AAD-ONE is a residential apartment building in Mallardevpally, Rajendranagar mandal, Ranga Reddy district, developed by registered promoter GULSHAN KAUR. The project occupies 1,670.00 sq.m. and comprises one building with one cellar, one stilt and five upper floors, with 40 3BHK units, each with a saleable area of 107.94 sq.m. It is registered under TG-RERA number P02400007838, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 31 May 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
6court cases on this project's land (survey 163, 165, Mailardevpally)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered projectAAD-ONE RERA record
Project type / useResidential apartment building RERA record RERA filing
Phase / registered portionNo separate phase is identified in the supplied record; the registration concerns the project on Plots 48 and 49
TG-RERA registrationP02400007838 Approvals record
Registration validity13 March 2024–31 May 2025, unless extended by the Authority; no extension record is supplied here Approvals record
Registered promoterGULSHAN KAUR, recorded as a proprietorship RERA filing Corporate record
RERA status in supplied recordThe certificate states the registration period above. A current registration-status determination is not supplied.

Land and geographic identity

ItemProject record
LocalityMallardevpally / MALLARDEVPALLY RERA record RERA filing
Revenue villageMailardevpally; the sanctioned document also records Mailardevpally (V) RERA record
Mandal / district / PINRajendranagar, Ranga Reddy, 500005 RERA record RERA filing
Project survey numbers163/2 and 165/2 Land records
Site / plot identificationPlots 48 and 49, Lal Bahadur Nagar Colony RERA filing
Site extent1,670.00 sq.m.; sanctioned net area is also 1,670.00 sq.m. Land records
Boundaries recorded in RERA project informationNorth and south: 9-metre roads; east: Plots 43 and 44; west: Plots 74 and 75 RERA filing
SubdivisionsNo subdivision suffix is specified for the project’s survey numbers in the RERA project identity. Land records

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit1/C11/00340/2022, dated 01 June 2022 Approvals record
Plan documentBuilding proposal/plan record for Plots 48 and 49, Survey Nos. 163/2 and 165/2; approval-plan document records approval date 14-07-2022
Building countOne residential building
Sanctioned configurationOne cellar, one stilt and five upper floors; building height is recorded as 14.90 MT.
Approved area figuresApproved-plan record lists Total BUA: 6356.78 sq.m., Built up area: 4366.98 sq.m., and Net BUA residential: 4046.80 sq.m. These are distinct figures as labelled in the supplied plan extract.
RERA-declared units40 residential units; the plan extract also states 40 units and eight units per floor. RERA unit table
Sanctioned parkingThe approval-plan extract lists 47 proposed parking spaces. Cellar and stilt are designated for parking.

Offering and status

ItemProject record
RERA-filed configuration3BHK; 40 units RERA unit table
RERA-filed saleable area107.94 sq.m. RERA unit table
Booked / available0 booked / 40 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageThe supplied RERA amenity/progress record reports water supply at 40% and sewerage at 100%; other listed progress items are at 0%. This is reported progress, not independent site verification. RERA amenities
Completion datesRERA record: 31/05/2025 completion date at registration; project information also states proposed completion 30/11/2026. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The GHMC permit requires an occupancy certificate before occupation.

Registration validity, the stated completion dates and the absence of an OC document are separate record items; none by itself establishes the building’s present physical status.

2. The project story

AAD-ONE is registered as a residential apartment project on Plots 48 and 49 in Lal Bahadur Nagar Colony, Mailardevpally village, Rajendranagar mandal, Ranga Reddy district. Its RERA land identity is Survey Nos. 163/2 and 165/2, with a recorded site extent of 1,670.00 sq.m. RERA record Land records

GHMC’s building-permit record describes one residential building with one cellar, stilt and five upper floors. The plan extract records 40 units, eight units per floor, and 47 proposed parking spaces. The RERA unit record lists 40 3BHK units. RERA unit table

The supplied material does not establish independently verified construction completion or a current site inspection. RERA progress entries report sewerage at 100% and water supply at 40%, while the other listed progress categories remain at 0%; these are portal-reported figures, not a physical verification. No OC is included in the supplied documents. RERA amenities Document index

3. Master plan, architecture & building design

The sanctioned-plan extract identifies one residential building on a 1,670.00 sq.m. site. It records proposed coverage of 959.90 sq.m. (57.48%), vacant plot area of 710.10 sq.m., and a tot-lot of 87.11 sq.m.

The building configuration is one cellar and stilt for parking, plus five residential upper floors. The plan extract states eight units per floor and a building height of 14.90 MT. It records Total BUA: 6356.78 sq.m., Built up area: 4366.98 sq.m., and Net BUA residential: 4046.80 sq.m. These are separate labels in the supplied approval record; no FSI-counted area is identified.

The approval record lists a single entry and exit, each subject to a minimum width of 4.5mts. and height clearance of 5mts. It also requires a tot-lot, peripheral greenery, rainwater harvesting, transformer space and a garbage house. The supplied extracts do not establish lift count, stair configuration, floor-by-floor unit mix, or detailed common-area distribution.

4. Homes, configurations & floor plans

The RERA filing lists 40 3BHK units, each with a saleable area of 107.94 sq.m. The portal-read count is 0 booked and 40 available, but has no stated as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK40040107.94 sq.m.53.4–86.0 sq.m.; median 79.5 sq.m.26%

Carpet-area figures are software measurements from the approved floor-plan drawing geometry in document 383676, not RERA-filed measurements, and are flagged as requiring review. The supplied drawing measurement covers 13 3BHK flat designs. Saleable area is the RERA-filed figure; it is not interchangeable with carpet area and includes the home’s share of common areas. RERA unit details Floor plans

The measured example 3BHK drawing shows living/dining, three bedrooms, kitchen, two toilets and utility areas. The example’s individual room measurements are drawing-derived software measurements, not RERA disclosures. RERA unit details

The same drawing set contains two software-measured 2BHK designs, with measured carpet area 68.2–78.2 sq.m. and median 73.2 sq.m. The supplied RERA unit record does not list a 2BHK configuration or unit count; no 2BHK saleable area or availability is therefore stated here. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC plan extract lists 47 proposed parking spaces and identifies the cellar and stilt as parking levels. The approval conditions state that these areas are to be used exclusively for vehicle parking and not converted or partitioned for another use.

The plan record requires one entry and one exit, with a minimum width of 4.5mts. and height clearance of 5mts. The supplied material does not give a parking-space breakdown by vehicle type, visitor or accessible spaces, EV charging provision, ramp arrangement, or unit-specific parking allocations. A plan parking provision does not establish exclusive allocation or ownership for a particular unit.

6. Amenities, recreation & open spaces

The table below separates approval-plan requirements from the RERA portal’s reported progress. Progress percentages are not independent completion verification.

Tot-lot
Description / size87.11 sq.m. in the GHMC permit extract; approval conditions require fencing and maintenance as greenery.
Declared progress / verified statusRERA progress record lists “Green Strip/TOT LOT/Park” at 0%; no independent completion verification supplied. RERA amenities
Green strip / peripheral greenery
Description / sizePeripheral greenery and a green strip are required by the approval conditions.
Declared progress / verified statusRERA progress record lists 0%; no independent completion verification supplied. RERA amenities
Visitors parking
Description / sizeListed in the approval-plan extract’s amenities/utility information; no separate count is given.
Declared progress / verified statusNo separate progress or completion verification supplied.
Community buildings
Description / sizeNo facility details or size supplied.
Evidence sourceRERA progress record RERA amenities
Declared progress / verified status0% reported.
Indoor or sports/recreation facilities
Description / sizeNo project-filed facility details supplied in the cited RERA/approval extracts.
Evidence sourceRERA amenities Document index
Declared progress / verified statusNot established by supplied project records.

7. Utilities, building services & safety

ServiceSupplied project evidence
WaterThe approval conditions require an underground static water-storage tank of 25,000 lits. and a separate residential terrace tank of 25,000 lits. RERA progress reports water supply at 40%; source, treatment and current operating status are not supplied. RERA amenities
Sewerage and drainageThe RERA progress record marks sewerage (chambers, lines, septic tank, STP) as available and reports 100%; it does not identify which system is installed or independently verify it. Storm-water drains are listed at 0%. RERA amenities
RainwaterThe approved conditions require a rainwater-harvesting structure (percolation pit). RERA progress lists water conservation/rainwater harvesting at 0%. RERA amenities
ElectricalThe permit conditions require transformer space and a generator as an alternate electricity source, with emergency lighting in corridors, common passages and staircases. The RERA progress item for electrical meter room/sub-station/receiving station is 0%. RERA amenities
Fire and life safetyApproval conditions specify fire-safety provisions, including hose reel/down corner, manual alarm, fire extinguishers, and a sprinkler system if the basement area exceeds 200 sq.m.; the permit extract also requires an Occupancy Fire NOC before OC. These are approval conditions, not confirmation of installation or statutory compliance.
WasteThe approval conditions require a garbage house within the premises. RERA progress for solid-waste management and disposal is 0%. RERA amenities
Lifts, security and accessibilityThe supplied project approval extracts do not specify lift count or capacity, CCTV/access-control systems, or accessible circulation details. Document index

8. Location, access & connectivity

The registered site is in Mailardevpally village, MALLARDEVPALLY locality, Rajendranagar mandal, Ranga Reddy district, PIN 500005. The project is identified on Plots 48 and 49, Survey Nos. 163/2 and 165/2. RERA record RERA filing

The RERA project information records 9-metre roads on the north and south boundaries. The approval extract also refers to a 9.00-metre road and other road-width labels, including an 18-metre road; the exact site-facing approach configuration is not established in the supplied material. RERA filing

The supplied location record gives Rajiv Gandhi International Airport as an anchor at 8.8 km. No public-transport route or additional landmark-distance measurements are supplied. Location record

9. Developer & development status

The registered promoter is GULSHAN KAUR, recorded in the project information as a proprietorship. The supplied address is B, Lal Bahadur Nagar Colony, 9 M Wide Road, Mallardevpally, Rajendranagar, Ranga Reddy, 500005. No corporate registration identifier or verified contact details are supplied. RERA filing Corporate record Parties record

The Form-B declaration is a promoter declaration: it states a legal-title basis, declares the land free from encumbrances, and records an undertaking that the project would be completed by 31/05/2025.

The RERA project information separately records 30/11/2026 as proposed completion and 31/05/2025 as completion date at registration. No registration-extension order or OC is included in the supplied evidence, and the construction progress figures are portal-reported rather than independently verified. RERA filing Document index RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / scopeAAD-ONE; P02400007838; certificate states validity from 13/03/2024 to 31/05/2025 unless extended.
GHMC building permit order
Identifier / scopeApproval 1/C11/00340/2022, dated 01 June 2022; residential building on Survey Nos. 163/2 and 165/2.
GHMC plan / approval-plan extract
Identifier / scopeResidential plan for Plots 48 and 49, Survey Nos. 163/2 and 165/2; approval-plan extract records 14-07-2022.
GHMC layout/building-plan file identifiers
Identifier / scopeInward/file number 1/C11/22405/2019; licence 179/SURVEROR-1; plot numbers 48,49; permit number 9.
EvidenceApprovals record
Completion / occupancy records
Identifier / scopeNo completion certificate or occupancy certificate supplied.
EvidenceDocument index
Other project-filed documents
Identifier / scopeForm-B declaration by GULSHAN KAUR; encumbrance statements 383675 and 401498; title-search report 395871; partially completed allotment-letter form 383687 and agreement-for-sale template 383686.
EvidenceDocument index

The GHMC building permit states that permission does not confer ownership rights and that an occupancy certificate is required before occupation. The permit conditions also specify that the mortgaged built-up area may be registered only after an OC is produced.

Frequently asked questions

Is AAD-ONE registered with Telangana RERA?

Yes. AAD-ONE is registered with the Telangana Real Estate Regulatory Authority as P02400007838; the registration status is New Project.

Who is the developer of AAD-ONE?

The promoter named in the RERA registration is GULSHAN KAUR.

Where is AAD-ONE located?

AAD-ONE is in MALLARDEVPALLY, Mailardevpally, Rajendranagar, Rangareddy, Telangana (500005).

When will AAD-ONE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.