Rainbow Towers
RAINBOW CONSTRUCTIONS · Rangareddy · RERA P02400005572
RAINBOW TOWERS is a residential apartment project in Mansoorabad Locality, Saroornagar Mandal, Rangareddy District. The registered promoter is RAINBOW CONSTRUCTIONS. The project covers 501.6 Sq. Mtrs and comprises one residential building with 1 Stilt + 5 upper floors and 10 proposed 3BHK units, each with a RERA-filed saleable area of 70.83 sqm. It is registered under TG-RERA number P02400005572, with a proposed completion date of 01/05/2025.
More from Rainbow Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | RAINBOW TOWERS RERA record |
| Project type | Residential apartment project RERA record Approvals record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for RAINBOW TOWERS RERA record |
| TG-RERA registration | P02400005572 RERA record |
| Registration validity | Certificate states validity from 20/12/2022 to 01/05/2025; extension is not recorded in the supplied certificate |
| Registered promoter | RAINBOW CONSTRUCTIONS RERA record Corporate record |
| RERA status | The supplied certificate records registration; the recorded validity end date has passed. Current registration status is not established by the supplied evidence |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / village | Mansoorabad Locality; revenue village recorded as Mansoorabad RERA record Land records |
| Mandal / district / PIN | Saroornagar Mandal; Rangareddy District; 500068 RERA record |
| Project survey number(s) | Survey No. 91; no subdivision is specified for the project in the filing or registration certificate Land records |
| Plot | Plot No. 29 RERA record |
| Site extent | 501.6 Sq. Mtrs; net plot area 501.6 Sq. Mtrs Land records |
| Road / nala affected area | 0.0 Sq. Mtrs each, as recorded in the building-permit extraction |
| Boundaries | East: plot no 13; West: 30 feet wide road; North: plot no 30; South: plot no 28 Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 1413/GHMC/LBN/2022-BP, approved 13 May, 2022 Approvals record |
| Related file number | 003764/GHMC/1923/LBN2/2022-BP Approvals record |
| Approved built-up area | 1,178.45 (Residential, as shown in the building-permit extraction); stilt area is separately recorded as 259.3 |
| Building count / configuration | One residential building; 1 Stilt + 5 upper floors RERA record |
| Sanctioned height | 14.90 |
| Parking provision in permit extraction | Stilt area 259.3; total parking area 259.3. The supplied record does not state a number of parking spaces |
| Unit counts | GHMC permit extraction does not provide a unit count. TG-RERA filing records 10 proposed units RERA record RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK RERA unit table |
| RERA-filed saleable area | 70.83 sqm per unit RERA unit table |
| Booking / availability | 0 booked; 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table |
| Construction stage | No independently verified construction-stage or site-progress evidence is supplied Document index |
| Completion dates | GHMC permit records construction to be completed before 13 May, 2025; the RERA certificate and Form B record 01/05/2025 as the validity end date and promoter’s completion undertaking, respectively |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. GHMC’s permit requires an occupancy certificate before occupation |
2. The project story
- RAINBOW TOWERS is registered as a residential apartment project on Plot No. 29, Survey No. 91, in Mansoorabad village, Saroornagar Mandal, Rangareddy District. The site is recorded as 501.6 Sq. Mtrs. GHMC’s building-permit order authorizes one residential building with one stilt level and five upper floors. RERA record Land records
- The TG-RERA filing describes a 3BHK offering of 10 units. The portal-read counts show 0 booked and 10 available, but are indicative because the record does not give a capture date. The supplied evidence does not establish the current construction stage, completion of individual floors, or whether any part of the building has been occupied. No occupancy or completion certificate is supplied. RERA unit table Document index
- The promoter’s Form B affidavit undertakes completion by 01.05.2025. That is a promoter declaration, not evidence of completion. The building-permit order separately requires a completion notice and an occupancy certificate before occupation.
3. Master plan, architecture & building design
- The supplied GHMC permit extraction records a single residential building on a 501.6 Sq. Mtrs site, with 1 Stilt + 5 upper floors and a sanctioned height of 14.90. It lists approved residential built-up area as 1,178.45 and stilt area as 259.3. These are permit-record figures; no separate FSI-counted area or gross built-up-area schedule is supplied.
- The permit extraction records front, rear and side setbacks of 3.05, 3.5, 3.5 and 3.5, respectively. It also records two rainwater-harvesting pits and a transformer space requirement. The supplied materials do not provide a readable floor-plan set from which to describe flat positions, entries, lifts, stairs, internal circulation, open-space dimensions or landscaping layout.
- A layout-plan document is listed in the TG-RERA filing, but its extraction is unavailable. The supplied evidence therefore does not establish further architectural or site-layout details.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 70.83 sqm | Not established | Not supplied |
- The configuration, counts and saleable area are TG-RERA filing figures; booking and availability counts are indicative because no as-of date is recorded. RERA unit table
- Two drawings are recorded as reviewed by the measurement process, but no 3BHK flat design has a usable software-measured carpet-area result. The drawing record reports four measurements held back as implausible. No room dimensions, balcony or utility measurements, or typical floor arrangement can therefore be reported from the supplied evidence. Software-measured carpet area, where available, would be a drawing-derived measurement—not a RERA filing—and should not be treated as interchangeable with saleable area. Floor plans
5. Parking & vehicle circulation
- The GHMC permit extraction records a 259.3 stilt area and 259.3 total parking area, and requires the approved stilt/cellar parking space to be used exclusively for vehicle parking. The supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible provision, parking allocation to individual units, or any mechanical parking. No cellar level is identified in the extracted sanctioned floor configuration.
- The permit also refers to the site abutting an 18 mt. road width and contains a condition concerning the absence of a front compound wall for sites abutting roads of that width. The project boundary record separately identifies the west boundary as a 30 feet wide road. No detailed driveway, ramp or pedestrian-circulation plan is available in the supplied materials. Land records
6. Amenities, recreation & open spaces
The following are recorded in the GHMC permit extraction or the TG-RERA amenity disclosure. The percentages are filing values, not independent verification of delivery.
| Description / size | Two pits; permit also requires a rainwater-harvesting structure |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Permit-record provision; completion not independently verified |
| Description / size | TG-RERA amenity row marked “YES,” 100%; permit requires periphery greenery and maintenance of a tot-lot as greenery |
|---|---|
| Evidence source | TG-RERA amenity disclosure; GHMC permit |
| Declared progress / verified status | Declared 100%; the permit extraction states “Tot Lot NA”; delivered status not independently verified RERA amenities |
| Description / size | No provision indicated in the amenity disclosure |
|---|---|
| Evidence source | TG-RERA amenity disclosure |
| Declared progress / verified status | 0% RERA amenities |
| Description / size | No progress percentage recorded |
|---|---|
| Evidence source | TG-RERA amenity disclosure |
| Declared progress / verified status | 0% RERA amenities |
- The broader amenity disclosure also marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES” at 100%. These are declarations in the filing; the evidence does not independently verify completion. Other listed items—including internal roads and footpaths, street lighting, energy management, fire protection and fire safety—show 0%, while no progress percentage is recorded for aggregate recreational open space. RERA amenities
7. Utilities, building services & safety
- The TG-RERA amenity disclosure marks water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES” at 100%. These are filing declarations; no capacities, technical designs, completion certificates or independent site verification are supplied. RERA amenities
- The GHMC permit requires two rainwater-harvesting pits, a transformer space and an on-site garbage house. It also requires an occupancy Fire NOC before issue of the occupancy certificate and states that fire-fighting installations and structural/means-of-escape safety are the responsibility of the project parties. The supplied material does not establish that these systems or clearances have been completed or obtained.
- The permit extraction does not specify lift count or capacity, backup-power capacity, water-storage or treatment capacity, CCTV, access-control arrangements, waste-segregation method, accessible circulation, or ramp provision. No statutory compliance conclusion can be drawn from the supplied amenity disclosure alone. RERA amenities
8. Location, access & connectivity
- The registered site location is Plot No. 29, Survey No. 91, Mansoorabad village, Saroornagar Mandal, Rangareddy District, PIN 500068. The filing records the west boundary as a 30 feet wide road; the GHMC permit extraction also refers to an 18 mt. road-width condition. RERA record Land records
- A location record gives an approximate coordinate of 17.3541765, 78.5652906 and records the Outer Ring Road nearest sampled interchange at 6.9 km. No public-transport route, measured distance to local services, or verified travel time is supplied. Location record
9. Developer & development status
- The registered promoter is RAINBOW CONSTRUCTIONS, identified in the project record as a partnership, with GSTIN 36ABEFR5441B1ZH. The supplied promoter address is Sri Sai Towers, Street No. 8, Mansoorabad, Saroornagar, Rangareddy, 500068. The TG-RERA registration certificate separately records the promoter office as Habsiguda, Uppal Mandal, Medchal-Malkajgiri, PIN 500007. No official website or contact details are supplied. Corporate record Parties record
- The RERA filing records one building and 10 proposed 3BHK units. The RERA portal-read booking counts are indicative, and the supplied evidence contains no independently verified construction-progress report or occupancy certificate. The promoter’s Form B affidavit declares a completion undertaking of 01.05.2025; it does not establish that the project was completed by that date. RERA record RERA unit table Document index
10. Approvals, official records & documents
| Identifier / date | P02400005572; issued 20/12/2022; stated validity through 01/05/2025 |
|---|---|
| What the supplied evidence establishes | Registration of RAINBOW TOWERS and stated registration conditions; no extension is recorded in the supplied certificate |
| Identifier / date | 1413/GHMC/LBN/2022-BP; 13 May, 2022 |
|---|---|
| What the supplied evidence establishes | Permit for one residential building comprising 1 Stilt + 5 upper floors, subject to permit conditions |
| Identifier / date | 003764/GHMC/1923/LBN2/2022-BP; 13 May, 2022 |
|---|---|
| What the supplied evidence establishes | File reference recorded in the building-permit extraction |
| Identifier / date | Dated 22.09.2022 |
|---|---|
| What the supplied evidence establishes | Promoter affidavit includes a completion undertaking for 01.05.2025 and other declarations |
| Identifier / date | Listed as document 268646 |
|---|---|
| What the supplied evidence establishes | Extraction unavailable; its contents cannot be described |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | No certificate or verified occupancy status is established by the available documents Document index |
The supplied document set also includes the TG-RERA registration certificate, building-permit extraction, Form B declaration and a partially filled agreement-for-sale form. The latter does not establish a completed sale or identify an executed unit agreement.
1. Project at a glance
Project identity
Registered project name: RAINBOW TOWERS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for RAINBOW TOWERS
TG-RERA registration: P02400005572
Registration validity: Certificate states validity from 20/12/2022 to 01/05/2025; extension is not recorded in the supplied certificate
Registered promoter: RAINBOW CONSTRUCTIONS
RERA status: The supplied certificate records registration; the recorded validity end date has passed. Current registration status is not established by the supplied evidence
Land and geographic identity
Locality / village: Mansoorabad Locality; revenue village recorded as Mansoorabad
Mandal / district / PIN: Saroornagar Mandal; Rangareddy District; 500068
Project survey number(s): Survey No. 91; no subdivision is specified for the project in the filing or registration certificate
Plot: Plot No. 29
Site extent: 501.6 Sq. Mtrs; net plot area 501.6 Sq. Mtrs
Road / nala affected area: 0.0 Sq. Mtrs each, as recorded in the building-permit extraction
Boundaries: East: plot no 13; West: 30 feet wide road; North: plot no 30; South: plot no 28
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 1413/GHMC/LBN/2022-BP, approved 13 May, 2022
Related file number: 003764/GHMC/1923/LBN2/2022-BP
Approved built-up area: 1,178.45 (Residential, as shown in the building-permit extraction); stilt area is separately recorded as 259.3
Building count / configuration: One residential building; 1 Stilt + 5 upper floors
Sanctioned height: 14.90
Parking provision in permit extraction: Stilt area 259.3; total parking area 259.3. The supplied record does not state a number of parking spaces
Unit counts: GHMC permit extraction does not provide a unit count. TG-RERA filing records 10 proposed units
Offering and status
RERA-filed configuration: 3BHK
RERA-filed saleable area: 70.83 sqm per unit
Booking / availability: 0 booked; 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative
Construction stage: No independently verified construction-stage or site-progress evidence is supplied
Completion dates: GHMC permit records construction to be completed before 13 May, 2025; the RERA certificate and Form B record 01/05/2025 as the validity end date and promoter’s completion undertaking, respectively
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. GHMC’s permit requires an occupancy certificate before occupation
2. The project story
- RAINBOW TOWERS is registered as a residential apartment project on Plot No. 29, Survey No. 91, in Mansoorabad village, Saroornagar Mandal, Rangareddy District. The site is recorded as 501.6 Sq. Mtrs. GHMC’s building-permit order authorizes one residential building with one stilt level and five upper floors.
- The TG-RERA filing describes a 3BHK offering of 10 units. The portal-read counts show 0 booked and 10 available, but are indicative because the record does not give a capture date. The supplied evidence does not establish the current construction stage, completion of individual floors, or whether any part of the building has been occupied. No occupancy or completion certificate is supplied.
- The promoter’s Form B affidavit undertakes completion by 01.05.2025. That is a promoter declaration, not evidence of completion. The building-permit order separately requires a completion notice and an occupancy certificate before occupation.
3. Master plan, architecture & building design
- The supplied GHMC permit extraction records a single residential building on a 501.6 Sq. Mtrs site, with 1 Stilt + 5 upper floors and a sanctioned height of 14.90. It lists approved residential built-up area as 1,178.45 and stilt area as 259.3. These are permit-record figures; no separate FSI-counted area or gross built-up-area schedule is supplied.
- The permit extraction records front, rear and side setbacks of 3.05, 3.5, 3.5 and 3.5, respectively. It also records two rainwater-harvesting pits and a transformer space requirement. The supplied materials do not provide a readable floor-plan set from which to describe flat positions, entries, lifts, stairs, internal circulation, open-space dimensions or landscaping layout.
- A layout-plan document is listed in the TG-RERA filing, but its extraction is unavailable. The supplied evidence therefore does not establish further architectural or site-layout details.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 70.83 sqm | Not established | Not supplied |
- The configuration, counts and saleable area are TG-RERA filing figures; booking and availability counts are indicative because no as-of date is recorded.
- Two drawings are recorded as reviewed by the measurement process, but no 3BHK flat design has a usable software-measured carpet-area result. The drawing record reports four measurements held back as implausible. No room dimensions, balcony or utility measurements, or typical floor arrangement can therefore be reported from the supplied evidence. Software-measured carpet area, where available, would be a drawing-derived measurement—not a RERA filing—and should not be treated as interchangeable with saleable area.
5. Parking & vehicle circulation
- The GHMC permit extraction records a 259.3 stilt area and 259.3 total parking area, and requires the approved stilt/cellar parking space to be used exclusively for vehicle parking. The supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible provision, parking allocation to individual units, or any mechanical parking. No cellar level is identified in the extracted sanctioned floor configuration.
- The permit also refers to the site abutting an 18 mt. road width and contains a condition concerning the absence of a front compound wall for sites abutting roads of that width. The project boundary record separately identifies the west boundary as a 30 feet wide road. No detailed driveway, ramp or pedestrian-circulation plan is available in the supplied materials.
6. Amenities, recreation & open spaces
The following are recorded in the GHMC permit extraction or the TG-RERA amenity disclosure. The percentages are filing values, not independent verification of delivery.
| Description / size | Two pits; permit also requires a rainwater-harvesting structure |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Permit-record provision; completion not independently verified |
| Description / size | TG-RERA amenity row marked “YES,” 100%; permit requires periphery greenery and maintenance of a tot-lot as greenery |
|---|---|
| Evidence source | TG-RERA amenity disclosure; GHMC permit |
| Declared progress / verified status | Declared 100%; the permit extraction states “Tot Lot NA”; delivered status not independently verified |
| Description / size | No provision indicated in the amenity disclosure |
|---|---|
| Evidence source | TG-RERA amenity disclosure |
| Declared progress / verified status | 0% |
| Description / size | No progress percentage recorded |
|---|---|
| Evidence source | TG-RERA amenity disclosure |
| Declared progress / verified status | 0% |
- The broader amenity disclosure also marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES” at 100%. These are declarations in the filing; the evidence does not independently verify completion. Other listed items—including internal roads and footpaths, street lighting, energy management, fire protection and fire safety—show 0%, while no progress percentage is recorded for aggregate recreational open space.
7. Utilities, building services & safety
- The TG-RERA amenity disclosure marks water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES” at 100%. These are filing declarations; no capacities, technical designs, completion certificates or independent site verification are supplied.
- The GHMC permit requires two rainwater-harvesting pits, a transformer space and an on-site garbage house. It also requires an occupancy Fire NOC before issue of the occupancy certificate and states that fire-fighting installations and structural/means-of-escape safety are the responsibility of the project parties. The supplied material does not establish that these systems or clearances have been completed or obtained.
- The permit extraction does not specify lift count or capacity, backup-power capacity, water-storage or treatment capacity, CCTV, access-control arrangements, waste-segregation method, accessible circulation, or ramp provision. No statutory compliance conclusion can be drawn from the supplied amenity disclosure alone.
8. Location, access & connectivity
- The registered site location is Plot No. 29, Survey No. 91, Mansoorabad village, Saroornagar Mandal, Rangareddy District, PIN 500068. The filing records the west boundary as a 30 feet wide road; the GHMC permit extraction also refers to an 18 mt. road-width condition.
- A location record gives an approximate coordinate of 17.3541765, 78.5652906 and records the Outer Ring Road nearest sampled interchange at 6.9 km. No public-transport route, measured distance to local services, or verified travel time is supplied.
9. Developer & development status
- The registered promoter is RAINBOW CONSTRUCTIONS, identified in the project record as a partnership, with GSTIN 36ABEFR5441B1ZH. The supplied promoter address is Sri Sai Towers, Street No. 8, Mansoorabad, Saroornagar, Rangareddy, 500068. The TG-RERA registration certificate separately records the promoter office as Habsiguda, Uppal Mandal, Medchal-Malkajgiri, PIN 500007. No official website or contact details are supplied.
- The RERA filing records one building and 10 proposed 3BHK units. The RERA portal-read booking counts are indicative, and the supplied evidence contains no independently verified construction-progress report or occupancy certificate. The promoter’s Form B affidavit declares a completion undertaking of 01.05.2025; it does not establish that the project was completed by that date.
10. Approvals, official records & documents
| Identifier / date | P02400005572; issued 20/12/2022; stated validity through 01/05/2025 |
|---|---|
| What the supplied evidence establishes | Registration of RAINBOW TOWERS and stated registration conditions; no extension is recorded in the supplied certificate |
| Identifier / date | 1413/GHMC/LBN/2022-BP; 13 May, 2022 |
|---|---|
| What the supplied evidence establishes | Permit for one residential building comprising 1 Stilt + 5 upper floors, subject to permit conditions |
| Identifier / date | 003764/GHMC/1923/LBN2/2022-BP; 13 May, 2022 |
|---|---|
| What the supplied evidence establishes | File reference recorded in the building-permit extraction |
| Identifier / date | Dated 22.09.2022 |
|---|---|
| What the supplied evidence establishes | Promoter affidavit includes a completion undertaking for 01.05.2025 and other declarations |
| Identifier / date | Listed as document 268646 |
|---|---|
| What the supplied evidence establishes | Extraction unavailable; its contents cannot be described |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | No certificate or verified occupancy status is established by the available documents |
The supplied document set also includes the TG-RERA registration certificate, building-permit extraction, Form B declaration and a partially filled agreement-for-sale form. The latter does not establish a completed sale or identify an executed unit agreement.
Frequently asked questions
Is RAINBOW TOWERS registered with Telangana RERA?
Yes. RAINBOW TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02400005572; the registration status is New Project.
Who is the developer of RAINBOW TOWERS?
The promoter named in the RERA registration is RAINBOW CONSTRUCTIONS.
Where is RAINBOW TOWERS located?
RAINBOW TOWERS is in mansoorabad, Saroornagar, Rangareddy, Telangana (500068).
When will RAINBOW TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 01/05/2025. This is the promoter's declaration, not a guarantee.