KUBERA LAKE VIEW is a residential apartment project in Anmagal, Hayathnagar Mandal, Ranga Reddy District. The registered promoter is KUBERA DEVELOPERS. The project is on a 668.88 sq. m site and comprises one residential building, Building A, with 1 Stilt + 5 upper floors and 10 3BHK units, with a filed saleable area of 106.83 sq. m. Its TG-RERA registration number is P02400005708, and its proposed completion date is 12/04/2025.

More from Kubera Developers · 3 projects →

01What we found

Period endedTG-RERA registration ran to 12 Apr 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
6court cases on this project's land (survey 306, 307, 308, 309, Anmagal)
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameKUBERA LAKE VIEW RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately named in the supplied registration record; registration concerns the project on Survey Nos. 306, 307, 308 and 309
TG-RERA registrationP02400005708
Registration validityIssued 09/03/2023; stated valid from 09/03/2023 to 12/04/2025. The supplied certificate records no extension. Registration validity is distinct from the project completion date and from occupancy certification.
Registered promoterKubera Developers; the RERA project record identifies the promoter as KUBERA DEVELOPERS RERA record Corporate record
RERA statusRegistration certificate issued under section 5. Current registration status beyond the certificate’s stated validity is not established by the supplied record.

Land and geographic identity

ItemRecord
LocalityHayathnagar / Anmagal RERA record
Revenue villageAnmagal; the approval document describes the location as “Anmagal Hayathnagar” RERA record
Mandal / district / PINHayathnagar / Ranga Reddy / 501505 RERA record
Survey numbers306, 307, 308 and 309 Land records
Plot numbers recorded150/C, 151, 103/A and 103/B in the RERA land record; the registration certificate and building permit list 150/C, 151, 103/A and 103/B Land records
Site areaTotal area 668.88 sq. m; net area 668.88 sq. m; road-affected area recorded as 0 sq. m Land records
BoundariesEast: 30 - WIDE ROAD; West: 33 - WIDE ROAD; North: PLOT NOS 103 152; South: PLOT NOS 150 B 103 C Land records

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 0948/GHMC/LBN/2022-BP, approved 12 April, 2022; file number 001619/GHMC/0837/LBN2/2022-BP Approvals record
Approved built-up area2,104.30 sq. m recorded in the project filing RERA filing
Sanctioned buildingOne residential building, “Building Name - A,” described in the permit as 1 Stilt + 5 upper floors
Parking provision shown in permitParking area 350.1 sq. m; the permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. A car-space count is not supplied.
UnitsGHMC-sanctioned unit count: not stated in the extracted permit details. RERA filing records 10 units; one building/unit entry is shown in the project summary. RERA unit table RERA filing

Offering and status

ItemRecord
RERA-filed configuration3BHK, 10 units RERA unit table
RERA-filed saleable area106.83 sq. m per filed configuration RERA unit table
Booked / available0 booked; 10 available in the portal-derived record. No as-of date is provided, so these counts are indicative rather than a confirmed current inventory. RERA unit table
Completion datePromoter’s Form B undertaking and project record state 12/04/2025 as the proposed completion date. RERA record
Construction stageThe supplied material does not establish current construction progress through a dated, independently verified site inspection. Document index
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied project documents. The building permit requires an occupancy certificate before occupation. Document index

2. The project story

KUBERA LAKE VIEW is a registered residential apartment project on a 668.88 sq. m site in Anmagal, Hayathnagar Mandal, Ranga Reddy District. The project filing identifies Survey Nos. 306, 307, 308 and 309, and the GHMC permit describes a single residential building, Building A, with a stilt level and five upper floors. RERA record Land records

The RERA record lists ten 3BHK units, with a filed saleable area of 106.83 sq. m for the configuration. The available portal-derived inventory shows none booked and ten available, but is undated. The promoter’s completion undertaking was 12/04/2025. The supplied evidence does not provide a current, dated construction-progress assessment or establish that the building has received an occupancy or completion certificate. Accordingly, no completed or occupation-certified portion can be confirmed from this material. RERA unit table Document index

3. Master plan, architecture & building design

The GHMC building permit approves a residential building on a plot area of 668.88 sq. m, with a stated net plot area of 668.88 sq. m and no road- or nala-affected area recorded in the extracted permit. It describes the building as 1 Stilt + 5 upper floors, with a stated height of 15.00 m. The extracted permit lists residential upper-floor area of 1,750.45 sq. m, stilt area of 350.1 sq. m, and first-floor area of 177.12 sq. m; the project filing separately records approved built-up area of 2,104.30 sq. m. These are reproduced as separately labelled record figures, not recalculated or reconciled here. RERA filing

The supplied permit extraction identifies Building A and the plot numbers and survey numbers, but does not provide a detailed drawing-based account of floor-by-floor unit arrangement, footprint, flats per floor, lifts, stairs, entrances, internal circulation or residential/common-area distribution. A layout-plan document is listed but was not extracted, so those design details cannot be confirmed from the supplied material. Document index

The permit records two rainwater-harvesting pits, a transformer space, a garbage house, and a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. These are permit requirements; the supplied material does not independently establish their completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010106.83 sq. mNot established from the supplied drawing measurementsNot supplied

The RERA filing identifies ten 3BHK units and gives 106.83 sq. m as the filed saleable area. The recorded booking and availability counts have no stated as-of date. RERA unit table

The supplied floor-plan measurement record concerns 2BHK designs, not a RERA-filed configuration for this project: software measurements from drawing geometry report a median carpet area of 69.5 sq. m (range 69.1–74.0 sq. m) across seven measured designs, from document 275341. These are drawing-based software measurements, not RERA disclosures, and are not a measurement of the filed 3BHK configuration. The underlying layout-plan document is listed as not extracted; verify any drawing measurements against the actual approved drawing. Floor plans RERA unit details Document index

Carpet area is not interchangeable with saleable area: the drawing-measurement record notes that carpet area is measured from the dwelling geometry, while RERA saleable area may include the home’s share of common areas. A project-specific loading figure is not supplied. Floor plans RERA unit table

5. Parking & vehicle circulation

The GHMC permit records 350.1 sq. m of total parking area and states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted permit describes the building as 1 Stilt + 5 upper floors, but the supplied material does not state a number of car or two-wheeler spaces, a visitor or accessible-space allocation, a ramp or driveway arrangement, or an EV-charging provision.

The unit record marks the ten filed 3BHK units as mortgaged, but does not provide a unit-by-unit parking allocation. A parking area shown or required in an approval does not, by itself, establish an exclusive parking entitlement for a particular unit. RERA unit table

6. Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizePermit requires a fenced tot-lot maintained as greenery before issue of an occupancy certificate; no size supplied
Evidence sourceGHMC building permit
Declared progress / verified statusPermit condition; completion not verified
Rainwater harvesting
Description / size2 rainwater-harvesting pits required
Evidence sourceGHMC building permit; RERA amenity record marks water conservation/rainwater harvesting available
Declared progress / verified statusPermit requirement and portal declaration; independent completion verification not supplied RERA amenities
Common garden
Description / sizeListed as an amenity in third-party/vendor data; no size supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; not established as a sanctioned or delivered facility Promoter website
Bike parking
Description / sizeListed in third-party/vendor amenity data; no count supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; project-specific provision is not quantified in the supplied evidence Promoter website
Fire safety
Description / sizeListed in third-party/vendor amenity data
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; the RERA amenity record does not report progress for fire-protection and fire-safety requirements Promoter website RERA amenities
Security / CCTV camera
Description / sizeListed in third-party/vendor amenity data; no system details supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; installation and operation not verified Promoter website
Waste management
Description / sizeListed in third-party/vendor amenity data; no capacity or process supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; the RERA amenity record does not report progress for solid-waste management and disposal Promoter website RERA amenities
Lift
Description / sizeListed in third-party/vendor amenity data; quantity and capacity not supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; installation and operating status not verified Promoter website
Power backup
Description / sizeListed in third-party/vendor amenity data as battery backup; no capacity supplied
Evidence sourceVendor
Declared progress / verified statusMarketing/listing claim; installation and capacity not verified Promoter website

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting/water conservation, and an electrical meter room/sub-station/receiving station as available at 100%. It records 0% for internal roads and footpaths, green strip/tot-lot/park, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-safety requirements, and aggregate recreational open space. These are portal-recorded progress values; the supplied material does not independently verify site completion. RERA amenities

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank/STP), storm-water drains, rainwater harvesting/water conservation, and an electrical meter room/sub-station/receiving station as available at 100%. These are filed progress indicators, not an independent engineering inspection. RERA amenities

The GHMC permit requires a rainwater-harvesting structure (percolation pit), space for a transformer, a garbage house within the premises, and an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The permit also requires the building to follow the sanctioned plan and requires an occupancy certificate before occupation. The supplied material does not establish that these conditions or the required fire NOC have been completed.

The vendor listing mentions borewell water and battery backup, but gives no capacity, storage or treatment details; these remain vendor-supplied claims rather than confirmed project services. No verified details are supplied for lift count or capacity, fire-fighting equipment, escape stairs, CCTV/access-control systems, accessibility provisions, or utility service capacities. Promoter website

8. Location, access & connectivity

The registered location is Anmagal, Hayathnagar Mandal, Ranga Reddy District, Telangana, PIN 501505. The permit describes Hayathnagar Locality and Anmagal Hayathnagar. The registered site boundaries identify a 30 - WIDE ROAD to the east and a 33 - WIDE ROAD to the west. RERA record Land records

A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 1.9 km from the project geocode. This is a sampled location measurement, not a travel-time estimate. The available evidence does not establish public-transport routes, service frequency, or other measured distances to landmarks. Location record

9. Developer & development status

The registered promoter is KUBERA DEVELOPERS, identified in the project record as a partnership. Its GSTIN is 36AAYFK3092N1ZE. The project record lists the promoter’s address as B, MANSOORABAD, SIRDI NAGAR, HAYATHNAGAR, Hayathnagar, Ranga Reddy, 501505; no official contact details or website are supplied. Corporate record Parties record

The project filing lists SEELAM SRIDHAR as a partner and PATHIPAKA MURALI KRISHNA as an authorised signatory. Form B, signed by Pathipaka Murali Krishna on 12th day of November 2022, undertakes project completion by 12/04/2025. The GHMC permit names the landowners as applicants and identifies SIRI CONSTRUCTIONS as developer in the permit extraction; this does not replace the registered promoter identity. Parties record

The supplied project evidence does not establish current construction progress, an approved extension of TG-RERA registration, or a project occupancy/completion certificate. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02400005708, issued 09/03/2023; stated validity through 12/04/2025
Scope and noteProject registration certificate; no extension is recorded in the supplied certificate.
GHMC building permit order
Reference / date0948/GHMC/LBN/2022-BP, approved 12 April, 2022; file 001619/GHMC/0837/LBN2/2022-BP
Scope and noteConditional residential-building permit for the site in Anmagal Hayathnagar, Survey Nos. 306, 307, 308 and 309.
Layout-plan record
Reference / dateDocument 275341
Scope and noteListed as a layout plan but not extracted in the supplied record. Document index
Form B declaration
Reference / dateDocument 275338, verified 12th day of November 2022
Scope and notePromoter declaration includes the completion undertaking of 12/04/2025 and statements concerning title, encumbrances, project funds, audits and pending approvals.
Occupancy / completion certificate
Reference / dateNot identified in supplied project documents
Scope and noteThe building permit requires an occupancy certificate before occupation. Document index
Additional approval identifiers in the permit
Reference / dateLRS Proceeding No. LRS04072018033239; licensed technical person BL/3879/2019; architect CA/2011/53136; structural engineer 388/STRL.ENG/TP10/GH; notarised affidavit No. 1656/2022
Scope and noteIdentifiers transcribed from the GHMC permit extraction.

Frequently asked questions

Is KUBERA LAKE VIEW registered with Telangana RERA?

Yes. KUBERA LAKE VIEW is registered with the Telangana Real Estate Regulatory Authority as P02400005708; the registration status is New Project.

Who is the developer of KUBERA LAKE VIEW?

The promoter named in the RERA registration is KUBERA DEVELOPERS.

Where is KUBERA LAKE VIEW located?

KUBERA LAKE VIEW is in HAYATHNAGAR, Anmagal, Rangareddy, Telangana (501505).

When will KUBERA LAKE VIEW be completed?

The promoter's proposed date of completion filed with RERA is 12/04/2025. This is the promoter's declaration, not a guarantee.