Sign in

Yadadri Smart City

M/s DDL PROPERTY DEVELOPERS · Yadadri Bhuvanagiri · RERA P02000002149

YADADRI SMART CITY is a plotted development in TALLAGUDEM HO, Peddakandukur, Yadagirigutta mandal, Yadadri Bhuvanagiri district. The registered promoter is M/s DDL PROPERTY DEVELOPERS. The registered site area is 64258.90 sq m, and the draft-layout approval identifies 204 plots; plot configurations are not stated in the supplied record. The project is registered with TG-RERA as P02000002149, with a proposed completion date of 27/07/2023.

📘 Project brochure from the promoter’s website ↗

01What we found

RegisteredTG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameYADADRI SMART CITY RERA record
Project type / registered portionPlotted development; registered phase or portion is not separately identified in the supplied record. RERA record RERA filing
TG-RERA registrationP02000002149 RERA record
Registration validityCertificate states validity from 16/09/2020 to 27/07/2023; no extension is recorded in the supplied certificate data. Registration validity is distinct from the completion deadline.
Registered promoterM/s DDL PROPERTY DEVELOPERS RERA record Corporate record
RERA statusThe project is identified as “New Project” in the registration information. Current registration status beyond the certificate’s stated validity is not established by the supplied record. RERA record RERA filing

Land and geographic identity

FieldRecord
Revenue villagePeddakandukur; the layout approval describes the site as Tallagudem H.O. Peddakandukur Revenue Village. RERA record
LocalityTALLAGUDEM HO RERA record
Mandal / district / PINYadagirigutta / Yadadri Bhuvanagiri / 508286 RERA record
Project survey numbers as filed with TG-RERA216/P, 217/P, 218/P RERA record
Survey references in draft-layout approval216/ LOO, 217/00U, 218/0OU, 217 AA, 218/ AA/1, 217/EE, 217/E, 218/ A2; these are reproduced as written in that approval.
Survey-level cadastral recordA Bhu Bharati GIS record is supplied for 216/P (whole-survey extent 61802.81 sq m); it does not establish the project’s precise parcel boundary or the extent held in that subdivision. Cadastral map
Registered site extentThe RERA land filing states 64258.90 sq m total and net area, with affected area 0. RERA filing Land records
Draft-layout area stated in approvalAc. 15.875 cts; 76835.0 SYDS.
Boundaries in RERA land filingEast: NATIONAL HIGHWAY; West: SY NO 216 AND 217; North: SY NO 220 219 AND 218 PART; South: LAND OF JADAPALLI VINITHA. RERA filing Land records

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning; the draft-layout document notes delegation to Tallagudem G.P. Approvals record
Principal approvalDraft - TLP.No. 153 /2020/ H, approved 27-07-2020; letter reference Lr.Roc.No. 15762/699/2020/H. Approvals record
Approval stageDraft Technical Layout Pattern approval. The document calls for development works and a later proposal through the Gram Panchayat to obtain final layout approval.
Approved built-up area36490.50 sq m is recorded in the RERA filing as “Approved Built up Area”; it is not a building count or plot saleable-area figure. RERA filing
Plot count204 plots in the draft-layout approval.
Buildings / floorsBuilding count and sanctioned building-floor configuration are not disclosed in the supplied project record; the approval is for a plotted layout.
Mortgage areaRERA filing records 5544.19 sq m. The draft-layout approval identifies Plot Nos 132 to 167, stated as Ac 1.37 Cents, or 6630.80 Sq. Yards, for mortgage to the Gram Panchayat. RERA filing

Offering and status

FieldRecord
Unit typePlots; RERA unit inventory, plot-size bands and plot-wise booking/availability counts are not supplied. RERA filing RERA amenities
Original completion date27/07/2023 is the proposed completion date in the project filing; the Form C certificate also ends its stated registration validity on 27/07/2023. RERA record RERA filing
Revised completion dateNot disclosed in the supplied evidence.
Construction/development stageTG-RERA amenity entries show 0% progress for the listed items. This is a filed progress figure, not independent site verification. RERA amenities
Occupancy/completion certificateNo project completion certificate or occupancy certificate is identified in the supplied records. Document index Approvals record
Availability / bookingsBooked and available plot counts are not disclosed in the supplied data. RERA amenities

2. The project story

  • YADADRI SMART CITY is registered as a plotted development in Peddakandukur village, Yadagirigutta mandal, Yadadri Bhuvanagiri district. Its TG-RERA record identifies 216/P, 217/P and 218/P and a registered site area of 64258.90 sq m. The DTCP document is a draft layout approval for 204 plots, with a stated 10% open-space reservation and a later final-layout approval step following completion of development works and compliance with the approval conditions. RERA record RERA filing
  • The registration certificate and promoter’s Form B record 27/07/2023 as the completion date. The supplied RERA progress entries show 0% for the listed development items; these are recorded disclosures, not a verified inspection of current site conditions. No completion/occupancy certificate or revised completion date is present in the supplied materials. RERA amenities Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey residential building scheme in the supplied approval. The draft-layout approval states a total layout area of Ac. 15.875 cts; 76835.0 SYDS, divided in its land-use schedule as follows:

Layout componentApproval figure
Open space (park)Ac. 1.588 cts; 7685.92 SYDS (10%)
RoadsAc. 5.27 cts; 25506.80 SYDS (33.20%)
Plotted areaAc. 9.017 cts; 43642.28 SYDS (56.80%)
Mortgage areaAc. 1.37 cts; 6630.80 SYDS (15.19%)
  • The approval identifies 204 plots and mortgage plots 132 to 167. It requires the open-space and road areas to be handed to the Gram Panchayat by registered gift deed before final-layout release. The document also calls for roads, drains and nala channelization, greenery and avenue plantation, open-space fencing, street lighting, electricity, sewerage disposal and protected water supply. These are requirements/approval provisions; the supplied record does not establish that they have been completed.
  • No approved plot-by-plot drawing measurements, building footprints, plot-size bands, internal road widths or final-layout plan are available in the supplied data. The RERA-filed 36490.50 sq m “Approved Built up Area” is reported as filed and is not treated here as plot area, carpet area or saleable area. RERA filing

4. Homes, configurations & floor plans

  • The registered offering is plots. No TG-RERA plot inventory table with plot sizes, saleable areas, booked counts or available counts is supplied, so a plot configuration schedule cannot be verified from this evidence. RERA filing RERA amenities
  • The file includes two drawing records pending measurement; neither has a supplied plot-by-plot measurement. The drawing review metadata says the drawings are scans pending processing and that no software-measured areas are available. Floor plans

5. Parking & vehicle circulation

The supplied record does not state a sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation. The draft-layout approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site; it does not provide a quantified vehicle-circulation or parking plan.

6. Amenities, recreation & open spaces

The following items appear in the TG-RERA amenity record. A listed “YES” indicates availability as filed; the accompanying progress entries are 0%. No independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize/details not suppliedTG-RERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified
Green strip / TOT LOT / parkLayout approval provides Ac. 1.588 cts; 7685.92 SYDS (10%) as open space (park)TG-RERA amenity record RERA amenities; draft-layout approvalListed “YES”; 0%; not independently verified
Community buildingsNo size or facility schedule suppliedTG-RERA amenity record RERA amenities0%; not independently verified
Water conservation / rainwater harvestingNo quantity or capacity suppliedTG-RERA amenity record RERA amenitiesListed “YES”; 0%; not independently verified

7. Utilities, building services & safety

The draft-layout approval requires the developer to provide sewerage disposal and protected water supply, and to undertake roads, drains and nala channelization, greenery and avenue plantation, street lighting and electricity facilities. It also mentions rainwater-harvesting pits. These are approval requirements; completion, operating capacity and service connections are not established by the supplied materials.

Water
Evidence in the recordProtected water supply is required by the draft-layout approval; no source, storage or treatment capacity is stated.
Status limitationRequired/proposed in the approval; completion not verified
Sewerage and drainage
Evidence in the recordSewerage disposal, drains and nala channelization are required; no system design, treatment capacity or reuse details are supplied. RERA amenities
Status limitationAmenity progress entries show 0%; not independently verified
Storm water / rainwater
Evidence in the recordRainwater-harvesting pits are listed in the approval; no quantities or capacities are stated.
Status limitationCompletion not verified
Electricity and lighting
Evidence in the recordElectricity facilities and street lighting are required in the approval. RERA amenities
Status limitationAmenity progress entries show 0%; not independently verified
Fire, waste, security and accessibility
Evidence in the recordNo project-specific system specifications or capacities are supplied. RERA amenities
Status limitationNot established by supplied evidence

8. Location, access & connectivity

  • The registered location is TALLAGUDEM HO, revenue village Peddakandukur, Yadagirigutta mandal, Yadadri Bhuvanagiri district, PIN 508286. The RERA land filing records the eastern boundary as NATIONAL HIGHWAY. A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 37.9 km; this is a mapped distance, not a travel-time estimate. RERA record RERA filing Location record
  • The supplied location record does not identify public-transport services or additional independently measured distances to landmarks. No travel-time claims are used in this profile. Location record

9. Developer & development status

  • The registered legal promoter is M/s DDL PROPERTY DEVELOPERS, identified as a partnership. The project record lists DACHEPALLY SHARATH BABU as authorized signatory; the partnership deed is described in the filed-document index as executed on 18 February 2019. The supplied contact/address information gives GROUND FLOOR BESIDE APPOLO PHARMACY, TALLAGUDEM HO, Yadagirigutta, Yadadri Bhuvanagiri, 508286. A promoter website is recorded as https://ddlpd.com/yadadri-smartcity.php. RERA record Corporate record Parties record Document index
  • The RERA filing’s proposed completion date is 27/07/2023. The certificate states validity through 27/07/2023 and the supplied certificate extraction records no extension. The available amenity progress entries show 0%, while the supplied materials do not establish current on-site progress or completion. RERA record RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration certificate for YADADRI SMART CITY, P02000002149, issued 16/09/2020, stating validity to 27/07/2023; the certificate identifies survey numbers 216/P, 217/P, 218/P.
Draft-layout approvalDTCP Draft - TLP.No. 153 /2020/ H, dated 27-07-2020, letter reference Lr.Roc.No. 15762/699/2020/H; draft Technical Layout Pattern for 204 plots, with stated conditions and subsequent final-layout step.
RERA layout-plan document slotThe TG-RERA document index contains a layout-plan request/slot, but the supplied record has no extracted approved final-layout plan.
Commencement/completion/occupancy certificatesThe document index labels a commencement-certificate slot, but its supplied extraction is the draft-layout approval. No project completion or occupancy certificate is identified in the supplied evidence. Document index
Project land and registration detailsRERA filing identifies site extent 64258.90 sq m, net area 64258.90 sq m, affected area 0, and mortgage area 5544.19 sq m. RERA filing RERA filing
Promoter declarationForm B extraction records a completion undertaking of 27.07.2023 and a separate-account declaration; the supplied extraction names SIYORA SERENE CITY, so it is not used here as project-specific approval evidence.
Current portal/layout lookupThe supplied HMDA DPMS lookup is described as not publicly reachable, and the record does not contain an independently verified final-layout approval. HMDA

Frequently asked questions

Is YADADRI SMART CITY registered with Telangana RERA?

Yes. YADADRI SMART CITY is registered with the Telangana Real Estate Regulatory Authority as P02000002149; the registration status is New Project.

Who is the developer of YADADRI SMART CITY?

The promoter named in the RERA registration is M/s DDL PROPERTY DEVELOPERS.

Where is YADADRI SMART CITY located?

YADADRI SMART CITY is in TALLAGUDEM HO, Peddakandukur, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508286).

When will YADADRI SMART CITY be completed?

The promoter's proposed date of completion filed with RERA is 27/07/2023. This is the promoter's declaration, not a guarantee.

More projects in Peddakandukur