jms chaitanya
jms constructions · Rangareddy · RERA P02400001349
jms chaitanya is a residential apartment project in Miiyapur, Serilingampally Mandal, Ranga Reddy District. The registered promoter is Jms Constructions. The project is on 487.84 sqmts of land and comprises one building and one tower, sanctioned as 1 Stilt + 5 upper floors, with 10 3BHK apartments, each with a RERA-filed saleable area of 157.47 sqm. It is registered under TG-RERA number P02400001349, with a proposed completion date of 10th May, 2025.
More from Jms Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | jms chaitanya RERA record |
| Project type / RERA status | Residential apartment project; recorded as a New Project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the project recorded at Plot No. 511-A, Survey No. 44/1 |
| TG-RERA registration | P02400001349 |
| Registration validity | 11/11/2019 to 10/05/2025; the supplied certificate states five years and records no extension |
| Registered promoter | Jms Constructions (project filing also uses “jms constructions” / “JMS CONSTRUCTIONS”) RERA filing |
| Registration status | Registration validity ended on 10/05/2025; no extension is recorded in the supplied certificate. This is separate from the project’s completion undertaking and from occupancy certification. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Miiyapur (also rendered “Miyapur Village” in filed title and approval documents) RERA record Land records |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500049 RERA record RERA filing |
| Survey number(s) and subdivision(s) | Survey No. 44/1; no further subdivision is stated Land records |
| Plot identifier | Plot No. 511-A RERA filing |
| Site extent | RERA land details: total area 487.84 sqmts and net area 487.84 sqmts. GHMC building-permit extraction records a site extent of 487.74 m2. RERA filing |
| Boundaries recorded in RERA filing | North: plot no 495; South: 30 feet road; East: plot no 511-B; West: plot no 510 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Permit No. 1/C21/07471/2019, dated 10 May, 2019; file no. 1/C21/00178/2019 Approvals record |
| Approved building | Building-A, residential; sanctioned as 1 Stilt + 5 upper floors |
| Approved height | 14.95 m |
| Approved built-up area | GHMC permit extraction lists residential upper-floor area 1,356.85 m2 and stilt area 258.98 m2. The RERA filing separately records approved built-up area 1356.83 sqmts. RERA filing |
| Building / tower count | One building and one tower are recorded in the project data RERA filing RERA unit table |
| Parking levels | Stilt is included in the sanctioned configuration. The permit records cellar approved for parking: 0, and parking floors—cellar: 0. The supplied material does not establish the number of parking spaces. |
| Unit count | GHMC permit condition: sanctioned unit count must not be increased without prior GHMC approval. RERA unit records list 10 units; the supplied permit extraction does not state a numerical sanctioned unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 157.47 sqm per recorded unit configuration RERA unit table |
| Booked / available | 0 booked / 10 available as last read from the TG-RERA portal; that record has no as-of date, so counts are indicative. RERA unit table |
| Declared completion date | The RERA Form B undertaking states 10th May, 2025; the GHMC permit also states construction was to be completed before 10 May, 2025. |
| Construction stage | The supplied record gives a RERA-filed completeness figure of 80%, but no dated site inspection or independent construction verification is supplied. RERA record |
| Occupancy / completion certificate | No completion certification is recorded in the supplied GHMC permit extraction, which states that an occupancy certificate is compulsory before occupation. The material supplied does not establish an issued OC. |
2. The project story
JMS Chaitanya is recorded with TG-RERA as a residential apartment project on Plot No. 511-A in Survey No. 44/1, Miiyapur revenue village, Serilingampally Mandal, Ranga Reddy District. The project land is recorded as 487.84 sqmts in the RERA land details, and the GHMC permit extraction describes a residential Building-A on a 487.74 m2 site. RERA record RERA filing
The approved building configuration is one stilt level plus five upper floors. The RERA unit schedule identifies ten 3BHK apartments, with no bookings recorded in the portal snapshot supplied. The project data reports 80% completeness, but this is a recorded progress figure rather than an independently verified site assessment. The supplied documents do not establish completion certification or an occupancy certificate. RERA unit table RERA record
3. Master plan, architecture & building design
The GHMC building permit identifies one residential building, Building-A, sanctioned at 1 Stilt + 5 upper floors, with a recorded height of 14.95 m. It lists a residential upper-floor area of 1,356.85 m2 and stilt area of 258.98 m2. The RERA filing records approved built-up area as 1356.83 sqmts; the figures are reproduced as recorded, without treating them as interchangeable measurement categories. RERA filing
The permit extraction records 0 cellar levels and 0 cellar parking floors. It also lists 20 Trees, a Compound Wall 89.59 RM, and Tot-lot (m2) 0. The permit conditions call for a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued, and for a strip of greenery on the site periphery to be maintained.
The supplied drawing-derived unit information is based on the floor-plan record identified as document 65777. The available project data does not provide a complete, independently reviewed drawing description of building footprint, flat distribution per floor, lifts, stairs, entrances, circulation, internal roads, landscaping layout or phase arrangement. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.47 sqm | Software-measured range: 111.4–121.3 sqm; median 113.7 sqm | 28% |
The unit count, booking figures and saleable area above are TG-RERA filing data; the portal record has no as-of date, so booking and availability figures are indicative. The carpet-area measurements are software-measured from drawing geometry, not RERA-filed measurements, and the drawing measurements are flagged as needing review. RERA unit table Floor plans
The RERA-filed saleable area is distinct from carpet area: the supplied drawing-measurement notes say saleable area also includes the home’s share of common areas. A utility area is shown in the measured flat information, but the supplied record does not provide a separate balcony-area measurement or a verified room schedule for every flat design. Floor plans RERA unit details
The measured first-floor plan panel identifies bedrooms, a living/dining area, a drawing room, a kitchen, toilets and a utility. One listed utility measures 3.28 m2 and is excluded from the measured carpet area. The record reports four measured flat designs and flags all four for review. RERA unit details
5. Parking & vehicle circulation
The GHMC permit extraction states Cellar approved for parking: 0 and lists one stilt level. A permit condition says the cellar and stilts approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied extraction does not establish a parking-space count or unit-wise allocation.
The RERA unit data marks the recorded 3BHK configuration as mortgaged, but does not provide a parking allocation schedule. No supported information is supplied on visitor or accessible spaces, parking ramps, internal driveways, pedestrian separation, mechanical parking or EV charging as a sanctioned or delivered project facility. RERA unit table RERA unit table
6. Amenities, recreation & open spaces
| Description / size | GHMC permit extraction lists Tot-lot (m2) 0; a permit condition requires a fenced tot-lot maintained as greenery before OC. |
|---|---|
| Declared progress / verified status | Permit condition; delivery status not independently verified. |
| Description / size | Strip of greenery on site periphery required by permit condition; no size supplied. |
|---|---|
| Declared progress / verified status | Permit condition; completion not verified. |
| Description / size | 20 Trees listed in the permit extraction. |
|---|---|
| Declared progress / verified status | Listed in permit data; planting or survival not verified. |
| Description / size | TG-RERA amenities record marks water conservation and rainwater harvesting as “YES”; permit extraction lists a rainwater-harvesting structure (percolation pit). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filed / permit-listed; progress record shows 0%; completion not verified. |
| Description / size | Listed in the TG-RERA amenities record; no size or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress record shows 0%; completion not verified. |
The supplied TG-RERA amenities record contains 14 categories. It marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting and electrical meter room/sub-station/receiving station as “YES”; the listed categories otherwise show 0% progress. No evidence supplied independently verifies any facility as complete. RERA amenities
7. Utilities, building services & safety
The TG-RERA amenities record marks water supply and sewerage as “YES”; it also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and electrical meter room/sub-station/receiving station. The listed progress for these categories is 0%, and the supplied materials do not state capacities, specifications or independent completion verification. RERA amenities
The GHMC permit extraction lists a space for a transformer, garbage house and rainwater-harvesting structure (percolation pit). It also requires an ETP as per standard specification and states that an occupancy certificate is compulsory before occupation. The permit lists the N.B.C. of India, 2005 and fire-related conditions among its references, but the available material does not establish the installed safety systems or statutory completion of those systems.
No supplied project record establishes water source or storage capacity, STP capacity or reuse arrangements, electrical backup capacity, lift count or capacity, fire equipment details, emergency access, waste segregation arrangements, CCTV, security systems, EV charging provision or accessible circulation. RERA amenities
8. Location, access & connectivity
The registered project location is Miiyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on Survey No. 44/1, Plot No. 511-A. The project filing records the southern boundary as a 30 feet road; the GHMC permit extraction separately refers to 18 mt. road widths in a permit condition concerning a site abutting such roads. The supplied material does not provide a verified project-specific approach-road map. RERA record RERA filing
The supplied parcel-centroid connectivity data lists Financial District (Nanakramguda) at 1.2 km, IndusInd Bank at 0.4 km, an unnamed bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, ADP at 0.0 km, South India Shopping Mall at 2.6 km, an unnamed park at 1.2 km, and Nanakramguda Govt primary school at 0.5 km. These are supplied location-record distances; no travel times are provided. Location record
9. Developer & development status
The registered promoter is Jms Constructions, recorded as a partnership in the RERA project data. The RERA filing lists Jagadish Babu Vasireddy as authorized signatory and Mallikarjuna Reddy Allampati as partner. The supplied registration certificate gives the promoter office as Village: Kukatpally, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN: 500072. A separate project address in the RERA filing is Srivani Nilayam, Sardar Patel Nagar, Matrusri Nagar, Miiyapur, Serilingampally, Ranga Reddy, 500049. RERA filing Parties record
The promoter’s Form B declaration undertakes project completion by 10th May, 2025. The project record reports completeness of 80%, without an accompanying independent site verification in the supplied material. The RERA certificate records validity to 10/05/2025 and no extension. No occupancy or completion certificate is established in the supplied project documents. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400001349; issued 11/11/2019 |
|---|---|
| What the supplied material establishes | Form C for jms chaitanya; validity from 11/11/2019 to 10/05/2025; no extension is recorded in the supplied certificate. |
| Identifier / date | Permit 1/C21/07471/2019; 10 May, 2019; file 1/C21/00178/2019 |
|---|---|
| What the supplied material establishes | Building-A on Survey No. 44/1, sanctioned as 1 Stilt + 5 upper floors, subject to permit conditions. |
| Identifier / date | Project declaration by V Jagadish Babu |
|---|---|
| What the supplied material establishes | Promoter declaration concerning the project, separate-account obligations and completion undertaking of 10th May, 2025. |
| Identifier / date | Document 65777 |
|---|---|
| What the supplied material establishes | Floor-plan record used for software measurements; drawing measurements are flagged for review. |
| Identifier / date | Document 67683 |
|---|---|
| What the supplied material establishes | The supplied RERA record identifies a request for layout approval documentation; an extracted approved layout is not provided. Document index |
| Identifier / date | Not established in supplied documents |
|---|---|
| What the supplied material establishes | The GHMC permit states that an occupancy certificate is compulsory before occupation; the supplied permit extraction is not a completion certification. |
1. Project at a glance
Project identity
Registered project name: jms chaitanya
Project type / RERA status: Residential apartment project; recorded as a New Project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the project recorded at Plot No. 511-A, Survey No. 44/1
TG-RERA registration: P02400001349
Registration validity: 11/11/2019 to 10/05/2025; the supplied certificate states five years and records no extension
Registered promoter: Jms Constructions (project filing also uses “jms constructions” / “JMS CONSTRUCTIONS”)
Registration status: Registration validity ended on 10/05/2025; no extension is recorded in the supplied certificate. This is separate from the project’s completion undertaking and from occupancy certification.
Land and geographic identity
Locality / revenue village: Miiyapur (also rendered “Miyapur Village” in filed title and approval documents)
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500049
Survey number(s) and subdivision(s): Survey No. 44/1; no further subdivision is stated
Plot identifier: Plot No. 511-A
Site extent: RERA land details: total area 487.84 sqmts and net area 487.84 sqmts. GHMC building-permit extraction records a site extent of 487.74 m2.
Boundaries recorded in RERA filing: North: plot no 495; South: 30 feet road; East: plot no 511-B; West: plot no 510
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Permit No. 1/C21/07471/2019, dated 10 May, 2019; file no. 1/C21/00178/2019
Approved building: Building-A, residential; sanctioned as 1 Stilt + 5 upper floors
Approved height: 14.95 m
Approved built-up area: GHMC permit extraction lists residential upper-floor area 1,356.85 m2 and stilt area 258.98 m2. The RERA filing separately records approved built-up area 1356.83 sqmts.
Building / tower count: One building and one tower are recorded in the project data
Parking levels: Stilt is included in the sanctioned configuration. The permit records cellar approved for parking: 0, and parking floors—cellar: 0. The supplied material does not establish the number of parking spaces.
Unit count: GHMC permit condition: sanctioned unit count must not be increased without prior GHMC approval. RERA unit records list 10 units; the supplied permit extraction does not state a numerical sanctioned unit count.
Offering and status
RERA-filed configuration: 3BHK apartments
RERA-filed saleable area: 157.47 sqm per recorded unit configuration
Booked / available: 0 booked / 10 available as last read from the TG-RERA portal; that record has no as-of date, so counts are indicative.
Declared completion date: The RERA Form B undertaking states 10th May, 2025; the GHMC permit also states construction was to be completed before 10 May, 2025.
Construction stage: The supplied record gives a RERA-filed completeness figure of 80%, but no dated site inspection or independent construction verification is supplied.
Occupancy / completion certificate: No completion certification is recorded in the supplied GHMC permit extraction, which states that an occupancy certificate is compulsory before occupation. The material supplied does not establish an issued OC.
2. The project story
JMS Chaitanya is recorded with TG-RERA as a residential apartment project on Plot No. 511-A in Survey No. 44/1, Miiyapur revenue village, Serilingampally Mandal, Ranga Reddy District. The project land is recorded as 487.84 sqmts in the RERA land details, and the GHMC permit extraction describes a residential Building-A on a 487.74 m2 site.
The approved building configuration is one stilt level plus five upper floors. The RERA unit schedule identifies ten 3BHK apartments, with no bookings recorded in the portal snapshot supplied. The project data reports 80% completeness, but this is a recorded progress figure rather than an independently verified site assessment. The supplied documents do not establish completion certification or an occupancy certificate.
3. Master plan, architecture & building design
The GHMC building permit identifies one residential building, Building-A, sanctioned at 1 Stilt + 5 upper floors, with a recorded height of 14.95 m. It lists a residential upper-floor area of 1,356.85 m2 and stilt area of 258.98 m2. The RERA filing records approved built-up area as 1356.83 sqmts; the figures are reproduced as recorded, without treating them as interchangeable measurement categories.
The permit extraction records 0 cellar levels and 0 cellar parking floors. It also lists 20 Trees, a Compound Wall 89.59 RM, and Tot-lot (m2) 0. The permit conditions call for a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued, and for a strip of greenery on the site periphery to be maintained.
The supplied drawing-derived unit information is based on the floor-plan record identified as document 65777. The available project data does not provide a complete, independently reviewed drawing description of building footprint, flat distribution per floor, lifts, stairs, entrances, circulation, internal roads, landscaping layout or phase arrangement.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.47 sqm | Software-measured range: 111.4–121.3 sqm; median 113.7 sqm | 28% |
The unit count, booking figures and saleable area above are TG-RERA filing data; the portal record has no as-of date, so booking and availability figures are indicative. The carpet-area measurements are software-measured from drawing geometry, not RERA-filed measurements, and the drawing measurements are flagged as needing review.
The RERA-filed saleable area is distinct from carpet area: the supplied drawing-measurement notes say saleable area also includes the home’s share of common areas. A utility area is shown in the measured flat information, but the supplied record does not provide a separate balcony-area measurement or a verified room schedule for every flat design.
The measured first-floor plan panel identifies bedrooms, a living/dining area, a drawing room, a kitchen, toilets and a utility. One listed utility measures 3.28 m2 and is excluded from the measured carpet area. The record reports four measured flat designs and flags all four for review.
5. Parking & vehicle circulation
The GHMC permit extraction states Cellar approved for parking: 0 and lists one stilt level. A permit condition says the cellar and stilts approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied extraction does not establish a parking-space count or unit-wise allocation.
The RERA unit data marks the recorded 3BHK configuration as mortgaged, but does not provide a parking allocation schedule. No supported information is supplied on visitor or accessible spaces, parking ramps, internal driveways, pedestrian separation, mechanical parking or EV charging as a sanctioned or delivered project facility.
6. Amenities, recreation & open spaces
| Description / size | GHMC permit extraction lists Tot-lot (m2) 0; a permit condition requires a fenced tot-lot maintained as greenery before OC. |
|---|---|
| Declared progress / verified status | Permit condition; delivery status not independently verified. |
| Description / size | Strip of greenery on site periphery required by permit condition; no size supplied. |
|---|---|
| Declared progress / verified status | Permit condition; completion not verified. |
| Description / size | 20 Trees listed in the permit extraction. |
|---|---|
| Declared progress / verified status | Listed in permit data; planting or survival not verified. |
| Description / size | TG-RERA amenities record marks water conservation and rainwater harvesting as “YES”; permit extraction lists a rainwater-harvesting structure (percolation pit). |
|---|---|
| Declared progress / verified status | Filed / permit-listed; progress record shows 0%; completion not verified. |
| Description / size | Listed in the TG-RERA amenities record; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Progress record shows 0%; completion not verified. |
The supplied TG-RERA amenities record contains 14 categories. It marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting and electrical meter room/sub-station/receiving station as “YES”; the listed categories otherwise show 0% progress. No evidence supplied independently verifies any facility as complete.
7. Utilities, building services & safety
The TG-RERA amenities record marks water supply and sewerage as “YES”; it also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and electrical meter room/sub-station/receiving station. The listed progress for these categories is 0%, and the supplied materials do not state capacities, specifications or independent completion verification.
The GHMC permit extraction lists a space for a transformer, garbage house and rainwater-harvesting structure (percolation pit). It also requires an ETP as per standard specification and states that an occupancy certificate is compulsory before occupation. The permit lists the N.B.C. of India, 2005 and fire-related conditions among its references, but the available material does not establish the installed safety systems or statutory completion of those systems.
No supplied project record establishes water source or storage capacity, STP capacity or reuse arrangements, electrical backup capacity, lift count or capacity, fire equipment details, emergency access, waste segregation arrangements, CCTV, security systems, EV charging provision or accessible circulation.
8. Location, access & connectivity
The registered project location is Miiyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on Survey No. 44/1, Plot No. 511-A. The project filing records the southern boundary as a 30 feet road; the GHMC permit extraction separately refers to 18 mt. road widths in a permit condition concerning a site abutting such roads. The supplied material does not provide a verified project-specific approach-road map.
The supplied parcel-centroid connectivity data lists Financial District (Nanakramguda) at 1.2 km, IndusInd Bank at 0.4 km, an unnamed bus station at 2.2 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, ADP at 0.0 km, South India Shopping Mall at 2.6 km, an unnamed park at 1.2 km, and Nanakramguda Govt primary school at 0.5 km. These are supplied location-record distances; no travel times are provided.
9. Developer & development status
The registered promoter is Jms Constructions, recorded as a partnership in the RERA project data. The RERA filing lists Jagadish Babu Vasireddy as authorized signatory and Mallikarjuna Reddy Allampati as partner. The supplied registration certificate gives the promoter office as Village: Kukatpally, Mandal: Kukatpally, District: Medchal-Malkajgiri, PIN: 500072. A separate project address in the RERA filing is Srivani Nilayam, Sardar Patel Nagar, Matrusri Nagar, Miiyapur, Serilingampally, Ranga Reddy, 500049.
The promoter’s Form B declaration undertakes project completion by 10th May, 2025. The project record reports completeness of 80%, without an accompanying independent site verification in the supplied material. The RERA certificate records validity to 10/05/2025 and no extension. No occupancy or completion certificate is established in the supplied project documents.
10. Approvals, official records & documents
| Identifier / date | P02400001349; issued 11/11/2019 |
|---|---|
| What the supplied material establishes | Form C for jms chaitanya; validity from 11/11/2019 to 10/05/2025; no extension is recorded in the supplied certificate. |
| Identifier / date | Permit 1/C21/07471/2019; 10 May, 2019; file 1/C21/00178/2019 |
|---|---|
| What the supplied material establishes | Building-A on Survey No. 44/1, sanctioned as 1 Stilt + 5 upper floors, subject to permit conditions. |
| Identifier / date | Project declaration by V Jagadish Babu |
|---|---|
| What the supplied material establishes | Promoter declaration concerning the project, separate-account obligations and completion undertaking of 10th May, 2025. |
| Identifier / date | Document 65777 |
|---|---|
| What the supplied material establishes | Floor-plan record used for software measurements; drawing measurements are flagged for review. |
| Identifier / date | Document 67683 |
|---|---|
| What the supplied material establishes | The supplied RERA record identifies a request for layout approval documentation; an extracted approved layout is not provided. |
| Identifier / date | Not established in supplied documents |
|---|---|
| What the supplied material establishes | The GHMC permit states that an occupancy certificate is compulsory before occupation; the supplied permit extraction is not a completion certification. |
Frequently asked questions
Is jms chaitanya registered with Telangana RERA?
Yes. jms chaitanya is registered with the Telangana Real Estate Regulatory Authority as P02400001349; the registration status is New Project.
Who is the developer of jms chaitanya?
The promoter named in the RERA registration is jms constructions.
Where is jms chaitanya located?
jms chaitanya is in Miiyapur, Serilingampally, Rangareddy, Telangana (500049).
When will jms chaitanya be completed?
The promoter's proposed date of completion filed with RERA is 10/05/2025. This is the promoter's declaration, not a guarantee.
More projects in Miyapur