Silversand Cyberdyne 3
Silversand Infratech Private Limited · Rangareddy · RERA P02400000074
Silversand Cyberdyne 3 is a residential apartment project in HITEX, Serilingampally, Ranga Reddy, developed by the registered promoter Silversand Infratech Private Limited. The project occupies 519.76 m² and comprises one residential building, Building A, with a stilt and 5 floors. The TG-RERA inventory records 10 3BHK apartments, with a saleable area of 124.35 m². Its TG-RERA registration is P02400000074, and its proposed completion date is 26/03/2023.
More from Silversand Infratech Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | Silversand Cyberdyne 3 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for Silversand Cyberdyne 3 |
| TG-RERA registration | P02400000074; registered from 13/12/2018 to 26/03/2023. The certificate states four years’ validity and does not record an extension |
| Registered promoter | Silversand Infratech Private Limited |
| RERA status | Portal record labels the project “On-Going Project”; the registration’s stated validity ended 26/03/2023 RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | HITEX RERA record RERA filing |
| Revenue village | Kannamet; the building-permit and title documents also spell it Khanammet/Khanamet RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record |
| Project survey number(s) and subdivision(s) | Survey No. 41/5; the RERA certificate describes the site as H.No. 2-41/5/A/1 (PART), ON PLOT Nos. 8 (PART) & 9. No further survey subdivision is stated in the project identity record |
| Site area | 519.76 m² total and 519.76 m² net; road-affected area recorded as 0 RERA filing |
| Boundaries recorded by RERA | East: 30 Feet Road; West, North and South: Neighbours Land RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Approval No. 1/C12/02715/2017, dated 26 March, 2017; the permit also identifies file No. 1/C12/05092/2016 Approvals record |
| Approved building | Building A, residential; sanctioned configuration Stilt + 5 floors |
| Approved area figures | Sanctioned parameters list 1,247.15 m² for five residential upper floors and 238.88 m² for the stilt. RERA records approved built-up area as 1,247.15 m²; these are differently labelled figures in the supplied records RERA filing |
| Building / block count | One building / block recorded RERA filing RERA unit table |
| Parking levels and provision | Permit says the cellar and stilt approved for parking are to be used exclusively for vehicle parking; a parking count is not supplied |
| Unit count | GHMC permit says sanctioned units must not be increased without prior approval, but the permit extraction does not state a numerical count. RERA records 1 proposed building unit; the unit inventory records 10 apartments RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units, 9 booked and 1 available in the portal inventory. The portal record provides no inventory as-of date, so counts are indicative RERA unit table |
| RERA-filed saleable area | 124.35 m² RERA unit table |
| Construction stage | RERA labels the project “On-Going Project” and records 90% completeness; this is a portal/declaration record, not independent site verification RERA record |
| Completion dates | Original and revised proposed completion dates are both 26/03/2023 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project evidence. The building permit states an occupancy certificate is compulsory before occupation |
2. The project story
Silversand Cyberdyne 3 is registered as a residential apartment development on Survey No. 41/5, at the recorded H.No. 2-41/5/A/1 (PART), Plot Nos. 8 (PART) and 9 site in Kannamet, Serilingampally, Ranga Reddy District. The RERA record identifies one building and a 3BHK offering; its unit inventory lists ten apartments, with nine booked and one available when last read, although no inventory as-of date is given. RERA record RERA unit table
GHMC’s building permit describes one residential Building A with a stilt and five upper floors. The RERA portal states 90% completeness and “On-Going Project,” while the promoter’s Form B declaration undertook completion by 26 March 2023. These are recorded statements, not an independent inspection of construction. No occupancy or completion certificate is present in the supplied evidence. RERA record
3. Master plan, architecture & building design
The filed project and permit identify a 519.76 m² site in Survey No. 41/5 and a single residential building, Building A. The permit specifies Stilt + 5 floors, a building height of 14.99 m, five residential upper floors totalling 1,247.15 m², and a stilt area of 238.88 m². The RERA filing labels 1,247.15 m² as approved built-up area. No floor-by-floor apartment count, building footprint, lift/stair arrangement, internal circulation plan, or project-wide residential/common-area schedule is available in the supplied drawing records. RERA filing RERA filing
The GHMC permit identifies a layout/subdivision reference LRS/765/NEW/CR-12/West Zone/GHMC/2013 and includes a condition for a fenced tot-lot maintained as greenery. The permit extraction states “Tot-lot (m2) 0” in its sanctioned parameters, so it does not establish a tot-lot area. No approved-layout drawing or detailed site plan is available here to describe landscaping, open-space distribution, or vehicle and pedestrian routes.
4. Homes, configurations & floor plans
The TG-RERA inventory records ten 3BHK apartments, nine booked and one available, with filed saleable area of 124.35 m². The booking counts have no supplied as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 9 | 1 | 124.35 m² | Software-measured median 93.6 m²; range 91.0–97.2 m² | 25% RERA unit table RERA unit details Floor plans |
The carpet-area figures are software measurements from drawing geometry, not RERA-filed areas, and the drawing review notes that they need review. The RERA-filed saleable area is a separate measure and includes the home’s share of common areas; the two figures should not be treated as interchangeable. RERA unit details Floor plans
One drawing sheet is measured and one is pending scanning. A measured typical-floor-plan example labels three bedrooms, living/dining, kitchen, two toilets and two utility areas. The cited room measurements are drawing-derived for that example, not RERA disclosures; utility areas are identified separately from the measured carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not give a parking-space count, and the project records do not establish resident, visitor or accessible-space allocations, parking ownership/allotment by apartment, EV charging, ramp arrangements or pedestrian separation. A vendor record lists covered and open parking, but provides no quantities or unit-allocation documentation. Promoter website
6. Amenities, recreation & open spaces
The following progress figures are RERA-portal declarations; they are not independently verified completion findings. The portal records 14 infrastructure/amenity categories, but does not provide facility dimensions or capacities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or facility size stated here | RERA amenity record RERA amenities | YES; 100% declared |
| Sewerage | Record groups chambers, lines, septic tank and STP; no component-specific details or capacity supplied | RERA amenity record RERA amenities | YES; 100% declared |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | RERA amenity record RERA amenities | YES; 100% declared |
| Green strip / tot-lot / park | GHMC permit also conditions maintenance of a fenced tot-lot; no area established | RERA amenity record RERA amenities | YES; 100% declared |
| Solid waste management and disposal | No system details or capacity supplied | RERA amenity record RERA amenities | YES; 100% declared |
| Water conservation / rainwater harvesting | GHMC permit requires a rainwater-harvesting structure (percolation pit) | RERA amenity record RERA amenities | YES; 100% declared |
| Fire protection and fire-safety requirements | No system specifications supplied | RERA amenity record RERA amenities | YES; 100% declared |
| Electrical meter room, sub-station or receiving station | No capacity or equipment details supplied | RERA amenity record RERA amenities | YES; 100% declared |
| Internal roads and footpaths | No dimensions or layout details supplied | RERA amenity record RERA amenities | 0% recorded |
| Storm-water drains | No dimensions or system details supplied | RERA amenity record RERA amenities | 0% recorded |
| Street lighting | Details not supplied | RERA amenity record RERA amenities | 0% recorded |
| Community buildings | Details not supplied | RERA amenity record RERA amenities | 0% recorded |
| Energy management | Details not supplied | RERA amenity record RERA amenities | 0% recorded |
| Aggregate recreational open space | Area not supplied | RERA amenity record RERA amenities | 0% recorded |
The GHMC permit extraction also identifies a requirement for 25 trees and refers to greenery around the site. The supplied records do not establish completion of that condition.
7. Utilities, building services & safety
GHMC’s permit requires a rainwater-harvesting percolation pit, a garbage house within the premises, space for a transformer, and an ETP in accordance with standard specifications. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are permit conditions; the supplied material does not provide capacities, detailed system designs, or independent confirmation of installation.
The RERA amenity record declares water supply, sewerage, sewage/sullage treatment, solid-waste management, rainwater harvesting, fire-safety requirements and an electrical meter room/sub-station/receiving station at 100%. It does not specify water sources or storage, STP/ETP capacity, reuse, storm-water arrangements, power backup, lift count or capacity, fire equipment, CCTV, security, or accessible circulation. A vendor record advertises separate municipal and bore-well water tanks, a six-passenger lift, 100% generator backup and CCTV/security, but these are vendor claims, not project-specific completion evidence. RERA amenities Promoter website
The building permit makes an occupancy certificate compulsory before occupation and says public water and electricity connections will be provided only on production of an occupancy certificate. See the occupancy-certificate status above.
8. Location, access & connectivity
The registered project location is HITEX, Kannamet, Serilingampally, Ranga Reddy District, Telangana 500084. The site record gives a 30 Feet Road boundary to the east. RERA record RERA filing
The supplied location record lists these mapped distances: medical clinic and school, 0.1 km each; unnamed park, 0.3 km; HITEC City railway station, 0.7 km; Andhra Bank, 0.8 km; Divyasree Omega, 1.2 km; KLH University GBS, 1.3 km; Night Bazar, 1.5 km; Kondapur Bus Depot, 1.6 km; and HITEC City metro, 2.1 km. These are supplied location-record distances; no travel times are provided. Location record
9. Developer & development status
The registered promoter is Silversand Infratech Private Limited, a company. The corporate identifier in the supplied entity record is U45200TG2008 PTC060892. The recorded promoter address is Silversand Cyberdyne 1, Flat No. 102, H.No. 2-41/5/A/3, Plot Nos. 5 & 6, HITEX/Khanamet, Serilingampally, Ranga Reddy, Telangana 500084. Corporate record Parties record
The promoter’s Form B affidavit, dated 21 November 2018, was made by Managing Director Mr. R. Srinivasa Reddy and undertook completion by 26 March 2023. The project record shows the same original and revised proposed completion date, labels the project ongoing, and records 90% completeness; no independent construction-progress inspection or occupancy/completion certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for Silversand Cyberdyne 3, registration P02400000074, issued 13/12/2018, valid through 26/03/2023; certificate states no extension |
| GHMC building permit | Building Permit Order dated 26 March, 2017, approval No. 1/C12/02715/2017, file No. 1/C12/05092/2016, for Building A, Stilt + 5 floors, Survey No. 41/5 |
| Layout / subdivision reference | LRS/765/NEW/CR-12/West Zone/GHMC/2013, quoted in the building permit; the supplied evidence does not include a separate approved-layout drawing |
| Promoter declaration | Form B affidavit dated 21 November 2018, including the promoter’s completion undertaking and other registration declarations |
| Agreement material | Filed agreement text refers to a permit and sanctioned plan, but that extracted text does not identify the approval number or include the approval instrument |
| Occupancy/completion certificate | Not identified in the supplied project documents Document index |
The permit lists conditions concerning commencement and completion notices, parking use, rainwater harvesting, greenery, transformer space, garbage storage, ETP, fire and structural safety, and the requirement to obtain an occupancy certificate before occupation.
1. Project at a glance
Project identity
Registered project name: Silversand Cyberdyne 3
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for Silversand Cyberdyne 3
TG-RERA registration: P02400000074; registered from 13/12/2018 to 26/03/2023. The certificate states four years’ validity and does not record an extension
Registered promoter: Silversand Infratech Private Limited
RERA status: Portal record labels the project “On-Going Project”; the registration’s stated validity ended 26/03/2023
Land and geographic identity
Locality: HITEX
Revenue village: Kannamet; the building-permit and title documents also spell it Khanammet/Khanamet
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Project survey number(s) and subdivision(s): Survey No. 41/5; the RERA certificate describes the site as H.No. 2-41/5/A/1 (PART), ON PLOT Nos. 8 (PART) & 9. No further survey subdivision is stated in the project identity record
Site area: 519.76 m² total and 519.76 m² net; road-affected area recorded as 0
Boundaries recorded by RERA: East: 30 Feet Road; West, North and South: Neighbours Land
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Approval No. 1/C12/02715/2017, dated 26 March, 2017; the permit also identifies file No. 1/C12/05092/2016
Approved building: Building A, residential; sanctioned configuration Stilt + 5 floors
Approved area figures: Sanctioned parameters list 1,247.15 m² for five residential upper floors and 238.88 m² for the stilt. RERA records approved built-up area as 1,247.15 m²; these are differently labelled figures in the supplied records
Building / block count: One building / block recorded
Parking levels and provision: Permit says the cellar and stilt approved for parking are to be used exclusively for vehicle parking; a parking count is not supplied
Unit count: GHMC permit says sanctioned units must not be increased without prior approval, but the permit extraction does not state a numerical count. RERA records 1 proposed building unit; the unit inventory records 10 apartments
Offering and status
RERA-filed configuration: 3BHK; 10 units, 9 booked and 1 available in the portal inventory. The portal record provides no inventory as-of date, so counts are indicative
RERA-filed saleable area: 124.35 m²
Construction stage: RERA labels the project “On-Going Project” and records 90% completeness; this is a portal/declaration record, not independent site verification
Completion dates: Original and revised proposed completion dates are both 26/03/2023
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project evidence. The building permit states an occupancy certificate is compulsory before occupation
2. The project story
Silversand Cyberdyne 3 is registered as a residential apartment development on Survey No. 41/5, at the recorded H.No. 2-41/5/A/1 (PART), Plot Nos. 8 (PART) and 9 site in Kannamet, Serilingampally, Ranga Reddy District. The RERA record identifies one building and a 3BHK offering; its unit inventory lists ten apartments, with nine booked and one available when last read, although no inventory as-of date is given.
GHMC’s building permit describes one residential Building A with a stilt and five upper floors. The RERA portal states 90% completeness and “On-Going Project,” while the promoter’s Form B declaration undertook completion by 26 March 2023. These are recorded statements, not an independent inspection of construction. No occupancy or completion certificate is present in the supplied evidence.
3. Master plan, architecture & building design
The filed project and permit identify a 519.76 m² site in Survey No. 41/5 and a single residential building, Building A. The permit specifies Stilt + 5 floors, a building height of 14.99 m, five residential upper floors totalling 1,247.15 m², and a stilt area of 238.88 m². The RERA filing labels 1,247.15 m² as approved built-up area. No floor-by-floor apartment count, building footprint, lift/stair arrangement, internal circulation plan, or project-wide residential/common-area schedule is available in the supplied drawing records.
The GHMC permit identifies a layout/subdivision reference LRS/765/NEW/CR-12/West Zone/GHMC/2013 and includes a condition for a fenced tot-lot maintained as greenery. The permit extraction states “Tot-lot (m2) 0” in its sanctioned parameters, so it does not establish a tot-lot area. No approved-layout drawing or detailed site plan is available here to describe landscaping, open-space distribution, or vehicle and pedestrian routes.
4. Homes, configurations & floor plans
The TG-RERA inventory records ten 3BHK apartments, nine booked and one available, with filed saleable area of 124.35 m². The booking counts have no supplied as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 9 | 1 | 124.35 m² | Software-measured median 93.6 m²; range 91.0–97.2 m² | 25% |
The carpet-area figures are software measurements from drawing geometry, not RERA-filed areas, and the drawing review notes that they need review. The RERA-filed saleable area is a separate measure and includes the home’s share of common areas; the two figures should not be treated as interchangeable.
One drawing sheet is measured and one is pending scanning. A measured typical-floor-plan example labels three bedrooms, living/dining, kitchen, two toilets and two utility areas. The cited room measurements are drawing-derived for that example, not RERA disclosures; utility areas are identified separately from the measured carpet area.
5. Parking & vehicle circulation
The GHMC permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not give a parking-space count, and the project records do not establish resident, visitor or accessible-space allocations, parking ownership/allotment by apartment, EV charging, ramp arrangements or pedestrian separation. A vendor record lists covered and open parking, but provides no quantities or unit-allocation documentation.
6. Amenities, recreation & open spaces
The following progress figures are RERA-portal declarations; they are not independently verified completion findings. The portal records 14 infrastructure/amenity categories, but does not provide facility dimensions or capacities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage capacity or facility size stated here | RERA amenity record | YES; 100% declared |
| Sewerage | Record groups chambers, lines, septic tank and STP; no component-specific details or capacity supplied | RERA amenity record | YES; 100% declared |
| Treatment and disposal of sewage and sullage water | No process or capacity supplied | RERA amenity record | YES; 100% declared |
| Green strip / tot-lot / park | GHMC permit also conditions maintenance of a fenced tot-lot; no area established | RERA amenity record | YES; 100% declared |
| Solid waste management and disposal | No system details or capacity supplied | RERA amenity record | YES; 100% declared |
| Water conservation / rainwater harvesting | GHMC permit requires a rainwater-harvesting structure (percolation pit) | RERA amenity record | YES; 100% declared |
| Fire protection and fire-safety requirements | No system specifications supplied | RERA amenity record | YES; 100% declared |
| Electrical meter room, sub-station or receiving station | No capacity or equipment details supplied | RERA amenity record | YES; 100% declared |
| Internal roads and footpaths | No dimensions or layout details supplied | RERA amenity record | 0% recorded |
| Storm-water drains | No dimensions or system details supplied | RERA amenity record | 0% recorded |
| Street lighting | Details not supplied | RERA amenity record | 0% recorded |
| Community buildings | Details not supplied | RERA amenity record | 0% recorded |
| Energy management | Details not supplied | RERA amenity record | 0% recorded |
| Aggregate recreational open space | Area not supplied | RERA amenity record | 0% recorded |
The GHMC permit extraction also identifies a requirement for 25 trees and refers to greenery around the site. The supplied records do not establish completion of that condition.
7. Utilities, building services & safety
GHMC’s permit requires a rainwater-harvesting percolation pit, a garbage house within the premises, space for a transformer, and an ETP in accordance with standard specifications. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are permit conditions; the supplied material does not provide capacities, detailed system designs, or independent confirmation of installation.
The RERA amenity record declares water supply, sewerage, sewage/sullage treatment, solid-waste management, rainwater harvesting, fire-safety requirements and an electrical meter room/sub-station/receiving station at 100%. It does not specify water sources or storage, STP/ETP capacity, reuse, storm-water arrangements, power backup, lift count or capacity, fire equipment, CCTV, security, or accessible circulation. A vendor record advertises separate municipal and bore-well water tanks, a six-passenger lift, 100% generator backup and CCTV/security, but these are vendor claims, not project-specific completion evidence.
The building permit makes an occupancy certificate compulsory before occupation and says public water and electricity connections will be provided only on production of an occupancy certificate. See the occupancy-certificate status above.
8. Location, access & connectivity
The registered project location is HITEX, Kannamet, Serilingampally, Ranga Reddy District, Telangana 500084. The site record gives a 30 Feet Road boundary to the east.
The supplied location record lists these mapped distances: medical clinic and school, 0.1 km each; unnamed park, 0.3 km; HITEC City railway station, 0.7 km; Andhra Bank, 0.8 km; Divyasree Omega, 1.2 km; KLH University GBS, 1.3 km; Night Bazar, 1.5 km; Kondapur Bus Depot, 1.6 km; and HITEC City metro, 2.1 km. These are supplied location-record distances; no travel times are provided.
9. Developer & development status
The registered promoter is Silversand Infratech Private Limited, a company. The corporate identifier in the supplied entity record is U45200TG2008 PTC060892. The recorded promoter address is Silversand Cyberdyne 1, Flat No. 102, H.No. 2-41/5/A/3, Plot Nos. 5 & 6, HITEX/Khanamet, Serilingampally, Ranga Reddy, Telangana 500084.
The promoter’s Form B affidavit, dated 21 November 2018, was made by Managing Director Mr. R. Srinivasa Reddy and undertook completion by 26 March 2023. The project record shows the same original and revised proposed completion date, labels the project ongoing, and records 90% completeness; no independent construction-progress inspection or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for Silversand Cyberdyne 3, registration P02400000074, issued 13/12/2018, valid through 26/03/2023; certificate states no extension
GHMC building permit: Building Permit Order dated 26 March, 2017, approval No. 1/C12/02715/2017, file No. 1/C12/05092/2016, for Building A, Stilt + 5 floors, Survey No. 41/5
Layout / subdivision reference: LRS/765/NEW/CR-12/West Zone/GHMC/2013, quoted in the building permit; the supplied evidence does not include a separate approved-layout drawing
Promoter declaration: Form B affidavit dated 21 November 2018, including the promoter’s completion undertaking and other registration declarations
Agreement material: Filed agreement text refers to a permit and sanctioned plan, but that extracted text does not identify the approval number or include the approval instrument
Occupancy/completion certificate: Not identified in the supplied project documents
The permit lists conditions concerning commencement and completion notices, parking use, rainwater harvesting, greenery, transformer space, garbage storage, ETP, fire and structural safety, and the requirement to obtain an occupancy certificate before occupation.
Frequently asked questions
Is Silversand Cyberdyne 3 registered with Telangana RERA?
Yes. Silversand Cyberdyne 3 is registered with the Telangana Real Estate Regulatory Authority as P02400000074; the registration status is On-Going Project.
Who is the developer of Silversand Cyberdyne 3?
The promoter named in the RERA registration is Silversand Infratech Private Limited.
Where is Silversand Cyberdyne 3 located?
Silversand Cyberdyne 3 is in HITEX, Kannamet, Serilingampally, Rangareddy, Telangana (500084).
When will Silversand Cyberdyne 3 be completed?
The promoter's proposed date of completion filed with RERA is 26/03/2023. This is the promoter's declaration, not a guarantee.
More projects in Kannamet