RV ADVAITA Block B
R.V. Constructions · Medchal-Malkajgiri · RERA P02200000451
RV ADVAITA Block B is a residential apartment project in Anjaneya Nagar, Habeeb Nagar, Kukatpally mandal, Medchal-Malkajgiri district, developed by the registered promoter R.V. Constructions, recorded as a partnership. The project covers 868.04 sq. m and comprises one building with 15 three-bedroom apartments, each with a RERA-filed saleable area of 170.0 sq. m. It is registered under TG-RERA number P02200000451, and its proposed completion date is 19/08/2019.
More from R.V. Constructions · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | RV ADVAITA Block B RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Block B is the registered project name; a separate phase identifier is not disclosed. RERA record |
| TG-RERA registration | P02200000451, registered 12/03/2019; certificate records validity through 19/08/2019. RERA record |
| Registered promoter | R.V. Constructions, recorded as a partnership. RERA record RERA filing |
| RERA status | Recorded as an On-Going Project. The certificate’s stated validity end date is separate from the project’s completion deadline and occupancy-certificate status. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Anjaneya Nagar; the RERA certificate identifies the locality as Habeeb Nagar, Kukatpally. RERA record RERA filing |
| Revenue village | Habeeb Nagar is recorded in the project identity and land details. The title report also uses spellings including Kukatpally/Kukotpolly; see the title record for its source readings. RERA record Land records |
| Mandal / district | Kukatpally mandal; Medchal-Malkajgiri district. RERA record RERA filing |
| PIN | 500072 in the project record and TG-RERA certificate. RERA record |
| Project survey numbers | 631 and 644. The supplied records do not identify project subdivisions. RERA record Land records |
| Plot / site identifier | BIT -2 in the TG-RERA certificate. |
| Registered site extent | 868.04 sq. m recorded as both total and net area in the RERA land details. RERA filing Land records |
| Boundaries | East: 30 Feet Wide Road; West: 30 Feet Wide Road; North and South: part of land in Survey Nos. 631 and 644. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal approval | Building permission approval number recorded as r/cL4/05577 /2018; filed plan approval number: 1/C14/05577/2018. Approvals record |
| Approval date | The extracted sanction records “l0 March, 2018”; the project-information fields record 30/03/2018. The extracted sanction date is unclear in the supplied text. RERA filing |
| Approved built-up area | The sanction extraction contains “Proposed Covered builtup area: 33,680.0( m2”; this figure is visibly garbled and cannot be reliably read from the supplied extraction. The RERA project fields separately record 2,130.4 sq. m approved built-up area. RERA filing |
| Building arrangement | One building/unit is recorded in the project land details; the filed unit schedule records 15 apartments. RERA filing RERA unit table |
| Sanctioned floor configuration | Sanction extraction describes Cellar + Ground + 4, with “2 proposed additional floors over the existing Ground + 3 upper Floor.” It also records a cellar parking floor. The precise sanctioned floor schedule should be checked against the actual stamped plan. |
| Parking / mortgage area | The sanction describes the cellar and stilts as approved for parking. RERA records a mortgage area of 217.45 sq. m; the supplied records do not establish parking-space counts or unit allocations. RERA filing |
| Unit counts | The sanctioned document states that sanctioned unit numbers must not be increased, but its extracted unit count is not supplied. The RERA filing records 15 apartments. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | TRIPLE BEDROOM (normalised as 3BHK), 15 units. RERA unit table RERA unit details |
| Filed saleable area | 170.0 sq. m per unit in the RERA filing. RERA unit table RERA unit details |
| Booked / available | 5 booked; 10 available, as read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | Project is labelled On-Going in the project record. A portal progress field records 90% completeness, but no independent site verification is supplied. RERA record RERA filing |
| Completion dates | Original and revised proposed completion dates are both 19/08/2019 in the project record. RERA record RERA filing |
| Occupancy / completion certificate | The supplied sanction extraction states that an occupancy certificate is compulsory before occupation and that completion notice must be submitted. It records completion_certified: false; no occupancy or completion certificate is supplied in this evidence pack. The available status is project/building-wide; no separate tower-wise certificate status is provided. Approvals record |
2. The project story
RV ADVAITA Block B is a residential apartment project registered with TG-RERA under P02200000451. The registered site is identified in Habeeb Nagar, Kukatpally mandal, Medchal-Malkajgiri district, covering Survey Nos. 631 and 644, at a recorded extent of 868.04 sq. m. The building permission material identifies GHMC as the sanctioning authority and describes a cellar, ground and upper floors. RERA record Land records
The RERA filing records one building and 15 three-bedroom apartments. Its portal-derived status lists 5 booked and 10 available, with no as-of date attached to those counts. The project is recorded as ongoing, and a supplied portal progress field states 90% completeness; that is a recorded progress figure, not an independent site inspection. The supplied documents do not establish that the building has received an occupancy or completion certificate. RERA filing RERA unit table RERA record
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 868.04 sq. m. The project fields list 2,130.4 sq. m as approved built-up area, while the extracted GHMC sanction text’s proposed covered built-up-area figure is corrupted (“33,680.0( m2”) and cannot be confidently interpreted. These are not treated as interchangeable area measures. No verified FSI-counted area, carpet area, floor-by-floor area schedule or building footprint is supplied. RERA filing RERA filing
The project record lists one building and 15 RERA-filed apartments. The sanction extraction describes Cellar + Ground + 4, including two proposed additional floors over an existing Ground + 3 upper-floor configuration. The exact approved floor arrangement should be confirmed from the stamped plan; the extracted sanction text is not a substitute for the plan drawing. RERA filing RERA unit table
The sanction extraction also refers to a tot-lot, a peripheral greenery strip, rainwater harvesting, transformer space, a garbage house and an ETP. It does not provide a complete architectural drawing set in the supplied material. The two floor-plan drawings on record are scans pending measurement; no drawing-based room, circulation, lift, stair or flat-per-floor measurements are available. Floor plans RERA amenities
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as “TRIPLE BEDROOM”) | 15 | 5 | 10 | 170.0 sq. m | Not available | Not supplied |
The configuration, counts, bookings and saleable area above are from the TG-RERA filing; booked/available counts are indicative because the portal record has no as-of date. Saleable area is the filed figure and should not be read as carpet area. The supplied floor-plan record contains two scans pending measurement, so no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC sanction extraction says the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It also records a cellar parking floor. No sanctioned parking-space count, visitor or accessible-space count, parking allocation by apartment, or EV-charging provision is established in the supplied record. A drawn or sanctioned parking area does not by itself establish exclusive ownership or an allotment to a particular unit.
The sanction refers to a site bordered by 30 Feet Wide Roads on its east and west sides in the RERA land details. The extracted approval also refers to an 18 mt. road width, but the supplied text does not establish the precise road segment or its relationship to each boundary. No ramp dimensions, driveway layout or vehicle entry/exit arrangement is available for review. RERA filing
6. Amenities, recreation & open spaces
| Description / size | Sanction extraction records a tot-lot of 14.14 sq. m (the extracted figure is textually imperfect) and requires it to be fenced and maintained as greenery before occupancy certificate. It also refers to a peripheral greenery strip. |
|---|---|
| Evidence source | GHMC sanction extraction |
| Declared progress / verified status | Required by the sanction conditions; completion is not established. |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Recorded at 0%; independent completion verification not supplied. RERA amenities |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Recorded at 0%; no specific building or size is supplied. RERA amenities |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Marked available “YES” and recorded at 0%; size and completion are not established. RERA amenities |
The third-party vendor list mentions additional recreational and indoor facilities, but these are not supported as TG-RERA-filed or sanctioned facilities in the supplied project documents and are not presented as confirmed project amenities. Promoter website
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks water supply “YES” and reports 50% progress. |
|---|---|
| Status / limitation | Source, storage, treatment and independent operating status are not supplied. RERA amenities |
| Evidence in the project record | RERA lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. The GHMC sanction extraction requires an ETP. |
|---|---|
| Status / limitation | RERA progress is recorded at 0%; no plant capacity, design or completion evidence is supplied. RERA amenities |
| Evidence in the project record | Storm-water drains are listed; rainwater harvesting is marked “YES.” The sanction requires a rainwater-harvesting percolation pit and records one RWHPS. |
|---|---|
| Status / limitation | Progress for the listed works is 0%; completion is not independently verified. RERA amenities |
| Evidence in the project record | The sanction requires transformer space; the RERA record lists an electrical meter room/sub-station/receiving station and marks it “YES.” |
|---|---|
| Status / limitation | No capacity or completion evidence is supplied. RERA amenities |
| Evidence in the project record | RERA lists fire protection and fire-safety requirements and marks them “YES.” |
|---|---|
| Status / limitation | No fire-system specification, clearance, test certificate or completion verification is supplied. RERA amenities |
| Evidence in the project record | The RERA amenity record lists solid-waste management and disposal. The sanction extraction identifies a garbage house. |
|---|---|
| Status / limitation | Progress is recorded at 0%; operating arrangements are not supplied. RERA amenities |
| Evidence in the project record | Listed and marked “YES” in the RERA amenity record. |
|---|---|
| Status / limitation | Specific equipment or completion evidence is not supplied. RERA amenities |
| Evidence in the project record | No project-specific RERA or sanction evidence establishing lift count/capacity, backup power, CCTV, access-control systems or accessible routes is supplied. |
|---|---|
| Status / limitation | Not established in the available records. Document index RERA amenities |
8. Location, access & connectivity
The registered project location is Anjaneya Nagar, with the RERA certificate identifying Habeeb Nagar, Kukatpally, in Medchal-Malkajgiri district, PIN 500072. The project land record gives east and west boundaries as 30 Feet Wide Roads. A geocoded location record places the site in Habeeb Nagar, Ward 115, Balaji Nagar, GHMC West Zone, Hyderabad, Kukatpally mandal; it supplies coordinates of 17.4743995, 78.4173741. RERA record RERA filing Location record
The supplied location record lists these distances: Clear Sight Eye Clinic 0.4 km; Yurani Fashion 0.4 km; nearest metro/Balanagar Metro 0.6 km; S.M. Model School 0.6 km; Government Degree College 0.8 km; Prashanth Nagar bus stop 0.9 km; Lampex Electronics Limited 0.9 km; Kotak Mahindra Bank 1.0 km; and Bharath Nagar railway station 1.9 km. These are listed distances; no travel times or independent route measurements are supplied. Location record
9. Developer & development status
The registered promoter is R.V. Constructions, identified in the RERA organization record as a partnership. The RERA project record names SASHIDHAR GOVINDARAJU as authorized signatory; the filed Form B declaration names Mr. G.SASHIDAR as an authorized partner/signatory. The evidence does not supply a corporate registration identifier or a verified registered office/contact record sufficient to report further corporate details. RERA record RERA filing Parties record
In the Form B declaration dated 16 November 2018, the promoter undertook to complete the project within 36 months and declared that landowners held title and an agreement for development was enclosed. These are promoter declarations in the registration material. The project record separately lists original and revised proposed completion as 19/08/2019. The RERA registration certificate records validity through 19/08/2019; it is not itself a completion certificate or evidence of an extension. RERA record
The project record reports 90% completeness, but no dated independent site inspection is supplied. No occupancy or completion certificate is included in the available evidence; the GHMC sanction requires an occupancy certificate before occupation. RERA filing Approvals record
10. Approvals, official records & documents
| Authority / date | Telangana State Real Estate Regulatory Authority; issued 12/03/2019 |
|---|---|
| What the supplied record establishes | Registers RV ADVAITA Block B, registration P02200000451, for Survey Nos. 631 and 644; certificate states validity through 19/08/2019. |
| Authority / date | GHMC; extracted approval date shown as “l0 March, 2018” |
|---|---|
| What the supplied record establishes | Sanction material for R.V. Constructions at Habeeb Nagar, Survey Nos. 631 and 644; approval number recorded as r/cL4/05577 /2018 and file number t/Ho/13216/2017. |
| Authority / date | GHMC, as recorded in the RERA project fields |
|---|---|
| What the supplied record establishes | Plan approval number 1/C14/05577/2018. The supplied evidence does not include a readable stamped-plan drawing. RERA record Approvals record |
| Authority / date | Dated 16 November 2018 |
|---|---|
| What the supplied record establishes | Promoter’s filed declarations on landowner title/development agreement, encumbrances, project completion undertaking and project-account obligations. |
| Authority / date | Not supplied |
|---|---|
| What the supplied record establishes | The sanction requires an occupancy certificate before occupation; the available extraction records completion as not certified. Approvals record |
| Authority / date | Not supplied as an extracted approved layout |
|---|---|
| What the supplied record establishes | RERA document list includes a layout-plan upload prompt, but the supplied record does not contain a readable approved layout plan. Document index |
| Authority / date | Two scans recorded; neither measured |
|---|---|
| What the supplied record establishes | No drawing-derived unit or room measurements are available from the supplied scans. Floor plans |
1. Project at a glance
Project identity
Registered project name: RV ADVAITA Block B
Project type: Residential apartment project
Phase / registered portion: Block B is the registered project name; a separate phase identifier is not disclosed.
TG-RERA registration: P02200000451, registered 12/03/2019; certificate records validity through 19/08/2019.
Registered promoter: R.V. Constructions, recorded as a partnership.
RERA status: Recorded as an On-Going Project. The certificate’s stated validity end date is separate from the project’s completion deadline and occupancy-certificate status.
Land and geographic identity
Locality: Anjaneya Nagar; the RERA certificate identifies the locality as Habeeb Nagar, Kukatpally.
Revenue village: Habeeb Nagar is recorded in the project identity and land details. The title report also uses spellings including Kukatpally/Kukotpolly; see the title record for its source readings.
Mandal / district: Kukatpally mandal; Medchal-Malkajgiri district.
PIN: 500072 in the project record and TG-RERA certificate.
Project survey numbers: 631 and 644. The supplied records do not identify project subdivisions.
Plot / site identifier: BIT -2 in the TG-RERA certificate.
Registered site extent: 868.04 sq. m recorded as both total and net area in the RERA land details.
Boundaries: East: 30 Feet Wide Road; West: 30 Feet Wide Road; North and South: part of land in Survey Nos. 631 and 644.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal approval: Building permission approval number recorded as r/cL4/05577 /2018; filed plan approval number: 1/C14/05577/2018.
Approval date: The extracted sanction records “l0 March, 2018”; the project-information fields record 30/03/2018. The extracted sanction date is unclear in the supplied text.
Approved built-up area: The sanction extraction contains “Proposed Covered builtup area: 33,680.0( m2”; this figure is visibly garbled and cannot be reliably read from the supplied extraction. The RERA project fields separately record 2,130.4 sq. m approved built-up area.
Building arrangement: One building/unit is recorded in the project land details; the filed unit schedule records 15 apartments.
Sanctioned floor configuration: Sanction extraction describes Cellar + Ground + 4, with “2 proposed additional floors over the existing Ground + 3 upper Floor.” It also records a cellar parking floor. The precise sanctioned floor schedule should be checked against the actual stamped plan.
Parking / mortgage area: The sanction describes the cellar and stilts as approved for parking. RERA records a mortgage area of 217.45 sq. m; the supplied records do not establish parking-space counts or unit allocations.
Unit counts: The sanctioned document states that sanctioned unit numbers must not be increased, but its extracted unit count is not supplied. The RERA filing records 15 apartments.
Offering and status
RERA-filed configuration: TRIPLE BEDROOM (normalised as 3BHK), 15 units.
Filed saleable area: 170.0 sq. m per unit in the RERA filing.
Booked / available: 5 booked; 10 available, as read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Construction stage: Project is labelled On-Going in the project record. A portal progress field records 90% completeness, but no independent site verification is supplied.
Completion dates: Original and revised proposed completion dates are both 19/08/2019 in the project record.
Occupancy / completion certificate: The supplied sanction extraction states that an occupancy certificate is compulsory before occupation and that completion notice must be submitted. It records completion_certified: false; no occupancy or completion certificate is supplied in this evidence pack. The available status is project/building-wide; no separate tower-wise certificate status is provided.
2. The project story
RV ADVAITA Block B is a residential apartment project registered with TG-RERA under P02200000451. The registered site is identified in Habeeb Nagar, Kukatpally mandal, Medchal-Malkajgiri district, covering Survey Nos. 631 and 644, at a recorded extent of 868.04 sq. m. The building permission material identifies GHMC as the sanctioning authority and describes a cellar, ground and upper floors.
The RERA filing records one building and 15 three-bedroom apartments. Its portal-derived status lists 5 booked and 10 available, with no as-of date attached to those counts. The project is recorded as ongoing, and a supplied portal progress field states 90% completeness; that is a recorded progress figure, not an independent site inspection. The supplied documents do not establish that the building has received an occupancy or completion certificate.
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 868.04 sq. m. The project fields list 2,130.4 sq. m as approved built-up area, while the extracted GHMC sanction text’s proposed covered built-up-area figure is corrupted (“33,680.0( m2”) and cannot be confidently interpreted. These are not treated as interchangeable area measures. No verified FSI-counted area, carpet area, floor-by-floor area schedule or building footprint is supplied.
The project record lists one building and 15 RERA-filed apartments. The sanction extraction describes Cellar + Ground + 4, including two proposed additional floors over an existing Ground + 3 upper-floor configuration. The exact approved floor arrangement should be confirmed from the stamped plan; the extracted sanction text is not a substitute for the plan drawing.
The sanction extraction also refers to a tot-lot, a peripheral greenery strip, rainwater harvesting, transformer space, a garbage house and an ETP. It does not provide a complete architectural drawing set in the supplied material. The two floor-plan drawings on record are scans pending measurement; no drawing-based room, circulation, lift, stair or flat-per-floor measurements are available.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as “TRIPLE BEDROOM”) | 15 | 5 | 10 | 170.0 sq. m | Not available | Not supplied |
The configuration, counts, bookings and saleable area above are from the TG-RERA filing; booked/available counts are indicative because the portal record has no as-of date. Saleable area is the filed figure and should not be read as carpet area. The supplied floor-plan record contains two scans pending measurement, so no software-measured carpet area or room dimensions can be reported.
5. Parking & vehicle circulation
The GHMC sanction extraction says the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It also records a cellar parking floor. No sanctioned parking-space count, visitor or accessible-space count, parking allocation by apartment, or EV-charging provision is established in the supplied record. A drawn or sanctioned parking area does not by itself establish exclusive ownership or an allotment to a particular unit.
The sanction refers to a site bordered by 30 Feet Wide Roads on its east and west sides in the RERA land details. The extracted approval also refers to an 18 mt. road width, but the supplied text does not establish the precise road segment or its relationship to each boundary. No ramp dimensions, driveway layout or vehicle entry/exit arrangement is available for review.
6. Amenities, recreation & open spaces
| Description / size | Sanction extraction records a tot-lot of 14.14 sq. m (the extracted figure is textually imperfect) and requires it to be fenced and maintained as greenery before occupancy certificate. It also refers to a peripheral greenery strip. |
|---|---|
| Evidence source | GHMC sanction extraction |
| Declared progress / verified status | Required by the sanction conditions; completion is not established. |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Recorded at 0%; independent completion verification not supplied. |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Recorded at 0%; no specific building or size is supplied. |
| Description / size | Listed in the RERA progress/amenity record. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Marked available “YES” and recorded at 0%; size and completion are not established. |
The third-party vendor list mentions additional recreational and indoor facilities, but these are not supported as TG-RERA-filed or sanctioned facilities in the supplied project documents and are not presented as confirmed project amenities.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks water supply “YES” and reports 50% progress. |
|---|---|
| Status / limitation | Source, storage, treatment and independent operating status are not supplied. |
| Evidence in the project record | RERA lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. The GHMC sanction extraction requires an ETP. |
|---|---|
| Status / limitation | RERA progress is recorded at 0%; no plant capacity, design or completion evidence is supplied. |
| Evidence in the project record | Storm-water drains are listed; rainwater harvesting is marked “YES.” The sanction requires a rainwater-harvesting percolation pit and records one RWHPS. |
|---|---|
| Status / limitation | Progress for the listed works is 0%; completion is not independently verified. |
| Evidence in the project record | The sanction requires transformer space; the RERA record lists an electrical meter room/sub-station/receiving station and marks it “YES.” |
|---|---|
| Status / limitation | No capacity or completion evidence is supplied. |
| Evidence in the project record | RERA lists fire protection and fire-safety requirements and marks them “YES.” |
|---|---|
| Status / limitation | No fire-system specification, clearance, test certificate or completion verification is supplied. |
| Evidence in the project record | The RERA amenity record lists solid-waste management and disposal. The sanction extraction identifies a garbage house. |
|---|---|
| Status / limitation | Progress is recorded at 0%; operating arrangements are not supplied. |
| Evidence in the project record | Listed and marked “YES” in the RERA amenity record. |
|---|---|
| Status / limitation | Specific equipment or completion evidence is not supplied. |
| Evidence in the project record | No project-specific RERA or sanction evidence establishing lift count/capacity, backup power, CCTV, access-control systems or accessible routes is supplied. |
|---|---|
| Status / limitation | Not established in the available records. |
8. Location, access & connectivity
The registered project location is Anjaneya Nagar, with the RERA certificate identifying Habeeb Nagar, Kukatpally, in Medchal-Malkajgiri district, PIN 500072. The project land record gives east and west boundaries as 30 Feet Wide Roads. A geocoded location record places the site in Habeeb Nagar, Ward 115, Balaji Nagar, GHMC West Zone, Hyderabad, Kukatpally mandal; it supplies coordinates of 17.4743995, 78.4173741.
The supplied location record lists these distances: Clear Sight Eye Clinic 0.4 km; Yurani Fashion 0.4 km; nearest metro/Balanagar Metro 0.6 km; S.M. Model School 0.6 km; Government Degree College 0.8 km; Prashanth Nagar bus stop 0.9 km; Lampex Electronics Limited 0.9 km; Kotak Mahindra Bank 1.0 km; and Bharath Nagar railway station 1.9 km. These are listed distances; no travel times or independent route measurements are supplied.
9. Developer & development status
The registered promoter is R.V. Constructions, identified in the RERA organization record as a partnership. The RERA project record names SASHIDHAR GOVINDARAJU as authorized signatory; the filed Form B declaration names Mr. G.SASHIDAR as an authorized partner/signatory. The evidence does not supply a corporate registration identifier or a verified registered office/contact record sufficient to report further corporate details.
In the Form B declaration dated 16 November 2018, the promoter undertook to complete the project within 36 months and declared that landowners held title and an agreement for development was enclosed. These are promoter declarations in the registration material. The project record separately lists original and revised proposed completion as 19/08/2019. The RERA registration certificate records validity through 19/08/2019; it is not itself a completion certificate or evidence of an extension.
The project record reports 90% completeness, but no dated independent site inspection is supplied. No occupancy or completion certificate is included in the available evidence; the GHMC sanction requires an occupancy certificate before occupation.
10. Approvals, official records & documents
| Authority / date | Telangana State Real Estate Regulatory Authority; issued 12/03/2019 |
|---|---|
| What the supplied record establishes | Registers RV ADVAITA Block B, registration P02200000451, for Survey Nos. 631 and 644; certificate states validity through 19/08/2019. |
| Authority / date | GHMC; extracted approval date shown as “l0 March, 2018” |
|---|---|
| What the supplied record establishes | Sanction material for R.V. Constructions at Habeeb Nagar, Survey Nos. 631 and 644; approval number recorded as r/cL4/05577 /2018 and file number t/Ho/13216/2017. |
| Authority / date | GHMC, as recorded in the RERA project fields |
|---|---|
| What the supplied record establishes | Plan approval number 1/C14/05577/2018. The supplied evidence does not include a readable stamped-plan drawing. |
| Authority / date | Dated 16 November 2018 |
|---|---|
| What the supplied record establishes | Promoter’s filed declarations on landowner title/development agreement, encumbrances, project completion undertaking and project-account obligations. |
| Authority / date | Not supplied |
|---|---|
| What the supplied record establishes | The sanction requires an occupancy certificate before occupation; the available extraction records completion as not certified. |
| Authority / date | Not supplied as an extracted approved layout |
|---|---|
| What the supplied record establishes | RERA document list includes a layout-plan upload prompt, but the supplied record does not contain a readable approved layout plan. |
| Authority / date | Two scans recorded; neither measured |
|---|---|
| What the supplied record establishes | No drawing-derived unit or room measurements are available from the supplied scans. |
Other registrations of Rv Advaita
Frequently asked questions
Is RV ADVAITA Block B registered with Telangana RERA?
Yes. RV ADVAITA Block B is registered with the Telangana Real Estate Regulatory Authority as P02200000451; the registration status is On-Going Project.
Who is the developer of RV ADVAITA Block B?
The promoter named in the RERA registration is R.V. Constructions.
Where is RV ADVAITA Block B located?
RV ADVAITA Block B is in Anjaneya Nagar, Habeeb Nagar, Kukatpally, Medchal-Malkajgiri, Telangana (500072).
When will RV ADVAITA Block B be completed?
The promoter's proposed date of completion filed with RERA is 19/08/2019. This is the promoter's declaration, not a guarantee.