Sign in

Oak Wood Block A

CAPITOL CONSTRUCTIONS · Rangareddy · RERA P02400002886

OAK WOOD BLOCK A is a residential apartment project in KANCHA GACHIBOWLI, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter CAPITOL CONSTRUCTIONS. The project has a registered land extent of 376.2 sq m and one building, BLDG-1, with 1 Stilt + 5 upper floors. Its RERA unit schedule lists 10 apartments: five 2BHK units of 113.34 sq m saleable area each and five 3BHK units of 141.49 sq m saleable area each. It is registered under TG-RERA number P02400002886, with a proposed completion date of 12/01/2027.

More from Capitol Constructions · 5 projects →

01What we found

RegisteredTG-RERA - valid till 12 Jan 2027
16documents on file - each fact links to its page
4court cases on this project's land (survey 10, 11, 12, Gachi Bowli)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Gachi Bowli, Serilingampally, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered project nameOAK WOOD BLOCK A RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portion“BLOCK A” is the registered project name; a separate phase description is not stated in the supplied record. RERA record
TG-RERA registrationP02400002886; Form C registration under section 5, issued 30/04/2021; recorded validity 30/04/2021–12/01/2027. Registration validity is distinct from the completion deadline and from occupancy status. RERA record
Registered promoterCAPITOL CONSTRUCTIONS, identified as a partnership in the RERA filing. RERA filing
RERA statusRegistration certificate states registration was granted; the supplied record does not show an extension.

Land and geographic identity

ItemProject record
LocalityKANCHA GACHIBOWLI RERA record RERA filing
Revenue villageGachi Bowli in the project identity record; the building-permit extraction describes the location as KANCHA GACHIBOWLI. RERA record
Mandal / district / PINSerilingampally / Ranga Reddy / 500046 RERA record RERA filing
Project survey numbers10, 11 & 12 PART RERA record Land records
Plot identification46 PART & 47 RERA filing
Registered site extent376.2 sq m total; 376.20 sq m net in the RERA land record. The building-permit extraction records Site Area 376.2 sq m and Net Area 374.07 sq m. RERA filing Land records
Boundaries in RERA land recordNorth: PLOT NO-52 AND 53; South: ROAD WIDTH-9; East: PLOT NO-PART OF PLOT NO 46; West: ROAD WIDTH-9. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 2/C20/00506/2021, dated 12 January, 2021; file no. 2/C20/11683/2020. Approvals record
Approved built-up areaRERA filing records 1,115.08 sq m as approved built-up area. The permit extraction separately contains a “Proposed Covered builtup area” figure of 52,818.40; its unit is not stated in the supplied extraction, so it is not treated here as an area measurement. RERA filing
Building count and sanctioned floorsOne building, BLDG-1, sanctioned as 1 Stilt + 5 upper floors; the permit extraction states height 14.99 m. RERA filing
Parking provisionThe permit requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking. The supplied record does not give a count of parking spaces or confirm a cellar level in the extracted floor configuration.
UnitsThe filing records 1 total building unit and 1 proposed building unit; the detailed RERA unit schedule lists 10 apartments: five 2BHK and five 3BHK. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 5 units, saleable area 113.34 sq m each; 3BHK: 5 units, saleable area 141.49 sq m each. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked and 5 available for each configuration (10 available in total). The record has no count as-of date, so these figures are indicative. RERA unit table RERA unit details
Completion deadlineRERA record: 12/01/2027 proposed completion date. This is not the registration-validity date or evidence of construction progress. RERA record RERA filing
Construction stageThe supplied data does not establish current construction progress through an independently verified site inspection or dated progress report. Document index RERA amenities
Occupancy certificateArchitect’s Form-1A identifies GHMC OC 001074/GHMC/0571/SLP2/2022-0C, dated 18-02-2022, and certifies overall project completion.

The project story

OAK WOOD BLOCK A is registered as a residential apartment project at KANCHA GACHIBOWLI, in the Gachi Bowli revenue-location record, Serilingampally Mandal, Ranga Reddy District. The registered land is identified as Survey Nos. 10, 11 & 12 PART, Plot Nos. 46 PART & 47, with a recorded extent of 376.2 sq m. RERA record Land records RERA filing

The GHMC building permit describes one residential building, BLDG-1, with a stilt and five upper floors. The RERA unit schedule lists ten apartments—five 2BHK and five 3BHK. RERA unit table An architect’s Form-1A states that GHMC issued an occupancy certificate for OAK WOOD BLOCK A on 18-02-2022 and certifies overall completion; this is the completion/OC evidence in the supplied project file. The record also lists a RERA completion deadline of 12/01/2027 and registration validity through that date; neither date by itself establishes the project’s present physical condition. RERA record

Master plan, architecture & building design

The permit extract records a 376.2 sq m site, 374.07 sq m net area, 45.83 sq m tot-lot, and 206.66 sq m for parking floors. It identifies one residential building, BLDG-1, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. The RERA filing separately records approved built-up area of 1,115.08 sq m. RERA filing

The permit’s land-use breakdown records 1,101.45 under Residential and 0.00 under Commercial and Others; the units for these breakdown figures are not specified in the supplied extraction. The permit also states that the tot-lot is to be fenced and maintained as greenery. No verified drawing-derived information is supplied on flats per floor, building footprint, lifts, stairs, entrances, internal circulation or landscaping beyond the tot-lot reference. A floor-plan record is present, but no flats were measured from the drawing. Floor plans

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505113.34 sq mNot measuredNot supplied
3BHK505141.49 sq mNot measuredNot supplied

The unit counts and saleable areas are RERA-filed; the booking and availability counts are portal-derived and have no stated as-of date. RERA unit table RERA unit details The available floor-plan record reports no flats measured, so no drawing-based carpet area or room dimensions can be provided. Floor plans Saleable area is the RERA-filed measure; it should not be read as carpet area. The supplied record does not provide a loading figure. RERA unit details

Parking & vehicle circulation

GHMC’s permit requires the approved cellar and stilt areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction records 206.66 for parking floors, but does not state the unit or provide a parking-space count. No supplied evidence establishes resident, visitor or accessible-space counts, mechanical parking, EV charging, parking allocation to individual apartments, or the number and arrangement of vehicle entries and ramps. The permit requirement alone does not establish an individual buyer’s exclusive parking allocation.

Amenities, recreation & open spaces

Tot-lot / greenery
Description / size45.83 sq m in the permit extraction; permit requires fencing and maintenance as greenery.
Declared progress / verified statusSanction condition; completion status not independently verified in the supplied record.
Rainwater harvesting
Description / sizePercolation pit required by the permit.
Declared progress / verified statusSanction condition; completion status not established.
Community buildings / recreation open space
Description / sizeListed in the RERA amenity record; no size or facility description supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0 in the supplied amenity record; no independent verification supplied.

The supplied evidence does not identify a sanctioned clubhouse, swimming pool, gym or other indoor or sports facility. RERA amenities

Utilities, building services & safety

The GHMC permit requires a transformer space, a garbage house, an ETP, twin bins for each tenement, a fire extinguisher on each floor near the staircase, and a fire NOC before issue of the occupancy certificate. It also requires a rainwater-harvesting percolation pit. These are permit conditions; the supplied material does not independently verify their installation, capacity or current operating status.

The RERA amenity record marks water supply, sewerage, energy management, fire protection and electrical meter room/sub-station/receiving station as available, but shows 0 progress for the listed amenities and provides no capacities or supporting completion details. RERA amenities The project file does not specify water source or storage, STP capacity or reuse arrangements, backup power, lift count or capacity, CCTV, access control, accessible circulation or a completed fire-safety inspection. RERA amenities

Location, access & connectivity

The registered location is KANCHA GACHIBOWLI, Gachi Bowli, Serilingampally Mandal, Ranga Reddy District, PIN 500046. RERA record RERA filing The project-location record identifies HITEC City at 4.7 km. Location record The permit extraction records roads on the south and west boundaries as ROAD WIDTH-9, and separately refers to 18 mt. road widths in a condition concerning sites abutting roads of that width; the supplied record does not establish that the project directly abuts an 18-metre road. RERA filing No public-transport routes or further verified landmark distances are supplied. Location record

Developer & development status

The registered promoter is CAPITOL CONSTRUCTIONS, an entity identified in the RERA filing as a partnership. The filing names CHIRUKURI ROHIT, ABBURI YASWANTH KUMAR and KODURI VANAJA as partners, and GAGAN KODURI as authorized signatory. Its GSTIN is 36AAPFC4794E1Z3. RERA filing Parties record Corporate record

The RERA registration certificate lists the promoter office as Village Moosapet, Mandal Balanagar, District Medchal-Malkajgiri, PIN 500037. The project filing gives the promoter address as Plot No. 27, KANCHA GACHIBOWLI, Serilingampally, Ranga Reddy, PIN 500046. RERA filing The supplied record does not include official promoter contact details or a promoter website. Parties record

An architect’s Form-1A reports project completion and identifies a GHMC occupancy certificate dated 18-02-2022. No independently verified current site-progress assessment is supplied.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002886; issued 30/04/2021; validity to 12/01/2027
Evidence in supplied fileForm C certificate under section 5.
GHMC building permit
Identifier / datePermit 2/C20/00506/2021; 12 January, 2021; file no. 2/C20/11683/2020
Evidence in supplied fileBuilding Permit Order for BLDG-1.
Occupancy certificate / completion certification
Identifier / dateGHMC OC 001074/GHMC/0571/SLP2/2022-0C; 18-02-2022
Evidence in supplied fileArchitect’s Form-1A identifies the OC and certifies overall project completion.
RERA Form B declaration
Identifier / dateProject completion undertaking states “12 2027”; the extraction has no legible project registration number or completed declaration date and place.
Evidence in supplied filePromoter declaration.
Approved floor-plan measurement record
Identifier / dateOne drawing record; no flats measured.
Evidence in supplied fileDrawing-based measurement status. Floor plans
Layout approval document
Identifier / dateA layout-plan document is listed, but the supplied record does not provide an extracted approval or legible layout details.

Other registrations of Oak Wood

Frequently asked questions

Is OAK WOOD BLOCK A registered with Telangana RERA?

Yes. OAK WOOD BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02400002886; the registration status is New Project.

Who is the developer of OAK WOOD BLOCK A?

The promoter named in the RERA registration is CAPITOL CONSTRUCTIONS.

Where is OAK WOOD BLOCK A located?

OAK WOOD BLOCK A is in KANCHA GACHIBOWLI, Gachi Bowli, Serilingampally, Rangareddy, Telangana (500046).

When will OAK WOOD BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 12/01/2027. This is the promoter's declaration, not a guarantee.

More projects in Gachi Bowli