BALAJI HOMES is a residential apartment project in Anmagal, Hayathnagar Mandal, Ranga Reddy District, developed by registered promoter BALAJI BUILDCON. The project has a total land area of 668.88 sq m and one residential building with 1 Stilt + 5 upper floors, comprising 20 2BHK units. It is registered under TG-RERA number P02400009532, with proposed completion recorded as 11/10/2027.

01What we found

RegisteredTG-RERA - valid till 11 Jun 2027
25documents on file - each fact links to its page
6court cases on this project's land (survey 209, 210, 215, 217, Anmagal)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from squareyards.com
▦ View all 2 photos
Anmagal, Hayathnagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameBALAJI HOMES RERA record
Project type / phaseResidential apartment project; TG-RERA records it as a “New Project.” A separate phase designation is not disclosed. RERA record RERA filing
TG-RERA registrationP02400009532; registered 11 June 2024 and valid through 11 June 2027, unless extended by the Authority. Registration validity is distinct from the completion undertaking and from any occupancy certificate. RERA record
Registered promoterBALAJI BUILDCON, recorded as a partnership. RERA record Parties record Corporate record
RERA statusRegistered; the supplied certificate states a three-year registration period.

Land and geographic identity

FieldProject record
Locality / revenue villageAnmagal; the building-permit record describes the village as Anmagal Hayathnagar. RERA record RERA filing
Mandal / district / PINHayathnagar / Ranga Reddy / 501505. RERA record RERA filing
Survey numbers and subdivisions209, 210 PART, 215 AND 217. RERA record Land records
Site extentRERA land details: total 668.88 sq m, affected area 22.11 sq m, net area 646.77 sq m. The building-permit extraction separately records a net plot area of 644.83 sq m. RERA filing
BoundariesNorth: 30FT WIDE ROAD; east: 25FT WIDE ROAD; west: PLOT NO 91 AND 92; south: NEIGHBOURS LAND. RERA filing
Plan-related identifiersBuilding permit 1550/GHMC/LBN/2024-BP; other identifiers in the permit record include 3/C3/07654/2018, 3/C3/07656/2018, and LRS2020. Approvals record

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit1550/GHMC/LBN/2024-BP, dated 11 June 2024. Approvals record
Approved building configurationOne residential building: 1 Stilt + 5 upper floors. The permit extraction records NO OF FLOORS: 6 and building height 14.95 MT.
Approved built-up areaPermit extraction: residential 1,612.70 sq m; total proposed built-up area including parking 1,935.20 sq m; total parking area 322.5 sq m.
Units20 units in the RERA filing and permit-plan extraction. RERA unit table
ParkingParking is identified in the permit record, with parking area 322.5 sq m. A number of parking spaces is not stated in the supplied record.

Offering and status

FieldProject record
Configuration2BHK; 20 units recorded. RERA unit table RERA unit details
RERA-filed saleable area29.26 sq m for the recorded configuration. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked / 20 available; the portal extract has no as-of date, so these counts are indicative. RERA unit table
Construction stageThe supplied project record identifies a proposed/new project; it does not provide independently verified site progress. RERA record RERA filing
Completion datesPromoter’s Form B undertaking states 11/06/2027 as the completion date. The project header separately records proposed completion as 11/10/2027. RERA record
Occupancy certificateNo occupancy certificate is included in the supplied evidence. The building-permit conditions say an OC is required before occupation and before delivery of possession.

2. The project story

BALAJI HOMES is a residential apartment project registered under TG-RERA number P02400009532. The RERA and permit records place it at Anmagal, Hayathnagar Mandal, Ranga Reddy District, on Survey Nos. 209, 210 PART, 215 AND 217. The sanctioned proposal is one building with a stilt level and five upper residential floors, comprising 20 units. RERA record Land records

The permit record identifies the development as proposed construction. The available evidence does not establish construction progress through an independent site inspection, nor does it include an occupancy certificate. The promoter’s Form B gives a completion undertaking of 11/06/2027; the project header records 11/10/2027 as the proposed completion date. RERA record

3. Master plan, architecture & building design

The supplied GHMC building-permit record describes a single residential building at the project site, with 1 Stilt + 5 upper floors. It records a building height of 14.95 MT. and a total height of 20.40mt.; the permit extraction also states 17.90 mt. from GL. The sanctioned-area figures identify residential built-up area as 1,612.70 sq m, total built-up area including parking as 1,935.20 sq m, and parking area as 322.50 sq m. These are permit-record figures, not carpet-area or saleable-area figures.

The permit extraction lists a vacant plot area of 322.29 sq m, and the project land record gives net area as 646.77 sq m. The permit-plan extraction records NET AREA OF PLOT 644.83 and BALANCE AREA OF PLOT 646.77; the supplied evidence does not explain that distinction. RERA filing

The permit conditions refer to stilt parking, a tot-lot, peripheral greenery, a transformer space, a garbage house and rainwater harvesting. The supplied material does not specify floor-by-floor dwelling arrangements, flats per floor, lift count or capacity, stairs, building footprint, or a detailed landscape/open-space plan.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002029.26 sq mNot established from the supplied drawing measurement recordNot supplied

The unit count, booking figures and saleable area are from the TG-RERA record; booking counts are indicative because the extract has no as-of date. The supplied floor-plan review reports drawings measured, but zero flat designs measured for the matched 2BHK configuration and states that eight results were held back as implausible. Therefore, no drawing-based carpet area or room dimensions can be reported from this evidence. RERA unit table RERA unit details Floor plans

Carpet area is distinct from RERA-filed saleable area: the supplied floor-plan note says saleable area includes the home’s share of common areas, while software-measured carpet area is derived from drawing geometry and requires review. No balcony, utility, room-layout or loading figures are established here. Floor plans

5. Parking & vehicle circulation

The GHMC permit record identifies a 322.5 sq m total parking area and requires the stilt parking area to be used exclusively for vehicle parking, without partition walls or rolling shutters. The layout-plan extraction also refers to cellar and stilt parking, although the permit’s stated building configuration is 1 Stilt + 5 upper floors. The evidence does not give a sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, or unit-level parking allocations.

The permit record requires one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. It also requires parking areas to have electric-vehicle charging infrastructure. A drawn parking provision or general permit condition does not establish exclusive parking rights for a particular unit.

6. Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizeTot-lot to be fenced and maintained as greenery; peripheral greenery and tree planting are also required by the permit conditions. No area or capacity is supplied.
Declared progress / verified statusPermit condition; completion is not established.
Rainwater harvesting
Description / sizePermit-plan extraction lists rainwater harvesting; building-permit extraction specifies Rain Water Harvesting Pits 2.
Declared progress / verified statusSpecified in permit record; completion is not established.
Internal roads and footpaths
Description / sizeListed in the RERA amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; progress shown as 0% in the supplied record.
Street lighting
Description / sizeListed in the RERA amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; progress shown as 0%.
Community buildings
Description / sizeListed in the RERA amenities record; no further description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; progress shown as 0%.
Other recreation/landscape
Description / sizeRERA record lists a green strip/tot-lot/park and an aggregate recreational open-space item, without a supplied area.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; progress shown as 0%.

The vendor record also lists a swimming pool, gym, children’s play area and clubhouse, but these are vendor-sourced claims rather than facilities established by the supplied GHMC permit or RERA amenity-progress record. Promoter website

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management and disposal, water conservation/rainwater harvesting, energy management, fire protection, and electrical meter/substation/receiving-station facilities. These entries show 0% progress where a percentage is supplied; the record does not establish that the facilities are complete or operational. RERA amenities

The GHMC permit conditions specify separate underground static water storage and terrace tanks, each with capacity 25,000 lits.; rainwater harvesting pits; space for a transformer; and a garbage house. They also call for fire extinguishers—minimum of four numbers fire extinguishers per floor—and an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The permit requires an occupancy fire NOC before issue of the occupancy certificate. These are permit conditions or specified provisions, not evidence of completed installation or statutory clearance.

The permit record lists a lift and staircase, but provides no lift count, capacity or service-lift details. It also requires C&D waste to be transferred to the designated collection point and requires EV charging infrastructure in parking places. No backup-power capacity, CCTV/security system, accessibility route or ramp details are established by the supplied records.

8. Location, access & connectivity

The registered location is Anmagal, Hayathnagar Mandal, Ranga Reddy District, Telangana, PIN 501505; the permit identifies Anmagal Hayathnagar Village. The project boundaries recorded in the RERA land details include a 30FT WIDE ROAD to the north and a 25FT WIDE ROAD to the east. The building-permit extraction also refers to existing and proposed roads of 7.62 MT WIDE EXISTING, 9.00 MT WIDE PROPOSED ROAD, and 9.00 MT WIDE EXISTING. RERA record RERA filing

A location record gives the nearest sampled Outer Ring Road interchange as approximately 1.6 km. No public-transport routes, measured distances to local facilities, or project-specific travel times are supplied. Location record

9. Developer & development status

The registered promoter is BALAJI BUILDCON, recorded as a partnership. TG-RERA identifies BUCHIPALLI KRISHNA RAO as an authorized signatory; the project record gives GSTIN 36AAYFB0725H1ZA. Parties record Corporate record RERA filing

The supplied registration certificate identifies the project and promoter and states registration validity from 11/06/2024 to 11/06/2027. The promoter’s Form B, dated 01-03-2025, undertakes completion by 11/06/2027 and makes declarations concerning project funds and approvals. The project header separately records proposed completion as 11/10/2027. No independently verified construction-progress assessment or occupancy certificate is included in this evidence. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400009532; valid 11 June 2024–11 June 2027
Scope and evidenceForm C certificate for BALAJI HOMES and BALAJI BUILDCON.
GHMC building permit
Identifier / date1550/GHMC/LBN/2024-BP; 11 June 2024
Scope and evidenceBuilding Permit Order for residential construction, 1 Stilt + 5 upper floors, on Survey Nos. 209, 210 PART, 215 AND 217.
Permit file reference
Identifier / date004065/GHMC/1974/LBN2/2024-BP
Scope and evidenceGHMC file number recorded in the building-permit extraction.
Layout / subdivision references
Identifier / date3/C3/07654/2018, 3/C3/07656/2018, LRS2020
Scope and evidenceReferences recorded in the building-permit extraction; a separate approved-layout document is not established in the supplied material.
Title search report
Identifier / dateDated 09-12-2024
Scope and evidenceAdvocate’s report concerning Plot Nos. 120, 121 and 122 and the stated project survey numbers.
Encumbrance records
Identifier / dateStatements 540356 and 553878
Scope and evidenceEncumbrance statements filed with the project; the supplied record notes that a fresh current EC is not included.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe permit conditions require an occupancy certificate before occupation and delivery of possession; no issued certificate is included here.

Frequently asked questions

Is BALAJI HOMES registered with Telangana RERA?

Yes. BALAJI HOMES is registered with the Telangana Real Estate Regulatory Authority as P02400009532; the registration status is New Project.

Who is the developer of BALAJI HOMES?

The promoter named in the RERA registration is BALAJI BUILDCON.

Where is BALAJI HOMES located?

BALAJI HOMES is in ANMAGAL HAYATHNAGAR VILLAGE, Anmagal, Hayathnagar, Rangareddy, Telangana (501505).

When will BALAJI HOMES be completed?

The promoter's proposed date of completion filed with RERA is 11/10/2027. This is the promoter's declaration, not a guarantee.