Sign in

Hill Crest

SRISTHIRA HOMES · Sangareddy · RERA P01100009705

HILL CREST is a residential apartment project in Madhavapuri Township, Ameenpur Mandal, Sangareddy District. It is being developed by the registered promoter SRISTHIRA HOMES, represented by POOSA VENKATA VAMSI KRISHNA. The project occupies 585.29 sq. m and comprises one residential building with 1 stilt + 5 upper floors and 15 homes: 10 2BHK units and 5 3BHK units. It is registered under TG-RERA number P01100009705, and the promoter’s Form B undertaking states a completion date of 03/04/2028.

01What we found

RegisteredTG-RERA - valid till 3 Apr 2028
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldProject record
Registered project nameHILL CREST RERA record
Project typeResidential apartment project RERA record
Phase / registered portionOne registered project; phase-specific designation is not stated RERA record
TG-RERA registrationP01100009705 RERA record
Registration validity3 April 2025–3 April 2028, unless extended by the Authority
Registered promoterSRISTHIRA HOMES, represented by POOSA VENKATA VAMSI KRISHNA Corporate record
RERA statusRegistered; the certificate records a three-year validity period RERA record

Land and geographic identity

FieldProject record
LocalityMadhavapuri Township; the RERA filing also gives “MADAVAPURI TOWNSHIP, SOUTH AVENUE” RERA record RERA filing
Revenue villageAMEENAPUR in the RERA project record; the approval-plan extraction names AMEENPUR RERA record
Mandal / district / PINAmeenpur / Sangareddy / 502032 RERA record RERA filing
Project survey number(s)336; no project subdivision is specified in the filing RERA record
Registered site extent585.29 sq. m (RERA land details: total and net area both 585.29 sq. m) RERA filing
Sanction-plan site area585.29 sq. m; plan-record net plot area 578.85 sq. m, after a stated 6.44 sq. m splay-area deduction
Boundaries recorded in RERA filingNorth: 60FT WIDE ROAD; South: PLOT NO 2; East: 40FT WIDE ROAD; West: PLOT NO 10 RERA filing

Development identity

FieldProject record
Sanctioning authorityAmeenpur Municipality/Municipal Corporation; the approval also identifies the delegated authority as Ameenpur Municipality
Principal building-permit number / date0170/BP/3121/2025, approved 03 April 2025
Other approval-plan referenceTS/064290/2024; the filed plan record names TS-DTCP and records delegation to Ameenpur Municipality
Approved built-up area1,630.20 sq. m including parking; 1,344.45 sq. m excluding parking, as recorded in the plan extraction
Building count / sanctioned configurationOne residential building: 1 stilt + 5 upper floors (six floors recorded); stated building height 14.99 m
Parking provision in plan285.75 sq. m parking area, including net residential parking; parking is shown at stilt level in the approval conditions
Unit count15 units in the RERA unit record; the approval-plan extraction also records 15 units RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units RERA unit table
RERA-filed saleable areas2BHK: 97.54 sq. m; 3BHK: 148.64 sq. m RERA unit table
Booked / availablePortal-derived counts show 0 booked and 10 available 2BHKs; 0 booked and 5 available 3BHKs. The portal record has no as-of date, so counts are indicative RERA unit table
Construction stageNot established by the supplied records; no independently verified site-progress information is provided Document index
Completion datePromoter’s Form B undertaking states 03/04/2028
Registration versus completionRERA registration validity ends 3 April 2028; the Form B completion undertaking is 03/04/2028. These are distinct record entries
Occupancy / completion certificateNo occupancy or completion certificate for the building is supplied; the municipal approval requires an application for occupancy certification after completion and before occupation

2. The project story

HILL CREST is a single-building residential apartment project registered under TG-RERA as P01100009705. The project record locates it in Madhavapuri Township, revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy District, on Survey No. 336. The RERA filing records a site of 585.29 sq. m and gives four boundaries, including roads to the north and east. RERA record RERA filing

The sanctioned building is described as one stilt level with five upper floors, for 15 residential units. The RERA unit schedule lists ten 2BHK and five 3BHK homes. The supplied record does not establish construction progress, completion of any floors, or occupation; the completion date is a promoter undertaking, not independent confirmation of delivery. RERA unit table

3. Master plan, architecture & building design

The approval-plan record describes one residential building and a proposed construction of stilt, first, second, third, fourth and fifth floors. It records 1,630.20 sq. m total built-up area including parking, 1,344.45 sq. m excluding parking, and 285.75 sq. m parking area. The plan extraction separately records a site area of 585.29 sq. m, a 6.44 sq. m splay deduction and a net plot area of 578.85 sq. m. These are plan-record figures; they are not carpet or saleable areas.

The approval extraction states a building height of 14.99 m and records a stilt area of 270.58 sq. m and residential upper-floor area of 1,344.45 sq. m. It also records a 2.50 m wide passage, a 1.22 m wide balcony, and a 1.5 m high compound wall. The supplied material does not establish a full building footprint, flats per floor, lift count, or a detailed common-area schedule.

The submitted plan includes rainwater harvesting, a lift and staircase. The approval conditions also specify a tot-lot to be fenced and maintained as greenery, peripheral planting, a garbage house, transformer space, and parking use for approved stilt areas. These are plan/approval provisions, not evidence that the facilities have been completed.

4. Homes, configurations & floor plans

The unit schedule below reports RERA-filed counts and saleable areas. Carpet-area figures are software measurements from the filed plan drawing, not RERA disclosures; the drawing-based measurements are stated as requiring review. Saleable area and carpet area are different measures, and the supplied record does not provide a separate breakdown of balcony, utility, or common-area components. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001097.54 sq. m56.3–58.9 sq. m; median 57.6 sq. m (software-measured)41% (software-derived)
3BHK505148.64 sq. m84.4–88.8 sq. m; median 85.4 sq. m (software-measured)43% (software-derived)

The supplied second-floor drawing labels a 2BHK example with a living/dining area, kitchen, two bedrooms, wash area and common toilet. A 3BHK example shows living/dining, kitchen, master and children’s bedrooms, guest room, two attached toilets and a balcony marked 1.22 M. WIDE BALC. The example room dimensions are drawing-based; they are not RERA-filed area disclosures. RERA unit details

5. Parking & vehicle circulation

The approval-plan extraction records 285.75 sq. m of parking area, also shown as net residential parking. The municipal approval conditions state that the approved stilt parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The supplied information does not establish the number of parking bays, visitor or accessible spaces, unit-by-unit allocations, or whether any space is legally allotted exclusively to a particular home.

The approval conditions require one entry and one exit with minimum width of 4.5 m and height clearance of 5 m. The plan extraction also lists road widths of 12 MT WIDE EXISTING ROAD, 18.00 MT WIDE EXISTING, and 18.00 MT WIDE PROPOSED ROAD. The supplied record does not describe a parking ramp, internal driveway arrangement, pedestrian separation, or parking-level circulation in further detail.

6. Amenities, recreation & open spaces

The RERA amenities record includes proposed project infrastructure and facilities; the progress fields shown are 0%. This is not independent confirmation of construction or delivery. The approval plan separately records certain building provisions and conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not statedRERA amenities record RERA amenities0%; not independently verified
Green strip / tot-lot / parkSize not stated in RERA amenities record; approval requires a fenced tot-lot and peripheral greeneryRERA amenities0% in amenities record; completion not verified
Community buildingsSize and provision details not statedRERA amenities record RERA amenities0%; not independently verified
Street lightingDetails not statedRERA amenities record RERA amenities0%; not independently verified
Lift and staircaseCounts and specifications not statedApproval planIncluded in plan record; installation status not established

7. Utilities, building services & safety

The RERA amenities schedule marks water supply, sewerage, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as available project provisions. The schedule records 0% progress for the listed infrastructure and does not provide capacities, sources, or completion verification. The approval plan records one rainwater-harvesting structure and requires transformer space and a garbage house within the premises. RERA amenities

The municipal approval conditions require generator backup, emergency lighting in corridors/common passages and staircases, fire extinguishers, a manually operated alarm system, hose reel and down-comer, and specified underground and terrace water storage tanks of 25,000 L each. They also require qualified technical supervision for services including sanitation, plumbing, fire safety, lifts and electrical installations. These are approval conditions; the supplied record does not verify installation or operational status.

The approval record also contains dual-piping language, EV-charging requirements for parking places, and digital-connectivity infrastructure provisions. It does not establish the project’s installed EV chargers, water-treatment or sewage-treatment capacity, lift count/capacity, CCTV, access-control systems, or accessibility arrangements.

8. Location, access & connectivity

The official project record identifies the location as Madhavapuri Township, AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502032. The recorded parcel centroid is 17.508061834621476, 78.33835033861322; this is a software/cadastral location reference, not a surveyed entrance point. RERA record Location record Cadastral map

The RERA land record gives 60FT WIDE ROAD to the north and 40FT WIDE ROAD to the east. The approval-plan extraction also lists existing 12 MT and 18.00 MT roads and an 18.00 MT proposed road. The supplied location record gives HITEC City — 8.3 km as a measured distance. No supplied project record establishes public-transport service details or travel times. RERA filing Location record

9. Developer & development status

The registered promoter is SRISTHIRA HOMES, recorded as a proprietorship. The RERA filing names POOSA VENKATA VAMSI KRISHNA as authorized signatory; the project certificate identifies him as representing the promoter. Corporate record Parties record

The supplied Shops & Establishments certificate identifies SRISTHIRA HOMES and POSA VENKATA VAMSI KRISHNA, with registration certificate number SEA/RAN/ALO/DK/1020996/2025, effective 10/01/2025. It is an establishment registration, not a land or building approval.

The promoter’s Form B declares a project completion period ending 03/04/2028. No occupancy certificate is supplied, and the project record does not establish that any unit or common area is complete or occupied.

10. Approvals, official records & documents

RecordReference and scopeEvidence
TG-RERA registration certificateHILL CREST; registration P01100009705; validity 03/04/2025–03/04/2028
Building approval0170/BP/3121/2025, approved 03 April 2025; one residential building, stilt plus five upper floors
Filed approval-plan referenceTS/064290/2024; plan extraction identifies TS-DTCP and delegation to Ameenpur Municipality
Layout/plan materialFiled plan record identifies Survey No. 336, one plot, 15 units, road widths and plan conditions
Promoter declarationForm B by POSA VENKATA VAMSI KRISHNA for SRISTHIRA HOMES; includes a completion undertaking and project-account/title declarations
Establishment certificateSEA/RAN/ALO/DK/1020996/2025; Shops & Establishments registration, not a building approval
Occupancy/completion certificateNot supplied; approval conditions require an occupancy certificate before occupation

The Overview reflects the supplied RERA filing and extracted approval documents. The construction-progress record, occupancy status and completed-facility status are not established by the supplied material.

Frequently asked questions

Is HILL CREST registered with Telangana RERA?

Yes. HILL CREST is registered with the Telangana Real Estate Regulatory Authority as P01100009705; the registration status is New Project.

Who is the developer of HILL CREST?

The promoter named in the RERA registration is SRISTHIRA HOMES.

Where is HILL CREST located?

HILL CREST is in MADHAVAPURI TOWNSHIP, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will HILL CREST be completed?

The promoter's proposed date of completion filed with RERA is 03/08/2028. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur