MEERA PHASE 7 is a residential apartment project in KANHA VILLAGE, Nandigama Mandal, Ranga Reddy District, developed by MEERA SHANTIVANAM PRIVATE LIMITED. The registered site extent is 21,910.83 sq.m and the project comprises eight residential blocks, A–H, and a clubhouse; the residential blocks are 1 Stilt + 5 Floors, except Block D, which has 1 Common Basement + 1 Stilt + 5 Floors. The RERA unit table lists 600 homes: 160 studios, 400 1BHKs and 40 2BHKs, with saleable areas of 65.65 sq.m, 75.99 sq.m and 128.66 sq.m respectively. TG-RERA registration number P02400010340 is valid 14 October 2025–14 October 2028, and the promoter’s declaration undertakes completion by 14TH OCT 2028.

More from Meera Shantivanam Pvt Ltd · 14 projects →

01What we found

RegisteredTG-RERA - valid till 14 Oct 2028
36documents on file - each fact links to its page
1court case on this project's land (survey 112, Kanha)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMEERA PHASE 7 RERA record
Project type / registered portionResidential apartment project; Phase 7 RERA record
TG-RERA registrationP02400010340; valid 14 October 2025–14 October 2028 RERA record Approvals record
Registered promoterMEERA SHANTIVANAM PRIVATE LIMITED RERA record Corporate record
RERA statusRegistered; the certificate is recorded as executed. Approvals record

Land and geographic identity

FieldProject record
Locality / revenue villageKANHA VILLAGE; the filed building-permit material also describes it as “KANHA VILLAGE (ERSTWHILE CHEGUR VILLAGE)”. The revenue-record identification should be confirmed. RERA record RERA filing
Mandal / district / PINNandigama / Ranga Reddy / 509328 RERA record RERA filing
Project survey numbers112/136P, 112/137P & 112/138P RERA record RERA filing
Registered site extent21,910.83 sq.m; the building-permit extraction also states 5 ACRES &18 GUNTAS. RERA filing
Net / total areaRERA-filed total and net area are both 21,910.83 sq.m. RERA filing
Boundaries as filedEast: OWN LAND; West: ROAD; North: OWN LAND; South: ROAD. RERA filing

Development identity

FieldProject record
Principal sanctioning authority / approvalHMDA; Building Permit Order 0799/HMDA/SWBP/2025, dated 14/10/2025, for the site and survey numbers above. Approvals record
HMDA file / application number006684/HMDA/02005/SWBP/SKP1/2025; the HMDA approval material says the application was technically approved and forwarded to Kanha Gram Panchayat for release of proceedings and plans. Approvals record
Approved buildingsEight residential blocks, A–H, and a clubhouse.
Sanctioned floor arrangementBlocks A, B, C, E, F, G and H: 1 Stilt + 5 Floors; Block D: 1 Common Basement + 1 Stilt + 5 Floors; clubhouse: Ground Floor + 3 Floors.
Approved built-up areaThe drawing extraction records 43,484.49 sq.m total proposed BUA excluding parking and 70,751.6 sq.m including parking. These are distinct filed drawing figures; neither is a carpet-area figure.
Parking provisionSanctioned parameters record 389.00 car-parking spaces; the permit extraction also records a total parking area of 26,361.17 sq.m.
RERA-declared units604 total units: 600 homes and 4 common-amenity entries, which are not homes for sale. RERA unit table RERA unit table

Offering and status

FieldProject record
Home typesStudio, 1BHK (including one filing row recorded as “1 BK”), and 2BHK. RERA unit table RERA unit table
RERA saleable areasStudio: 65.65 sq.m; 1BHK: 75.99 sq.m; 2BHK: 128.66 sq.m. RERA unit table
Booked / availableThe portal-derived unit table reports 0 booked and 600 available homes (160 studios, 400 1BHKs and 40 2BHKs). The unit-count snapshot has no stated as-of date, so treat it as indicative. RERA unit table
Construction stageNo independently verified site-progress information is supplied. The approval extraction says completion is not certified.
Completion timelineThe promoter’s Form B declaration undertakes completion by 14TH OCT 2028; the building-permit extraction says construction is to be completed before 14/10/2028.
Registration validity14 October 2025–14 October 2028; this is the TG-RERA registration period, not an occupancy certificate. Approvals record
Occupancy / completion certificateNot evidenced as issued for Phase 7 in the supplied record; the permit requires an occupancy certificate before occupation.

2. The project story

  • MEERA PHASE 7 is a registered residential apartment project on the site identified in the RERA record as KANHA VILLAGE, Nandigama Mandal, Ranga Reddy District, comprising survey numbers 112/136P, 112/137P and 112/138P. Its filed building-permit materials use the village description “Kanha Village (erstwhile Chegur Village).” The RERA-filed site extent is 21,910.83 sq.m. RERA record RERA filing
  • The project is organized as eight residential blocks, A–H, with a separate clubhouse. The sanctioned residential configuration is generally stilt plus five floors, with Block D additionally having a common basement; the clubhouse is shown as ground plus three floors. The RERA unit table lists 600 homes—160 studios, 400 1BHKs and 40 2BHKs—alongside four common-amenity entries that are not sale homes. RERA unit table
  • The registration certificate and promoter’s declaration establish registration and a stated completion undertaking, but the supplied material does not independently establish construction progress or completion. The approval extraction records no completion certification, and no Phase 7 occupancy certificate is included in the evidence provided.

3. Master plan, architecture & building design

The filed building-plan material describes a residential complex on a site of 21,910.83 sq.m, with proposed coverage of 8,964.94 sq.m (41%) and vacant plot area of 12,878.63 sq.m. It separately records proposed BUA of 43,484.49 sq.m excluding parking and 70,751.6 sq.m including parking. The plan also lists 26,361.17 sq.m of parking area and 905.93 sq.m of visitor parking area. These are plan-extraction figures, not carpet or saleable areas.

The sanctioned layout comprises blocks A–H and a clubhouse. Residential blocks are stilt plus five floors, except Block D, which also has a common basement; the clubhouse is ground plus three floors. The permit extraction gives heights of 14.95 m for blocks A, B, C, E, F, G and H; 14.35 m for D; and 14.99 m for the clubhouse.

The drawing extraction lists 2,235.26 sq.m of tot-lot area. It also itemizes eight tot-lots and four green strips, but does not provide a complete drawing-derived narrative of their location or arrangement. Detailed information on building footprints by block, flats per floor, lift and stair counts, residential entries, internal circulation and landscaping beyond the listed open-space figures is not established in the supplied overview data.

4. Homes, configurations & floor plans

The RERA filing lists saleable areas and unit counts. Separately, software measurements from the approved floor-plan drawings estimate carpet areas for measured designs; these are not RERA-filed measurements, and the drawing-based measurements are flagged for review. Carpet area is not the same as saleable area: the latter includes the home’s share of common areas, and balcony areas are separately identified in the drawing measurements where available. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Studio160016065.65 sq.mNot suppliedNot supplied
1BHK400040075.99 sq.mSoftware-measured median 44.6 sq.m; range 39.5–62.1 sq.m41%
2BHK40040128.66 sq.mSoftware-measured median 56.7 sq.m; range 54.0–76.4 sq.m56%

The available-unit figures are portal-derived and have no stated as-of date. The drawing measurements cover 25 1BHK and 16 2BHK designs. A separate drawing measurement identifies two 3BHK designs, with measured carpet area 88.0 sq.m each, but 3BHK is not listed in the RERA unit configurations; it is therefore not included as a RERA-filed sale configuration. RERA unit table RERA unit details Floor plans

Examples of room and balcony labels in the measured drawings include a 1BHK bedroom, living-and-dining area, kitchen, toilet and open-to-air balcony; and a 2BHK kitchen-and-dining area and balcony. Some room dimensions are absent from the supplied extraction. The drawing-based measurements should be checked against the plan before relying on them. RERA unit details

5. Parking & vehicle circulation

The building-plan extraction records 389.00 car-parking spaces, a total parking area of 26,361.17 sq.m, and 905.93 sq.m of visitor parking. The plan describes cellar/stilt areas as approved for parking and requires those areas to remain dedicated to vehicle parking rather than being partitioned or repurposed. Block D has a common basement and stilt; the other residential blocks are shown with stilt parking.

The supplied material does not establish a unit-by-unit parking allocation, separate resident/visitor space counts, accessible-space counts, two-wheeler spaces, parking ownership rights, or ramp and vehicle-entry details. The permit lists EV-charging infrastructure as a requirement for parking places; installation or operational status is not evidenced.

6. Amenities, recreation & open spaces

The filed amenity schedule and building-permit material identify a clubhouse, tot-lots, green strips, internal roads and footpaths, water supply, sewerage and drainage systems, street lighting, community buildings, rainwater harvesting, fire-safety provisions, and electrical meter/substation/receiving facilities. The schedules show these as declared or planned provisions; the supplied data does not verify that they have been completed or are operational. RERA amenities

Clubhouse
Description / sizeSanctioned as Ground Floor + 3 Floors; area recorded as 577.52 sq.m in the building-plan extraction.
Declared progress / verified statusSanctioned; completion not independently verified.
Tot-lots
Description / sizeTotal 2,235.26 sq.m in the building-permit extraction. Individual areas listed: 176.49, 966.51, 390.46, 235.44, 234.14, 50.75, 130.91 and 50.55 sq.m.
Declared progress / verified statusListed in plan; completion not independently verified.
Green strips
Description / sizeListed areas: 147.1, 176.25, 58.66 and 17.55 sq.m.
Declared progress / verified statusListed in plan; completion not independently verified.
Internal roads and footpaths
Description / sizeDeclared available in the RERA amenity schedule; no dimensions or completion evidence supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared; completion percentage recorded as 0.
Community buildings
Description / sizeListed in the RERA amenity schedule; the building-plan extraction identifies a clubhouse.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared / sanctioned; completion not independently verified.
Street lighting
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared; completion percentage recorded as 0.

7. Utilities, building services & safety

The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting and water conservation, energy management, fire protection, electrical meter-room/substation/receiving-station facilities, and solid-waste management. Each listed RERA schedule item has a recorded completion percentage of 0 in the supplied data; this is a filing status, not an independent site inspection. RERA amenities

The building permit identifies rainwater-harvesting pits, a sump, water supply, a transformer space and a garbage house. Its extracted conditions also call for EV-charging infrastructure in parking areas and digital-connectivity infrastructure. The supplied Phase 7 material does not establish water-source capacity, storage volume, STP capacity or commissioning, electrical supply capacity or backup generation, lift numbers or capacity, or installed fire-system details.

The environmental clearance for Phase VII lists proposed water and wastewater figures and an STP capacity of 165 KLD, and calls for water connections from HMWS&SB or the local municipality. These are clearance-document project specifications; the supplied data does not establish that the facilities have been built, connected or commissioned.

8. Location, access & connectivity

  • The registered location is KANHA VILLAGE, Nandigama Mandal, Ranga Reddy District, PIN 509328, on survey numbers 112/136P, 112/137P and 112/138P. The building-permit extraction refers to the locality as Kanha Village and describes it as erstwhile Chegur Village. RERA record RERA filing
  • A cadastral-parcel centroid is supplied at 17.41528, 78.35459. The recorded connectivity data lists Financial District (Nanakramguda) — 1.2 km. No approach-road route, public-transport service, travel-time estimate or further landmark distance is supplied. Location record

9. Developer & development status

The registered promoter is MEERA SHANTIVANAM PRIVATE LIMITED, a private limited company. Its supplied corporate identifier is GSTIN 36AAMCM1835C1ZM; the company website recorded in the project evidence is https://WWW.MSVKANHA.COM. Corporate record Parties record Promoter website

The promoter’s Form B declaration, made by authorised signatory I Siva Kumar and verified on 17/10/2025, states that the project is to be completed by 14TH OCT 2028. This is a promoter declaration. The permit material likewise records construction completion before 14/10/2028 and says completion has not been certified. No independently verified construction-progress report or Phase 7 occupancy certificate is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400010340; valid 14 October 2025–14 October 2028
What the supplied evidence establishesRegistration of MEERA PHASE 7 under MEERA SHANTIVANAM PRIVATE LIMITED.
HMDA building permit order
Identifier / date0799/HMDA/SWBP/2025, 14/10/2025
What the supplied evidence establishesBuilding permit material for blocks A–H and clubhouse at the stated site; conditions include completion notice and occupancy-certificate requirements.
HMDA file / application
Identifier / date006684/HMDA/02005/SWBP/SKP1/2025
What the supplied evidence establishesHMDA material says technical approval was forwarded to Kanha Gram Panchayat for release of proceedings and plans.
Filed plan drawing
Identifier / date006684/HMDA/02005/SWBP/SKP1/2025
What the supplied evidence establishesDrawing extraction lists the site, blocks, floor arrangements, area figures, parking and tot-lots.
Environmental clearance—Phase VII
Identifier / dateEC25C3801TG5382005N; 13/08/2025
What the supplied evidence establishesSEIAA Telangana clearance names Meera Shantivanam (Phase-VII) Residential Apartments and identifies the project survey numbers in its extraction.
Form B declaration
Identifier / dateVerified 17/10/2025
What the supplied evidence establishesPromoter declaration of title basis, encumbrance status and completion undertaking.

The supplied permit material states that permission does not itself confer ownership rights and requires an occupancy certificate before occupation. No occupancy certificate or completion certificate for Phase 7 is included in the evidence reviewed here.

Other registrations of Meera

Frequently asked questions

Is MEERA PHASE 7 registered with Telangana RERA?

Yes. MEERA PHASE 7 is registered with the Telangana Real Estate Regulatory Authority as P02400010340; the registration status is New Project.

Who is the developer of MEERA PHASE 7?

The promoter named in the RERA registration is MEERA SHANTIVANAM PRIVATE LIMITED.

Where is MEERA PHASE 7 located?

MEERA PHASE 7 is in KANHA VILLAGE, Nandigama, Rangareddy, Telangana (509328).

When will MEERA PHASE 7 be completed?

The promoter's proposed date of completion filed with RERA is 14/02/2029. This is the promoter's declaration, not a guarantee.