Temple Town
SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS · Yadadri Bhuvanagiri · RERA P02000010182
TEMPLE TOWN is a plotted development in Yadagirpalli, Yadagirigutta Mandal, Yadadri Bhuvanagiri District. It is being developed by SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS. The TG-RERA record states a total land area of 36320.53 sqmts and a net area of 26041.51 sqmts; the project comprises plots, with plot count and plot-size range not disclosed. Registered under TG-RERA number P02000010182, the project has a proposed completion date of 07/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | TEMPLE TOWN |
| Project type | Plotted development / residential draft layout RERA record |
| Phase or registered portion | Phase not separately identified; registration concerns the layout on Sy.No.124/P and 129/P |
| TG-RERA registration | P02000010182 |
| Registration validity | 07/09/2022 to 07/09/2025; certificate records no extension. This is registration validity, not a current certificate of project completion. |
| Registered promoter | SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS, identified as a partnership RERA record Corporate record |
| RERA record status | Registration certificate issued under section 5; the certificate is dated 25/10/2025 and states the validity dates above. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Yadagirpalli; approval documents refer to Yadagiripalli Shivar. RERA record |
| Mandal / district / PIN | Yadagirigutta, Yadadri Bhuvanagiri, 508115 RERA record |
| Project survey numbers | 124/P and 129/P; the filed land details also state 124/P AND 129/P. RERA record |
| Site extent in RERA filing | Total area 36320.53 sqmts; area affected in road widening/FTL of Tanks/Nala Widening 10279.02 sqmts; net area 26041.51 sqmts. RERA filing |
| Approval-document extent | Draft-layout records describe Ac.8-975 cents; one DTCP communication states site area Ac.8.975 cents (-) Ac.0.40 cents = Ac.8.575 cents. |
| Boundaries as filed | East: OTHERS LAND; West: OTERS LAND; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning / approval authorities shown in the filed record | Director of Town and Country Planning (DTCP) and Yadagirigutta Municipality appear in the layout proceedings. Approvals record |
| Principal layout reference | Draft TLP.No.05/2020/YTDA; municipal proceedings are dated 07.09.2022. The filed documents describe a draft layout and conditions applying before final layout release. |
| Approved built-up area in RERA filing | 26041.51 sqmts (as labelled “Approved Built up Area”). RERA filing |
| Buildings / floors | Not disclosed in the supplied project record; this is a plotted layout, not an evidenced multi-storey building scheme. RERA record Document index |
| Parking | RERA filing states a Mortgage Area of 3111.23 sqmts; no project-wide resident or visitor parking count, parking levels, or parking allocation is supplied. RERA filing |
| Approved versus RERA-declared plot counts | Plot inventory/counts are not available in the supplied records. The approval proceedings identify specific plot numbers for mortgage and facilities, but do not provide a complete saleable plot schedule. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots; plot count and plot-size range are not disclosed in the supplied data. RERA record Document index |
| Booked / available counts | Not supplied in the available RERA data. Document index |
| Construction / development stage | RERA filing labels the project New Project and reports 80% completeness; this is a filing/software record, not independent site verification. RERA record |
| Completion deadline | Promoter’s Form B declaration states 07/09/2025. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; final layout-release status is not established by the supplied documents. Document index |
2. The project story
- TEMPLE TOWN is registered as a plotted-development project at Yadagirpalli, in Yadagirigutta Mandal, Yadadri Bhuvanagiri District. Its RERA-filed land identifiers are Sy.Nos.124/P and 129/P. The registration record describes total site area of 36320.53 sqmts, including 10279.02 sqmts affected by road widening/FTL of Tanks/Nala Widening, and a stated net area of 26041.51 sqmts. RERA record RERA filing
- The filed layout proceedings describe roads, open space, social-infrastructure and utility areas, and specify that certain plots are to be mortgaged to YTDA. They also set conditions for handing over designated areas to the local body by registered gift deed before final layout release. The supplied record does not establish that all such conditions have been completed or that final layout release has occurred.
- The RERA filing labels the project “New Project” and records 80% completeness, while the promoter’s Form B gives a completion deadline of 07/09/2025. Neither figure is independent verification of present site progress, and no completion or occupancy certificate is supplied. RERA record Document index
3. Master plan, architecture & building design
- This is a plotted layout, so the supplied design evidence concerns land division and layout infrastructure rather than apartment buildings, floors or towers. The RERA filing separately labels 26041.51 sqmts as approved built-up area; the record does not clarify that area label further. RERA filing
- The municipal proceedings for Draft TLP.No.05/2020/YTDA refer to Sy.No.124/P and 129/P and a site extent of Ac.8-975 cents. They identify layout roads of 18 mts and above and specify land for open space, social infrastructure, roads and utilities.
- The approval records identify plots 71 to 87, measuring 3721.34 Sq. Yards, as mortgaged to YTDA under mortgage deed 10686/2018. The DTCP communication separately describes plots 71 to 84 and 3721.00 sq. yds. for mortgage, and identifies plots 3 to 8, 1235.00 sq. yds., for Master Plan facilities. The municipal proceedings also identify open-space, social-infrastructure, road and utility land to be gifted to the local body before final layout release.
- No complete plot plan, plot-size schedule, complete layout drawing, or detailed division of saleable and common land is available in the supplied extracts. Four floor-plan drawings are recorded as scans pending measurement; no software-measured floor-plan areas are available. Floor plans
4. Homes, configurations & floor plans
The project is a plotted development. The supplied RERA evidence does not provide plot counts, plot-size bands, booked/available inventory, or a plot-by-plot saleable-area schedule. RERA record Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The available floor-plan record is not a plot-inventory schedule: it lists four drawings, all scans pending measurement, and records no software-measured areas. Floor plans
5. Parking & vehicle circulation
The RERA filing records Mortgage Area (In Sqmts): 3111.23; the approval documents identify mortgaged layout plots as security for layout-development works. This does not establish a count of parking spaces or a parking allocation to purchasers. RERA filing
No sanctioned or RERA-filed resident/visitor parking count, parking levels, vehicle ramps, EV charging provision, or individual plot parking allocation is available in the supplied evidence. Document index RERA amenities
6. Amenities, recreation & open spaces
The project’s RERA amenity record marks several layout infrastructure items as available, but reports 0% for each item’s progress field. These are filed declarations, not independent confirmation of delivery. RERA amenities
| Description / size | Municipal proceedings identify AC.0.645 cents (7.5%) for open space. DTCP communication identifies Ac. 0.643 cents. |
|---|---|
| Declared progress / verified status | RERA amenity record lists Green Strip/TOT LOT/Park; 0%. No independent completion verification. RERA amenities |
| Description / size | AC.O.215 cents (2.50%) in municipal proceedings; Ac.0.215 cents in DTCP communication. |
|---|---|
| Declared progress / verified status | Identified in approval documents; handover condition recorded. Delivery not independently verified. |
| Description / size | No size or facility description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field 0%; no verified completion evidence. |
| Description / size | Layout roads include widths of 18 mts and above; municipal proceedings identify AC.2.59 cents (30.20%) for roads. |
|---|---|
| Declared progress / verified status | RERA amenity record lists “YES”; progress 0%. No independent completion verification. RERA amenities |
| Description / size | No quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed “YES”; progress 0%; no independent completion verification. |
| Description / size | DTCP communication identifies Ac. 0.091 cents; municipal proceedings identify AC.0.095 cents (1.10%). |
|---|---|
| Declared progress / verified status | Approval-document land allocation; handover condition recorded. Delivery not independently verified. |
No project-specific evidence establishes a clubhouse, swimming pool, gym, children’s play area or other recreational facility as sanctioned or delivered; those details are not included in the project’s filed amenity evidence used here.
7. Utilities, building services & safety
- The RERA amenity record lists water supply, sewerage (including chamber, lines, septic tank/STP), storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. The available progress fields are 0%; the listing is not proof that these works are completed or operational. RERA amenities
- The municipal layout proceedings further refer to a common septic tank / STP, overhead tank, transformer, avenue plantation, park development, and rain water harvesting pits. The documents do not provide capacities, technical specifications, or evidence of completion.
- The supplied evidence does not identify water sources or storage capacity, sewage-treatment capacity or reuse arrangements, storm-water discharge details, power-backup capacity, fire-system specifications, security arrangements, or accessibility provisions. RERA amenities Document index
8. Location, access & connectivity
- The registered project location is Yadagirpalli, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508115. Layout documents describe the site as being at Yadagiripalli Shivar. RERA record
- A cadastral parcel-centroid geocode is supplied at 17.596527682662863, 78.9370767858244. The nearest sampled Outer Ring Road interchange is listed at approximately 31.8 km; this is a supplied distance estimate, not a travel-time claim. Location record Cadastral map
- The layout proceedings state that roads are to be opened for access to neighbouring sites and prohibit a compound wall that would obstruct that access. No specific approach-road name, public-transport route, or additional landmark distance is established in the supplied project record.
9. Developer & development status
The registered legal promoter is SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS, identified as a Partnership, with GSTIN 36ADHFS2353N1ZN. The RERA filing identifies RACHAMALLA VENKATESHWARLU as an authorized signatory. Corporate record Parties record
The RERA certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500060”; a complete street address and official contact details are not supplied in the certificate extract.
The promoter’s Form B, signed by VENKATESHWARLU RACHUMALLA on 16.07.2025, declares a completion deadline of 07/09/2025. The project filing records 80% completeness, but no independent site-progress inspection or completion certificate is provided. RERA record Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration | Form C records TEMPLE TOWN, registration P02000010182, validity 07/09/2022–07/09/2025, and no extension recorded in the certificate. |
| Layout proceedings | Municipal proceedings approve Draft TLP.No.05/2020/YTDA for a draft layout on Sy.No.124/P and 129/P, dated 07.09.2022, and state conditions for development and final layout release. |
| DTCP layout communications | DTCP communications refer to revised draft layout/TLP material, including 05/2020/YTDA and Lr.Roc.No.1770/2017/YTDA. |
| Mortgage document | The filed title material describes mortgage deed 10686/2018, covering specified layout plots in favour of YTDA as security for development works. |
| Promoter declaration | Form B affidavit dated 16.07.2025 records the promoter’s title and encumbrance declarations and completion undertaking. |
| Occupancy/completion certificate | No occupancy or completion certificate is present in the supplied evidence. Document index |
| Layout plan / final-release evidence | A complete stamped final layout plan or evidence establishing final layout release is not available in the supplied extracts. Document index |
1. Project at a glance
Project identity
Registered project name: TEMPLE TOWN
Project type: Plotted development / residential draft layout
Phase or registered portion: Phase not separately identified; registration concerns the layout on Sy.No.124/P and 129/P
TG-RERA registration: P02000010182
Registration validity: 07/09/2022 to 07/09/2025; certificate records no extension. This is registration validity, not a current certificate of project completion.
Registered promoter: SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS, identified as a partnership
RERA record status: Registration certificate issued under section 5; the certificate is dated 25/10/2025 and states the validity dates above.
Land and geographic identity
Locality / revenue village: Yadagirpalli; approval documents refer to Yadagiripalli Shivar.
Mandal / district / PIN: Yadagirigutta, Yadadri Bhuvanagiri, 508115
Project survey numbers: 124/P and 129/P; the filed land details also state 124/P AND 129/P.
Site extent in RERA filing: Total area 36320.53 sqmts; area affected in road widening/FTL of Tanks/Nala Widening 10279.02 sqmts; net area 26041.51 sqmts.
Approval-document extent: Draft-layout records describe Ac.8-975 cents; one DTCP communication states site area Ac.8.975 cents (-) Ac.0.40 cents = Ac.8.575 cents.
Boundaries as filed: East: OTHERS LAND; West: OTERS LAND; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning / approval authorities shown in the filed record: Director of Town and Country Planning (DTCP) and Yadagirigutta Municipality appear in the layout proceedings.
Principal layout reference: Draft TLP.No.05/2020/YTDA; municipal proceedings are dated 07.09.2022. The filed documents describe a draft layout and conditions applying before final layout release.
Approved built-up area in RERA filing: 26041.51 sqmts (as labelled “Approved Built up Area”).
Buildings / floors: Not disclosed in the supplied project record; this is a plotted layout, not an evidenced multi-storey building scheme.
Parking: RERA filing states a Mortgage Area of 3111.23 sqmts; no project-wide resident or visitor parking count, parking levels, or parking allocation is supplied.
Approved versus RERA-declared plot counts: Plot inventory/counts are not available in the supplied records. The approval proceedings identify specific plot numbers for mortgage and facilities, but do not provide a complete saleable plot schedule.
Offering and status
Unit type: Plots; plot count and plot-size range are not disclosed in the supplied data.
Booked / available counts: Not supplied in the available RERA data.
Construction / development stage: RERA filing labels the project New Project and reports 80% completeness; this is a filing/software record, not independent site verification.
Completion deadline: Promoter’s Form B declaration states 07/09/2025.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; final layout-release status is not established by the supplied documents.
2. The project story
- TEMPLE TOWN is registered as a plotted-development project at Yadagirpalli, in Yadagirigutta Mandal, Yadadri Bhuvanagiri District. Its RERA-filed land identifiers are Sy.Nos.124/P and 129/P. The registration record describes total site area of 36320.53 sqmts, including 10279.02 sqmts affected by road widening/FTL of Tanks/Nala Widening, and a stated net area of 26041.51 sqmts.
- The filed layout proceedings describe roads, open space, social-infrastructure and utility areas, and specify that certain plots are to be mortgaged to YTDA. They also set conditions for handing over designated areas to the local body by registered gift deed before final layout release. The supplied record does not establish that all such conditions have been completed or that final layout release has occurred.
- The RERA filing labels the project “New Project” and records 80% completeness, while the promoter’s Form B gives a completion deadline of 07/09/2025. Neither figure is independent verification of present site progress, and no completion or occupancy certificate is supplied.
3. Master plan, architecture & building design
- This is a plotted layout, so the supplied design evidence concerns land division and layout infrastructure rather than apartment buildings, floors or towers. The RERA filing separately labels 26041.51 sqmts as approved built-up area; the record does not clarify that area label further.
- The municipal proceedings for Draft TLP.No.05/2020/YTDA refer to Sy.No.124/P and 129/P and a site extent of Ac.8-975 cents. They identify layout roads of 18 mts and above and specify land for open space, social infrastructure, roads and utilities.
- The approval records identify plots 71 to 87, measuring 3721.34 Sq. Yards, as mortgaged to YTDA under mortgage deed 10686/2018. The DTCP communication separately describes plots 71 to 84 and 3721.00 sq. yds. for mortgage, and identifies plots 3 to 8, 1235.00 sq. yds., for Master Plan facilities. The municipal proceedings also identify open-space, social-infrastructure, road and utility land to be gifted to the local body before final layout release.
- No complete plot plan, plot-size schedule, complete layout drawing, or detailed division of saleable and common land is available in the supplied extracts. Four floor-plan drawings are recorded as scans pending measurement; no software-measured floor-plan areas are available.
4. Homes, configurations & floor plans
The project is a plotted development. The supplied RERA evidence does not provide plot counts, plot-size bands, booked/available inventory, or a plot-by-plot saleable-area schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The available floor-plan record is not a plot-inventory schedule: it lists four drawings, all scans pending measurement, and records no software-measured areas.
5. Parking & vehicle circulation
The RERA filing records Mortgage Area (In Sqmts): 3111.23; the approval documents identify mortgaged layout plots as security for layout-development works. This does not establish a count of parking spaces or a parking allocation to purchasers.
No sanctioned or RERA-filed resident/visitor parking count, parking levels, vehicle ramps, EV charging provision, or individual plot parking allocation is available in the supplied evidence.
6. Amenities, recreation & open spaces
The project’s RERA amenity record marks several layout infrastructure items as available, but reports 0% for each item’s progress field. These are filed declarations, not independent confirmation of delivery.
| Description / size | Municipal proceedings identify AC.0.645 cents (7.5%) for open space. DTCP communication identifies Ac. 0.643 cents. |
|---|---|
| Declared progress / verified status | RERA amenity record lists Green Strip/TOT LOT/Park; 0%. No independent completion verification. |
| Description / size | AC.O.215 cents (2.50%) in municipal proceedings; Ac.0.215 cents in DTCP communication. |
|---|---|
| Declared progress / verified status | Identified in approval documents; handover condition recorded. Delivery not independently verified. |
| Description / size | No size or facility description supplied. |
|---|---|
| Declared progress / verified status | Progress field 0%; no verified completion evidence. |
| Description / size | Layout roads include widths of 18 mts and above; municipal proceedings identify AC.2.59 cents (30.20%) for roads. |
|---|---|
| Declared progress / verified status | RERA amenity record lists “YES”; progress 0%. No independent completion verification. |
| Description / size | No quantity or specification supplied. |
|---|---|
| Declared progress / verified status | Listed “YES”; progress 0%; no independent completion verification. |
| Description / size | DTCP communication identifies Ac. 0.091 cents; municipal proceedings identify AC.0.095 cents (1.10%). |
|---|---|
| Declared progress / verified status | Approval-document land allocation; handover condition recorded. Delivery not independently verified. |
No project-specific evidence establishes a clubhouse, swimming pool, gym, children’s play area or other recreational facility as sanctioned or delivered; those details are not included in the project’s filed amenity evidence used here.
7. Utilities, building services & safety
- The RERA amenity record lists water supply, sewerage (including chamber, lines, septic tank/STP), storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. The available progress fields are 0%; the listing is not proof that these works are completed or operational.
- The municipal layout proceedings further refer to a common septic tank / STP, overhead tank, transformer, avenue plantation, park development, and rain water harvesting pits. The documents do not provide capacities, technical specifications, or evidence of completion.
- The supplied evidence does not identify water sources or storage capacity, sewage-treatment capacity or reuse arrangements, storm-water discharge details, power-backup capacity, fire-system specifications, security arrangements, or accessibility provisions.
8. Location, access & connectivity
- The registered project location is Yadagirpalli, Yadagirigutta Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508115. Layout documents describe the site as being at Yadagiripalli Shivar.
- A cadastral parcel-centroid geocode is supplied at 17.596527682662863, 78.9370767858244. The nearest sampled Outer Ring Road interchange is listed at approximately 31.8 km; this is a supplied distance estimate, not a travel-time claim.
- The layout proceedings state that roads are to be opened for access to neighbouring sites and prohibit a compound wall that would obstruct that access. No specific approach-road name, public-transport route, or additional landmark distance is established in the supplied project record.
9. Developer & development status
The registered legal promoter is SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS, identified as a Partnership, with GSTIN 36ADHFS2353N1ZN. The RERA filing identifies RACHAMALLA VENKATESHWARLU as an authorized signatory.
The RERA certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500060”; a complete street address and official contact details are not supplied in the certificate extract.
The promoter’s Form B, signed by VENKATESHWARLU RACHUMALLA on 16.07.2025, declares a completion deadline of 07/09/2025. The project filing records 80% completeness, but no independent site-progress inspection or completion certificate is provided.
10. Approvals, official records & documents
TG-RERA registration: Form C records TEMPLE TOWN, registration P02000010182, validity 07/09/2022–07/09/2025, and no extension recorded in the certificate.
Layout proceedings: Municipal proceedings approve Draft TLP.No.05/2020/YTDA for a draft layout on Sy.No.124/P and 129/P, dated 07.09.2022, and state conditions for development and final layout release.
DTCP layout communications: DTCP communications refer to revised draft layout/TLP material, including 05/2020/YTDA and Lr.Roc.No.1770/2017/YTDA.
Mortgage document: The filed title material describes mortgage deed 10686/2018, covering specified layout plots in favour of YTDA as security for development works.
Promoter declaration: Form B affidavit dated 16.07.2025 records the promoter’s title and encumbrance declarations and completion undertaking.
Occupancy/completion certificate: No occupancy or completion certificate is present in the supplied evidence.
Layout plan / final-release evidence: A complete stamped final layout plan or evidence establishing final layout release is not available in the supplied extracts.
Frequently asked questions
Is TEMPLE TOWN registered with Telangana RERA?
Yes. TEMPLE TOWN is registered with the Telangana Real Estate Regulatory Authority as P02000010182; the registration status is New Project.
Who is the developer of TEMPLE TOWN?
The promoter named in the RERA registration is SRI LAXMI NARASIMHA SWAMY INFRA PROJECTS.
Where is TEMPLE TOWN located?
TEMPLE TOWN is in YADAGIRIPALLI, Yadagirpalli, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508115).
When will TEMPLE TOWN be completed?
The promoter's proposed date of completion filed with RERA is 07/09/2025. This is the promoter's declaration, not a guarantee.