SIKHARA PARKSIDE is a residential apartment project in Ameenpur, Ameenpur Mandal, Sangareddy District, developed by the registered promoter SIKHARA INFRACON. The project is on a 390.13 sq.m plot and comprises one proposed building of 1 Stilt + 5 Floors with 10 3BHK homes, each with a RERA-filed saleable area of 140.08 sq.m. Its TG-RERA registration number is P01100011153, and the TG-RERA record gives a proposed completion date of 17/04/2029.

More from Sikhara Infracon · 7 projects →

01What we found

RegisteredTG-RERA - valid till 17 Dec 2028
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com
Ameenpur, Ameenpur, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameSIKHARA PARKSIDE RERA record
Project type / phaseResidential apartment project; registered portion is the proposed building on Plots 342 (North Part) and 342 (South Part). A separate phase number is not disclosed. RERA record
TG-RERA registrationP01100011153; granted under section 5. RERA record
Registration validity17/12/2025–17/12/2028. This is the registration period, not the construction deadline. RERA record
Registered promoter / statusSIKHARA INFRACON; TG-RERA project status recorded as New Project. RERA record Corporate record
Entity typePartnership. RERA filing Parties record

Land and geographic identity

ItemProject record
LocalityAmeenpur. RERA record
Revenue villageAmeenpur (also recorded as Ameenapur in the promoter-office address on the certificate). RERA record
Mandal / district / PINAmeenpur / Sangareddy / 502032. RERA record
Survey number(s)33/1; no further subdivision is identified in the project filing. RERA record Land records
Site / plot identifiersPlot No. 342 (North Part) & 342 (South Part).
Site areaGross plot area 390.13 sq.m; net plot area 390.13 sq.m. The filed plan records road-affected, nala-widening and water-bodies areas as 0 sq.m.
BoundariesNorth: other land; south: other land; east: other land; west: road. RERA filing
Road recorded on planExisting and proposed road width 12.0 m; the plan also labels a 12m Wide Main Road.

Development identity

ItemProject record
Sanctioning authorityHMDA technical approval / building permit, delegated to Ameenpur Municipality.
Principal approval1266/HMDA/SWBP/2025, approved 17/12/2025; associated file number 008507/HMDA/02507/SWBP/SKP2/2025. Approvals record
Building and floorsOne proposed residential building: 1 Stilt + 5 Floors.
Building heightSanctioned parameters state 14.99 m building height; the plan extract separately records 17.99 m height from GL, 20.99 m total height and 14.99 m excluding stilt.
Approved built-up area1151.6 sq.m excluding parking is recorded in the filed plan. The same extract also records 1381.92 sq.m total proposed BUA including parking and 1394.80 sq.m as Gross BUA in sanctioned parameters; these are distinct plan entries.
Approved units10 dwelling units.
Parking provisionPlan records 3.00 Car Parking Spaces and 230.32 sq.m proposed parking area; onsite parking is separately recorded as 0.00 in the plan parameters.

Offering and status

ItemProject record
RERA-filed configuration3BHK; RERA-filed saleable area 140.08 sq.m. RERA unit table RERA unit details
Portal inventory10 units; 0 booked and 10 available in the portal data, which has no as-of date and should be treated as indicative. RERA unit table
Construction stageThe project is registered as a new project. No independently verified construction-progress measurement is supplied. RERA record RERA unit table
Completion datesThe building-permit record states construction to commence before 15/06/2026 and be completed before 17/12/2028. The TG-RERA project header separately records proposed completion 17/04/2029; the promoter’s Form B declares completion by 17/12/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied for this building; the permit makes occupancy certification a post-construction requirement.

2. The project story

SIKHARA PARKSIDE is a single-building residential apartment development registered on land identified as Plot Nos. 342 North Part and 342 South Part in Survey No. 33/1, Ameenpur. The filed building-permit plan describes one building with a stilt level and five floors, containing ten residential units.

The RERA filing lists ten 3BHK homes, all shown as available and none booked in the portal snapshot; because that snapshot has no stated retrieval date, the inventory is indicative rather than a current sales confirmation. The records establish approval and registration, but do not provide independently verified construction progress. The supplied permit extract records a construction commencement deadline and a completion deadline; no OC or completion certificate is included. RERA unit table Document index

3. Master plan, architecture & building design

The sanctioned building-permit plan covers a 390.13 sq.m gross and net plot. It records proposed coverage of 230.32 sq.m (59%), vacant plot area of 151.05 sq.m, and proposed built-up area of 1151.6 sq.m excluding parking. It also lists 1381.92 sq.m total proposed BUA including parking and 1394.80 sq.m Gross BUA in its sanctioned parameters; the source presents these as separate figures, and they should not be treated as interchangeable area measures.

The approved arrangement is one residential building of 1 Stilt + 5 Floors, with 10 sanctioned units. The plan records four setbacks: front 3.0 m, rear 2.0 m, and both side setbacks 2.0 m. No floor-by-floor unit distribution, lift count, stair configuration, building footprint drawing measurements beyond the proposed coverage, or detailed internal circulation information is available in the supplied extracts.

The plan names a tot-lot and periphery greenery among its conditions and records rainwater harvesting and a transformer space; the building-permit extract records the tot-lot area as 0. These entries do not establish completed facilities.

4. Homes, configurations & floor plans

The RERA filing lists ten 3BHK units with a saleable area of 140.08 sq.m each; portal inventory records 0 booked and 10 available, without an as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010140.08 sq.m74.2–76.7 sq.m; median 75.4 sq.m (software-measured from drawings)46% (software-derived)

The carpet-area figures are software measurements from the floor-plan drawing, not RERA disclosures; four flat designs were measured, and all four measurements are marked as needing review. The RERA-filed saleable area is a separate figure and includes the home’s share of common areas; it is not carpet area. Floor plans RERA unit details

The drawing extract shows a living/dining area, kitchen, three bedrooms, a common toilet, an attached toilet and two balconies for one measured flat. Balcony areas are excluded from the stated software-measured carpet area. RERA unit details

5. Parking & vehicle circulation

The filed plan records 3.00 car parking spaces and a proposed parking area of 230.32 sq.m. It also records onsite parking as 0.00 and two-wheeler spaces as 0.00; the extract does not clarify the relationship between these separate entries. The building permit specifies that the stilt/parking area is to be used exclusively for parking.

The available record does not establish visitor or accessible-space counts, individual unit parking allocations, EV charging installations, parking-bay ownership, or detailed vehicle entry, ramp and driveway arrangements. The sanctioned space count should not be read as an exclusive allocation to a particular flat.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / greeneryListed as a permit condition; periphery tree planting and greenery are also specified. Plan extract records tot-lot area as 0 sq.m and 10 trees.Required or specified in the permit; completion not verified.
Rainwater harvesting1 rainwater-harvesting pit recorded.Sanctioned/recorded; installation not verified.
Electrical room / sub-station / receiving stationRERA amenities record says “YES”; permit lists transformer space.RERA amenitiesFiled as available; progress shown as 0% in the supplied amenities record.
Water supplyRERA amenities record says “YES.”RERA amenitiesFiled as available; progress shown as 0%.
SewerageRERA amenities record says “YES” for sewerage infrastructure, including chamber, lines, septic tank or STP. Permit extract lists septic tank.RERA amenitiesFiled as available; progress shown as 0%; completion not verified.
Internal roads and footpathsListed in the RERA amenities record.RERA amenitiesProgress shown as 0%.
Storm-water drainsListed in the RERA amenities record.RERA amenitiesProgress shown as 0%.
Street lightingListed in the RERA amenities record.RERA amenitiesProgress shown as 0%.
Community buildings / recreational open spaceListed in the RERA amenities record; no size or facility detail supplied.RERA amenitiesProgress shown as 0%.
Solid-waste management and disposalListed in the RERA amenities record; permit extract specifies a garbage house.RERA amenitiesProgress shown as 0%; completion not verified.
Water conservation / rainwater harvestingListed in the RERA amenities record and building-permit extract.RERA amenitiesProgress shown as 0%; installation not verified.
Fire protection and fire safetyListed in the RERA amenities record; the permit contains fire-safety and occupancy-related conditions.RERA amenitiesProgress shown as 0%; no completion verification or Fire NOC supplied.

No clubhouse or sports facility is identified in the supplied RERA amenities and permit extracts. RERA amenities

7. Utilities, building services & safety

The RERA amenities record marks water supply and sewerage as available, but supplies no water source, storage capacity, treatment capacity or verified operating status. The permit lists a septic tank and requires a rainwater-harvesting percolation pit; no STP capacity, treated-water reuse arrangement or storm-water system design is supplied. RERA amenities

A transformer space is specified, but no electrical-load, backup-power or substation-capacity details are provided. The plan lists a lift, without count or capacity. Fire-safety requirements appear in the permit conditions, including a requirement to obtain an occupancy Fire NOC before OC; no Fire NOC or completed fire-system evidence is included.

The permit also specifies a garbage house and rainwater harvesting. It includes construction and occupancy conditions for safety and services, but the supplied material does not establish their installation or completion. No accessibility design details, CCTV, security arrangements, EV charger count or capacity are evidenced in the RERA-filed material supplied for this overview.

8. Location, access & connectivity

The registered location is Ameenpur village, Ameenpur Mandal, Sangareddy District, Telangana, PIN 502032, on Survey No. 33/1, Plot Nos. 342 North Part and 342 South Part. The filed plan records a road on the western boundary and a 12.0 m existing/proposed road width. RERA record Land records

The supplied location dataset lists these proximity distances from its mapped project point: ADP 0.0 km, IndusInd Bank 0.4 km, Nanakramguda Government Primary School 0.5 km, Financial District (Nanakramguda) 1.2 km, an unnamed park 1.2 km, Manuu Polytechnic Hyderabad 1.6 km, Sankaraya Eye Hospital 1.6 km, an unnamed bus station 2.2 km, and South India Shopping Mall 2.6 km. These are dataset distances; no route or travel-time measurements are supplied. Location record

9. Developer & development status

The registered promoter is SIKHARA INFRACON, recorded as a partnership, with GSTIN 36AENFS4605N1ZG. The supplied promoter address is SIKHARA MARIGOLD, SAI RAJESHWARI PHASE 2, Ameenpur, Sangareddy, Telangana, 502032. Corporate record Parties record RERA filing

The RERA-filed project is a single-building development. The portal lists ten 3BHK units and shows none booked and all ten available, but gives no inventory as-of date. No construction-progress percentage or independent site verification is supplied. The permit states a construction commencement deadline of 15/06/2026 and completion before 17/12/2028; the TG-RERA header records proposed completion 17/04/2029, while the promoter’s Form B declares 17/12/2028. No OC or completion certificate is supplied. RERA unit table RERA record

10. Approvals, official records & documents

RecordIdentifier / dateEvidence
TG-RERA registration certificateP01100011153; valid 17/12/2025–17/12/2028
Building permit / technical approvalApproval 1266/HMDA/SWBP/2025, dated 17/12/2025; file 008507/HMDA/02507/SWBP/SKP2/2025
Plan and building detailsBuilding-permit plan for Survey No. 33/1, Plot Nos. 342 North Part and 342 South Part; one building, 1 Stilt + 5 Floors, ten units
Promoter declarationForm B by authorized signatory Nangineni Rajesh; completion declared by 17/12/2028
RERA-filed development agreementDevelopment Agreement-cum-GPA 6286/2026, covering the two plot portions; filed extract describes development rights and a 30:70 built-up-area share
Title opinionAdvocate’s title report dated 31 May 2026
Occupancy / completion certificateNot supplied; permit conditions call for completion notice and occupancy certification after construction.

Frequently asked questions

Is SIKHARA PARKSIDE registered with Telangana RERA?

Yes. SIKHARA PARKSIDE is registered with the Telangana Real Estate Regulatory Authority as P01100011153; the registration status is New Project.

Who is the developer of SIKHARA PARKSIDE?

The promoter named in the RERA registration is SIKHARA INFRACON.

Where is SIKHARA PARKSIDE located?

SIKHARA PARKSIDE is in AMEENPUR, Sangareddy, Telangana (502032).

When will SIKHARA PARKSIDE be completed?

The promoter's proposed date of completion filed with RERA is 17/04/2029. This is the promoter's declaration, not a guarantee.