Sign in

Cozy Essence Elite

ADHIREDDY · Medchal-Malkajgiri · RERA P02200003548

Cozy Essence Elite is a residential apartment project in Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, developed by registered promoter Mr./Ms. Adhireddy Pavan Kumar Reddy. It occupies 4,025.93 Sq. Mt. and comprises 2 proposed residential building blocks: Building 1 has 1Cellar + 1Ground + 5 floors, and Building 2 has 1Ground + 5 Upper floors. The RERA record lists 90 apartments: 61 2BHK units of 121.05 sqm and 29 3BHK units of 173.01 sqm. Its TG-RERA registration number is P02200003548, and the project header records proposed completion on 26/08/2027.

01What we found

RegisteredTG-RERA - valid till 26 Apr 2027
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from estatedekho.comPhoto from brokernetwork.in
▦ View all 2 photos
Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameCozy Essence Elite RERA record
Project type / registered portionResidential apartment project; phase or separately identified registered portion is not disclosed in the supplied record. RERA record
TG-RERA registrationP02200003548
Registration validityIssued 20/11/2021; certificate states validity through 26/04/2027, unless extended. Extension is recorded as not extended in the supplied certificate. This is registration validity, not the completion deadline or evidence of occupancy.
Registered promoterADHIREDDY in the project header; the registration certificate names Mr./Ms. Adhireddy Pavan Kumar Reddy as promoter. RERA record
RERA statusThe supplied record identifies this as a New Project and supplies a TG-RERA registration certificate. Current construction or occupancy status is not established by that status label. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageDulapally; the HMDA technical approval describes the village as Dulapalle. The revenue-village identity in the project record is Dulapally. RERA record RERA filing
MandalDundigal Gandimaisamma in the project/RERA record. RERA record
District / PINMedchal-Malkajgiri / 500100 RERA record RERA filing
Survey number(s) and subdivision(s)15 Part (also written 15/PART in the HMDA technical approval). No other project survey number or subdivision is supplied. RERA record Land records
Site extent4,025.93 Sq. Mt. in the HMDA technical approval; RERA land details report total area and net area as 4025.93 sqmts, with 0 area affected by road widening/FTL/nala widening. RERA filing
Boundaries recorded in project land detailsEast: Land In Survey No 15; West: Nala; North: Neighbours Apartment; South: Neighbours House And Water Tank. RERA filing Land records

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) technical approval; the approval directs the applicant to approach Kompally Municipality for sanction and release. Approvals record
Principal approval041679/MED/R1/U6/HMDA/05012021, approved 27/04/2021. The project header also records plan approval no. 041679/MED/R1/U6/HMD. RERA record Approvals record
Approved built-up areaHMDA technical approval records Total Built up Area (In Sq.mts) 11210.35. The project filing’s separate “Approved Built up Area” field records 10897.69 Sqmts; these figures are reported as recorded, not treated as interchangeable. RERA filing
Buildings / blocks2 proposed residential building blocks. RERA filing
Sanctioned floor configurationBuilding 1: 1Cellar + 1Ground + 5; Building 2: 1Ground + 5 Upper floors. HMDA approval states cellar and stilts approved for parking, but the supplied extract does not assign a stilt level to either block.
Approved versus RERA-declared unitsProject land details report 2 total building units and 2 proposed building units; these are building/block counts, not apartment counts. The RERA unit record lists 90 apartments: 61 2BHK and 29 3BHK. RERA filing RERA unit table RERA unit details
Parking levelsHMDA approval refers to cellar and stilt parking, and requires those areas to be used exclusively for vehicle parking. A parking-space count is not supplied.

Offering and status

ItemProject record
RERA-filed configurations2BHK: 61 units, saleable area 121.05 sqm each as recorded; 3BHK: 29 units, saleable area 173.01 sqm each as recorded. RERA unit table RERA unit details
Booked / availablePortal figures show 0 booked, 61 available for 2BHK and 0 booked, 29 available for 3BHK. The record supplies no as-of date, so these counts are indicative rather than a current inventory confirmation. RERA unit table RERA unit details
Construction stageNot established by the supplied evidence. The RERA amenities record gives 0% for the listed progress fields; this is not a verified site inspection or a reliable overall construction-stage finding. RERA amenities
Completion datesThe promoter’s Form B declares completion by 26-04-2027. The project header records proposed completion 26/08/2027. These dates are retained as separate record entries; neither establishes actual completion. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The HMDA approval requires an occupancy certificate before occupation.

2. The project story

Cozy Essence Elite is registered as a residential apartment development in Dulapally, on Survey No. 15 Part, Medchal-Malkajgiri district. The project record identifies two proposed residential blocks on a 4,025.93 Sq. Mt. site. The HMDA technical approval describes one block as 1Cellar + 1Ground + 5 and the other as 1Ground + 5 Upper floors. RERA record Land records

The RERA unit record lists 90 homes: 61 2BHK and 29 3BHK. Booking and availability figures are portal-reported and lack an as-of date. The supplied material does not establish whether either block is under construction, complete, or ready for occupation; it also does not include an occupancy certificate. The promoter’s Form B states a completion undertaking of 26-04-2027, while the project header records 26/08/2027 as proposed completion. RERA unit table RERA unit details RERA record

3. Master plan, architecture & building design

The RERA land record gives total and net site area as 4025.93 sqmts, and records no area affected by road widening, FTL, or nala widening. The HMDA technical approval describes a residential scheme of two blocks and gives total built-up area as 11210.35 Sq.mts. Separately, the RERA filing field states approved built-up area of 10897.69 Sqmts. No floor-plan measurement or drawing-based review is available to reconcile or further describe these area figures. RERA filing RERA filing

The approval extract specifies the two blocks’ floor configurations and building heights of 17.9 and 17; the supplied extract does not state the unit of height. It also records a 18 mt. road width and a mortgage over 1202.07 Sq.mtrs of built-up area, described as 11.03% of Built Up Area on the second floor of buildings 1 and 2. Approvals record

The supplied material does not establish building footprints, flats per floor, number or capacity of lifts, stair arrangements, internal circulation, landscaping/open-space dimensions, or the residential/common-area distribution. The floor-plan set is described as three drawings, with no measured plans, one scan pending, and two drawings without flats; no drawing-based unit measurements are available. Floor plans

4. Homes, configurations & floor plans

RERA records two apartment configurations. The figures below are filed saleable areas; no measured carpet area is available from the supplied floor-plan data. The portal’s booked/available counts have no stated as-of date. RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK61061121.05 sqmNot availableNot supplied
3BHK29029173.01 sqmNot availableNot supplied

The drawing review reports 0 measured drawings; one scan remains pending and two drawings contain no flats. Accordingly, room layouts, room dimensions, balcony or utility areas, and orientation cannot be described from the available drawing measurements. Saleable area is the RERA-filed figure; it should not be read as carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The HMDA technical approval states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and must not be converted to another use. The approval extract does not provide a count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or details of ramps, entry/exit arrangements, or internal driveways. A drawn or approved parking area does not, by itself, establish exclusive parking ownership for a particular apartment. The RERA record identifies a mortgage over 1202.07 Sq.mtrs of built-up area; it does not identify that area as a count or allocation of parking spaces.

6. Amenities, recreation & open spaces

The RERA amenity record includes site infrastructure and facility categories, but lists 0% progress for the recorded items; this is not independent verification of completion. The HMDA technical approval also specifies certain site provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor
Community buildingsListed; size and facility details not suppliedRERA amenities record RERA amenities0%; completion not independently verified
Sports / recreation
Green strip / tot lot / parkListed as available in the RERA amenity fields; HMDA requires the tot-lot to be fenced and maintained as greenery before occupancy certificateRERA amenities RERA amenities; HMDA approvalRERA progress 0%; HMDA condition is not evidence of completion
Aggregate recreational open spaceListed; area not suppliedRERA amenities RERA amenities0%; completion not independently verified
Landscape / open space
Tree plantingHMDA requires planting along the periphery and in front of the premisesHMDA approvalRequired by approval; completion not established
Convenience / community
Street lightingListed as available; quantities and specifications not suppliedRERA amenities RERA amenitiesRERA progress 0%; completion not independently verified
Marketing-only facility claims
Swimming pool, badminton court, indoor games, sit-out area, garden/park and children’s play areaListed on vendor material; sizes and quantities not suppliedVendor Promoter websitePromoter/vendor marketing claims; not established as sanctioned or delivered

7. Utilities, building services & safety

The RERA amenities record lists water supply, storm-water drains, rainwater harvesting, an electrical meter room/sub-station/receiving station, sewerage, sewage and sullage treatment/disposal, solid-waste management, energy management, and fire-protection requirements. The progress fields shown for the listed items are 0%; the record does not provide capacities or independently verify installation or operation. RERA amenities

The HMDA technical approval requires rainwater-harvesting structures, provision within the premises for a transformer and garbage house, and compliance with the National Building Code of 2005. It also specifies that occupancy requires an occupancy certificate. These are approval conditions, not evidence that the facilities have been completed or that statutory compliance has been independently verified.

The vendor lists “Treated Water Supply 24x7,” power backup, elevators, CCTV/video surveillance, solar fencing and security; these are vendor claims and the supplied official record does not provide capacities, equipment schedules, or completion verification. Promoter website No lift count or capacity, backup capacity, water source/storage/treatment details, STP capacity, fire-system equipment details, accessible circulation, or waste-segregation arrangements are established in the supplied records.

8. Location, access & connectivity

The registered project location is Dulapally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500100, with the project record also giving Kompally as the street/locality description. The project is on Survey No. 15 Part. RERA record RERA filing Land records The supplied location record places the project at approximately 17.5467126, 78.4668466. Location record

The HMDA technical approval records an 18 mt. road width. The supplied location dataset lists Kukatpally Metro at 9.0 km, State Bank of India at 0.6 km, Sri Chaitanya Junior College at 0.8 km, an unnamed hospital at 0.9 km, an unnamed park at 1.9 km, Transguard Electrical Systems at 2.1 km, and a primary school at 0.3 km. These are dataset-listed distances, not route or travel-time measurements. Location record

9. Developer & development status

The registered promoter is recorded as ADHIREDDY in the project header and as Adhireddy Pavan Kumar Reddy in the TG-RERA registration certificate. The supplied evidence does not establish the promoter’s legal entity type or corporate identifier; the certificate lists a promoter office at House No. 8-81, Ranga Reddy district, Telangana, PIN 500014. RERA record Corporate record

The project filing identifies ten landowners under area-share arrangements. The Form B is a promoter declaration by ADHIREDDY PAVAN KUMAR REDDY, verified at Hyderabad on 27-10-2021; among its statements, it declares the land free from encumbrances and undertakes completion by 26-04-2027. These are declarations by the promoter, not independent verification of title or progress. Parties record

The project’s construction stage and current occupancy status are not established in the supplied evidence. The certificate states registration validity through 26/04/2027; that validity is separate from the promoter’s completion undertaking and from the project header’s proposed completion date. No occupancy/completion certificate is supplied. RERA record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate, P02200003548Form ‘C’ certificate issued under section 5; project Cozy Essence Elite; registration validity 20/11/2021–26/04/2027, unless extended.
HMDA technical approval, 041679/MED/R1/U6/HMDA/05012021Technical approval dated 27/04/2021 for the residential development on Survey No. 15/PART, Dulapalle; two proposed blocks, floor configurations, site extent, conditions and built-up-area mortgage are recorded. The letter directs the applicant to approach Kompally Municipality for sanction and release.
Project Form B declarationPromoter affidavit by ADHIREDDY PAVAN KUMAR REDDY, verified 27-10-2021, including a completion undertaking and statements concerning title, encumbrances, project funds, audits and pending approvals.
Building-plan approval filingThe RERA filing lists plan approval number 041679/MED/R1/U6/HMD. The HMDA technical approval document is supplied; a separate approved-layout plan is not available in the supplied evidence. Approvals record Document index HMDA
Occupancy/completion certificateNot supplied. HMDA approval states that an occupancy certificate is required before occupation and directs the applicant to approach HMDA after completion as per the sanctioned plan.
Other RERA-filed project documentsThe record lists title-report documents 193093, 193094, 193100, 193106, 193107, 193108, 193111, 193196, a blank agreement-for-sale form 193098, and an encumbrance statement 193423. Their substantive title and encumbrance review belongs in the Land & Title section. Document index

Frequently asked questions

Is Cozy Essence Elite registered with Telangana RERA?

Yes. Cozy Essence Elite is registered with the Telangana Real Estate Regulatory Authority as P02200003548; the registration status is New Project.

Who is the developer of Cozy Essence Elite?

The promoter named in the RERA registration is ADHIREDDY.

Where is Cozy Essence Elite located?

Cozy Essence Elite is in Dulapally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500100).

When will Cozy Essence Elite be completed?

The promoter's proposed date of completion filed with RERA is 26/08/2027. This is the promoter's declaration, not a guarantee.

More projects in Dulapally