Kabir

LAND-IN INFRA · Rangareddy · RERA P02400010727

KABIR is a residential apartment project in Shastripuram Co-Operative House Building Society Limited, Rajendranagar mandal, Ranga Reddy district, developed by registered promoter LAND-IN INFRA. The project covers 683.01 sq. m and comprises one building with 1 Stilt + 5 upper floors and 20 DOUBLE BEDROOM units. It is registered under TG-RERA **P02400010727**, and the proposed completion date is **18/11/2028**.

01What we found

RegisteredTG-RERA - valid till 18 Jul 2028
24documents on file - each fact links to its page
21court cases on this project's land (survey 134, Mailardevpally)
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from justdial.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameKABIR RERA record
Project type / phaseResidential apartment project; the filing identifies a new project. Phase or separately registered portion is not specified. RERA record RERA filing
TG-RERA registrationP02400010727; registered from 18 July 2025 to 18 July 2028. RERA record
RERA statusRegistration is recorded in the TG-RERA filing. The supplied record does not state a cancellation or extension. Registration validity is not the same as the project completion deadline or an occupancy certificate. RERA record Approvals record
Registered promoterLAND-IN INFRA; partnership. RERA record Corporate record

Land and geographic identity

ItemProject record
LocalityShastripuram Co-Operative House Building Society Limited; Meer Sagar is also used in the filed plan description. RERA record RERA filing
Revenue villageMailardevpally; the filed records also use “Mailardevpally Village.” RERA record
Mandal / district / PINRajendranagar / Ranga Reddy / 500005. RERA record
Survey and subdivision identifiersSurvey No. 134/20; the registration certificate also lists plot identifiers 585/2 (Part), 586/1 and 586/2, Block A. These plot identifiers are not additional survey numbers. RERA record
Registered site extent683.01 sq. m total and net plot area in the filed land details and GHMC building permit. RERA filing
BoundariesEast: 40 Feet wide Road; West: Neighbour Property; North: Neighbour Property; South: Land Owners Property. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approval1260/GHMC/CHR/2025-BP, approved 18 July 2025. Approvals record
Other approval referencesFile No. 264/ENG/TP10/GHMC/2020-25 and application No. TS/010822/2025 are recorded with the filed plan; the building permit order also identifies file No. 001761/GHMC/0779/CHR2/2025-BP. Approvals record
Approved building / floorsOne residential apartment building; sanctioned as 1 Stilt + 5 upper floors, with a stated building height of 15.00 MT. RERA filing
Approved areaGHMC permit records 1,711.55 Sq.Mt. residential upper floors, 360.2 Sq.Mt. stilt area, and 374.7 as total parking area. The filed plan separately states total proposed built-up area excluding parking of 1711.55, including parking of 2086.20, and TOTAL BUA 2098.45; these labels are retained as recorded.
Units20 units in the RERA-filed unit schedule; the GHMC plan extraction also records 20 sanctioned units. RERA unit table

Offering and status

ItemProject record
RERA-filed configurationDOUBLE BEDROOM, normalised in the filing as 2BHK; 20 units. RERA unit table RERA unit details
RERA-filed saleable area30.66 sq. m for the listed configuration. RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageThe project is identified as a new project. No construction-progress percentage or independently verified site-stage record is supplied here. RERA record RERA filing
Completion timingForm B declares completion by 18/07/2028; the project header gives proposed completion as 18/11/2028. These are recorded as distinct completion-date entries; the supplied evidence does not explain their relationship. RERA record
Occupancy certificate (OC)No OC is recorded in the supplied project evidence. GHMC’s permit requires an OC before occupation and sets out completion-notice requirements.

2. The project story

KABIR is a single-building residential apartment project registered with TG-RERA on Survey No. 134/20, at the plots identified as 585/2 (Part), 586/1 and 586/2 in Block A, Shastripuram Co-Operative House Building Society Limited, Mailardevpally village, Rajendranagar mandal, Ranga Reddy district. The registered site is recorded as 683.01 sq. m. RERA record RERA filing

The GHMC building permit describes a 1 Stilt + 5 upper floors residential apartment building. The RERA unit schedule lists 20 DOUBLE BEDROOM units, with 20 shown as available and none booked in the portal data supplied; those counts have no recorded as-of date. The record includes no verified construction-progress percentage, so the current physical stage cannot be established from this evidence. RERA unit table RERA record

The permit requires a completion notice and an occupancy certificate before occupation. No occupancy certificate is included in the supplied records.

3. Master plan, architecture & building design

The project is recorded as one residential building on a 683.01 sq. m plot. GHMC’s building permit describes 1 Stilt + 5 upper floors, a height of 15.00 MT., and 1,711.55 Sq.Mt. residential upper floors. It also records a 360.2 Sq.Mt. stilt area and 374.7 as total parking area.

The filed plan states AREA OF PLOT (Minimum) 683.01, NET AREA OF PLOT 683.01, VACANT PLOT AREA 308.36, TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1711.55, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 2086.20, and TOTAL BUA 2098.45. These are separate figures and labels as transcribed from the plan; the supplied material does not provide a reconciled area schedule.

The permit identifies plot portions 585/2 (Part), 586/1 and 586/2 in Block A, within Survey No. 134/20. The filed plan names rainwater harvesting, a transformer, a garbage house and a tot-lot; the permit extraction lists five rainwater-harvesting pits and records “Tot Lot NA.”

The supplied drawing-derived data does not provide a verified building footprint, flats per floor, tower-height breakdown, lift or stair count, internal circulation plan, or residential/common-area schedule. The RERA floor-plan analysis reports no measured flat designs for the 2BHK configuration, so drawing-based carpet or room measurements are not available in this evidence. Floor plans

4. Homes, configurations & floor plans

The TG-RERA unit schedule records 20 units as DOUBLE BEDROOM, normalised as 2BHK. Saleable area is reported as 30.66 sq. m per unit; the portal booking figures are indicative because no as-of date is supplied. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (filed as DOUBLE BEDROOM)2002030.66 sq. mNot available from the supplied drawing measurementsNot supplied

No software-measured carpet area is available for this configuration in the supplied floor-plan data. Saleable area and carpet area are distinct measures: the supplied floor-plan guidance notes that saleable area includes the home’s share of common areas, while carpet area is a separate drawing-based measurement. No balcony, utility, room-dimension or loading figures are provided here. RERA unit details Floor plans

5. Parking & vehicle circulation

GHMC’s permit records 374.7 as total parking area and describes parking in the stilt; the filed plan also refers to cellar and stilt parking. No number of car or two-wheeler spaces, visitor or accessible-space allocation, or mechanical-parking provision is supplied.

The plan conditions require the approved parking areas to be used exclusively for vehicle parking and not converted or misused. The supplied records do not establish an individual buyer’s parking allocation or exclusive ownership of a particular bay.

6. Amenities, recreation & open spaces

The filed plan and permit identify a small set of site features. Separately, the RERA amenities record lists 14 infrastructure categories, but gives no measurable completion progress for them; the amenity record is not evidence of independent completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripTot-lot appears as a plan condition; the permit extraction records “Tot Lot NA.” No size is supplied.Not independently verified complete; amenities record shows 0%.
Rainwater harvestingPlan requires a rainwater-harvesting structure; permit records 5 rainwater-harvesting pits.Not independently verified complete; amenities record shows 0%.
Transformer spaceSpace for a transformer is required on site.Not independently verified complete.
Garbage houseRequired within the premises.Not independently verified complete.
Internal roads and footpathsListed in the RERA amenities record; no dimensions supplied.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Water supplyListed as “YES” in the RERA amenities record.RERA amenitiesProgress recorded as 0%; no source or capacity supplied.
Sewerage / sewage treatment and disposalRERA amenities record lists sewerage (chamber, lines, septic tank, STP) as “YES” and separately lists treatment and disposal of sewage and sullage water.RERA amenitiesProgress recorded as 0%; no capacity or independent completion evidence supplied.
Storm-water drainsListed in the RERA amenities record.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Water conservation / rainwater harvestingListed as “YES” in the RERA amenities record.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Street lightingListed in the RERA amenities record.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Community buildingsListed in the RERA amenities record; no type or size supplied.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Solid-waste management and disposalListed in the RERA amenities record.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Energy managementListed in the RERA amenities record.RERA amenitiesProgress recorded as 0%; no system details supplied.
Fire protection and fire-safety requirementsListed in the RERA amenities record; the permit requires fire-safety provisions and a Fire NOC before OC.RERA amenitiesProgress recorded as 0%; no Fire NOC or independent completion evidence supplied.
Electrical meter room / sub-station / receiving stationListed in the RERA amenities record; permit requires transformer space.RERA amenitiesProgress recorded as 0%; not independently verified complete.
Recreational open spaceListed in the RERA amenities record; no area is supplied.RERA amenitiesProgress recorded as 0%; not independently verified complete.

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drainage, rainwater harvesting, electrical infrastructure, energy management and solid-waste management, but provides no capacities or independently verified completion status. The building permit requires a rainwater-harvesting structure; its extraction records five pits, space for a transformer and a garbage house. RERA amenities

The permit requires fire-safety provisions and a Fire NOC from the Director (EV&DM) before an occupancy certificate. It also requires the owner/developer to provide sanitation, plumbing, fire-safety and electrical installations under qualified technical supervision. No fire-system specifications, water-storage or treatment capacities, lift details, backup-power capacity, accessibility arrangements or CCTV/security system details are established by the supplied project records.

8. Location, access & connectivity

The registered project location is Shastripuram Co-Operative House Building Society Limited, Meer Sagar, Mailardevpally village, Rajendranagar mandal, Ranga Reddy district, PIN 500005. The project parcel centroid is listed as 17.31138, 78.45274. RERA record Location record

The filed plan identifies a 12.00MT WIDE MAINROAD and a 12.00 MT WIDE ROAD. The site boundaries also identify a 40 Feet wide Road on the east. RERA filing

The supplied location record gives Rajiv Gandhi Intl Airport at 8.3 km. No travel time, public-transport service, or further measured connection is provided. Location record

9. Developer & development status

The registered promoter is LAND-IN INFRA, identified in the RERA record as a partnership. Its GSTIN is 36AAIFL0158N1Z0. The RERA record names Chaithanya Kumar Myadam as authorised signatory and Bhavana Myadam as partner. Corporate record Parties record

The project registration lists the promoter’s address as Kummarwadi, Bandhnaka, Meer Sagar, Shastripuram Co-Operative House Building Society Limited, Rajendranagar, Ranga Reddy, 500005. No official promoter website or contact details are supplied. Parties record

Form B, signed by Chaithanya Kumar Myadam for LAND IN INFRA and dated 02-03-2026, declares completion by 18/07/2028 and states project-account, audit and approval undertakings. The project header separately lists proposed completion as 18/11/2028. No construction-progress percentage or verified site-progress evidence is provided. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02400010727; valid 18/07/2025–18/07/2028
What the supplied record establishesForm C certificate for KABIR, naming LAND-IN INFRA as promoter.
GHMC building permit order
Reference / date1260/GHMC/CHR/2025-BP; 18 July 2025
What the supplied record establishesConditional permission for a residential 1 Stilt + 5 upper floors building on 683.01 sq. m; includes permit conditions, including OC before occupation and Fire NOC before OC.
Filed GHMC plan
Reference / dateFile No. 264/ENG/TP10/GHMC/2020-25; application No. TS/010822/2025
What the supplied record establishesFiled plan for the proposed residential apartment building; includes sanctioned-plan parameters and conditions.
Approved-layout reference
Reference / date9091/MP2/HUDA/1988
What the supplied record establishesReference recorded in the GHMC building permit; a separate approved-layout document is not supplied here.
Form B declaration
Reference / date02-03-2026
What the supplied record establishesPromoter-signed declaration for KABIR, including the stated completion undertaking and project-account commitments.
Partnership / signatory records
Reference / datePartnership deed and authorisation records
What the supplied record establishesPartnership information and authority for the named signatory are present in the filed document set.
Title and encumbrance material
Reference / dateTitle search report, deed extracts and filed encumbrance statements
What the supplied record establishesProject-filed land/title materials are available; this overview does not determine title or encumbrance status.
Occupancy / completion certificate
Reference / dateNot supplied
What the supplied record establishesNo OC or completion certificate is recorded in the supplied project evidence. Document index

Frequently asked questions

Is KABIR registered with Telangana RERA?

Yes. KABIR is registered with the Telangana Real Estate Regulatory Authority as P02400010727; the registration status is New Project.

Who is the developer of KABIR?

The promoter named in the RERA registration is LAND-IN INFRA.

Where is KABIR located?

KABIR is in Shastripuram Co-Operative House Building Society Limited, Mailardevpally, Rajendranagar, Rangareddy, Telangana (500005).

When will KABIR be completed?

The promoter's proposed date of completion filed with RERA is 18/11/2028. This is the promoter's declaration, not a guarantee.