Maruti S Tulip
MARUTI DEVELOPERS · Rangareddy · RERA P02400005499
MARUTI S TULIP is a residential apartment project in Dilsukhnagar, Saroornagar mandal, Ranga Reddy district. The registered promoter developing it is MARUTI DEVELOPERS. The project covers 382.14 sq. m and comprises one proposed residential building with 1 Stilt + 5 upper floors and 10 3BHK units, each with a RERA-filed saleable area of 130.0 sq. m. It is registered under TG-RERA number P02400005499, with proposed completion on 01/12/2024.
More from Maruti Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | TG-RERA record |
|---|---|
| Registered project name | MARUTI S TULIP RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; the registration describes the project. RERA record |
| TG-RERA registration | P02400005499; issued 07/12/2022, valid 07/12/2022–01/12/2024. The supplied certificate records no extension. Registration validity is distinct from the construction completion deadline. RERA record |
| Registered promoter | MARUTI DEVELOPERS (also rendered “Maruti Developers” on the certificate) RERA record |
| RERA status | Registration period shown in the certificate has ended; current registration status beyond that recorded period is not established by the supplied evidence. |
Land and geographic identity
| Field | TG-RERA / filed record |
|---|---|
| Locality | Dilsukhnagar; the registration certificate identifies Bhavaninagar, Saroornagar. RERA record |
| Revenue village | Bhavaninagar as recorded in the project identity and registration certificate. The building permit describes the location as Moosaram Bagh, under Saidabad mandal, Hyderabad district. RERA record |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500060 RERA record |
| Survey number(s) | Sy. No. 47; no subdivision is identified in the project registration. The filed title materials also refer to part Sy. No. 47. RERA record |
| Plot numbers | Plots 3 and 4 RERA record |
| Site extent | 382.14 sq. m total and net plot area in the building permit and RERA land record; road-affected and nala-affected areas are each recorded as 0.0 sq. m. Land records |
| Boundaries filed with project | North: 40-wide road; South: neighbour’s plot; East: “H NO 16 11 511 BY F BY 2”; West: western part of land in Plot No. 4 belonging to owner. RERA filing |
Development identity
| Field | Approved / filed record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order 1261/GHMC/CHR/2021-BP, approved 01 December 2021; file no. 002345/GHMC/1380/CHR2/2021-BP. Approvals record |
| Other approval identifier on permit | Approved Layout No. / LRS Proceeding No. / Sub division No. C/GHMC/075629/2020 |
| Building arrangement and floors | One proposed residential building: 1 Stilt + 5 upper floors; permit-stated height 15 m. |
| Approved built-up area | Building permit records 1,113.30 sq. m residential built-up area. This is distinct from the project data’s approved built-up area of 1,335.92 sq. m; the supplied evidence does not reconcile those figures. RERA filing |
| Parking provision | Permit records 209.2 total parking area and 209.24 sq. m stilt parking area. The permit conditions also refer to cellar and stilt parking, but a cellar level is not included in the stated “1 Stilt + 5 upper floors” configuration. |
| Unit count | 10 units in the RERA-filed 3BHK configuration; the building permit says sanctioned unit count must not be increased but the supplied extraction does not state the numerical sanctioned count. RERA unit table |
Offering and status
| Field | TG-RERA / supplied evidence |
|---|---|
| Filed offering | 3BHK, 10 units; RERA-filed saleable area 130.0 sq. m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | No independently verified or current construction-progress evidence is supplied. The permit sets a construction commencement deadline of 01 June 2022. |
| Completion deadline | GHMC permit completion deadline: 01 December 2024; the RERA project record also gives proposed completion as 01/12/2024. This is separate from registration validity. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the project’s OC status is therefore not established by this evidence. Document index |
2. The project story
MARUTI S TULIP is registered as a residential apartment project on Plots 3 and 4 in Sy. No. 47, in the Bhavaninagar / Dilsukhnagar area of Saroornagar, Ranga Reddy district. The GHMC permit describes one proposed residential building with a stilt level and five upper floors. The RERA filing lists ten 3BHK apartments; the available portal count is 0 booked and 10 available, with no stated date for that inventory snapshot. RERA record Land records RERA unit table
The records establish a proposed and sanctioned development, not its present physical completion. The supplied material does not include a current site inspection, certified construction-progress report, or occupancy certificate. The permit requires a completion notice and an occupancy certificate before occupation. Document index
3. Master plan, architecture & building design
The GHMC building permit covers 382.14 sq. m of plot area, with the same figure shown as net plot area. It sanctions one residential building described as 1 Stilt + 5 upper floors, with a permit-stated height of 15 m. The permit records 1,113.30 sq. m residential built-up area; the RERA project fields separately state approved built-up area of 1,335.92 sq. m. The supplied documents do not explain the difference, so the figures are retained as recorded rather than treated as interchangeable. RERA filing
The building permit specifies front, rear and side setbacks of 3, 2, 2 and 2 respectively, without a unit shown in the extracted fields. The supplied drawing extraction identifies a fifth-floor plan, but does not provide a complete, verifiable account of building footprint, floor-by-floor unit arrangement, lifts, stairs, entrances, or circulation.
No approved master-plan or site-layout drawing extraction is available to describe internal roads, landscaping distribution, open-space dimensions, or phase organization. The GHMC permit does require a peripheral greenery strip, a rainwater-harvesting structure and a tot-lot maintained as greenery.
4. Homes, configurations & floor plans
The RERA-filed offering is ten 3BHK units with saleable area of 130.0 sq. m per unit. Saleable area is the filed figure; it should not be read as carpet area. A software measurement of the supplied fifth-floor drawing gives 88.7 sq. m (955 sq. ft) carpet area for one measured 3BHK design. This is a drawing-based software measurement, not a RERA disclosure, and the measurement record says it needs review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 130.0 sq. m | 88.7 sq. m (955 sq. ft), software-measured from one drawing design | 32% (supplied drawing-analysis record) |
The measured 3BHK drawing labels a living/dining room, kitchen, three bedrooms, three toilets, a wash area and a balcony marked 1.22 M. WIDE BALC. The area measurement excludes the balcony from carpet area. Carpet area, balcony/utility areas and the proportionate common-area component are not interchangeable; the RERA-filed figure here is saleable area. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records 209.2 total parking area and 209.24 sq. m stilt parking area. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The permit’s building description is 1 Stilt + 5 upper floors; the supplied material does not establish a cellar level’s configuration.
No reliable count of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangement, EV charging provision, or unit-specific parking allocation is supplied. A parking area shown or recorded in the permit does not establish exclusive parking ownership for a particular apartment. Document index
6. Amenities, recreation & open spaces
The GHMC permit identifies a tot-lot as “NA” in its extracted amenities/utilities fields, while its conditions call for a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. The permit also requires a peripheral greenery strip and rainwater-harvesting structures. No completion status for these items is supplied.
| Description / size | Permit extraction lists “Tot Lot NA”; permit condition calls for a fenced tot-lot maintained as greenery. No size supplied. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not established. |
| Description / size | Greenery strip at the site periphery; no size supplied. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not established. |
No project-specific TG-RERA evidence is supplied for a clubhouse, swimming pool, gym, children’s play area or other recreational facilities; these are not treated here as established project amenities.
7. Utilities, building services & safety
The building permit identifies 2 Rain Water Harvesting Pits and requires a rainwater-harvesting structure, transformer space and an on-site garbage house. It also lists water supply and sewerage-related infrastructure as available in the RERA amenities record, but the recorded progress for the listed infrastructure is 0%; that entry does not establish operational or completed service. RERA amenities
The permit conditions require occupancy certification before occupation, a fire NOC before issue of the occupancy certificate, fire-fighting installations and means-of-escape safety, and supervision of sanitation, plumbing, fire safety, lifts and electrical installations by qualified technical personnel. These are permit conditions, not evidence that the systems have been installed or certified.
No capacities or project-specific completed-status evidence is supplied for water storage or treatment, sewage-treatment capacity or reuse, electrical backup, lifts, waste segregation, CCTV/security, or accessible circulation. RERA amenities Document index
8. Location, access & connectivity
The registered location is Dilsukhnagar, in the Bhavaninagar / Saroornagar area, Ranga Reddy district, Telangana, PIN 500060. The permit describes the site as Moosaram Bagh and identifies a 40-wide road on the north boundary; the extracted permit also refers to an 18 mt. road width in its conditions. RERA record
Location data lists Dilsukh Nagar Metro at 0.1 km, TGSRTC Bus Station, Dilshuknagar at 0.1 km, Kotak Mahindra Bank at 0.3 km, an Urban Primary Health Centre at 0.2 km, and Brilliant School at 0.2 km. These are supplied mapped-location distances; no travel times are provided. Location record
9. Developer & development status
The registered promoter is MARUTI DEVELOPERS, identified in the RERA fields as a partnership, with GSTIN 36ABSFM6026B1Z9. The listed promoter address is Maple Homes Premises, Street No. 11, Saket Nagar, Moosaram Bagh, Dilsukhnagar, Saroornagar, Ranga Reddy, PIN 500060. The supplied registration certificate gives a promoter office address in Kapra, Medchal-Malkajgiri, PIN 500062; no official contact details or website are supplied here. RERA record Corporate record RERA filing
The RERA record identifies D. Pushpalatha and MARUTI DEVELOPERS as landowner/promoter participants under an area-share arrangement. The GHMC permit was issued to Smt D. Pushpalatha and records one proposed building. The supplied record gives no current, certified construction-progress update; no phase-wise completion or occupancy status is established. Parties record
10. Approvals, official records & documents
| Identifier / date | P02400005499; issued 07/12/2022, validity shown through 01/12/2024 |
|---|---|
| What it establishes | Registration of MARUTI S TULIP and its recorded conditions. |
| Identifier / date | 1261/GHMC/CHR/2021-BP; 01 December 2021; file no. 002345/GHMC/1380/CHR2/2021-BP |
|---|---|
| What it establishes | Conditional sanction for residential construction on Plots 3 and 4, described as 1 Stilt + 5 upper floors. |
| Identifier / date | C/GHMC/075629/2020 |
|---|---|
| What it establishes | Identifier recorded as the approved layout / LRS proceeding / subdivision number. |
| Identifier / date | 30 May 2022 (date transcription as supplied) |
|---|---|
| What it establishes | Promoter-authorized signatory’s declarations concerning title, encumbrances, funds, audits and approvals. |
| Identifier / date | Dated 3 February 2022 |
|---|---|
| What it establishes | Advocate’s title/search report concerning Plots 3 and 4 in part Sy. No. 47. |
| Identifier / date | Document 222587 |
|---|---|
| What it establishes | Unfilled form template; it does not evidence an executed agreement with a specific allottee. |
| Identifier / date | Document 222326 |
|---|---|
| What it establishes | Supplied floor-plan drawing used for software measurement of the 2BHK and 3BHK designs; drawing-based measurements are not RERA-filed areas. |
The permit requires a completion notice and occupancy certificate and states that an occupancy certificate is compulsory before occupation. No occupancy or completion certificate is included in the supplied documents.
1. Project at a glance
Project identity
Registered project name: MARUTI S TULIP
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration describes the project.
TG-RERA registration: P02400005499; issued 07/12/2022, valid 07/12/2022–01/12/2024. The supplied certificate records no extension. Registration validity is distinct from the construction completion deadline.
Registered promoter: MARUTI DEVELOPERS (also rendered “Maruti Developers” on the certificate)
RERA status: Registration period shown in the certificate has ended; current registration status beyond that recorded period is not established by the supplied evidence.
Land and geographic identity
Locality: Dilsukhnagar; the registration certificate identifies Bhavaninagar, Saroornagar.
Revenue village: Bhavaninagar as recorded in the project identity and registration certificate. The building permit describes the location as Moosaram Bagh, under Saidabad mandal, Hyderabad district.
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500060
Survey number(s): Sy. No. 47; no subdivision is identified in the project registration. The filed title materials also refer to part Sy. No. 47.
Plot numbers: Plots 3 and 4
Site extent: 382.14 sq. m total and net plot area in the building permit and RERA land record; road-affected and nala-affected areas are each recorded as 0.0 sq. m.
Boundaries filed with project: North: 40-wide road; South: neighbour’s plot; East: “H NO 16 11 511 BY F BY 2”; West: western part of land in Plot No. 4 belonging to owner.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 1261/GHMC/CHR/2021-BP, approved 01 December 2021; file no. 002345/GHMC/1380/CHR2/2021-BP.
Other approval identifier on permit: Approved Layout No. / LRS Proceeding No. / Sub division No. C/GHMC/075629/2020
Building arrangement and floors: One proposed residential building: 1 Stilt + 5 upper floors; permit-stated height 15 m.
Approved built-up area: Building permit records 1,113.30 sq. m residential built-up area. This is distinct from the project data’s approved built-up area of 1,335.92 sq. m; the supplied evidence does not reconcile those figures.
Parking provision: Permit records 209.2 total parking area and 209.24 sq. m stilt parking area. The permit conditions also refer to cellar and stilt parking, but a cellar level is not included in the stated “1 Stilt + 5 upper floors” configuration.
Unit count: 10 units in the RERA-filed 3BHK configuration; the building permit says sanctioned unit count must not be increased but the supplied extraction does not state the numerical sanctioned count.
Offering and status
Filed offering: 3BHK, 10 units; RERA-filed saleable area 130.0 sq. m per unit.
Booked / available: 0 booked / 10 available, as read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative.
Construction stage: No independently verified or current construction-progress evidence is supplied. The permit sets a construction commencement deadline of 01 June 2022.
Completion deadline: GHMC permit completion deadline: 01 December 2024; the RERA project record also gives proposed completion as 01/12/2024. This is separate from registration validity.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the project’s OC status is therefore not established by this evidence.
2. The project story
MARUTI S TULIP is registered as a residential apartment project on Plots 3 and 4 in Sy. No. 47, in the Bhavaninagar / Dilsukhnagar area of Saroornagar, Ranga Reddy district. The GHMC permit describes one proposed residential building with a stilt level and five upper floors. The RERA filing lists ten 3BHK apartments; the available portal count is 0 booked and 10 available, with no stated date for that inventory snapshot.
The records establish a proposed and sanctioned development, not its present physical completion. The supplied material does not include a current site inspection, certified construction-progress report, or occupancy certificate. The permit requires a completion notice and an occupancy certificate before occupation.
3. Master plan, architecture & building design
The GHMC building permit covers 382.14 sq. m of plot area, with the same figure shown as net plot area. It sanctions one residential building described as 1 Stilt + 5 upper floors, with a permit-stated height of 15 m. The permit records 1,113.30 sq. m residential built-up area; the RERA project fields separately state approved built-up area of 1,335.92 sq. m. The supplied documents do not explain the difference, so the figures are retained as recorded rather than treated as interchangeable.
The building permit specifies front, rear and side setbacks of 3, 2, 2 and 2 respectively, without a unit shown in the extracted fields. The supplied drawing extraction identifies a fifth-floor plan, but does not provide a complete, verifiable account of building footprint, floor-by-floor unit arrangement, lifts, stairs, entrances, or circulation.
No approved master-plan or site-layout drawing extraction is available to describe internal roads, landscaping distribution, open-space dimensions, or phase organization. The GHMC permit does require a peripheral greenery strip, a rainwater-harvesting structure and a tot-lot maintained as greenery.
4. Homes, configurations & floor plans
The RERA-filed offering is ten 3BHK units with saleable area of 130.0 sq. m per unit. Saleable area is the filed figure; it should not be read as carpet area. A software measurement of the supplied fifth-floor drawing gives 88.7 sq. m (955 sq. ft) carpet area for one measured 3BHK design. This is a drawing-based software measurement, not a RERA disclosure, and the measurement record says it needs review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 130.0 sq. m | 88.7 sq. m (955 sq. ft), software-measured from one drawing design | 32% (supplied drawing-analysis record) |
The measured 3BHK drawing labels a living/dining room, kitchen, three bedrooms, three toilets, a wash area and a balcony marked 1.22 M. WIDE BALC. The area measurement excludes the balcony from carpet area. Carpet area, balcony/utility areas and the proportionate common-area component are not interchangeable; the RERA-filed figure here is saleable area.
5. Parking & vehicle circulation
The GHMC permit records 209.2 total parking area and 209.24 sq. m stilt parking area. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The permit’s building description is 1 Stilt + 5 upper floors; the supplied material does not establish a cellar level’s configuration.
No reliable count of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangement, EV charging provision, or unit-specific parking allocation is supplied. A parking area shown or recorded in the permit does not establish exclusive parking ownership for a particular apartment.
6. Amenities, recreation & open spaces
The GHMC permit identifies a tot-lot as “NA” in its extracted amenities/utilities fields, while its conditions call for a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. The permit also requires a peripheral greenery strip and rainwater-harvesting structures. No completion status for these items is supplied.
| Description / size | Permit extraction lists “Tot Lot NA”; permit condition calls for a fenced tot-lot maintained as greenery. No size supplied. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not established. |
| Description / size | Greenery strip at the site periphery; no size supplied. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Required by permit condition; completion not established. |
No project-specific TG-RERA evidence is supplied for a clubhouse, swimming pool, gym, children’s play area or other recreational facilities; these are not treated here as established project amenities.
7. Utilities, building services & safety
The building permit identifies 2 Rain Water Harvesting Pits and requires a rainwater-harvesting structure, transformer space and an on-site garbage house. It also lists water supply and sewerage-related infrastructure as available in the RERA amenities record, but the recorded progress for the listed infrastructure is 0%; that entry does not establish operational or completed service.
The permit conditions require occupancy certification before occupation, a fire NOC before issue of the occupancy certificate, fire-fighting installations and means-of-escape safety, and supervision of sanitation, plumbing, fire safety, lifts and electrical installations by qualified technical personnel. These are permit conditions, not evidence that the systems have been installed or certified.
No capacities or project-specific completed-status evidence is supplied for water storage or treatment, sewage-treatment capacity or reuse, electrical backup, lifts, waste segregation, CCTV/security, or accessible circulation.
8. Location, access & connectivity
The registered location is Dilsukhnagar, in the Bhavaninagar / Saroornagar area, Ranga Reddy district, Telangana, PIN 500060. The permit describes the site as Moosaram Bagh and identifies a 40-wide road on the north boundary; the extracted permit also refers to an 18 mt. road width in its conditions.
Location data lists Dilsukh Nagar Metro at 0.1 km, TGSRTC Bus Station, Dilshuknagar at 0.1 km, Kotak Mahindra Bank at 0.3 km, an Urban Primary Health Centre at 0.2 km, and Brilliant School at 0.2 km. These are supplied mapped-location distances; no travel times are provided.
9. Developer & development status
The registered promoter is MARUTI DEVELOPERS, identified in the RERA fields as a partnership, with GSTIN 36ABSFM6026B1Z9. The listed promoter address is Maple Homes Premises, Street No. 11, Saket Nagar, Moosaram Bagh, Dilsukhnagar, Saroornagar, Ranga Reddy, PIN 500060. The supplied registration certificate gives a promoter office address in Kapra, Medchal-Malkajgiri, PIN 500062; no official contact details or website are supplied here.
The RERA record identifies D. Pushpalatha and MARUTI DEVELOPERS as landowner/promoter participants under an area-share arrangement. The GHMC permit was issued to Smt D. Pushpalatha and records one proposed building. The supplied record gives no current, certified construction-progress update; no phase-wise completion or occupancy status is established.
10. Approvals, official records & documents
| Identifier / date | P02400005499; issued 07/12/2022, validity shown through 01/12/2024 |
|---|---|
| What it establishes | Registration of MARUTI S TULIP and its recorded conditions. |
| Identifier / date | 1261/GHMC/CHR/2021-BP; 01 December 2021; file no. 002345/GHMC/1380/CHR2/2021-BP |
|---|---|
| What it establishes | Conditional sanction for residential construction on Plots 3 and 4, described as 1 Stilt + 5 upper floors. |
| Identifier / date | C/GHMC/075629/2020 |
|---|---|
| What it establishes | Identifier recorded as the approved layout / LRS proceeding / subdivision number. |
| Identifier / date | 30 May 2022 (date transcription as supplied) |
|---|---|
| What it establishes | Promoter-authorized signatory’s declarations concerning title, encumbrances, funds, audits and approvals. |
| Identifier / date | Dated 3 February 2022 |
|---|---|
| What it establishes | Advocate’s title/search report concerning Plots 3 and 4 in part Sy. No. 47. |
| Identifier / date | Document 222587 |
|---|---|
| What it establishes | Unfilled form template; it does not evidence an executed agreement with a specific allottee. |
| Identifier / date | Document 222326 |
|---|---|
| What it establishes | Supplied floor-plan drawing used for software measurement of the 2BHK and 3BHK designs; drawing-based measurements are not RERA-filed areas. |
The permit requires a completion notice and occupancy certificate and states that an occupancy certificate is compulsory before occupation. No occupancy or completion certificate is included in the supplied documents.
Frequently asked questions
Is MARUTI S TULIP registered with Telangana RERA?
Yes. MARUTI S TULIP is registered with the Telangana Real Estate Regulatory Authority as P02400005499; the registration status is New Project.
Who is the developer of MARUTI S TULIP?
The promoter named in the RERA registration is MARUTI DEVELOPERS.
Where is MARUTI S TULIP located?
MARUTI S TULIP is in DILSUKHNAGAR, Bhavaninagar, Saroornagar, Rangareddy, Telangana (500060).
When will MARUTI S TULIP be completed?
The promoter's proposed date of completion filed with RERA is 01/12/2024. This is the promoter's declaration, not a guarantee.
More projects in Saroornagar