SP ANANDHA NILAYAM is a residential apartment development in Sofinagar / Siddapur, Nirmal Mandal, Nirmal District, developed by registered promoter RR INFRA. The project occupies 1511.44 sq.m. and comprises one residential building with Stilt + 5 Upper Floors and 30 homes: 15 2BHK and 15 3BHK. Its TG-RERA registration number is P02300011091, valid from 26/05/2026 to 25/05/2029, and the promoter’s Form B states a proposed completion date of 25/05/2029.

01What we found

RegisteredTG-RERA - valid till 25 May 2029
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Siddapur, Nirmal, Nirmal · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameSP ANANDHA NILAYAM RERA record
Project typeResidential apartment development RERA record
Phase / registered portionNot separately identified as a phase; the registered project concerns the apartment development on Plot Nos. 55–60
TG-RERA registrationP02300011091 RERA record
Registration validity26/05/2026 to 25/05/2029
Registered promoterRR INFRA RERA record
RERA status in supplied recordRegistration certificate recorded; captured 09/09/2026 Approvals record

Land and geographic identity

FieldProject record
LocalitySofinagar / Siddapur
Revenue villageSiddapur; the building-permit plan also describes the site as Siddapur Shivar RERA record
Mandal / district / PINNirmal / Nirmal / 504106 RERA record
Project survey number(s)Survey No. 251; no subdivision is stated for the project parcel in the supplied filing
Site / plotsPlot Nos. 55, 56, 57, 58, 59 and 60
Registered site extent1511.44 sq.m.
Approved-plan areaGross plot area 1511.44 sq.m; net plot area 1511.44 sq.m
BoundariesEast, West, North and South: 10M WIDE MAIN ROAD RERA filing

Development identity

FieldProject record
Building-permit authorityNirmal Municipality
Principal approvalBuilding Permit Order 0012/NIRM/SWBP/2026, approved 26/05/2026; file number 018524/NIRM/00020/SWBP/2026
Plan authority / filed plan numberDT&CP; 018524/NIRM/00020/SWBP/2026
Approved built-up areaProposed BUA excluding parking: 3653.95 sq.m; including parking: 4465.99 sq.m
Building countOne residential building is recorded RERA record
Sanctioned configurationStilt + 5 Upper Floors
Building heightPermit record: 14.75 m; plan record also states proposed height 17.7 m and height from Ground Level 14.75 m
Parking provision in approval recordRequired parking area 730.79 sq.m; proposed parking area 737.75 sq.m. Visitor parking: required 73.08 (10 %); proposed 74.30 (10.17 %). Vehicle-space counts are not provided in the extracted record
Units30 dwelling units sanctioned and recorded: 15 2BHK and 15 3BHK RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 127.09 sq.m; 3BHK: 162.2 sq.m RERA unit table
Portal inventory30 units recorded as available: 15 2BHK and 15 3BHK; booked count recorded as 0. The portal extract has no as-of date, so counts are indicative RERA unit table
Construction stageThe supplied materials describe a proposed/sanctioned building but provide no verified site-progress report or independently confirmed construction stage RERA amenities
Completion datesPromoter’s Form B states 25/05/2029; municipal permit states construction to be completed before 26/05/2029
Registration validity vs completionTG-RERA registration runs to 25/05/2029; this is separate from the building-permit completion date recorded as 26/05/2029
Occupancy certificateNo occupancy certificate is supplied. The permit makes an occupancy certificate compulsory before occupation

2. The project story

SP ANANDHA NILAYAM is a single-building residential apartment project registered with TG-RERA as P02300011091, promoted by RR INFRA. The registered site is described as Plot Nos. 55–60 in Survey No. 251, at Sofinagar, Siddapur, Nirmal Mandal and District. The building-permit record describes a Stilt + 5 Upper Floors apartment building with 30 dwellings.

The filing lists 15 two-bedroom and 15 three-bedroom homes. The available portal inventory records all 30 as available and none as booked, but the extract is undated. This should be treated as a filing snapshot, not a current reservation confirmation. RERA unit table

The plans and permit establish approval and proposed development; the supplied evidence does not establish the current construction stage through an independent site inspection. No occupancy certificate is included. The permit requires an occupancy certificate before occupation, while the promoter’s Form B states a completion undertaking of 25/05/2029.

3. Master plan, architecture & building design

The approved-plan extraction records a site of 1511.44 sq.m, with 811.95 sq.m proposed coverage (54 %) and 680.24 sq.m vacant plot area. Proposed BUA is stated separately as 3653.95 sq.m excluding parking and 4465.99 sq.m including parking; these are approved-plan figures, not saleable or carpet areas. The plan records 385.03 (10.54 %) as proposed mortgage area.

The building is shown as one residential apartment block with a Stilt + 5 Upper Floors configuration. The supplied extracts do not establish the number of flats on each floor, stair or lift count, internal circulation arrangement, or a detailed residential-versus-common-area schedule.

The plan identifies a 78.65 sq.m tot-lot and four green strips: 30.73 sq.m, 16.5 sq.m, 26.57 sq.m and 22.7 sq.m. These are plan-recorded provisions; the supplied data does not verify their construction or present condition.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015127.09 sq.mNot suppliedNot supplied
3BHK15015162.2 sq.m94.9–95.2 sq.m; median 95.1 sq.m41%
Total30030———

Unit counts, booking counts and saleable areas are from the TG-RERA filing; the portal inventory has no as-of date. RERA unit table

The 3BHK carpet range is software-measured from approved floor-plan drawing geometry, not a RERA-filed carpet-area disclosure; the measurement is marked as needing review. The drawing sample identifies a hall, kitchen-and-dining area, three bedrooms, three toilets and an open-to-air balcony. For one measured 3BHK, the hall is labelled 6.99 × 4.21 m, and the open-to-air balcony 1.66 × 4.73 m. These drawing measurements should be checked against the approved drawing. Floor plans RERA unit details

The RERA record does not provide a 2BHK carpet measurement. No drawing-based 1BHK count is included in the RERA unit schedule, so the offered configurations in this overview are limited to the filed 2BHK and 3BHK types. RERA unit table RERA unit details

5. Parking & vehicle circulation

The building-permit plan records 737.75 sq.m of proposed parking area against a stated required area of 730.79 sq.m. It also records visitor parking area of 74.30 (10.17 %) against a stated requirement of 73.08 (10 %). The permit states that the stilt parking area is to be used exclusively for vehicle parking and not converted to another use.

The supplied extracts do not give a count of car or two-wheeler spaces, identify accessible parking, describe ramps or driveway circulation, or establish unit-specific parking allocations. The parking-area figures do not by themselves establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot78.65 sq.mApproved-plan extraction and building-permit recordSanctioned provision; permit requires fencing and greenery before occupancy certification. Progress not verified
Green strips30.73 sq.m, 16.5 sq.m, 26.57 sq.m, 22.7 sq.mApproved-plan extractionPlan-recorded; construction and maintenance not verified
Rainwater harvesting8 rainwater-harvesting pits stated in the permit recordBuilding-permit recordRequired/provided as a permit condition; completion not verified
Trees70 stated in the permit recordBuilding-permit recordPermit-record figure; planting not verified
Garbage houseRequired within the premisesApproved-plan conditionsCondition recorded; completion not verified
Community buildingsListed in RERA amenity update dataRERA amenitiesProgress shown as 0%
Internal roads and footpathsListed in RERA amenity update dataRERA amenitiesProgress shown as 0%
Water supply, sewerage, storm-water drains, street lighting, waste management and energy managementListed in RERA amenity update dataRERA amenitiesEach listed item shows 0% progress; not independently verified
Aggregate recreational open spaceListed in RERA amenity update dataRERA amenitiesProgress shown as 0%

No clubhouse or other indoor recreational facility is established by the supplied project evidence. Amenity progress percentages are RERA-recorded figures, not independent verification of site conditions. RERA amenities

7. Utilities, building services & safety

The RERA amenity update lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, and fire-protection and fire-safety requirements. The listed progress is 0% for the amenities; the evidence does not establish completed services, source or capacity of water, treatment capacity, power backup, or electrical substation capacity. RERA amenities

The permit records space for a transformer, rainwater-harvesting structures, and a garbage house. It also requires qualified technical personnel to supervise services including sanitation, plumbing, fire safety, lifts and electrical installations. The permit requires an occupancy fire NOC before issuance of an occupancy certificate and states that an occupancy certificate is required before occupation. These are permit conditions; the supplied pack does not include evidence that the systems or certificates have been completed or obtained.

Lift provision is listed in the approved-plan extraction, but lift count, capacity and service-lift details are not supplied. The supplied evidence also does not establish CCTV, access-control arrangements, accessibility features, sewerage-treatment capacity, reuse arrangements or backup-power capacity.

8. Location, access & connectivity

The project is recorded at Plot Nos. 55–60, Survey No. 251, Sofinagar, Siddapur, Nirmal Mandal, Nirmal District, PIN 504106. The filed boundary descriptions identify a 10M WIDE MAIN ROAD on all four sides. RERA record RERA filing

A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 161.2 km. This is a sampled connectivity distance, not a travel-time estimate. No further public-transport or landmark details are provided in the evidence. Location record

9. Developer & development status

The registered promoter is RR INFRA, recorded as a partnership. The supplied corporate identifier is GSTIN 36ABNFR1340Q1ZN. The project filing gives the promoter address as RR Towers, Nirmal, Sofinagar, Siddapur, Nirmal District, PIN 504106. Corporate record Parties record

The RERA record names MUSKU SATHISH REDDY as authorized signatory and identifies MUSKU HARIKA, GANGISHETTY PRAVEEN and GANGISHETTY URMILA as partners. A partner resolution dated 22/05/2026 authorizes MUSKU SATISH REDDY to act and sign documents for the firm’s registration application. Parties record

The promoter’s Form B declares a completion period ending 25/05/2029. This is a promoter declaration; no independent construction-progress verification is supplied. The registration certificate is valid through 25/05/2029, and the building permit records completion before 26/05/2029.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02300011091; valid 26/05/2026–25/05/2029
What the supplied document establishesForm C registration certificate for SP ANANDHA NILAYAM naming RR INFRA as promoter
Building Permit Order
Identifier / date0012/NIRM/SWBP/2026; approved 26/05/2026
What the supplied document establishesNirmal Municipality permit for a Stilt + 5 Upper Floors residential building and 30 dwelling units on Plot Nos. 55–60, Survey No. 251
Building permission plan
Identifier / dateFile 018524/NIRM/00020/SWBP/2026; approved 26/05/2026
What the supplied document establishesPlan record identifies the proposed apartment, site area, proposed built-up areas, parking-area figures and plan conditions
Form B affidavit-cum-declaration
Identifier / dateFiled by authorized signatory MUSKU SATHISH REDDY
What the supplied document establishesPromoter declaration concerning title basis, encumbrances, fund management and completion undertaking
Title-search report
Identifier / dateDated 03-07-2026
What the supplied document establishesAdvocate’s report concerning Plot Nos. 55–60 in Survey No. 251; detailed title evidence belongs in the Land & Title section
Encumbrance details
Identifier / dateEncumbrance statement 230019187
What the supplied document establishesFiled encumbrance record; details are addressed in the Land & Title section
Unit allotment and sale documents
Identifier / datePartially completed pro forma allotment letter and agreement for sale
What the supplied document establishesTemplates are filed; they do not identify a completed unit allotment

No occupancy or completion certificate is included in the supplied project documents. The building permit states that an occupancy certificate is required before occupation.

Frequently asked questions

Is SP ANANDHA NILAYAM registered with Telangana RERA?

Yes. SP ANANDHA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02300011091; the registration status is New Project.

Who is the developer of SP ANANDHA NILAYAM?

The promoter named in the RERA registration is RR INFRA.

Where is SP ANANDHA NILAYAM located?

SP ANANDHA NILAYAM is in SIDDAPUR, Nirmal, Telangana (504106).

When will SP ANANDHA NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 25/09/2029. This is the promoter's declaration, not a guarantee.

More projects in Siddapur