Tyl Infra Projects
TYL INFRA PROJECTS LLP · Sangareddy · RERA P01100001228
TYL INFRA PROJECTS is a residential apartment project at Plot No. 85, Survey No. 337, in Ameenpur, Ameenpur Mandal, Sangareddy District. The registered promoter is TYL INFRA PROJECTS LLP. The project covers 501.70 sq. m. and comprises one building with stilt plus five upper floors and 10 3BHK apartments, each with a filed saleable area of 118.15 sq. m. Its TG-RERA registration is P01100001228, and its proposed completion date is 02/07/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TYL INFRA PROJECTS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Not separately identified in the supplied registration record; the registered site is Plot No. 85 in Survey No. 337 |
| TG-RERA registration | P01100001228; certificate issued 5 October 2019; stated validity 5 October 2019–2 July 2026, unless extended by the Authority |
| RERA status | Listed as a registered project. The certificate’s stated validity ended on 2 July 2026; no extension is shown in the supplied evidence. The portal record was captured on 10 September 2026 RERA record Approvals record |
| Registered promoter | TYL INFRA PROJECTS LLP, an LLP RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site reference | Ameenpur; Plot No. 85 RERA record |
| Revenue village | Ameenpur Village; the HMDA technical approval spells it “Ameenapur” |
| Mandal / district / PIN | Ameenpur Mandal; Sangareddy District; PIN 502032 RERA record |
| Project survey number(s) and subdivisions | Survey No. 337; no project subdivision is specified in the RERA filing RERA record |
| Registered site extent | 501.70 sq. m. in the project record RERA filing |
| Total / net area and affected area | Total area 501.70 sq. m.; net area 501.70 sq. m.; area recorded as affected by road widening/FTL/Nala widening: 0 sq. m. RERA filing |
| Boundaries | East: 40 Feet Wide Road; West: PARK; North: PLOT NO-84; South: PLOT NO-86 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authorities | HMDA technical approval, with building permit issued by Ameenpur Municipality |
| Principal building approval | HMDA technical approval 020801/SKP/R1/U6/HMDA/24022019, dated 22 April 2019 |
| Building permit | Ameenpur Municipality approval 276/2019-20, dated 03 07 2019 |
| Approved built-up area | HMDA technical approval records Built up Area 1181.5; RERA project fields record approved built-up area 1181.50 sq. m. RERA filing |
| Building count / floors | One building; stilt plus five upper floors in the municipal building permit RERA filing |
| Parking levels / mortgage | Stilt and cellar are referenced for parking in the technical approval conditions; a 122.04 sq. m. built-up area is recorded as mortgaged to HMDA RERA filing |
| Unit count | Approved plan: 1 building unit; RERA unit schedule: 10 apartments RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 118.15 sq. m. per unit RERA unit table |
| Booked / available | 0 booked and 10 available as last read from the TG-RERA portal; the portal record gives no as-of date, so these counts are indicative RERA unit table |
| Construction stage | No current construction-progress percentage or independently verified site-stage record is supplied Document index RERA amenities |
| Completion dates | Municipal building permit records completion before 02.07.2026; the RERA project record lists proposed completion 02/07/2026. Form B separately records a promoter undertaking to complete within 7 years from registration RERA record |
| Occupancy certificate | An HMDA Occupancy Certificate is present in the supplied file, but it identifies Plot No. 314, not this project’s Plot No. 85. It therefore does not establish OC status for the registered Plot No. 85 building |
2. The project story
TYL INFRA PROJECTS is registered as a residential apartment project on Plot No. 85, Survey No. 337, in Ameenpur Village, Sangareddy District. The RERA record describes a single residential building, with the municipal permit specifying stilt plus five upper floors. The project’s RERA unit schedule lists ten 3BHK apartments RERA record RERA filing RERA unit table.
The permit and technical-approval documents describe a 501.6/501.70 sq. m. site and an approved built-up area of 1181.50 sq. m. The permit includes a tot-lot and rainwater-harvesting structure, and specifies that the stilt/cellar parking areas are to be used for vehicle parking. These are documented approval provisions; the supplied record does not establish their current on-site completion.
No current, independent construction inspection or measured progress report is supplied. The filed amenity schedule shows no progress percentages, and the available floor-plan records have not yielded software-measured unit areas RERA amenities Floor plans.
3. Master plan, architecture & building design
The project record identifies one building on Plot No. 85, Survey No. 337. The municipal permit specifies STILT + 5 Upper floors. HMDA’s technical-approval document also describes 1 Stilt + 5 Upper floors RERA filing.
The approved built-up area is recorded as 1181.50 sq. m. The HMDA technical-approval schedule separately records Proposed Built-up Area 1417.8 and Built up Area 1181.5; these are distinct figures and are not treated here as interchangeable area measures RERA filing.
The municipal permit records a Tot-lot Area: 122.04 sq m, Compound wall: 91.44 M, and No. of Trees: 10. It also requires a rainwater-harvesting percolation pit, transformer space, and a garbage house. The documents do not provide a verified building footprint, floor-by-floor apartment arrangement, lift or staircase count, or measured internal circulation plan Floor plans.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 118.15 sq. m. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 118.15 sq. m. | Not measured in supplied drawings | Not supplied |
Booked and available counts are portal figures without an as-of date and should be treated as indicative RERA unit table. No software-measured carpet area is available: the drawing review records four drawings, with two scans pending and two containing no flats Floor plans. Saleable area and carpet area are different measures; the supplied record does not provide a carpet-area figure or loading calculation for these units RERA unit table Floor plans.
5. Parking & vehicle circulation
The HMDA technical approval and municipal building permit identify the stilt/cellar or stilt areas for vehicle parking and state that these areas are to be used exclusively for parking. The supplied record does not provide an approved parking-space count, visitor or accessible-space allocation, unit-wise parking allocation, or a verified parking layout. It also does not establish an EV-charging provision.
6. Amenities, recreation & open spaces
The municipal building permit records a tot-lot area and related site features. The RERA amenity schedule lists project facilities and infrastructure, but reports no progress percentages; the record does not establish which items have been completed on site RERA amenities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | No project-filed facility identified | RERA amenities | Not established |
| Sports / recreation | Tot-lot: 122.04 sq m | Approval provision recorded; completion not independently verified | |
| Landscape / open space | Green strip / tot lot / park appears in the RERA amenity schedule; permit specifies tree planting and tot-lot greenery | RERA amenities | Progress not recorded; completion not independently verified |
| Convenience / community | Community buildings appear in the RERA amenity schedule; no size or detailed facility specification supplied | RERA amenities | Progress not recorded; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, a substation/electrical meter-room item, solid-waste management, fire protection, energy management, street lighting, and internal roads and footpaths. The schedule does not provide capacities or progress percentages for these items RERA amenities.
The municipal permit specifies a rainwater-harvesting percolation pit, transformer space, garbage house, generator, emergency lighting, and separate underground and terrace water tanks of 25,000 litres each. It also specifies fire-safety provisions, including hose reel/down corner, manually operated alarm system, and automatic sprinklers. These are approval requirements; the supplied evidence does not independently verify installation or operational status.
The approval records do not state a lift count or capacity, STP capacity, water source, backup-power capacity, waste-security or CCTV arrangements, or accessible-unit/circulation details. The supplied drawings do not establish these items Floor plans.
8. Location, access & connectivity
The registered project location is Ameenpur Village, Ameenpur Mandal, Sangareddy District, Telangana 502032, at Plot No. 85 in Survey No. 337 RERA record. The RERA-filed boundaries identify a 40 Feet Wide Road on the east, PARK on the west, Plot No. 84 on the north, and Plot No. 86 on the south RERA filing.
The project geocode is a cadastral-parcel centroid at 17.506427366345996, 78.33818280626488 Location record. The supplied location record lists HITEC City at 8.1 km Location record. No further project-specific public-transport or approach-route measurements are supplied.
9. Developer & development status
The registered promoter is TYL INFRA PROJECTS LLP, an LLP. The RERA filing identifies Potluri Srikalyan as the promoter declarant; the project records name POTLURI SRIKALYAN as authorized signatory and Sujith Kumar Achilat Vachali as partner Corporate record Parties record.
The registration certificate gives a promoter-office address at Teachers Colony, Saroornagar, Ranga Reddy District, PIN 500079. No official project website or contact details are supplied. Form B records the promoter’s declaration that completion would occur within 7 years from registration; the project record separately states a proposed completion date of 2 July 2026 RERA record. No independently verified current construction status is provided.
10. Approvals, official records & documents
| Record | Details |
|---|---|
| TG-RERA registration | Form C for TYL INFRA PROJECTS, registration P01100001228, issued 5 October 2019; stated validity through 2 July 2026 |
| HMDA technical approval | 020801/SKP/R1/U6/HMDA/24022019, dated 22 April 2019; residential building on Plot No. 85, Survey No. 337 |
| Ameenpur Municipality building permit | Approval 276/2019-20, file 428/2019-20, dated 03 07 2019 |
| Project title/report documents filed with RERA | Title documents and advocate’s title search report are listed in the supplied document register Document index |
| Form B declaration | Promoter declaration by Potluri Srikalyan |
| Occupancy Certificate in file | HMDA certificate dated 18 May 2022 identifies Plot No. 314, Teachers Colony, Phase II; it does not establish occupancy certification for this project’s Plot No. 85 building |
| Approved layout / floor-plan drawings | The supplied review records no layout sheets; two drawing scans remain pending and two contain no flats Floor plans HMDA |
1. Project at a glance
Project identity
Registered project name: TYL INFRA PROJECTS
Project type: Residential apartment project
Phase / registered portion: Not separately identified in the supplied registration record; the registered site is Plot No. 85 in Survey No. 337
TG-RERA registration: P01100001228; certificate issued 5 October 2019; stated validity 5 October 2019–2 July 2026, unless extended by the Authority
RERA status: Listed as a registered project. The certificate’s stated validity ended on 2 July 2026; no extension is shown in the supplied evidence. The portal record was captured on 10 September 2026
Registered promoter: TYL INFRA PROJECTS LLP, an LLP
Land and geographic identity
Locality / site reference: Ameenpur; Plot No. 85
Revenue village: Ameenpur Village; the HMDA technical approval spells it “Ameenapur”
Mandal / district / PIN: Ameenpur Mandal; Sangareddy District; PIN 502032
Project survey number(s) and subdivisions: Survey No. 337; no project subdivision is specified in the RERA filing
Registered site extent: 501.70 sq. m. in the project record
Total / net area and affected area: Total area 501.70 sq. m.; net area 501.70 sq. m.; area recorded as affected by road widening/FTL/Nala widening: 0 sq. m.
Boundaries: East: 40 Feet Wide Road; West: PARK; North: PLOT NO-84; South: PLOT NO-86
Development identity
Sanctioning authorities: HMDA technical approval, with building permit issued by Ameenpur Municipality
Principal building approval: HMDA technical approval 020801/SKP/R1/U6/HMDA/24022019, dated 22 April 2019
Building permit: Ameenpur Municipality approval 276/2019-20, dated 03 07 2019
Approved built-up area: HMDA technical approval records Built up Area 1181.5; RERA project fields record approved built-up area 1181.50 sq. m.
Building count / floors: One building; stilt plus five upper floors in the municipal building permit
Parking levels / mortgage: Stilt and cellar are referenced for parking in the technical approval conditions; a 122.04 sq. m. built-up area is recorded as mortgaged to HMDA
Unit count: Approved plan: 1 building unit; RERA unit schedule: 10 apartments
Offering and status
Configuration: 3BHK apartments
RERA-filed saleable area: 118.15 sq. m. per unit
Booked / available: 0 booked and 10 available as last read from the TG-RERA portal; the portal record gives no as-of date, so these counts are indicative
Construction stage: No current construction-progress percentage or independently verified site-stage record is supplied
Completion dates: Municipal building permit records completion before 02.07.2026; the RERA project record lists proposed completion 02/07/2026. Form B separately records a promoter undertaking to complete within 7 years from registration
Occupancy certificate: An HMDA Occupancy Certificate is present in the supplied file, but it identifies Plot No. 314, not this project’s Plot No. 85. It therefore does not establish OC status for the registered Plot No. 85 building
2. The project story
TYL INFRA PROJECTS is registered as a residential apartment project on Plot No. 85, Survey No. 337, in Ameenpur Village, Sangareddy District. The RERA record describes a single residential building, with the municipal permit specifying stilt plus five upper floors. The project’s RERA unit schedule lists ten 3BHK apartments.
The permit and technical-approval documents describe a 501.6/501.70 sq. m. site and an approved built-up area of 1181.50 sq. m. The permit includes a tot-lot and rainwater-harvesting structure, and specifies that the stilt/cellar parking areas are to be used for vehicle parking. These are documented approval provisions; the supplied record does not establish their current on-site completion.
No current, independent construction inspection or measured progress report is supplied. The filed amenity schedule shows no progress percentages, and the available floor-plan records have not yielded software-measured unit areas.
3. Master plan, architecture & building design
The project record identifies one building on Plot No. 85, Survey No. 337. The municipal permit specifies STILT + 5 Upper floors. HMDA’s technical-approval document also describes 1 Stilt + 5 Upper floors.
The approved built-up area is recorded as 1181.50 sq. m. The HMDA technical-approval schedule separately records Proposed Built-up Area 1417.8 and Built up Area 1181.5; these are distinct figures and are not treated here as interchangeable area measures.
The municipal permit records a Tot-lot Area: 122.04 sq m, Compound wall: 91.44 M, and No. of Trees: 10. It also requires a rainwater-harvesting percolation pit, transformer space, and a garbage house. The documents do not provide a verified building footprint, floor-by-floor apartment arrangement, lift or staircase count, or measured internal circulation plan.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 118.15 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 118.15 sq. m. | Not measured in supplied drawings | Not supplied |
Booked and available counts are portal figures without an as-of date and should be treated as indicative. No software-measured carpet area is available: the drawing review records four drawings, with two scans pending and two containing no flats. Saleable area and carpet area are different measures; the supplied record does not provide a carpet-area figure or loading calculation for these units.
5. Parking & vehicle circulation
The HMDA technical approval and municipal building permit identify the stilt/cellar or stilt areas for vehicle parking and state that these areas are to be used exclusively for parking. The supplied record does not provide an approved parking-space count, visitor or accessible-space allocation, unit-wise parking allocation, or a verified parking layout. It also does not establish an EV-charging provision.
6. Amenities, recreation & open spaces
The municipal building permit records a tot-lot area and related site features. The RERA amenity schedule lists project facilities and infrastructure, but reports no progress percentages; the record does not establish which items have been completed on site.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | No project-filed facility identified | Not established | |
| Sports / recreation | Tot-lot: 122.04 sq m | Approval provision recorded; completion not independently verified | |
| Landscape / open space | Green strip / tot lot / park appears in the RERA amenity schedule; permit specifies tree planting and tot-lot greenery | Progress not recorded; completion not independently verified | |
| Convenience / community | Community buildings appear in the RERA amenity schedule; no size or detailed facility specification supplied | Progress not recorded; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, a substation/electrical meter-room item, solid-waste management, fire protection, energy management, street lighting, and internal roads and footpaths. The schedule does not provide capacities or progress percentages for these items.
The municipal permit specifies a rainwater-harvesting percolation pit, transformer space, garbage house, generator, emergency lighting, and separate underground and terrace water tanks of 25,000 litres each. It also specifies fire-safety provisions, including hose reel/down corner, manually operated alarm system, and automatic sprinklers. These are approval requirements; the supplied evidence does not independently verify installation or operational status.
The approval records do not state a lift count or capacity, STP capacity, water source, backup-power capacity, waste-security or CCTV arrangements, or accessible-unit/circulation details. The supplied drawings do not establish these items.
8. Location, access & connectivity
The registered project location is Ameenpur Village, Ameenpur Mandal, Sangareddy District, Telangana 502032, at Plot No. 85 in Survey No. 337. The RERA-filed boundaries identify a 40 Feet Wide Road on the east, PARK on the west, Plot No. 84 on the north, and Plot No. 86 on the south.
The project geocode is a cadastral-parcel centroid at 17.506427366345996, 78.33818280626488. The supplied location record lists HITEC City at 8.1 km. No further project-specific public-transport or approach-route measurements are supplied.
9. Developer & development status
The registered promoter is TYL INFRA PROJECTS LLP, an LLP. The RERA filing identifies Potluri Srikalyan as the promoter declarant; the project records name POTLURI SRIKALYAN as authorized signatory and Sujith Kumar Achilat Vachali as partner.
The registration certificate gives a promoter-office address at Teachers Colony, Saroornagar, Ranga Reddy District, PIN 500079. No official project website or contact details are supplied. Form B records the promoter’s declaration that completion would occur within 7 years from registration; the project record separately states a proposed completion date of 2 July 2026. No independently verified current construction status is provided.
10. Approvals, official records & documents
TG-RERA registration: Form C for TYL INFRA PROJECTS, registration P01100001228, issued 5 October 2019; stated validity through 2 July 2026
HMDA technical approval: 020801/SKP/R1/U6/HMDA/24022019, dated 22 April 2019; residential building on Plot No. 85, Survey No. 337
Ameenpur Municipality building permit: Approval 276/2019-20, file 428/2019-20, dated 03 07 2019
Project title/report documents filed with RERA: Title documents and advocate’s title search report are listed in the supplied document register
Form B declaration: Promoter declaration by Potluri Srikalyan
Occupancy Certificate in file: HMDA certificate dated 18 May 2022 identifies Plot No. 314, Teachers Colony, Phase II; it does not establish occupancy certification for this project’s Plot No. 85 building
Approved layout / floor-plan drawings: The supplied review records no layout sheets; two drawing scans remain pending and two contain no flats
Frequently asked questions
Is TYL INFRA PROJECTS registered with Telangana RERA?
Yes. TYL INFRA PROJECTS is registered with the Telangana Real Estate Regulatory Authority as P01100001228; the registration status is New Project.
Who is the developer of TYL INFRA PROJECTS?
The promoter named in the RERA registration is TYL INFRA PROJECTS LLP.
Where is TYL INFRA PROJECTS located?
TYL INFRA PROJECTS is in Ameenpur, Sangareddy, Telangana (502032).
When will TYL INFRA PROJECTS be completed?
The promoter's proposed date of completion filed with RERA is 02/07/2026. This is the promoter's declaration, not a guarantee.