; 16427 Sq. Yds; 26.42% to roads | Tentative layout approval | 60% in RERA amenity data; not independently verified. |
| Avenue plantation | Described as a layout development work; no separate area or quantity stated | Tentative layout approval | No separate progress figure supplied. |
| Street lighting | Listed as a layout development work | Tentative layout approval | 60% in RERA amenity data; not independently verified. |
7. Utilities, building services & safety
The tentative layout approval describes the planned layout services and assigns their development to the applicant. The RERA amenity entries supply progress percentages for selected services; the evidence does not independently verify completion or provide system capacities.
| Supplied project information | Internal water-supply pipelines, an overhead tank and an assured water-supply source are specified in the approval conditions. No source capacity or storage volume is stated. |
|---|---|
| Filed progress / status | Water Supply: 60%. |
| Supplied project information | Underground drainage lines and a common septic tank / STP are specified. Capacity and treatment details are not supplied. |
|---|---|
| Filed progress / status | Sewerage (chamber, lines, septic tank, STP): 60%; treatment and disposal of sewage and sullage water: 0%. |
| Supplied project information | Storm-water drains and rain-water-harvesting pits are specified. |
|---|---|
| Filed progress / status | Storm Water Drains: 0%; Water Conservation, Rain water Harvesting: 60%. |
| Supplied project information | Electrical supply lines, a transformer and street lights are specified. A utility area is reserved for utilities including an electric transformer. |
|---|---|
| Filed progress / status | Electrical Meter Room, Sub-Station, Receiving Station: 60%; Street Lighting: 60%. |
| Supplied project information | Solid-waste management is identified in the approval’s utility and development conditions. |
|---|---|
| Filed progress / status | Solid Waste Management and Disposal: 0%. |
| Supplied project information | No project-specific fire-system details or fire clearance are identified in the supplied material. |
|---|---|
| Filed progress / status | Fire Protection and Fire Safety Requirements: 0%. |
| Supplied project information | No project-specific system is described. |
|---|---|
| Filed progress / status | Energy management: 0%. |
| Supplied project information | No lifts, building systems, accessible circulation or related capacities are disclosed; the approval concerns a plotted layout. |
|---|---|
| Filed progress / status | Not disclosed. |
8. Location, access & connectivity
The registered location is Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district, Telangana, PIN 509001. The filed address describes the locality as MAHABOOBNAGAR MANDAL AND DISTRICT. The RERA land record identifies GANGOJI KUNTA to the north and a 188M PROPOSED ROAD to the south.
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 80.4 km. No other measured access distances, public-transport details, travel times or project approach-road descriptions are supplied.
9. Developer & development status
The TG-RERA certificate names Mohammed Suleman as the registered promoter. The supplied evidence does not verify a separate legal entity type, corporate registration number, registered office or official project contact details.
The Form B affidavit dated 18-07-2023 is made by promoter MOHAMMED SULEMAN and states that MOHAMMED SULEMAN and MOHAMMED FAIZUDDIN hold legal title to the stated project land, with an agreement between the landowners and promoter for development said to be enclosed. It also declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account and states a completion undertaking on or before 13/09/2025. These are promoter-filed declarations.
The RERA project record lists 80% completeness, but the supplied data does not define the basis or date of that figure. RERA amenity progress entries separately list some works at 60% and others at 0%; neither set of figures is independent site verification. No completion or occupancy certificate is identified.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for MODERN SMART DIAMOND CITY, registration P01400007047, issued 04/10/2023, valid through 13/09/2025 as stated in the certificate.
Principal layout approval: Tentative layout approval 0059/LO/3063/2022, dated 13 September, 2022, issued by MAHABOOBNAGAR Municipality/Municipal Corporation.
Layout application: 007428/LO/DTCP/3063/0074/2022, dated 15/02/2022.
Mortgage recorded with layout approval: Mortgage Deed No. 10938/2022, dated 05 September, 2022, in favour of the Municipality; the approval identifies 26 plots and a total mortgage area of 5402 Sq. Yds.
Promoter declaration: Form B affidavit dated 18-07-2023, naming Mohammed Suleman as promoter and stating the project land, title basis, encumbrance declaration and completion undertaking.
Completion / occupancy record: No completion certificate or occupancy certificate is identified in the supplied project documents.
Other project-specific records: The supplied project file includes an advocate’s title search report, an irrigation/cadastral NOC and demarcation material; these are listed here as filed documents, without a conclusion about title or regulatory sufficiency.
The tentative layout approval expressly describes itself as not proof of title and places responsibility for layout development works on the applicant.
Frequently asked questions
Is MODERN SMART DIAMOND CITY registered with Telangana RERA?
Yes. MODERN SMART DIAMOND CITY is registered with the Telangana Real Estate Regulatory Authority as P01400007047; the registration status is On-Going Project.
Who is the developer of MODERN SMART DIAMOND CITY?
The promoter named in the RERA registration is MOHAMMED.
Where is MODERN SMART DIAMOND CITY located?
MODERN SMART DIAMOND CITY is in MAHABOOBNAGAR MANDAL AND DISTRICT, Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana (509001).
When will MODERN SMART DIAMOND CITY be completed?
The promoter's proposed date of completion filed with RERA is 13/09/2025. This is the promoter's declaration, not a guarantee.