Pslr Sri Nivasam
FORTUNE HOMES BUILDERS AND DEVELOPERS · Medchal-Malkajgiri · RERA P02200003562
PSLR SRI NIVASAM is a residential apartment project in Jeedimetla-Village, Qutballapur, Medchal-Malkajgiri. The registered promoter is FORTUNE HOMES BUILDERS AND DEVELOPERS. The project has a site area of 339.57 m² and one building, A-1, with 1 Stilt + 5 upper floors; the RERA filing lists 10 3BHK units with a saleable area of 110.55 m². It is registered under TG-RERA number P02200003562, and the proposed completion date is 28/12/2027.
More from Fortune Homes Builders And Developers · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project | PSLR SRI NIVASAM RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied registration record; the registration covers the project associated with Building A-1 |
| TG-RERA registration | P02200003562; registered 20/11/2021; stated validity through 28/08/2027, unless extended by the Authority |
| Registered promoter | FORTUNE HOMES BUILDERS AND DEVELOPERS |
| RERA status | Registered. The certificate records a five-year validity period; it is not evidence of construction completion or an occupancy certificate |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Jeedimetla-Village; the building permit also identifies JEEDIMETLA |
| Mandal / district / PIN | Qutballapur / Medchal-Malkajgiri / 500055 |
| Project survey numbers | 119, 120PART, 121/A and 121/AA as recorded on the RERA certificate; the building permit writes these as 119, 120/PART, 121/A and 121/AA |
| Plot reference | Plots 66&67 in the registration certificate |
| Site area | 339.57 m²; the permit records the same figure as site area and net area, with road-affected area 0 m² and nala-affected area 0 m² |
| Boundaries | North: Plot No. 65; South: Plot No. 68; East: road; West: other building Land records |
| Road width stated in permit | 18 mt. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order, approval no. 2/C25/09370/2021, dated 28 August, 2021; file no. 2/C25/03221/2021 |
| Approved building | Building A-1, residential building |
| Approved floors / height | 1 Stilt + 5 upper floors; stated building height 14.99 m |
| Area figures in permit | Site area 339.57 m²; residential upper-floor area 966.05 m²; stilt parking area 180.02 m². These are distinct permit figures and are not carpet or saleable areas |
| Building count | One building is recorded in the RERA project information RERA filing |
| Approved / RERA-declared homes | The filing records 10 3BHK units; the permit states that the sanctioned unit count must not be increased without GHMC’s prior approval RERA unit table |
| Parking levels | Stilt parking area is specified in the permit; a count of parking spaces is not available in the supplied evidence |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units RERA unit table |
| RERA-filed saleable area | 110.55 m² per listed configuration RERA unit table |
| Booked / available | Portal-derived record shows 0 booked and 10 available; the record has no as-of date, so counts are indicative RERA unit table |
| Construction stage | No project-specific, dated construction-progress evidence is supplied; stage is therefore not established here Document index |
| Completion deadline | The building permit states construction to be completed before 28 August, 2027; the RERA project information separately gives proposed completion date 28/12/2027 RERA filing |
| Registration validity | Through 28/08/2027, unless extended |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is identified in the supplied project records; status is not established Document index |
2. The project story
- PSLR SRI NIVASAM is a registered residential apartment project in Jeedimetla, Qutballapur mandal, Medchal-Malkajgiri district. The supplied records identify a single residential building, A-1, on the site associated with survey numbers 119, 120/PART, 121/A and 121/AA. GHMC’s building-permit record describes one stilt level and five upper floors. RERA record
- The RERA filing lists ten 3BHK homes, with a filed saleable area of 110.55 m² for the configuration. Its portal-derived inventory snapshot shows all ten as available and none booked, but has no as-of date. This is an indicative portal record, not a current booking confirmation. RERA unit table
- The supplied documents establish that the project was registered and that a building permit was issued. They do not establish the present physical construction stage, completion, or issuance of an occupancy certificate. The permit itself requires submission of a completion notice and obtaining an occupancy certificate before occupation.
3. Master plan, architecture & building design
- GHMC’s permit identifies a single residential building, A-1, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. It records a site area of 339.57 m², residential upper-floor area of 966.05 m², and stilt parking area of 180.02 m². The permit also records a 0 m² road-affected area and a 0 m² nala-affected area. These figures are presented as stated in the permit; the evidence does not provide a separate FSI calculation, carpet-area total, or gross-built-up-area definition.
- The supplied material does not establish the building footprint, flats per floor, number of lifts or stairs, detailed circulation, open-space dimensions, or a wider phase layout. The permit records Tot-lot 0 m² and requires a fenced tot-lot to be maintained as greenery before an occupancy certificate is issued; the supplied record does not show that such work has been completed.
4. Homes, configurations & floor plans
- The TG-RERA unit record lists ten 3BHK units and a saleable area of 110.55 m². A separate software measurement from the supplied drawing material identifies 2BHK floor-plan geometry, but that configuration is not listed in the RERA unit filing. The drawing-derived measurements are not RERA disclosures and are not used as the project’s filed home configuration. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 110.55 m² | Not supplied | Not supplied |
- For context only, software measurement of two 2BHK designs from drawing document 185259 produced carpet-area measurements ranging from 58.7 m² to 68.5 m² (median 63.6 m²). These are drawing-based, software-measured figures requiring review, not RERA-filed areas or evidence of the 3BHK units’ dimensions. The same drawing extraction identifies bedroom, living/kitchen, hall, toilet, balcony and utility spaces in one measured 2BHK plan. Floor plans RERA unit details
- Carpet area excludes the exclusive balcony and utility areas identified in that measured plan. RERA saleable area is a separate filed figure; no project-specific loading figure is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 180.02 m² of stilt parking area. The supplied records do not establish the number of parking spaces, whether spaces are allocated to particular homes, visitor or accessible parking provision, two-wheeler provision, parking circulation or ramp arrangements. A vendor listing mentions covered car parking, but no count or unit-specific allocation document is supplied. Promoter website
6. Amenities, recreation & open spaces
The GHMC permit specifies certain site provisions and conditions. The RERA amenity record lists facilities, but its supplied progress fields show 0 for each item; those entries do not establish completion. Vendor-listed amenities are promotional-source claims and are not treated as confirmed sanctioned or delivered facilities. RERA amenities Promoter website
| Description / size | Permit records Tot-lot 0 m² and requires a fenced tot-lot maintained as greenery before issue of an occupancy certificate |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Completion not established |
| Description / size | Permit requires a rainwater-harvesting structure (percolation pit); the permit’s utility summary records 1 No. of RWHPs |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Completion not established |
| Description / size | Space for transformer required on site |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Completion not established |
| Description / size | Required within the premises |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Completion not established |
| Description / size | Permit records an ETP requirement |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Completion not established |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0; completion not established RERA amenities |
| Description / size | RERA amenity record includes sewerage and treatment/disposal of sewage and sullage water; vendor list also names a sewage treatment plant |
|---|---|
| Evidence source | RERA amenity record; vendor |
| Declared progress / verified status | RERA progress shown as 0; vendor claim not independently verified RERA amenities Promoter website |
| Description / size | Listed in the RERA amenity record and vendor amenities |
|---|---|
| Evidence source | RERA amenity record; vendor |
| Declared progress / verified status | RERA progress shown as 0; completion not established RERA amenities Promoter website |
| Description / size | Listed in the RERA amenity record and vendor amenities |
|---|---|
| Evidence source | RERA amenity record; vendor |
| Declared progress / verified status | RERA progress shown as 0; completion not established RERA amenities Promoter website |
| Description / size | Listed in the RERA amenity record and vendor amenities |
|---|---|
| Evidence source | RERA amenity record; vendor |
| Declared progress / verified status | RERA progress shown as 0; completion not established RERA amenities Promoter website |
| Description / size | Listed in the RERA amenity record and vendor amenities |
|---|---|
| Evidence source | RERA amenity record; vendor |
| Declared progress / verified status | RERA progress shown as 0; completion not established RERA amenities Promoter website |
| Description / size | RERA record lists a green strip/tot-lot/park and aggregate recreational open space; permit records Tot-lot 0 m² |
|---|---|
| Evidence source | RERA amenity record; GHMC building permit |
| Declared progress / verified status | Progress shown as 0; completion not established RERA amenities |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress shown as 0; facility details and completion not established RERA amenities |
The vendor also lists a swimming pool, gym, children’s play area and clubhouse. No supplied permit or RERA progress evidence establishes their size, sanctioned status, or delivery. Promoter website
7. Utilities, building services & safety
- The permit requires a rainwater-harvesting structure, transformer space, a garbage house and an ETP. The RERA amenity record also lists water supply, sewerage, storm-water drainage, solid-waste management, water conservation/rainwater harvesting, energy management, fire-protection requirements and an electrical meter room/sub-station/receiving station; the supplied progress figures are 0, and completion is not established. RERA amenities
- The vendor lists 24-hour water supply, full power backup, lifts, CCTV, security and a sewage treatment plant. These are vendor-listed claims, not verified as installed or operational in the supplied project evidence. No water source or storage capacity, STP/ETP capacity, backup capacity, lift count or capacity, accessibility arrangements, or detailed fire-system specifications are supplied. Promoter website
- The permit makes an occupancy certificate compulsory before occupation and requires an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied records do not establish that the fire NOC or occupancy certificate has been obtained.
8. Location, access & connectivity
- The registered project location is Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The building permit identifies the site as JEEDIMETLA and states an 18 mt. road width.
- A cadastral parcel-centroid coordinate is recorded as 17.50196310684567, 78.48088886517151. The location record gives the nearest sampled Outer Ring Road interchange at approximately 9.4 km. A vendor listing refers generally to Quthbullapur as the nearest landmark and says bus stops and railway stations are in close proximity; no distances or travel times for those connections are supplied. Location record Promoter website
9. Developer & development status
- The registered promoter is FORTUNE HOMES BUILDERS AND DEVELOPERS, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAFFF7505C1ZR. The registered office/address recorded in the project material is CELEBRITY HOMES WEST BLOCK, MAHAGAYATHRI NAGAR PH-II, JEEDIMETLA VILLAGE, Qutballapur, Medchal-Malkajgiri, 500055. Corporate record Parties record
- The registration certificate records validity through 28/08/2027, unless extended. Separately, the GHMC permit states construction completion before 28 August, 2027, while the RERA project information states proposed completion on 28/12/2027. No construction-progress evidence or occupancy certificate is supplied, so present completion and occupancy status cannot be established from this review. RERA filing Document index
10. Approvals, official records & documents
| What the supplied evidence establishes | Form C registration of PSLR SRI NIVASAM under P02200003562, issued 20/11/2021; certificate states validity through 28/08/2027, unless extended |
|---|
| What the supplied evidence establishes | Building Permit Order for Building A-1, approval no. 2/C25/09370/2021, dated 28 August, 2021; file no. 2/C25/03221/2021 |
|---|
| What the supplied evidence establishes | Promoter affidavit/declaration, dated September 2021, containing title and encumbrance declarations and project-fund undertakings |
|---|
| What the supplied evidence establishes | Filed title-report documents and an encumbrance statement are present in the project record; their substantive review is addressed in the Land & Title section |
|---|---|
| Source | Document index |
| What the supplied evidence establishes | No occupancy certificate or completion certificate is identified among the supplied records |
|---|---|
| Source | Document index |
1. Project at a glance
Project identity
Registered project: PSLR SRI NIVASAM
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied registration record; the registration covers the project associated with Building A-1
TG-RERA registration: P02200003562; registered 20/11/2021; stated validity through 28/08/2027, unless extended by the Authority
Registered promoter: FORTUNE HOMES BUILDERS AND DEVELOPERS
RERA status: Registered. The certificate records a five-year validity period; it is not evidence of construction completion or an occupancy certificate
Land and geographic identity
Locality / revenue village: Jeedimetla-Village; the building permit also identifies JEEDIMETLA
Mandal / district / PIN: Qutballapur / Medchal-Malkajgiri / 500055
Project survey numbers: 119, 120PART, 121/A and 121/AA as recorded on the RERA certificate; the building permit writes these as 119, 120/PART, 121/A and 121/AA
Plot reference: Plots 66&67 in the registration certificate
Site area: 339.57 m²; the permit records the same figure as site area and net area, with road-affected area 0 m² and nala-affected area 0 m²
Boundaries: North: Plot No. 65; South: Plot No. 68; East: road; West: other building
Road width stated in permit: 18 mt.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order, approval no. 2/C25/09370/2021, dated 28 August, 2021; file no. 2/C25/03221/2021
Approved building: Building A-1, residential building
Approved floors / height: 1 Stilt + 5 upper floors; stated building height 14.99 m
Area figures in permit: Site area 339.57 m²; residential upper-floor area 966.05 m²; stilt parking area 180.02 m². These are distinct permit figures and are not carpet or saleable areas
Building count: One building is recorded in the RERA project information
Approved / RERA-declared homes: The filing records 10 3BHK units; the permit states that the sanctioned unit count must not be increased without GHMC’s prior approval
Parking levels: Stilt parking area is specified in the permit; a count of parking spaces is not available in the supplied evidence
Offering and status
RERA-filed configuration: 3BHK, 10 units
RERA-filed saleable area: 110.55 m² per listed configuration
Booked / available: Portal-derived record shows 0 booked and 10 available; the record has no as-of date, so counts are indicative
Construction stage: No project-specific, dated construction-progress evidence is supplied; stage is therefore not established here
Completion deadline: The building permit states construction to be completed before 28 August, 2027; the RERA project information separately gives proposed completion date 28/12/2027
Registration validity: Through 28/08/2027, unless extended
Occupancy / completion certificate: No occupancy certificate or completion certificate is identified in the supplied project records; status is not established
2. The project story
- PSLR SRI NIVASAM is a registered residential apartment project in Jeedimetla, Qutballapur mandal, Medchal-Malkajgiri district. The supplied records identify a single residential building, A-1, on the site associated with survey numbers 119, 120/PART, 121/A and 121/AA. GHMC’s building-permit record describes one stilt level and five upper floors.
- The RERA filing lists ten 3BHK homes, with a filed saleable area of 110.55 m² for the configuration. Its portal-derived inventory snapshot shows all ten as available and none booked, but has no as-of date. This is an indicative portal record, not a current booking confirmation.
- The supplied documents establish that the project was registered and that a building permit was issued. They do not establish the present physical construction stage, completion, or issuance of an occupancy certificate. The permit itself requires submission of a completion notice and obtaining an occupancy certificate before occupation.
3. Master plan, architecture & building design
- GHMC’s permit identifies a single residential building, A-1, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. It records a site area of 339.57 m², residential upper-floor area of 966.05 m², and stilt parking area of 180.02 m². The permit also records a 0 m² road-affected area and a 0 m² nala-affected area. These figures are presented as stated in the permit; the evidence does not provide a separate FSI calculation, carpet-area total, or gross-built-up-area definition.
- The supplied material does not establish the building footprint, flats per floor, number of lifts or stairs, detailed circulation, open-space dimensions, or a wider phase layout. The permit records Tot-lot 0 m² and requires a fenced tot-lot to be maintained as greenery before an occupancy certificate is issued; the supplied record does not show that such work has been completed.
4. Homes, configurations & floor plans
- The TG-RERA unit record lists ten 3BHK units and a saleable area of 110.55 m². A separate software measurement from the supplied drawing material identifies 2BHK floor-plan geometry, but that configuration is not listed in the RERA unit filing. The drawing-derived measurements are not RERA disclosures and are not used as the project’s filed home configuration.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 110.55 m² | Not supplied | Not supplied |
- For context only, software measurement of two 2BHK designs from drawing document 185259 produced carpet-area measurements ranging from 58.7 m² to 68.5 m² (median 63.6 m²). These are drawing-based, software-measured figures requiring review, not RERA-filed areas or evidence of the 3BHK units’ dimensions. The same drawing extraction identifies bedroom, living/kitchen, hall, toilet, balcony and utility spaces in one measured 2BHK plan.
- Carpet area excludes the exclusive balcony and utility areas identified in that measured plan. RERA saleable area is a separate filed figure; no project-specific loading figure is supplied.
5. Parking & vehicle circulation
The GHMC permit records 180.02 m² of stilt parking area. The supplied records do not establish the number of parking spaces, whether spaces are allocated to particular homes, visitor or accessible parking provision, two-wheeler provision, parking circulation or ramp arrangements. A vendor listing mentions covered car parking, but no count or unit-specific allocation document is supplied.
6. Amenities, recreation & open spaces
The GHMC permit specifies certain site provisions and conditions. The RERA amenity record lists facilities, but its supplied progress fields show 0 for each item; those entries do not establish completion. Vendor-listed amenities are promotional-source claims and are not treated as confirmed sanctioned or delivered facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Permit records Tot-lot 0 m² and requires a fenced tot-lot maintained as greenery before issue of an occupancy certificate | GHMC building permit | Completion not established |
| Rainwater harvesting | Permit requires a rainwater-harvesting structure (percolation pit); the permit’s utility summary records 1 No. of RWHPs | GHMC building permit | Completion not established |
| Transformer space | Space for transformer required on site | GHMC building permit | Completion not established |
| Garbage house | Required within the premises | GHMC building permit | Completion not established |
| ETP | Permit records an ETP requirement | GHMC building permit | Completion not established |
| Water supply | Listed in the RERA amenity record | RERA amenity record | Progress shown as 0; completion not established |
| Sewerage / sewage treatment | RERA amenity record includes sewerage and treatment/disposal of sewage and sullage water; vendor list also names a sewage treatment plant | RERA amenity record; vendor | RERA progress shown as 0; vendor claim not independently verified |
| Storm-water drains | Listed in the RERA amenity record and vendor amenities | RERA amenity record; vendor | RERA progress shown as 0; completion not established |
| Street lighting | Listed in the RERA amenity record and vendor amenities | RERA amenity record; vendor | RERA progress shown as 0; completion not established |
| Internal roads and footpaths | Listed in the RERA amenity record and vendor amenities | RERA amenity record; vendor | RERA progress shown as 0; completion not established |
| Solid-waste management | Listed in the RERA amenity record and vendor amenities | RERA amenity record; vendor | RERA progress shown as 0; completion not established |
| Landscape / open space | RERA record lists a green strip/tot-lot/park and aggregate recreational open space; permit records Tot-lot 0 m² | RERA amenity record; GHMC building permit | Progress shown as 0; completion not established |
| Community buildings | Listed in the RERA amenity record | RERA amenity record | Progress shown as 0; facility details and completion not established |
The vendor also lists a swimming pool, gym, children’s play area and clubhouse. No supplied permit or RERA progress evidence establishes their size, sanctioned status, or delivery.
7. Utilities, building services & safety
- The permit requires a rainwater-harvesting structure, transformer space, a garbage house and an ETP. The RERA amenity record also lists water supply, sewerage, storm-water drainage, solid-waste management, water conservation/rainwater harvesting, energy management, fire-protection requirements and an electrical meter room/sub-station/receiving station; the supplied progress figures are 0, and completion is not established.
- The vendor lists 24-hour water supply, full power backup, lifts, CCTV, security and a sewage treatment plant. These are vendor-listed claims, not verified as installed or operational in the supplied project evidence. No water source or storage capacity, STP/ETP capacity, backup capacity, lift count or capacity, accessibility arrangements, or detailed fire-system specifications are supplied.
- The permit makes an occupancy certificate compulsory before occupation and requires an Occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied records do not establish that the fire NOC or occupancy certificate has been obtained.
8. Location, access & connectivity
- The registered project location is Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The building permit identifies the site as JEEDIMETLA and states an 18 mt. road width.
- A cadastral parcel-centroid coordinate is recorded as 17.50196310684567, 78.48088886517151. The location record gives the nearest sampled Outer Ring Road interchange at approximately 9.4 km. A vendor listing refers generally to Quthbullapur as the nearest landmark and says bus stops and railway stations are in close proximity; no distances or travel times for those connections are supplied.
9. Developer & development status
- The registered promoter is FORTUNE HOMES BUILDERS AND DEVELOPERS, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAFFF7505C1ZR. The registered office/address recorded in the project material is CELEBRITY HOMES WEST BLOCK, MAHAGAYATHRI NAGAR PH-II, JEEDIMETLA VILLAGE, Qutballapur, Medchal-Malkajgiri, 500055.
- The registration certificate records validity through 28/08/2027, unless extended. Separately, the GHMC permit states construction completion before 28 August, 2027, while the RERA project information states proposed completion on 28/12/2027. No construction-progress evidence or occupancy certificate is supplied, so present completion and occupancy status cannot be established from this review.
10. Approvals, official records & documents
| What the supplied evidence establishes | Form C registration of PSLR SRI NIVASAM under P02200003562, issued 20/11/2021; certificate states validity through 28/08/2027, unless extended |
|---|
| What the supplied evidence establishes | Building Permit Order for Building A-1, approval no. 2/C25/09370/2021, dated 28 August, 2021; file no. 2/C25/03221/2021 |
|---|
| What the supplied evidence establishes | Promoter affidavit/declaration, dated September 2021, containing title and encumbrance declarations and project-fund undertakings |
|---|
| What the supplied evidence establishes | Filed title-report documents and an encumbrance statement are present in the project record; their substantive review is addressed in the Land & Title section |
|---|
| What the supplied evidence establishes | No occupancy certificate or completion certificate is identified among the supplied records |
|---|
Frequently asked questions
Is PSLR SRI NIVASAM registered with Telangana RERA?
Yes. PSLR SRI NIVASAM is registered with the Telangana Real Estate Regulatory Authority as P02200003562; the registration status is New Project.
Who is the developer of PSLR SRI NIVASAM?
The promoter named in the RERA registration is FORTUNE HOMES BUILDERS AND DEVELOPERS.
Where is PSLR SRI NIVASAM located?
PSLR SRI NIVASAM is in JEEDIMETLA VILLAGE, Jeedimetla-Village, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will PSLR SRI NIVASAM be completed?
The promoter's proposed date of completion filed with RERA is 28/12/2027. This is the promoter's declaration, not a guarantee.