Apurupa Sree
APURUPA INFRASTRUCTURES PRIVATE LIMITED · Rangareddy · RERA P02400002326
APURUPA SREE is a residential apartment project in Gafoornagar, Serilingampally mandal, Ranga Reddy district, developed by the registered promoter APURUPA INFRASTRUCTURES PRIVATE LIMITED. It covers 999.37 sq. m and has one building, Building - A, with a cellar, stilt and 5 upper floors. The TG-RERA filing records 20 units in a 3BHK configuration. Its TG-RERA registration is P02400002326, and the proposed and revised proposed completion date is 19/10/2024.
More from Apurupa Infrastructures Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | APURUPA SREE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase name or separate phase identification is disclosed. The filed building permission identifies Building - A (RESIDENTIAL). RERA filing |
| TG-RERA registration | P02400002326 RERA record |
| Registration validity | Certificate states 10/11/2020 to 19/10/2024; no extension is recorded in the supplied certificate. This is registration validity, not the project completion deadline. RERA record |
| Registered promoter | APURUPA INFRASTRUCTURES PRIVATE LIMITED RERA record Corporate record |
| RERA status in supplied record | Listed as On-Going Project. The supplied registration certificate’s stated validity ended on 19/10/2024; the materials do not establish a subsequent extension or current registration status. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gafoornagar; the building permit spells the locality Gafoor Nagar. RERA record RERA filing |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500081 RERA record RERA filing |
| Project survey numbers | 4, 5, 6, 8, 9 & 10; no subdivisions are specified in the RERA identity fields. RERA record Land records |
| Plot references | Plots 78 & 79 RERA filing |
| Registered site extent | 999.37 sq. m; the filed building permit states site area 999.37 m², road-affected area 0, and net area 999.37 m². RERA filing |
| Boundaries as filed | East: Plot No 80; west: Road Width - 9; north: Plot No 74 and open space; south: Road Width - 12. Units for the boundary road widths are not stated in these fields. RERA filing |
| Boundary road width in building permit | 18 mt. is recorded in the permit; the supplied extraction does not identify which boundary this figure describes. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C20/16626/2018, approved 19 October, 2018; file no. 2/SL/18199/2018. Approvals record |
| Approved built-up area | Permit extraction records residential upper floors: 2,524.45 m². The RERA filing separately records approved built-up area 2,524.44 m². RERA filing |
| Building count | One building is recorded in the RERA land details; the permit identifies it as Building - A. RERA filing |
| Sanctioned floor configuration | Cellar + Stilt + 5 upper floors; permit extraction records building height 14.93 m. |
| Parking levels / approved unit count | Cellar and stilt are approved for parking. A sanctioned unit count is not provided in the supplied permit extraction. The RERA filing records 20 total building units and 20 proposed units as per agreement. RERA filing |
| Site features recorded in permit | Tot-lot: 51.91 m²; 22 rainwater-harvesting structures; 45 Trees. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration and saleable area | 3BHK, 20 units; filed saleable area 43.06 sq. m. RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | The project is listed as On-Going Project. No independently verified construction-progress evidence or dated site inspection is supplied. RERA filing RERA unit table |
| Completion dates | TG-RERA fields state proposed and revised proposed completion as 19/10/2024. The Form B declaration dated 06" October 2020 separately undertakes completion by 31/12/2021. RERA filing |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is identified in the supplied project documents. The GHMC permit says an occupancy certificate is compulsory before occupation. Document index |
2. The project story
APURUPA SREE is a residential apartment project registered with TG-RERA as P02400002326, located in Gafoornagar village, Serilingampally mandal, Ranga Reddy district. Its filed land identity covers survey numbers 4, 5, 6, 8, 9 & 10, with plots 78 & 79 referenced in the registration certificate. RERA record Land records
The GHMC building permit describes one residential building, Building A, with a cellar, stilt and five upper floors. The RERA filing lists 20 units and records 3BHK as the configuration. The portal’s unit counts show 20 available and none booked, but have no stated as-of date. RERA filing RERA unit details
The project is labelled ongoing in the RERA filing, while its stated revised completion date is 19/10/2024. The supplied materials do not establish current construction progress through an independent inspection, or document that an occupancy/completion certificate has been issued. RERA filing
3. Master plan, architecture & building design
The filed GHMC permit is for a residential Building - A on a site of 999.37 m². It records Cellar: 1; area 577.66 m², Stilt: 1; area 564.58 m², and Residential upper floors: 5; area 2,524.45 m²; the stated building height is 14.93 m. Separately, the RERA filing records approved built-up area as 2,524.44 m². These are the figures as recorded in their respective supplied records; no FSI-counted area, carpet area, floor-by-floor plan measurements, or building footprint is supplied. RERA filing
The permit records a 51.91 m² tot-lot and a compound wall of 116.24 RM. It also lists 22 rainwater-harvesting structures and 45 Trees. The supplied drawing-derived material does not provide a verified account of floor layouts, flats per floor, lifts, stairs, entries, internal circulation, landscaped-area distribution or apartment/common-area allocation. Floor plans
4. Homes, configurations & floor plans
The TG-RERA unit record lists 20 units in one 3BHK configuration, with filed saleable area of 43.06 sq. m. Booked and available figures are portal readings without an as-of date. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 0 | 20 | 43.06 sq. m | Not measured from the supplied drawings | Not supplied |
The supplied floor-plan assessment reports 3 drawings in total: 2 measured, 1 scan pending, and 0 measured flat designs for 3BHK. It does not provide a software-measured carpet area or room dimensions for this configuration. Thus, the RERA-filed saleable area above is the available unit-area figure; no carpet, balcony or utility measurement can be stated from the supplied evidence. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit specifies that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a car-space or two-wheeler-space count, or identify resident, visitor or accessible parking.
The RERA filing marks the units as mortgaged and records a mortgage area of 277.82 m²; it does not identify a unit-by-unit parking allocation. A drawn or permitted parking area does not establish exclusive parking rights for a particular home. RERA unit table RERA filing
6. Amenities, recreation & open spaces
The RERA amenities record lists the following facilities and infrastructure. Each item is recorded at 0% in the supplied progress field; no independent completion verification is provided. “Available: YES” reflects the RERA amenity entry, not confirmation that the facility is complete or operating. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Permit separately records Tot-lot: 51.91 m² | RERA amenities | RERA amenity progress 0%; no independent completion verification |
| Internal Roads & Footpaths | Size not supplied | RERA amenities | Progress 0% |
| Community Buildings | Size or facility details not supplied | RERA amenities | Progress 0% |
| Street Lighting | Details not supplied | RERA amenities | Progress 0% |
| Swimming pool, gym, children’s play area, clubhouse | Appears only in third-party vendor amenity claims; no corresponding project-specific RERA or sanctioned evidence is supplied here | Promoter website | Marketing/vendor claim; completion not verified |
| CCTV, security personnel, lift, covered car parking | Appears in third-party vendor amenity claims; project-specific details are not supplied in the RERA amenity record | Promoter website | Marketing/vendor claim; completion not verified |
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, and Water Conservation, Rain water Harvesting as available, but records each amenity’s progress as 0%. It does not specify water source, storage or treatment capacity; sewerage treatment or reuse details; drainage design; or rainwater-harvesting capacity. The building permit requires a rainwater-harvesting structure (percolation pit) and lists 22 rainwater-harvesting structures. RERA amenities
The permit also requires space for a transformer and a garbage house within the premises. The RERA amenities record lists an electrical meter room/sub-station/receiving station and solid-waste management and disposal, each with 0% progress. No electrical supply or backup capacity, lift count or capacity, fire-system specification, accessible-route details, or verified utility completion information is supplied. RERA amenities
The permit states that the occupancy certificate is compulsory before occupying the building. This overview does not determine compliance from the permit illustration or from the amenities entries.
8. Location, access & connectivity
The registered project location is Gafoornagar, Serilingampally mandal, Ranga Reddy district, PIN 500081. A supplied cadastral parcel centroid is recorded at 17.41528, 78.35459. RERA record RERA filing Location record
The supplied location data identifies Financial District (Nanakramguda), 1.2 km away as an anchor. It does not provide verified approach-road details, public-transport distances or travel times. Location record
9. Developer & development status
The registered promoter is APURUPA INFRASTRUCTURES PRIVATE LIMITED, a company. The RERA filing identifies its address as APURUPA CLASSIC APTS, ROAD NO 1, Gafoornagar, Gafoornagar, Serilingampally, Ranga Reddy, 500081. The supplied registration certificate gives the promoter office as Village: Mandal: District: Hyderabad, Pin: 500034, without further village, mandal or district particulars. No official company website or project contact details are supplied. Corporate record Parties record
The RERA filing lists the project as ongoing and gives proposed and revised completion dates of 19/10/2024. The Form B affidavit-cum-declaration, made by K Sreedhar Reddy and dated 06" October 2020, states a completion undertaking of 31/12/2021 and includes promoter declarations on title, encumbrances, project funds, approvals and auditing. Those are promoter declarations, not independent verification of completion or title. RERA filing
The supplied record identifies SREEDHAR REDDY KOPPULA as an authorized signatory and lists director names, but does not provide independent corporate-registry verification of those roles. Parties record
10. Approvals, official records & documents
| Identifier / date | P02400002326, issued 10/11/2020; stated validity to 19/10/2024 |
|---|---|
| Scope and source | Form C for APURUPA SREE; |
| Identifier / date | 2/C20/16626/2018, approved 19 October, 2018; file no. 2/SL/18199/2018 |
|---|---|
| Scope and source | Residential Building A on survey numbers 4, 5, 6, 8, 9 & 10; |
| Identifier / date | 13108/mpl/H/98 |
|---|---|
| Scope and source | Listed among the permit’s other numbers; this is not a supplied layout approval certificate; |
| Identifier / date | Doc 63404, page 1, date read as 22-10-2018 |
|---|---|
| Scope and source | Drawing stamp read from text layer and marked as needing review; Approvals record |
| Identifier / date | 06" October 2020 |
|---|---|
| Scope and source | Declaration by K Sreedhar Reddy; includes promoter-stated completion and other undertakings; |
| Identifier / date | Not identified in the supplied documents |
|---|---|
| Scope and source | No supplied evidence establishes that one has been issued. Document index |
The building permit states that commencement notice is to be submitted before construction and completion notice after completion, followed by obtaining an occupancy certificate. The supplied record does not include those notices or an occupancy/completion certificate.
1. Project at a glance
Project identity
Registered project name: APURUPA SREE
Project type: Residential apartment project
Phase / registered portion: No phase name or separate phase identification is disclosed. The filed building permission identifies Building - A (RESIDENTIAL).
TG-RERA registration: P02400002326
Registration validity: Certificate states 10/11/2020 to 19/10/2024; no extension is recorded in the supplied certificate. This is registration validity, not the project completion deadline.
Registered promoter: APURUPA INFRASTRUCTURES PRIVATE LIMITED
RERA status in supplied record: Listed as On-Going Project. The supplied registration certificate’s stated validity ended on 19/10/2024; the materials do not establish a subsequent extension or current registration status.
Land and geographic identity
Locality / revenue village: Gafoornagar; the building permit spells the locality Gafoor Nagar.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500081
Project survey numbers: 4, 5, 6, 8, 9 & 10; no subdivisions are specified in the RERA identity fields.
Plot references: Plots 78 & 79
Registered site extent: 999.37 sq. m; the filed building permit states site area 999.37 m², road-affected area 0, and net area 999.37 m².
Boundaries as filed: East: Plot No 80; west: Road Width - 9; north: Plot No 74 and open space; south: Road Width - 12. Units for the boundary road widths are not stated in these fields.
Boundary road width in building permit: 18 mt. is recorded in the permit; the supplied extraction does not identify which boundary this figure describes.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C20/16626/2018, approved 19 October, 2018; file no. 2/SL/18199/2018.
Approved built-up area: Permit extraction records residential upper floors: 2,524.45 m². The RERA filing separately records approved built-up area 2,524.44 m².
Building count: One building is recorded in the RERA land details; the permit identifies it as Building - A.
Sanctioned floor configuration: Cellar + Stilt + 5 upper floors; permit extraction records building height 14.93 m.
Parking levels / approved unit count: Cellar and stilt are approved for parking. A sanctioned unit count is not provided in the supplied permit extraction. The RERA filing records 20 total building units and 20 proposed units as per agreement.
Site features recorded in permit: Tot-lot: 51.91 m²; 22 rainwater-harvesting structures; 45 Trees.
Offering and status
RERA-filed configuration and saleable area: 3BHK, 20 units; filed saleable area 43.06 sq. m.
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative.
Construction stage: The project is listed as On-Going Project. No independently verified construction-progress evidence or dated site inspection is supplied.
Completion dates: TG-RERA fields state proposed and revised proposed completion as 19/10/2024. The Form B declaration dated 06" October 2020 separately undertakes completion by 31/12/2021.
Occupancy / completion certificate: No occupancy certificate or completion certificate is identified in the supplied project documents. The GHMC permit says an occupancy certificate is compulsory before occupation.
2. The project story
APURUPA SREE is a residential apartment project registered with TG-RERA as P02400002326, located in Gafoornagar village, Serilingampally mandal, Ranga Reddy district. Its filed land identity covers survey numbers 4, 5, 6, 8, 9 & 10, with plots 78 & 79 referenced in the registration certificate.
The GHMC building permit describes one residential building, Building A, with a cellar, stilt and five upper floors. The RERA filing lists 20 units and records 3BHK as the configuration. The portal’s unit counts show 20 available and none booked, but have no stated as-of date.
The project is labelled ongoing in the RERA filing, while its stated revised completion date is 19/10/2024. The supplied materials do not establish current construction progress through an independent inspection, or document that an occupancy/completion certificate has been issued.
3. Master plan, architecture & building design
The filed GHMC permit is for a residential Building - A on a site of 999.37 m². It records Cellar: 1; area 577.66 m², Stilt: 1; area 564.58 m², and Residential upper floors: 5; area 2,524.45 m²; the stated building height is 14.93 m. Separately, the RERA filing records approved built-up area as 2,524.44 m². These are the figures as recorded in their respective supplied records; no FSI-counted area, carpet area, floor-by-floor plan measurements, or building footprint is supplied.
The permit records a 51.91 m² tot-lot and a compound wall of 116.24 RM. It also lists 22 rainwater-harvesting structures and 45 Trees. The supplied drawing-derived material does not provide a verified account of floor layouts, flats per floor, lifts, stairs, entries, internal circulation, landscaped-area distribution or apartment/common-area allocation.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 20 units in one 3BHK configuration, with filed saleable area of 43.06 sq. m. Booked and available figures are portal readings without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 0 | 20 | 43.06 sq. m | Not measured from the supplied drawings | Not supplied |
The supplied floor-plan assessment reports 3 drawings in total: 2 measured, 1 scan pending, and 0 measured flat designs for 3BHK. It does not provide a software-measured carpet area or room dimensions for this configuration. Thus, the RERA-filed saleable area above is the available unit-area figure; no carpet, balcony or utility measurement can be stated from the supplied evidence.
5. Parking & vehicle circulation
The GHMC permit specifies that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a car-space or two-wheeler-space count, or identify resident, visitor or accessible parking.
The RERA filing marks the units as mortgaged and records a mortgage area of 277.82 m²; it does not identify a unit-by-unit parking allocation. A drawn or permitted parking area does not establish exclusive parking rights for a particular home.
6. Amenities, recreation & open spaces
The RERA amenities record lists the following facilities and infrastructure. Each item is recorded at 0% in the supplied progress field; no independent completion verification is provided. “Available: YES” reflects the RERA amenity entry, not confirmation that the facility is complete or operating.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Permit separately records Tot-lot: 51.91 m² | RERA amenity progress 0%; no independent completion verification | |
| Internal Roads & Footpaths | Size not supplied | Progress 0% | |
| Community Buildings | Size or facility details not supplied | Progress 0% | |
| Street Lighting | Details not supplied | Progress 0% | |
| Swimming pool, gym, children’s play area, clubhouse | Appears only in third-party vendor amenity claims; no corresponding project-specific RERA or sanctioned evidence is supplied here | Marketing/vendor claim; completion not verified | |
| CCTV, security personnel, lift, covered car parking | Appears in third-party vendor amenity claims; project-specific details are not supplied in the RERA amenity record | Marketing/vendor claim; completion not verified |
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, and Water Conservation, Rain water Harvesting as available, but records each amenity’s progress as 0%. It does not specify water source, storage or treatment capacity; sewerage treatment or reuse details; drainage design; or rainwater-harvesting capacity. The building permit requires a rainwater-harvesting structure (percolation pit) and lists 22 rainwater-harvesting structures.
The permit also requires space for a transformer and a garbage house within the premises. The RERA amenities record lists an electrical meter room/sub-station/receiving station and solid-waste management and disposal, each with 0% progress. No electrical supply or backup capacity, lift count or capacity, fire-system specification, accessible-route details, or verified utility completion information is supplied.
The permit states that the occupancy certificate is compulsory before occupying the building. This overview does not determine compliance from the permit illustration or from the amenities entries.
8. Location, access & connectivity
The registered project location is Gafoornagar, Serilingampally mandal, Ranga Reddy district, PIN 500081. A supplied cadastral parcel centroid is recorded at 17.41528, 78.35459.
The supplied location data identifies Financial District (Nanakramguda), 1.2 km away as an anchor. It does not provide verified approach-road details, public-transport distances or travel times.
9. Developer & development status
The registered promoter is APURUPA INFRASTRUCTURES PRIVATE LIMITED, a company. The RERA filing identifies its address as APURUPA CLASSIC APTS, ROAD NO 1, Gafoornagar, Gafoornagar, Serilingampally, Ranga Reddy, 500081. The supplied registration certificate gives the promoter office as Village: Mandal: District: Hyderabad, Pin: 500034, without further village, mandal or district particulars. No official company website or project contact details are supplied.
The RERA filing lists the project as ongoing and gives proposed and revised completion dates of 19/10/2024. The Form B affidavit-cum-declaration, made by K Sreedhar Reddy and dated 06" October 2020, states a completion undertaking of 31/12/2021 and includes promoter declarations on title, encumbrances, project funds, approvals and auditing. Those are promoter declarations, not independent verification of completion or title.
The supplied record identifies SREEDHAR REDDY KOPPULA as an authorized signatory and lists director names, but does not provide independent corporate-registry verification of those roles.
10. Approvals, official records & documents
| Identifier / date | P02400002326, issued 10/11/2020; stated validity to 19/10/2024 |
|---|---|
| Scope and source | Form C for APURUPA SREE; |
| Identifier / date | 2/C20/16626/2018, approved 19 October, 2018; file no. 2/SL/18199/2018 |
|---|---|
| Scope and source | Residential Building A on survey numbers 4, 5, 6, 8, 9 & 10; |
| Identifier / date | 13108/mpl/H/98 |
|---|---|
| Scope and source | Listed among the permit’s other numbers; this is not a supplied layout approval certificate; |
| Identifier / date | Doc 63404, page 1, date read as 22-10-2018 |
|---|---|
| Scope and source | Drawing stamp read from text layer and marked as needing review; |
| Identifier / date | 06" October 2020 |
|---|---|
| Scope and source | Declaration by K Sreedhar Reddy; includes promoter-stated completion and other undertakings; |
| Identifier / date | Not identified in the supplied documents |
|---|---|
| Scope and source | No supplied evidence establishes that one has been issued. |
The building permit states that commencement notice is to be submitted before construction and completion notice after completion, followed by obtaining an occupancy certificate. The supplied record does not include those notices or an occupancy/completion certificate.
Frequently asked questions
Is APURUPA SREE registered with Telangana RERA?
Yes. APURUPA SREE is registered with the Telangana Real Estate Regulatory Authority as P02400002326; the registration status is On-Going Project.
Who is the developer of APURUPA SREE?
The promoter named in the RERA registration is APURUPA INFRASTRUCTURES PRIVATE LIMITED.
Where is APURUPA SREE located?
APURUPA SREE is in Gafoornagar, Serilingampally, Rangareddy, Telangana (500081).
When will APURUPA SREE be completed?
The promoter's proposed date of completion filed with RERA is 19/10/2024. This is the promoter's declaration, not a guarantee.
More projects in Gafoor Nagar





