Sign in

Capital-II

T RAJESWARI AND OTHERS · Yadadri Bhuvanagiri · RERA P02000002757

CAPITAL-II is a residential plotted development in Tangutur, Alair Mandal, Yadadri Bhuvanagiri District. The registered promoter is T Rajeswari And Others. The RERA-filed site area is 251309.78 sq. m., and the filed draft-layout document records 838 residential plots; tower or block and floor configurations are not stated. The project is registered with TG-RERA under P02000002757, with proposed completion recorded as 01/03/2023.

01What we found

Period endedTG-RERA registration ran to 1 Mar 2023 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameCAPITAL-II RERA record
Project typePlotted development / residential plotted layout RERA record
Phase / registered portionNew Project; the RERA certificate identifies the project as CAPITAL-II. The supplied record does not specify a separately named phase. RERA record
TG-RERA registrationP02000002757
Registration validityCommenced 30/03/2021; stated to end 01/03/2023. The supplied certificate records no extension. This is registration validity, not an occupancy certificate or proof of completion.
Registered promoterT Rajeswari And Others (also recorded as T RAJESWARI AND OTHERS) RERA record
RERA statusNew Project; the supplied certificate establishes registration under section 5. Current registration status beyond the certificate’s stated end date is not established by the supplied record. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageTangutur; the layout-approval document refers to Tangtoor Gram Panchayat / Tangtoor. RERA record
MandalAlair RERA record
DistrictYadadri Bhuvanagiri (also written Yadadri-Bhuvanagiri in the layout document) RERA record
PIN508001 RERA record
Project survey numbers402, 425, 426, 427, 428, 446, 447, 448, 450 and 451. The RERA filing and layout document do not specify subdivisions for this full project list. RERA record
Registered site extent251309.78 sq. m. total and net area, as recorded in the RERA land details. RERA filing
Boundaries (RERA-filed)East: 200 FEET ROAD; west, north and south: OTHERS LAND. RERA filing
Survey-level cadastral recordsBhu Bharati entries include 402/అ and other subdivisions of survey 402, and 451/P; these are survey-record extracts, not a complete statement of the project’s acquired subdivisions. Cadastral map Land records

Development identity

FieldRecord
Sanctioning authority / approvalDirector of Town and Country Planning; T.L.P.NO. 102/2020/H, described in the filed document as a Draft Technical Layout Pattern for development through Tangtoor G.P. Approvals record
Approval dateRERA project information records 12/05/2020 as the approved date. The supplied approval extraction also cites reference letter Lr. No. 14684/630, dated 10.03.2020. RERA filing
Plot countThe draft-layout document records 838 plots.
Land-use figures in filed draft layoutLayout area: Ac. 62.10 cts; 300564.0 SYDS; plotted area: Ac. 34.451 cts; 166743.00 SYDS; roads: Ac. 21.436 cts; 103750.0 SYDS; open-space park: Ac. 6.213 cts; 30071.0 SYDS. The document also lists areas for a primary school, nursery school, convenient shopping and mortgage area.
Buildings / floors / built-up areaNot applicable as a multi-storey building description to the recorded plotted-layout offering; approved built-up area and building/floor configuration are not disclosed in the supplied evidence. RERA filing

Offering and status

FieldRecord
OfferingResidential plots; the filed layout document records 838 plots. Plot-wise dimensions, sizes, inventory, booked/available counts and saleable-area schedule are not supplied here. RERA record
Construction / development stageNo independently verified site-progress evidence is supplied. The RERA registration certificate gives the registration period; it does not establish construction completion.
Completion dateThe RERA project information records proposed completion 01/03/2023. Form B, dated 05th March, 2021, separately declares completion by 12'* May, 2022. The supplied evidence does not establish a revised completion date or completion on site. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The available layout document is expressly described as a draft technical layout pattern, not final layout approval.

2. The project story

CAPITAL-II is registered with TG-RERA as a plotted residential development in Tangutur, Alair Mandal, Yadadri Bhuvanagiri District. The project identity in the filing covers surveys 402, 425, 426, 427, 428, 446, 447, 448, 450 and 451. Its RERA land details state a total/net site area of 251309.78 sq. m. RERA record RERA filing

The filed layout document describes a Draft Technical Layout Pattern for a residential layout, recording 838 plots and allocating land to plots, roads, open space and listed community/commercial uses. Its stated open-space and roads areas are to be transferred to the Gram Panchayat by registered gift deed before final layout release; designated plots are stated to be mortgaged to the Gram Panchayat and not for sale. The document also says that the draft layout is not final approval and that the permission is not proof of title.

The supplied record does not establish the present physical stage of development, plot-by-plot availability, or a final layout release. The RERA certificate’s validity dates and the completion dates in the filed project information and Form B are reported separately above; none alone proves that the development has been completed or occupancy-certified. RERA filing

3. Master plan, architecture & building design

The available design evidence concerns a plotted layout, not apartment blocks or towers. The filed approval document identifies T.L.P.NO. 102/2020/H and records a draft layout with 838 plots. It gives a layout area of Ac. 62.10 cts; 300564.0 SYDS, plotted area of Ac. 34.451 cts; 166743.00 SYDS, roads area of Ac. 21.436 cts; 103750.0 SYDS, and open-space park area of Ac. 6.213 cts; 30071.0 SYDS. These are the figures stated in that document; no conversion to the RERA-filed site-area figure is made here.

The same document lists a primary school (Ac. 1.204 cts; 5831.00 SYDS), nursery school (Ac. 0.25 cts; 1210 0 SYDS), convenient shopping (Ac. 0.428 cts; 2072.0 SYDS, plot numbers 375 to 384), and mortgage area (Ac. 5.25 cts; 25410.0 SYDS). It identifies plots 205, 206, 220 to 315 and 560 to 608 as mortgage plots in favour of Tangtoor Gram Panchayat and says these are not for sale. It also specifies open-space and roads transfers by registered gift deed before final layout release.

The supplied material does not include a readable layout drawing or plot schedule from which plot arrangement, dimensions, internal-road geometry, landscaped areas beyond the stated open-space allocation, or a more detailed land-use split can be described. No building footprint, floor configuration, parking levels or approved built-up area is provided.

4. Homes, configurations & floor plans

The project is a plotted development, not a stated apartment or villa scheme. The filed draft-layout document records 838 plots, but the supplied evidence does not provide plot-size bands, individual plot dimensions, plot-wise saleable areas, booking figures or available inventory.

The two drawing files recorded in the supplied floor-plan data have not been measured; both are marked as scans pending. Accordingly, no software-measured plot or room dimensions can be reported. Floor plans

5. Parking & vehicle circulation

The supplied evidence does not establish parking-space counts, visitor or accessible parking, parking allocation to purchasers, or dedicated vehicle-circulation arrangements. The draft layout document requires roads to be opened for access to neighbouring sites and says the site is not to be enclosed by a compound wall or fencing; it does not provide road widths or a detailed circulation plan.

6. Amenities, recreation & open spaces

The RERA-filed amenities list marks several items as available in the filing, but records 0% progress for each item; this is not evidence of completed or independently verified facilities. The draft layout approval separately identifies the land-use areas listed below. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo dimensions suppliedRERA-filed amenities RERA amenitiesListed as available; 0% recorded; completion not independently verified
Green strip / tot lot / parkDraft layout open-space park: Ac. 6.213 cts; 30071.0 SYDSRERA amenitiesRERA-listed; 0% recorded; layout document requires transfer to Gram Panchayat before final layout release
Community buildingsNo size or facility detail suppliedRERA-filed amenities RERA amenitiesListed; 0% recorded; completion not independently verified
Primary schoolAc. 1.204 cts; 5831.00 SYDSDraft layoutLand-use entry in draft layout; delivery not established
Nursery schoolAc. 0.25 cts; 1210 0 SYDSDraft layoutLand-use entry in draft layout; delivery not established
Convenient shoppingAc. 0.428 cts; 2072.0 SYDS, plots 375 to 384Draft layoutLand-use entry in draft layout; delivery not established

7. Utilities, building services & safety

The RERA-filed amenities list includes water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. Where an “available” status is provided, the same list records 0% progress. The supplied evidence does not establish the specific system design, capacities, installation or operational status of these services. RERA amenities

8. Location, access & connectivity

The registered project location is Tangutur, Alair Mandal, Yadadri Bhuvanagiri District, Telangana 508001. The RERA-filed land boundaries identify a 200 FEET ROAD on the east. RERA record RERA filing

The supplied location data gives the cadastral parcel centroid as 17.65841, 79.09665 and records the nearest sampled Outer Ring Road interchange at 49.9 km (approx.). A third-party vendor entry describes the site as facing Hyderabad–Warangal NH 163; this is vendor-provided connectivity information, not established here as a RERA-filed road-access fact. Location record Promoter website

9. Developer & development status

The registered promoter is T Rajeswari And Others (also recorded as T RAJESWARI AND OTHERS). The RERA filing records the organisation type as “Others,” with the description Partnership; no corporate registration number or verified registered-office details are supplied in the project evidence. RERA record RERA filing Corporate record

A board resolution dated 26-02-2021 records that Smt. THOUTREDDY RAJESHWARI was authorised to sign and submit documents on behalf of the firm. The Form B affidavit dated 05th March, 2021 is also made by THOUTREDDY RAJESHWARI and declares a completion time of 12'* May, 2022. These are promoter-filed statements, not independent verification of project progress.

The RERA project information records proposed completion as 01/03/2023. No revised completion date, current construction-progress certificate, final layout release or completion/occupancy certificate is supplied. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm “C” registration certificate for CAPITAL-II, registration P02000002757, issued 30/03/2021, with stated validity to 01/03/2023.
Principal layout approvalDirector of Town and Country Planning document T.L.P.NO. 102/2020/H, file Lr.Roc.No. 14684/630/2020/H, described as a Draft Technical Layout Pattern for the project surveys. Approvals record
Layout drawing / final layout releaseA layout-plan document is listed in the RERA filing, but the supplied record does not include an extracted drawing. The available approval document describes the draft layout and says final release follows development and compliance with conditions.
Promoter declarationForm B affidavit by THOUTIREDDY RAJESWARI, dated 05th March, 2021, containing title, encumbrance, completion and project-account declarations.
Other project documentsThe supplied evidence includes title-report documents and an encumbrance statement, but this Overview does not make a title or encumbrance determination. Document index
Completion / occupancy certificateNone supplied in this evidence pack. Document index

Frequently asked questions

Is CAPITAL-II registered with Telangana RERA?

Yes. CAPITAL-II is registered with the Telangana Real Estate Regulatory Authority as P02000002757; the registration status is New Project.

Who is the developer of CAPITAL-II?

The promoter named in the RERA registration is T RAJESWARI AND OTHERS.

Where is CAPITAL-II located?

CAPITAL-II is in Tangutur, Alair, Yadadri Bhuvanagiri, Telangana (508001).

When will CAPITAL-II be completed?

The promoter's proposed date of completion filed with RERA is 01/03/2023. This is the promoter's declaration, not a guarantee.

More projects in Tangutur