Mor Di Bianca
M/S MOR PROJECTS · Sangareddy · RERA P01100011370
MOR DI BIANCA is a plotted development in Mohammadapur, Kondapur mandal, Sangareddy district, developed by the registered promoter M/S MOR PROJECTS. The registered site area is 18413.04 sq.mts, and the drawing-derived record lists 25 plots ranging from 307.56–1793.05 sq.m. It is registered under TG-RERA number P01100011370, with proposed completion on 23/06/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MOR DI BIANCA RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase or registered portion | A plotted layout registered under P01100011370; a separate phase designation is not disclosed. |
| TG-RERA registration | P01100011370; FORM ‘C’, issued 06/11/2026. |
| Registration validity | 23/06/2026 to 23/06/2029. This is the registration-validity period, not an occupancy certificate or evidence of completion. |
| Registered promoter | M/S MOR PROJECTS, a partnership; the certificate names VENKAT THRINATH BABU ENDLA AND OTHERS as its representatives. RERA filing |
| RERA status | Listed as an On-Going Project; the registration certificate records registration under section 5. RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | MOHAMMADAPUR / Mohammadapur RERA filing |
| Mandal | KONDAPUR RERA filing |
| District | Sangareddy RERA record RERA filing |
| PIN | 502295 RERA record RERA filing |
| Project survey number(s) / subdivision(s) | 71/A RERA record RERA filing |
| Registered site extent | 18413.04 sq.mts total area; 281.73 sq.mts affected area; 18131.31 sq.mts net area. RERA filing |
| Layout area | 18131.31 Sqmt stated in the draft layout letter. |
| Boundaries | East: LAND OF SY NO 75; West: ROAD AND REMAINING LAND OF PARVEDHA SHARADHA; North: LAND OF VADLA NARAYANA; South: LAND OF P RUKKAMMA. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the project records also include a Mohammadapur Gram Panchayat draft layout letter following HMDA technical approval. Approvals record |
| Principal layout approval | HMDA Layout Permit No. 2254/HMDA/SWDL/2026, dated 23/06/2026. Application No. 017364/HMDA/04426/SWDL/SKP2/2026. Approvals record |
| Layout approval status in filed records | The supplied approval documents describe a draft layout and require infrastructure works and specified transfers before final layout release. |
| Approved built-up area | The RERA filing states 11481.67 sq.mts; the evidence does not describe this as a residential building area. RERA filing |
| Buildings / floor configuration | Not applicable as a disclosed building configuration for this open-plot layout; no building or floor schedule is provided. RERA record RERA filing |
| Parking | The layout area statement records Common Parking Area: 0.0. No separate sanctioned parking count or plot-wise parking allocation is supplied. |
Offering and status
| Field | Project record |
|---|---|
| Project offering | Plots within a plotted layout. The supplied drawing-derived record lists 25 plots; see the measurement qualification below. Layout record |
| Plot-size range | 307.56–1793.05 sq.m (software-read from the layout drawing; verify against the drawing). Layout record |
| Booked / available counts | Not disclosed in the supplied project data. RERA filing |
| Construction / development stage | The RERA filing records 70% completeness; this is a declared figure, not independent site verification. RERA record |
| Completion date | 23/06/2029 proposed and revised proposed completion date in the supplied RERA record. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. This is a plotted development; no tower-specific OC status is disclosed. Document index |
The project story
MOR DI BIANCA is registered as a plotted development on Survey No. 71/A, in Mohammadapur village, Kondapur mandal, Sangareddy district. Its RERA-filed site area is 18413.04 sq.mts, including 281.73 sq.mts affected area, with 18131.31 sq.mts net area. The boundaries and complete site identity are listed above. RERA record RERA filing
The layout drawing’s software-read plot schedule indicates 25 plots, with sizes from 307.56 sq.m to 1793.05 sq.m. These are drawing-derived readings, not RERA-filed unit-size disclosures, and should be checked against the drawing. Layout record The project record declares 70% completeness, but the supplied data does not independently verify physical progress at the site. RERA record
The project’s proposed and revised completion date is 23/06/2029. Registration is separately valid through that date; neither the registration validity nor the declared progress establishes that the layout is complete or that a completion certificate has been issued. RERA record
Master plan, architecture & building design
This is a plotted layout rather than a disclosed apartment or multi-storey building scheme. The RERA-filed site area is 18413.04 sq.mts, with 281.73 sq.mts affected and 18131.31 sq.mts net; the HMDA draft layout letter also states a net layout extent of 18131.31 Sqmt. RERA filing
The drawing-derived layout record identifies 25 plots. Its land-use statement is based on the 18131.31 sq.m net layout area:
| Layout component | Area | Share shown in supplied record |
|---|---|---|
| Plots | 11481.47 sq.m | 63.32% |
| Roads | 4624.16 sq.m | 25.50% |
| Parks / open space | 1382.68 sq.m | 7.63% |
| Utilities | 181.90 sq.m | 1.00% |
| Social infrastructure | 461.10 sq.m | 2.54% |
| Amenities | 0.00 sq.m | 0% |
Layout record
The HMDA draft layout letter describes internal roads, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipes and an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits as layout development works. These are specified works, not evidence that they have been completed. The drawing-derived record lists 0.0 common parking area and no amenities area.
No building footprint, building count, floor configuration, tower height, apartment plan or building-specific phase schedule is disclosed for this plotted layout. The supplied floor-plan record contains one layout sheet and reports no measured dwelling plans. Floor plans
Homes, configurations & floor plans
This is a plotted development, so the relevant offering is plots rather than apartment configurations. The supplied RERA data does not include a plot-wise schedule of filed saleable areas, booked plots or available plots. The layout drawing is the source for the software-read count and size bands below; those readings are not RERA-filed unit disclosures and should be verified against the drawing. Layout record RERA filing
| Plot-size band | Plot count |
|---|---|
| 300–400 sq.yd (251–334 sq.m) | 1 |
| 400–500 sq.yd (334–418 sq.m) | 15 |
| 500–1000 sq.yd (418–836 sq.m) | 8 |
| 1000+ sq.yd (836+ sq.m) | 1 |
| Total | 25 |
The supplied drawing-derived record reports the smallest plot as 307.56 sq.m (367.8 sq.yd), the median as 359.53 sq.m (430.0 sq.yd), and the largest as 1793.05 sq.m (2144.5 sq.yd). It identifies 12 plots at 359.53 sq.m. These are software-read drawing figures, not RERA-filed saleable-area figures. Layout record
No carpet-area, balcony, utility-area or common-area-loading figures are supplied for plots. The project evidence does not establish individual plot allocations or their sale status. Layout record RERA filing
Parking & vehicle circulation
The layout area statement records Common Parking Area: 0.0. No separate count of car or two-wheeler spaces, visitor or accessible parking, or plot-wise parking allocation is supplied.
The draft layout documents refer to internal roads and require roads to remain open for accessibility to neighbouring sites. Road access is therefore described in the approval conditions; the supplied record does not establish the completed road condition, vehicle-entry arrangement or pedestrian separation.
Amenities, recreation & open spaces
No clubhouse or indoor amenity schedule is supplied. The layout drawing records parks/open space, social infrastructure and utility land, while the draft layout letter lists facilities and works to be developed. RERA amenity data includes progress percentages, which are reported here as declared figures and are not independent completion verification. Layout record RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | 1382.68 sq.m; 7.63% of net layout area | Layout record | RERA amenity record: 0%; no independent completion verification supplied. RERA amenities |
| Social infrastructure land | 461.10 sq.m; 2.54% | Layout record | Recorded in the draft layout land-use statement; completion status not supplied. |
| Internal roads and footpaths | Layout roads: 4624.16 sq.m; 25.50% | Layout record | RERA amenity record: 5%. RERA amenities |
| Green strip / park development | Park development is listed as a required layout work; the layout statement records parks/open space separately. | RERA amenities | RERA amenity record: 0% for Green Strip/TOT LOT/Park. RERA amenities |
| Community buildings | No size or facility detail supplied | RERA amenities | Progress: 0%; no completion evidence supplied. |
| Solid-waste management | The draft layout letter lists solid-waste works and a bio-compost unit. | RERA amenities | RERA amenity record: 0%; no completion evidence supplied. |
Utilities, building services & safety
The HMDA draft layout letter lists proposed layout infrastructure including internal water-supply pipelines and an overhead tank; assured water supply; underground drainage lines and a common septic tank / STP; storm-water drains; rainwater-harvesting pits; electrical supply lines, street lights and a transformer; and park and avenue-plantation works. The documents describe these as development works to be provided, not as independently verified completed services.
The RERA amenity record reports sewerage, storm-water drains and sewage/sullage treatment at 10% each; internal roads and footpaths at 5%; and water supply, green strip/park, street lighting, rainwater harvesting, electrical meter room/sub-station/receiving station, energy management and fire-safety requirements at 0%. These are declared progress values. RERA amenities The supplied records do not give water-source or storage capacities, STP capacity, electrical capacity, backup power, fire-system specifications, security systems or accessibility provisions.
Location, access & connectivity
The registered project location is MOHAMMADAPUR, Mohammadapur village, Kondapur mandal, Sangareddy district, Telangana, PIN 502295. RERA record RERA filing The supplied location record places the project at approximately 17.5100925, 77.995652. Location record
The only supplied measured connectivity reference is the nearest sampled Outer Ring Road interchange, at approximately 28.1 km. No project approach-road description, public-transport service details or additional landmark distances are supplied. Location record
Developer & development status
The registered promoter is M/S MOR PROJECTS, identified in the RERA filing as a partnership. Its supplied GSTIN is 36ACBFM3727B1ZM. The named authorised signatories are VENKAT THRINATH BABU ENDLA and RUPESH KUMAR ENDLA. RERA filing Corporate record Parties record
The registration certificate lists the promoter’s office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. The project record declares 70% completeness and a proposed/revised completion date of 23/06/2029; no independent site-progress verification is included. RERA record No occupancy or completion certificate is supplied. Document index
Approvals, official records & documents
| Reference / scope | MOR DI BIANCA; P01100011370; issued 06/11/2026; valid 23/06/2026–23/06/2029 |
|---|
| Reference / scope | Layout Permit No. 2254/HMDA/SWDL/2026, dated 23/06/2026; Survey No. 71/A, Mohammadapur; stated extent 18131.31 Sqmt |
|---|
| Reference / scope | File No. 017364/HMDA/04426/SWDL/SKP2/2026; records HMDA technical approval and layout conditions |
|---|
| Reference / scope | One supplied layout sheet; drawing-based plot count, plot sizes and land-use readings are software-measured and should be checked against the drawing |
|---|---|
| Evidence | Layout record |
| Reference / scope | Mortgage Deed No. 3614/2026, dated 08/06/2026; draft layout records Plot Nos. 20 to 23, extent 1973.58 sq.m, in favour of the Metropolitan Commissioner, HMDA |
|---|
| Reference / scope | Gift Deed No. 3613/2026, dated 08/06/2026; the Gram Panchayat draft letter records the 281.73 sq.mts road-affected area as handed over |
|---|
| Reference / scope | Records proposed landowner/developer plot shares and an undertaking concerning supplementary agreements; it does not itself establish a registered transfer of title |
|---|
| Reference / scope | Not supplied in the reviewed project evidence |
|---|---|
| Evidence | Document index |
The HMDA draft layout letters state that infrastructure works and specified transfers are required before final layout release; the supplied records do not include a final layout release document.
Project at a glance
Project identity
Registered name: MOR DI BIANCA
Project type: Plotted development / open-plot layout
Phase or registered portion: A plotted layout registered under P01100011370; a separate phase designation is not disclosed.
TG-RERA registration: P01100011370; FORM ‘C’, issued 06/11/2026.
Registration validity: 23/06/2026 to 23/06/2029. This is the registration-validity period, not an occupancy certificate or evidence of completion.
Registered promoter: M/S MOR PROJECTS, a partnership; the certificate names VENKAT THRINATH BABU ENDLA AND OTHERS as its representatives.
RERA status: Listed as an On-Going Project; the registration certificate records registration under section 5.
Land and geographic identity
Locality / revenue village: MOHAMMADAPUR / Mohammadapur
Mandal: KONDAPUR
District: Sangareddy
PIN: 502295
Project survey number(s) / subdivision(s): 71/A
Registered site extent: 18413.04 sq.mts total area; 281.73 sq.mts affected area; 18131.31 sq.mts net area.
Layout area: 18131.31 Sqmt stated in the draft layout letter.
Boundaries: East: LAND OF SY NO 75; West: ROAD AND REMAINING LAND OF PARVEDHA SHARADHA; North: LAND OF VADLA NARAYANA; South: LAND OF P RUKKAMMA.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the project records also include a Mohammadapur Gram Panchayat draft layout letter following HMDA technical approval.
Principal layout approval: HMDA Layout Permit No. 2254/HMDA/SWDL/2026, dated 23/06/2026. Application No. 017364/HMDA/04426/SWDL/SKP2/2026.
Layout approval status in filed records: The supplied approval documents describe a draft layout and require infrastructure works and specified transfers before final layout release.
Approved built-up area: The RERA filing states 11481.67 sq.mts; the evidence does not describe this as a residential building area.
Buildings / floor configuration: Not applicable as a disclosed building configuration for this open-plot layout; no building or floor schedule is provided.
Parking: The layout area statement records Common Parking Area: 0.0. No separate sanctioned parking count or plot-wise parking allocation is supplied.
Offering and status
Project offering: Plots within a plotted layout. The supplied drawing-derived record lists 25 plots; see the measurement qualification below.
Plot-size range: 307.56–1793.05 sq.m (software-read from the layout drawing; verify against the drawing).
Booked / available counts: Not disclosed in the supplied project data.
Construction / development stage: The RERA filing records 70% completeness; this is a declared figure, not independent site verification.
Completion date: 23/06/2029 proposed and revised proposed completion date in the supplied RERA record.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. This is a plotted development; no tower-specific OC status is disclosed.
The project story
MOR DI BIANCA is registered as a plotted development on Survey No. 71/A, in Mohammadapur village, Kondapur mandal, Sangareddy district. Its RERA-filed site area is 18413.04 sq.mts, including 281.73 sq.mts affected area, with 18131.31 sq.mts net area. The boundaries and complete site identity are listed above.
The layout drawing’s software-read plot schedule indicates 25 plots, with sizes from 307.56 sq.m to 1793.05 sq.m. These are drawing-derived readings, not RERA-filed unit-size disclosures, and should be checked against the drawing. The project record declares 70% completeness, but the supplied data does not independently verify physical progress at the site.
The project’s proposed and revised completion date is 23/06/2029. Registration is separately valid through that date; neither the registration validity nor the declared progress establishes that the layout is complete or that a completion certificate has been issued.
Master plan, architecture & building design
This is a plotted layout rather than a disclosed apartment or multi-storey building scheme. The RERA-filed site area is 18413.04 sq.mts, with 281.73 sq.mts affected and 18131.31 sq.mts net; the HMDA draft layout letter also states a net layout extent of 18131.31 Sqmt.
The drawing-derived layout record identifies 25 plots. Its land-use statement is based on the 18131.31 sq.m net layout area:
| Layout component | Area | Share shown in supplied record |
|---|---|---|
| Plots | 11481.47 sq.m | 63.32% |
| Roads | 4624.16 sq.m | 25.50% |
| Parks / open space | 1382.68 sq.m | 7.63% |
| Utilities | 181.90 sq.m | 1.00% |
| Social infrastructure | 461.10 sq.m | 2.54% |
| Amenities | 0.00 sq.m | 0% |
The HMDA draft layout letter describes internal roads, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipes and an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits as layout development works. These are specified works, not evidence that they have been completed. The drawing-derived record lists 0.0 common parking area and no amenities area.
No building footprint, building count, floor configuration, tower height, apartment plan or building-specific phase schedule is disclosed for this plotted layout. The supplied floor-plan record contains one layout sheet and reports no measured dwelling plans.
Homes, configurations & floor plans
This is a plotted development, so the relevant offering is plots rather than apartment configurations. The supplied RERA data does not include a plot-wise schedule of filed saleable areas, booked plots or available plots. The layout drawing is the source for the software-read count and size bands below; those readings are not RERA-filed unit disclosures and should be verified against the drawing.
300–400 sq.yd (251–334 sq.m): 1
400–500 sq.yd (334–418 sq.m): 15
500–1000 sq.yd (418–836 sq.m): 8
1000+ sq.yd (836+ sq.m): 1
Total: 25
The supplied drawing-derived record reports the smallest plot as 307.56 sq.m (367.8 sq.yd), the median as 359.53 sq.m (430.0 sq.yd), and the largest as 1793.05 sq.m (2144.5 sq.yd). It identifies 12 plots at 359.53 sq.m. These are software-read drawing figures, not RERA-filed saleable-area figures.
No carpet-area, balcony, utility-area or common-area-loading figures are supplied for plots. The project evidence does not establish individual plot allocations or their sale status.
Parking & vehicle circulation
The layout area statement records Common Parking Area: 0.0. No separate count of car or two-wheeler spaces, visitor or accessible parking, or plot-wise parking allocation is supplied.
The draft layout documents refer to internal roads and require roads to remain open for accessibility to neighbouring sites. Road access is therefore described in the approval conditions; the supplied record does not establish the completed road condition, vehicle-entry arrangement or pedestrian separation.
Amenities, recreation & open spaces
No clubhouse or indoor amenity schedule is supplied. The layout drawing records parks/open space, social infrastructure and utility land, while the draft layout letter lists facilities and works to be developed. RERA amenity data includes progress percentages, which are reported here as declared figures and are not independent completion verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | 1382.68 sq.m; 7.63% of net layout area | RERA amenity record: 0%; no independent completion verification supplied. | |
| Social infrastructure land | 461.10 sq.m; 2.54% | Recorded in the draft layout land-use statement; completion status not supplied. | |
| Internal roads and footpaths | Layout roads: 4624.16 sq.m; 25.50% | RERA amenity record: 5%. | |
| Green strip / park development | Park development is listed as a required layout work; the layout statement records parks/open space separately. | RERA amenity record: 0% for Green Strip/TOT LOT/Park. | |
| Community buildings | No size or facility detail supplied | Progress: 0%; no completion evidence supplied. | |
| Solid-waste management | The draft layout letter lists solid-waste works and a bio-compost unit. | RERA amenity record: 0%; no completion evidence supplied. |
Utilities, building services & safety
The HMDA draft layout letter lists proposed layout infrastructure including internal water-supply pipelines and an overhead tank; assured water supply; underground drainage lines and a common septic tank / STP; storm-water drains; rainwater-harvesting pits; electrical supply lines, street lights and a transformer; and park and avenue-plantation works. The documents describe these as development works to be provided, not as independently verified completed services.
The RERA amenity record reports sewerage, storm-water drains and sewage/sullage treatment at 10% each; internal roads and footpaths at 5%; and water supply, green strip/park, street lighting, rainwater harvesting, electrical meter room/sub-station/receiving station, energy management and fire-safety requirements at 0%. These are declared progress values. The supplied records do not give water-source or storage capacities, STP capacity, electrical capacity, backup power, fire-system specifications, security systems or accessibility provisions.
Location, access & connectivity
The registered project location is MOHAMMADAPUR, Mohammadapur village, Kondapur mandal, Sangareddy district, Telangana, PIN 502295. The supplied location record places the project at approximately 17.5100925, 77.995652.
The only supplied measured connectivity reference is the nearest sampled Outer Ring Road interchange, at approximately 28.1 km. No project approach-road description, public-transport service details or additional landmark distances are supplied.
Developer & development status
The registered promoter is M/S MOR PROJECTS, identified in the RERA filing as a partnership. Its supplied GSTIN is 36ACBFM3727B1ZM. The named authorised signatories are VENKAT THRINATH BABU ENDLA and RUPESH KUMAR ENDLA.
The registration certificate lists the promoter’s office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. The project record declares 70% completeness and a proposed/revised completion date of 23/06/2029; no independent site-progress verification is included. No occupancy or completion certificate is supplied.
Approvals, official records & documents
| Reference / scope | MOR DI BIANCA; P01100011370; issued 06/11/2026; valid 23/06/2026–23/06/2029 |
|---|
| Reference / scope | Layout Permit No. 2254/HMDA/SWDL/2026, dated 23/06/2026; Survey No. 71/A, Mohammadapur; stated extent 18131.31 Sqmt |
|---|
| Reference / scope | File No. 017364/HMDA/04426/SWDL/SKP2/2026; records HMDA technical approval and layout conditions |
|---|
| Reference / scope | One supplied layout sheet; drawing-based plot count, plot sizes and land-use readings are software-measured and should be checked against the drawing |
|---|
| Reference / scope | Mortgage Deed No. 3614/2026, dated 08/06/2026; draft layout records Plot Nos. 20 to 23, extent 1973.58 sq.m, in favour of the Metropolitan Commissioner, HMDA |
|---|
| Reference / scope | Gift Deed No. 3613/2026, dated 08/06/2026; the Gram Panchayat draft letter records the 281.73 sq.mts road-affected area as handed over |
|---|
| Reference / scope | Records proposed landowner/developer plot shares and an undertaking concerning supplementary agreements; it does not itself establish a registered transfer of title |
|---|
| Reference / scope | Not supplied in the reviewed project evidence |
|---|
The HMDA draft layout letters state that infrastructure works and specified transfers are required before final layout release; the supplied records do not include a final layout release document.
Frequently asked questions
Is MOR DI BIANCA registered with Telangana RERA?
Yes. MOR DI BIANCA is registered with the Telangana Real Estate Regulatory Authority as P01100011370; the registration status is On-Going Project.
Who is the developer of MOR DI BIANCA?
The promoter named in the RERA registration is M/S MOR PROJECTS.
Where is MOR DI BIANCA located?
MOR DI BIANCA is in MOHAMMADAPUR, KONDAPUR, Sangareddy, Telangana (502295).
When will MOR DI BIANCA be completed?
The promoter's proposed date of completion filed with RERA is 23/06/2029. This is the promoter's declaration, not a guarantee.